- Testing Requirements RU17MAY217113.pdf
PDF 191 KB Posted
- Solicitation number
- HC101321QA370
- Issued by
-
Defense Information Systems Agency
About this file
This document contains a solicitation for a 10Gb circuit between two government buildings in California. The solicitation requests quotes to provide, install, and maintain a 10Gb Ethernet circuit with committed information rate of 10Gb between Building 33 at Naval Base Ventura County, Point Mugu and Building 1482 at Naval Air Station North Island by July 14, 2021. Quotes should include monthly recurring charges in CLIN 0001 and non-recurring charges in CLIN 0002. The selected company must comply with commercial item terms and conditions in Federal Acquisition Regulation and existing basic agreements. The solicitation is issued by Defense Information Systems Agency for the requirement.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| - HC101321QA370.v1.pdf | ||
| - Vendor Block Diagram Sample and Maps.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
ADDITIONAL INFORMATION PERTINENT TO REQUIREMENT
THIS REQUIREMENT MUST BE ENGINEERED AND PROVISIONED TOTALLY
DIVERSE END TO END TO GOVERNMENT'S SERVICE DELIVERY POINTS (SDP'S)
FROM TSR RU17MAY217115, MEANING THAT PHYSICAL PATHS ARE TOTALLY
SEPARATE INCLUDING MAN HOLES, CONDUIT, (CENTRAL OFFICE LOCATIONS),
AND FIBER BUILDS. ADDITIONALLY AS A MINIMUM THERE MUST BE A 50 METER
PHYSICAL SEPARATION FROM TSR RU17MAY217115. *** THE 50 METER
SEPARATION IS WAIVED INSIDE BLDG 531 FOR POINT MUGU LOCATION***.
THE TELECOM PROVIDER MUST PROVIDE DITCO COLOR POWERPOINT
DRAWINGS FOR TECHNICAL REVIEW SHOWING THE ROUTES FROM THE
DEMARCS TO THE SUPPORTING CENTRAL OFFICES AND/OR WIRING CENTERS.
DRAWINGS MUST INCLUDE SEPARATION DISTANCES BETWEEN DIVERSE
REQUIREMENTS, TOTAL FIBER MILES AND ROUND TRIP DELAY (RTD), AND FIBER
ROUTES RED LINED END TO END SO THE GOVERNMENT CAN CONFIRM PHYSICAL
END TO END DIVERSITY REQUIREMENTS ARE MET. ADDITIONALLY, THE VENDOR
IS TO PROVIDE DITCO WITH DETAILED CIRCUIT/PATH CONNECTIVITY
DIAGRAMS, IN KMZ OR KML FORMAT, IDENTIFYING ALL POINTS OF PRESENCE
FOR EVALUATION AND AS A FINAL RECORD OF THE INSTALLED PATH. THESE
DIAGRAMS MUST BE PROVIDED TO DISA HQ IE16 (DISA.MEADE.IE.MBX.IE16-
PROVISIONING-TEAM@MAIL.MIL) FOR HISTORICAL PURPOSES.
THE VENDOR MUST PROVIDE LIGHT LEVEL READINGS (SIGNAL STRENGTH IN
DBM) ON THE EXTENSION FROM COMMERCIAL POP TO THE GOVERNMENT
SERVICE DELIVERY POINT AT THE A AND Z LOCATION PRIOR TO CIRCUIT
TURN OVER TO THE GOVERNMENT ENSURING LEVELS ARE WITHIN SPECS.
LIGHT LEVELS MUST BE ADJUSTED TO -3 TO -9 DBM.
THE VENDOR MUST TERMINATE 10GB ETHERNET SERVICE AT SERVICE
DELIVERY LOCATIONS, IAW UNIQUE INSTALLATION FACTORS.
THE VENDOR MUST CONDUCT WALK-THROUGH SITE SURVEY PRIOR TO
INSTALLATION AT BOTH LOCATIONS.
THE VENDOR MUST CONTACT DISA GOC IP BACKBONE ENGINEERING AND
IMPLEMENTATION GROUP UPON RECEIPT OF A VALID TSO TO ESTABLISH THE
COORDINATION AND ACTIVATION PROCESS. PHONE: C618-418-8627,
D418-8627.
