AWARD - IN ACCORDANCE WITH INQUIRY HC101321QA341, PROCEED TO PROVIDE, INSTALL, AND MAINTAIN A NEW NEW 10GB LEASED ACCESS CIRCUIT ON THE IQO PL8211 CONTRACT BETWEEN BLDG 322, FRAME ROOM, 322 PRATT AVENUE, CARLISLE BARRACKS, CARLISLE, PA 17013-5013/CCI AND BLDG 308, ROOM 203, 5450 CARLISLE PIKE, MECHANICSBURG, PA 17050-0975/CCI

View the file

Other files

File Type Posted
_GGTG000529EBMv0 Contents.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Testing Requirements and Circuit Parameters for HC101321QA341

THIS REQUIREMENT MUST BE ENGINEERED AND PROVISIONED TOTALLY DIVERSE END TO END TO

GOVERNMENT'S SERVICE DELIVERY POINTS (SDP'S) FROM CJON SF11MAY217932, MEANING THAT PHYSICAL

PATHS ARE TOTALLY SEPARATE INCLUDING MAN HOLES, CONDUIT, (CENTRAL OFFICE LOCATIONS), AND

FIBER BUILDS. ADDITIONALLY AS A MINIMUM THERE MUST BE A 50 METER PHYSICAL SEPARATION FROM

CJON SF11MAY217932. THE TELECOM PROVIDER MUST PROVIDE DITCO COLOR POWERPOINT DRAWINGS

FOR TECHNICAL REVIEW SHOWING THE ROUTES FROM THE COMMERCIAL DEMARCS TO THE SUPPORTING

CENTRAL OFFICES AND/OR WIRING CENTERS. DRAWINGS MUST INCLUDE SEPARATION DISTANCES BETWEEN

DIVERSE

REMARKS CONTINUED: REQUIREMENTS, TOTAL FIBER MILES AND ROUND TRIP DELAY (RTD), AND FIBER

ROUTES RED LINED END TO END SO THE GOVERN MENT CAN CONFIRM PHYSICAL END TO END DIVERSITY

REQUIREMENTS ARE M ET. ADDITIONALLY, THE VENDOR IS TO PROVIDE DITCO WITH DETAILED CI

RCUIT/PATH CONNECTIVITY DIAGRAMS, IN KMZ OR KML FORMAT, IDENTIFYI NG ALL POINTS OF PRESENCE

FOR EVALUATION AND AS A FINAL RECORD OF THE INSTALLED PATH. THESE DIAGRAMS MUST BE PROVIDED

TO DISA HQ I E16 (DISA.MEADE.IE.MBX.IE16-PROVISIONING-TEAM@MAIL.MIL) FOR HISTO RICAL PURPOSES.

THE VENDOR MUST PROVIDE LIGHT LEVEL READINGS (SIGNAL STRENGTH IN DBM) ON THE EXTENSION

FROM COMMERCIAL POP TO THE GOVERNMENT SERVICE DELIVERY POINT AT THE A AND Z LOCATION

PRIOR TO CIRCUIT TURN OVER TO THE GOVERNMENT ENSURING LEVELS ARE WITHIN SPECS. LIGHT

LEVELS MUST BE ADJUSTED TO -3 TO -9 DBM. 9. THE VENDOR MUST TERMINATE 10GB ETHERNET

SERVICE AT SERVICE DELIVERY LOCATIONS, IAW UNIQUE INSTALLATION FACTORS.

THE VENDOR MUST CONDUCT WALK-THROUGH SITE SURVEY PRIOR TO INSTALLATION AT BOTH

LOCATIONS.

THE VENDOR MUST CONTACT DISA GOC IP BACKBONE ENGINEERING AND IMPLEMENTATION GROUP

UPON RECEIPT OF A VALID TSO TO ESTABLISH THE COORDINATION AND ACTIVATION PROCESS. PHONE:

C618-418-8627, D418-8627.

THE VENDOR MUST CONTACT DISA GOC TIER-II ENGINEERING 48 HOURS PRIOR TO BEGINNING THEIR

END-TO-END TESTING. PHONE: C618-418-8627, D418-8627.

THE PROVIDER MUST CONDUCT A SATISFACTORY 24-HOUR TEST FROM THE DROP SIDE OF THEIR OR

LOCAL EXCHANGE CARRIERS FDP INSTALLED IN THEIR EQUIPMENT SUITE AT THE A LOCATION TO THEIR

OR LOCAL EXCHANGE CARRIERS FDP INSTALLED IN THEIR EQUIPMENT SUITE AT THE Z LOCATION AND

MUST INCLUDE THE EXTENSION BETWEEN THE COMMERCIAL DEMARC AND THE GOVERNMENT'S SDP.

VENDOR MUST ENSURE TEST SETS ARE PLACED AT THE DROP SIDE AT THE A LOCATION AND AT THE Z

LOCATION. TESTING MUST BE SATISFACTORY PRIOR TO TURN OVER TO THE GOVERNMENT FOR

ACCEPTANCE TESTING. THE VENDOR MUST TEST THE CIRCUIT FOR 24 HOURS IAW THE FULL ITU-

T.Y.1564 BENCH MARKING METHODOLOGY FOR NETWORK INTERCONNECT DEVICES STANDARD, AND

AT THE COMMITTED INFORMATION RATE IAW ITU-T-Y.1564.

