View the file

Other files

File Type Posted
- HC101321QA451.v0.pdf PDF
- Vendor Block Diagram Sample and Maps.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

ADDITIONAL INFORMATION PERTINENT TO REQUIREMENT

THIS REQUIREMENT MUST BE ENGINEERED AND PROVISIONED TOTALLY DIVERSE END TO END TO GOVERNMENT'S SERVICE DELIVERY POINTS (SDP'S) FROM TSR RU11JUN217202, MEANING THAT

PHYSICAL PATHS ARE TOTALLY SEPARATE INCLUDING MANHOLES, CONDUIT, (CENTRAL OFFICE

LOCATIONS), AND FIBER BUILDS. ADDITIONALLY, AS A MINIMUM THERE MUST BE A 50 METER PHYSICAL

SEPARATION FROM TSR RU22JUN217206.

THE TELECOM PROVIDER MUST PROVIDE DITCO COLOR POWERPOINT DRAWINGS FOR TECHNICAL

REVIEW SHOWING THE ROUTES FROM THE COMMERCIAL DEMARCS TO THE SUPPORTING CENTRAL

OFFICES AND/OR WIRING CENTERS. DRAWINGS MUST INCLUDE SEPARATION DISTANCES BETWEEN DIVERSE REQUIREMENTS, TOTAL FIBER MILES AND ROUND-TRIP DELAY (RTD), AND FIBER ROUTES RED

LINED END TO END SO THE GOVERNMENT CAN CONFIRM PHYSICAL END TO END DIVERSITY

REQUIREMENTS ARE MET. ADDITIONALLY, THE VENDOR IS TO PROVIDE DITCO WITH DETAILED

CIRCUIT/PATH CONNECTIVITY DIAGRAMS, IN KMZ OR KML FORMAT, IDENTIFYING ALL POINTS OF PRESENCE (POP) FOR EVALUATION AND AS A FINAL RECORD OF THE INSTALLED PATH. THE SE

DIAGRAMS MUST BE PROVIDED TO DISA HQ IE16 (DISA.MEADE.IE.MBX.IE16-PROVISIONING-

TEAM@MAIL.MIL) FOR HISTORICAL PURPOSES.

A) VENDOR IS RESPONSIBLE FOR INSTALLATION AND MAINTENANCE OF INGLE MODE FIBER FROM THE DROP SIDE OF COMMERCIAL FIBER POINT OF PRESENCE FIBER DISTRIBUTION PANEL BLDG

1000, ROOM 222 TO LINE SIDE OF DISA IE1 PROVIDED FIBER TERMINATING PATCH PANEL

INSTALLED IN CISCO ASR-9010 ROUTER SUITE (UJEWOFF030) BLDG 1000, ROOM 222.

TERMINATE WITH "SC" CONNECTORS TO DISA PROVIDED FIBER TERMINATING PATCH PANEL.

B) VENDOR MUST PROVIDE FIBER STRANDS FROM THE DISA PROVIDED FIBER PATCH PANEL TO

THE DROP SIDE OF THEIR POP/FIBER DISTRIBUTION PANEL WITHOUT SPLICING AND OR USE OF

CONNECTORS TO CONNECT 2 OR MORE FIBER STRANDS MEANING THE FIBER CANNOT BE

BROKEN IN THE MIDDLE AND MUST BE CONTINUOUS.

C) CIRCUIT MUST BE TAGGED WITH VENDOR'S LONG HAUL CIRCUIT ID AND LOCAL EXCHANGE

CARRIER CIRCUIT NO. AS APPLICABLE AT DROP SIDE OF THEIR POINT OF PRESENCE (FIBER

DISTRIBUTION PANEL) BLDG 1000, ROOM 222. ADDITIONALLY, VENDOR MUST SHOW SITE

PERSONNEL LISTED ONTHIS ORDER THE EXACT TERMINATION POINT WHEN CIRCUIT

INSTALLATION IS COMPLETE.

D) VENDOR MUST SCHEDULE/COORDINATE WITH POC'S LISTED ON THIS ORDER 72 HOURS IN

ADVANCE PRIOR TO SITE SURVEYS OR INSTALLATIONS.

THE VENDOR MUST PROVIDE LIGHT LEVEL READINGS (SIGNAL STRENGTH IN DBM) ON THE EXTENSION FROM COMMERCIAL POP TO THE GOVERNMENT SERVICE DELIVERY POINT (SDP) AT THE "A" AND "Z" LOCATION PRIOR TO CIRCUIT TURN OVER TO THE GOVERNMENT ENSURING LEVELS ARE WITHIN SPECS.