THE VENDOR MUST CONTACT DISA GOC TIER-II ENGINEERING 48 HOURS
PRIOR TO BEGINNING THEIR END-TO-END TESTING. PHONE:
C618-418-8627, D618-8627.
THE PROVIDER MUST CONDUCT A SATISFACTORY 24-HOUR TEST FROM THE
DROP SIDE OF THEIR OR LOCAL EXCHANGE CARRIERS FDP INSTALLED IN THEIR
EQUIPMENT SUITE AT THE A LOCATION TO THEIR OR LOCAL EXCHANGE
CARRIERS FDP INSTALLED IN THEIR EQUIPMENT SUITE AT THE Z LOCATION AND
MUST INCLUDE THE EXTENSION BETWEEN THE COMMERCIAL DEMARC AND THE
GOVERNMENT'S SDP.
VENDOR MUST ENSURE TEST SETS ARE PLACED AT THE DROP SIDE AT THE "A"
LOCATION AND AT THE "Z" LOCATION. TESTING MUST BE SATISFACTORY PRIOR
TO TURN OVER TO THE GOVERNMENT FOR ACCEPTANCE TESTING. THE VENDOR
MUST TEST THE CIRCUIT FOR 24 HOURS IAW THE FULL ITU-T.Y.1564 BENCH
MARKING METHODOLOGY FOR NETWORK INTERCONNECT DEVICES STANDARD,
AND AT THE COMMITTED INFORMATION RATE (CIR) IAW ITU-T-Y.1564.
VENDOR MUST MEET SERVICE DATE.
SITE SURVEYS ARE AUTHORIZED AT BOTH GOVERNMENT SITES.
TESTING REQUIREMENTS:
1. CIRCUIT REQUIRES THE FOLLOWING PARAMETERS:
(A) FIBER TERMINATION: FRAME FORMAT: 10GB ETHERNET (OPTICAL
HANDOFF-10GB ETHERNET-LAN-PHY-SINGLE MODE FIBER), 1310NM. "SC"
OR "LC" CONNECTORS AS DETERMINED BY SITE SURVEY. NOTE: WHEN
EXTENDED REACH OPTICS ARE USED THAT CHANGE THE TX/RX
WAVELENGTH OF THE OPTIC, THE VENDOR WILL NOTIFY THE
GOVERNMENT 30 DAYS PRIOR TO DELIVERY.
(B) COMMITTED INFORMATION RATE (CIR): 10GB.
(C) ETHERNET FRAME SIZE WILL BE CONFIGURED TO SUPPORT MAXIMUM
TRANSMISSION UNIT (MTU) OF 9000 OCTETS (BYTES) JUMBO FRAMES.
(D) NO NETWORK INTERFACE UNIT, DEDICATED PATH.
(E) GFE CLOCKING: VENDOR ESFU (OR EQUIVALENT) NOT TO BE
ENGINEERED INTO CIRCUIT.
(F) TESTING CRITERIA: VENDOR MUST TEST THE CIRCUIT FOR 24 HOURS
IAW THE FULL ITU-T.Y.1564 BENCH MARKING METHODOLOGY FOR
NETWORK INTERCONNECT DEVICES STANDARD, AND AT THE COMMITTED
INFORMATION RATE (CIR) IAW ITU-T-Y.1564.
NOTE: ETHERNET FRAME SIZE DESIGNATOR 'H' (MTU) IS EQUAL TO 9000
BYTES.
(G) LINE MUST REMAIN FULLY OPERATIONAL AND AVAILABLE TO USERS
24 HOURS A DAY, SEVEN DAYS PER WEEK, MONTHLY PERFORMANCE OF
99.5% AVAILABILITY OR BETTER.
(H) 1 HOUR RESPONSE TIME TO RESPOND TO CUSTOMER UPON RECEIPT OF
TROUBLE.
(I) VENDOR REQUIRED TO HAVE CIRCUIT VISIBILITY TO ASSIST IN ANY
CIRCUIT OUTAGES.
(J) VENDOR MUST HAVE A 24X7 NETWORK OPERATIONS CENTER.
(K) TELECOM PROVIDER MUST MAINTAIN OPERATIONS, MAINTENANCE
AND ADMINISTRATION MONITORING OF ETHERNET CIRCUIT.