CIRCUIT REQUIRES THE FOLLOWING PARAMETERS:

(A) FIBER TERMINATION: FRAME FORMAT: 10GB ETHERNET (OPTICAL HANDOFF-10GB ETHERNET-LAN-

PHY-SINGLE MODE FIBER), 1310NM. "SC" OR "LC" CONNECTORS AS DETERMINED BY SITE SURVEY.

NOTE: WHEN EXTENDED REACH OPTICS ARE USED THAT CHANGE THE TX/RX WAVELENGTH OF THE

OPTIC, THE VENDOR WILL NOTIFY THE GOVERNMENT 30 DAYS PRIOR TO DELIVERY.

(B) COMMITTED INFORMATION RATE (CIR): 10GB.

(C) ETHERNET FRAME SIZE WILL BE CONFIGURED TO SUPPORT MAXIMUM TRANSMISSION UNIT (MTU)

OF 9000 OCTETS (BYTES) JUMBO FRAMES.

(D) NO NETWORK INTERFACE UNIT, DEDICATED PATH.

(E) GFE CLOCKING: VENDOR ESFU (OR EQUIVALENT) NOT TO BE ENGINEERED INTO CIRCUIT.

(F) TESTING CRITERIA: VENDOR MUST TEST THE CIRCUIT FOR 24 HOURS IAW THE FULL ITU-T.Y.1564

BENCH MARKING METHODOLOGY FOR NETWORK INTERCONNECT DEVICES STANDARD, AND AT THE

COMMITTED INFORMATION RATE (CIR) IAW ITU-T-Y.1564. NOTE: FRAME SIZE DESIGNATOR 'H' (MTU) IS

EQUAL TO 9000 BYTES.

(G) LINE MUST REMAIN FULLY OPERATIONAL AND AVAILABLE TO USERS 24 HOURS A DAY, SEVEN DAYS

PER WEEK, MONTHLY PERFORMANCE OF 99.5% AVAILABILITY OR BETTER.

(H) 1 HOUR RESPONSE TIME TO RESPOND TO CUSTOMER UPON RECEIPT OF TROUBLE.

(I) VENDOR REQUIRED TO HAVE CIRCUIT VISIBILITY TO ASSIST IN ANY CIRCUIT OUTAGES.

(J) VENDOR MUST HAVE A 24X7 NETWORK OPERATIONS CENTER.

(K) TELECOM PROVIDER MUST MAINTAIN OPERATIONS, MAINTENANCE AND ADMINISTRATION

MONITORING OF ETHERNET CIRCUIT.

(L) THE COMMERCIAL CIRCUIT WILL BE ACCEPTED ON BEHALF OF THE GOVERNMENT BY THE DISA GOC

IP BACKBONE ENGINEERING AND IMPLEMENTATION GROUP, SCOTT AFB, IL. C618-418-8627, D418-8627.

MINIMUM TECHNICAL SPECIFICATIONS:

SPECIFIC FORMAT TO BE USED IS: LINE RATE: 10.3125 GIGABITS/S, +- 100 PPM LINE CODE: OPTICAL

TEST AND ACCEPTANCE: THIS CIRCUIT SHALL PASS A FULLY DOCUMENTED, SATISFACTORY, 72 HOUR

SOAK TEST BY DISA GOC AT SCOTT AFB, IL. PRIMARY: C618-418-8627 D418-8627.

ERROR PERFORMANCE: ERROR PERFORMANCE SHALL BE BETTER THAN THE FOLLOWING PARAMETER

THRESHOLDS TO BE ACCEPTABLE: AVAILABILITY SHALL BE GREATER THAN 99.5% OR BETTER. FRAME

LOSS SHALL BE EQUAL TO ZERO WHEN TESTING AT 10 GIGABIT HIGHEST FRAME RATE, AND SHALL MEET

ITU-T-Y.1564 STANDARDS. JITTER SHALL BE LESS THAN 3 MSEC. DELAY SHALL BE BETTER THAN 10 MSEC.

MEAN TIME TO LOSS OF BIT COUNT INTEGRITY SHALL BE GREATER THAN 24 HOURS.

ROUND TRIP DELAY FOR THIS DISA TRANSPORT TRUNK WILL BE MEASURED IN MILLISECONDS FROM

THE CUSTOMER'S SERVICE DELIVERY POINT (SDP) SITE-A TO THE CUSTOMER'S SERVICE DELIVERY POINT

(SDP) SITE-Z. THE RTD SHALL BE LESS THAN OR EQUAL TO 10 (10MS (<450)/15MS (450-1000)/ 20MS

(1000-1500)/ 29MS (>1500)) MILLISECONDS TO EFFECTIVELY SUPPORT THE GOVERNMENT'S MISSION.

THE GOVERNMENT ACCEPTING AUTHORITY WILL CONFIRM THE RTD DURING THE TURN-UP AND TEST

PHASE AND IF IT DOES NOT ALIGN WITH THE CONTRACTORS PROPOSAL, DISA IE161 WILL NOTIFY DITCO

IMMEDIATELY IN WRITING.