LIGHT LEVELS MUST BE ADJUSTED TO -3 TO -9 DBM.

THE VENDOR MUST TERMINATE 10GB ETHERNET SERVICE AT SERVICE DELIVERY LOCATIONS, IAW

UNIQUE INSTALLATION FACTORS.

THE VENDOR MUST CONDUCT WALK-THROUGH SITE SURVEY PRIOR TO INSTALLATION AT BOTH

LOCATIONS.

THE VENDOR MUST CONTACT DISA GOC IP BACKBONE ENGINEERING AND IMPLEMENTATION GROUP UPON RECEIPT OF A VALID TSO TO ESTABLISH THE COORDINATION AND ACTIVATION PROCESS. PHONE:

(C) 618-418-8627, (D) 418-8627.

THE VENDOR MUST CONTACT DISA GOC TIER-II ENGINEERING 48 HOURS PRIOR TO BEGINNING THEIR

END-TO-END TESTING. PHONE: (C) 618-418-8627, (D) 418-8627.

THE PROVIDER MUST CONDUCT A SATISFACTORY 24-HOUR TEST FROM THE DROP SIDE OF THEIR OR LOCAL EXCHANGE CARRIERS FDP INSTALLED IN THEIR EQUIPMENT SUITE AT THE "A" LOCATION TO THEIR OR LOCAL EXCHANGE CARRIERS FDP INSTALLED IN THEIR EQUIPMENT SUITE AT THE "Z"

LOCATION AND MUST INCLUDE THE EXTENSION BETWEEN THE COMMERCIAL DEMARC AND THE

GOVERNMENT'S SDP. VENDOR

THE VENDOR MUST ENSURE TEST SETS ARE PLACED AT THE DROP SIDE AT THE "A" LOCATION AND AT THE "Z" LOCATION. TESTING MUST BE SATISFACTORY PRIOR TO TURN OVER TO THE GOVERNMENT FOR ACCEPTANCE TESTING. THE VENDOR MUST TEST THE CIRCUIT FOR 24 HOURS IAW THE FULL ITU- T.Y.1564 BENCH MARKING METHODOLOGY FOR NETWORK INTERCONNECT DEVICES STANDARD, AND

AT THE COMMITTED INFORMATION RATE (CIR) IAW ITU-T-Y.1564.

VENDOR MUST MEET SERVICE DATE.SITE SURVEYS ARE AUTHORIZED AT BOTH

GOVERNMENT SITES.

TESTING REQUIREMENTS

1. CIRCUIT REQUIRES THE FOLLOWING PARAMETERS:

(A) FIBER TERMINATION: FRAME FORMAT: 10GB ETHERNET (OPTICAL HANDOFF-10GB ETHERNET-LAN- PHY-SINGLE MODE FIBER), 1310NM. "SC" OR "LC" CONNECTORS AS DETERMINED BY SITE SURVEY.

NOTE: WHEN EXTENDED REACH OPTICS ARE USED THAT CHANGE THE TX/RX WAVELENGTH OF THE

OPTIC, THE VENDOR WILL NOTIFY THE GOVERNMENT 30 DAYS PRIOR TO DELIVERY.

(B) COMMITTED INFORMATION RATE (CIR): 10GB.

(C) ETHERNET FRAME SIZE WILL BE CONFIGURED TO SUPPORT MAXIMUM TRANSMISSION UNIT (MTU)

OF 9000 OCTETS (BYTES) JUMBO FRAMES.

(D) NO NETWORK INTERFACE UNIT, DEDICATED PATH.

(E) GFE CLOCKING: VENDOR ESFU (OR EQUIVALENT) NOT TO BE ENGINEERED INTO CIRCUIT.

(F) TESTING CRITERIA: VENDOR MUST TEST THE CIRCUIT FOR 24 HOURS IAW THE FULL ITU-T.Y.1564

BENCH MARKING METHODOLOGY FOR NETWORK INTERCONNECT DEVICES STANDARD, AND AT THE

COMMITTED INFORMATION RATE (CIR) IAW ITU-T-Y.1564. NOTE: FRAME SIZE DESIGNATOR 'H' (MTU) IS

EQUAL TO 9000 BYTES.

(G) LINE MUST REMAIN FULLY OPERATIONAL AND AVAILABLE TO USERS 24 HOURS A DAY, SEVEN DAYS

PER WEEK, MONTHLY PERFORMANCE OF 99.5% AVAILABILITY OR BETTER.

(H) 1 HOUR RESPONSE TIME TO RESPOND TO CUSTOMER UPON RECEIPT OF TROUBLE.