(L) THE COMMERCIAL CIRCUIT WILL BE ACCEPTED ON BEHALF OF THE
GOVERNMENT BY THE DISA GOC IP BACKBONE ENGINEERING AND
IMPLEMENTATION GROUP, SCOTT AFB, IL. C618-418-8627, D418-8627.
2. VENDOR WINNING AWARD IS RESPONSIBLE FOR INSTALLATION AND
MAINTENANCE OF THE SERVICE IAW THE UNIQUE INSTALLATION FACTORS.
3. INSIDE WIRING IS AUTHORIZED IAW THE UNIQUE INSTALLATION FACTORS.
4. VENDOR MUST COORDINATE SITE VISIT WITH POC'S 72 HOURS IN ADVANCE
PRIOR TO REQUIRING ACCESS TO FACILITIES AT BOTH USER LOCATIONS.
5. VENDOR MUST CONTACT DISA GOC TIER-II ENGINEERING 48 HOURS PRIOR TO
BEGINNING THEIR END-TO-END TESTING.
6. ALL EQUIPMENT AND CIRCUIT PROBLEMS WILL BE REPORTED BY PHONE TO
THE DISA GOC IP BACKBONE ENGINEERING AND IMPLEMENTATION GROUP,
SCOTT AFB, IL. PRIMARY: C618-418-9950, D418-9950 TOLL FREE: 855-868-9950.
MINIMUM TECHNICAL SPECIFICATIONS:
SPECIFIC FORMAT TO BE USED IS: LINE RATE: 10.3125 GIGABITS/S, +- 100 PPM LINE
CODE: OPTICAL
1. TEST AND ACCEPTANCE: THIS CIRCUIT SHALL PASS A FULLY DOCUMENTED,
SATISFACTORY, 72 HOUR SOAK TEST BY DISA GOC AT SCOTT AFB, IL. PRIMARY:
C618-418-8627 D418-8627.
2. ERROR PERFORMANCE: ERROR PERFORMANCE SHALL BE BETTER THAN THE
FOLLOWING PARAMETER THRESHOLDS TO BE ACCEPTABLE: AVAILABILITY
SHALL BE GREATER THAN 99.5% OR BETTER. FRAME LOSS SHALL BE EQUAL
TO ZERO WHEN TESTING AT 10 GIGABIT HIGHEST FRAME RATE, AND SHALL
MEET ITU-T-Y.1564 STANDARDS. JITTER SHALL BE LESS THAN 3 MSEC. DELAY
SHALL BE BETTER THAN 10 MSEC.
3. MEAN TIME TO LOSS OF BIT COUNT INTEGRITY (MTTLBCI) SHALL BE GREATER
THAN 24 HOURS.
4. ROUND TRIP DELAY (RTD) FOR THIS DISA TRANSPORT TRUNK WILL BE
MEASURED IN MILLISECONDS FROM THE CUSTOMER'S SERVICE DELIVERY POINT
(SDP) SITE-A TO THE CUSTOMER'S SERVICE DELIVERY POINT (SDP) SITE-Z. THE
RTD SHALL BE LESS THAN OR EQUAL TO 10 (10MS (<450)/15MS (450-1000)/ 20MS
(1000-1500)/29MS (>1500)) MILLISECONDS TO EFFECTIVELY SUPPORT THE
GOVERNMENT'S MISSION. THE GOVERNMENT ACCEPTING AUTHORITY WILL
CONFIRM THE RTD DURING THE TURN-UP AND TEST PHASE AND IF IT DOES
NOT ALIGN WITH THE CONTRACTORS PROPOSAL, DISA IE161 WILL NOTIFY DITCO
IMMEDIATELY IN WRITING.
**UNIQ INSTALL FACTORS**
(SP A) PATCH PANEL BLDG 531, ROOM 212 TO THE LINE SIDE OF THE SITE
PROVIDED FIBER TERMINATING PATCH PANEL BLDG 33, DCO/FRAME ROOM,
USING EXISTING ON-BASE SINGLE-MODE FIBER.** DIVERSITY INFO **SERVICE
DIVERSITY REQUESTED; DUAL HOMING CCSD: BZF4; ** ADDITIONAL
PROVISIONING INFORMATION ** (ORG ACCT) DISA (DISN IP ROUTER NETWORK
BACKBONE AND BACKBONE HOSTS)(CONUS AND OCONUS).
File details come from the government source that posted it. Updated .