(I) VENDOR REQUIRED TO HAVE CIRCUIT VISIBILITY TO ASSIST IN ANY CIRCUIT OUTAGES.

(J) VENDOR MUST HAVE A 24X7 NETWORK OPERATIONS CENTER.

(K) TELECOM PROVIDER MUST MAINTAIN OPERATIONS, MAINTENANCE AND ADMINISTRATION

MONITORING OF ETHERNET CIRCUIT.

(L) THE COMMERCIAL CIRCUIT WILL BE ACCEPTED ON BEHALF OF THE GOVERNMENT BY THE DISA GOC IP BACKBONE ENGINEERING AND IMPLEMENTATION GROUP, SCOTT AFB, IL. (C) 618-418-8627, (D) 418- 8627.

2. VENDOR WINNING AWARD IS RESPONSIBLE FOR INSTALLATION AND MAINTENANCE OF THE SERVICE

IAW THE UNIQUE INSTALLATION FACTORS.

3. INSIDE WIRING IS AUTHORIZED IAW THE UNIQUE INSTALLATION FACTORS.

4. VENDOR MUST COORDINATE SITE VISIT WITH POC'S 72 HOURS IN ADVANCE PRIOR TO REQUIRING

ACCESS TO FACILITIES AT BOTH USER LOCATIONS.

5. VENDOR MUST CONTACT DISA GOC TIER-II ENGINEERING 48 HOURS PRIOR TO BEGINNING THEIR

END-TO-END TESTING.

6. ALL EQUIPMENT AND CIRCUIT PROBLEMS WILL BE REPORTED BY PHONE TO THE DISA GOC IP BACKBONE ENGINEERING AND IMPLEMENTATION GROUP, SCOTT AFB, IL. PRIMARY: (C) 618-418-9950,

(D) 418-9950 TOLL FREE: 855-868-9950.

MINIMUM TECHNICAL SPECIFICATIONS:

SPECIFIC FORMAT TO BE USED IS:

LINE RATE: 10.3125 GIGABITS/S, +- 100 PPM

LINE CODE: OPTICAL

1. TEST AND ACCEPTANCE: THIS CIRCUIT SHALL PASS A FULLY DOCUMENTED, SATISFACTORY, 72 HOUR

SOAK TEST BY DISA GOC AT SCOTT AFB, IL. PRIMARY: (C) 618-418-8627 (D) 418-8627.

2. ERROR PERFORMANCE: ERROR PERFORMANCE SHALL BE BETTER THAN THE FOLLOWING PARAMETER THRESHOLDS TO BE ACCEPTABLE: AVAILABILITY SHALL BE GREATER THAN 99.5% OR BETTER. FRAME LOSS SHALL BE EQUAL TO ZERO WHEN TESTING AT 10 GIGABIT HIGHEST FRAME RATE AND SHALL MEET ITU-T-Y.1564 STANDARDS. JITTER SHALL BE LESS THAN 3 MSEC. DELAY SHALL BE BETTER THAN 10 MSEC.

3. MEAN TIME TO LOSS OF BIT COUNT INTEGRITY (MTTLBCI) SHALL BE GREATER THAN 24 HOURS.

4. ROUND TRIP DELAY (RTD) FOR THIS DISA TRANSPORT TRUNK WILL BE MEASURED IN MILLISECONDS FROM THE CUSTOMER'S SERVICE DELIVERY POINT (SDP) SITE-A TO THE CUSTOMER'S SERVICE DELIVERY POINT (SDP) SITE-Z. THE RTD SHALL BE LESS THAN OR EQUAL TO 10 (10MS (<450)/15MS (450-1000)/ 20MS (1000-1500)/ 29MS (>1500)) MILLISECONDS TO EFFECTIVELY SUPPORT THE GOVERNMENT'S MISSION. THE GOVERNMENT ACCEPTING AUTHORITY WILL CONFIRM THE RTD DURING THE TURN-UP AND TEST PHASE AND IF IT DOES NOT ALIGN WITH THE CONTRACTORS PROPOSAL, DISA IE161 WILL NOTIFY DITCO IMMEDIATELY IN WRITING. DIVERSITY INFO: NETWORK DIVERSITY REQUIRED: PATH DIVERSITY; COMMERCIAL DIVERSITY: NO; DIVERSITY FROM TSR RU22JUN217206 ** ADDITIONAL PROVISIONING INFORMATION: DISA (DISN IP ROUTER NETWORK BACKBONE AND BACKBONE HOSTS)

(CONUS AND OCONUS).

File details come from the government source that posted it. Updated .