ATTACHMENT 1 FOR SOLICITATION HC101321QA322
ATTENTION STENNIS SPACE CENTER LOCATION: THIS REQUIREMENT MUST BE
ENGINEERED AND PROVISIONED TOTALLY DIVERSE END TO END TO
GOVERNMENT'S SERVICE DELIVERY POINTS (SDP'S) FROM CJON: SF05APR216699,
MEANING THAT PHYSICAL PATHS ARE TOTALLY SEPARATE INCLUDING MAN
HOLES, CONDUIT, (CENTRAL OFFICE LOCATIONS), AND FIBER BUILDS.
ADDITIONALLY AS A MINIMUM THERE MUST BE A 50 METER PHYSICAL
SEPARATION FROM CJON: SF05APR216699. 7. THE TELECOM PROVIDER MUST
PROVIDE DITCO COLOR POWERPOINT DRAWINGS FOR TECHNICAL REVIEW
SHOWING THE ROUTES FROM THE COMMERCIAL DEMARCS TO THE SUPPORTING
CENTRAL OFFICES AND/OR WIRING CENTERS. DRAWINGS MUST INCLUDE
SEPARATION DISTANCES BETWEEN DIVERSE REQUIREMENTS, TOTAL FIBER
MILES AND ROUND TRIP DELAY (RTD), AND FIBER ROUTES RED LINED END TO
END SO THE GOVERNMENT CAN CONFIRM PHYSICAL END TO END DIVERSITY
REQUIREMENTS ARE MET. ADDITIONALLY, THE VENDOR IS TO PROVIDE DITCO
WITH DETAILED CIRCUIT/PATH CONNECTIVITY DIAGRAMS, IN KMZ OR KML
FORMAT, IDENTIFYING ALL POINTS OF PRESENCE (POP) FOR EVALUATION AND
AS A FINAL RECORD OF THE INSTALLED PATH. THESE DIAGRAMS MUST BE
PROVIDED TO DISA HQ IE16 (DISA.MEADE.IE.MBX.IE16-PROVISIONING-
TEAM@MAIL.MIL) FOR HISTORICAL PURPOSES. 8. THE VENDOR MUST PROVIDE
LIGHT LEVEL READINGS (SIGNAL STRENGTH IN DBM) ON THE EXTENSION FROM
COMMERCIAL POP TO THE GOVERNMENT SERVICE DELIVERY POINT (SDP) AT
THE "A" AND "Z" LOCATION PRIOR TO CIRCUIT TURN OVER TO THE
GOVERNMENT ENSURING LEVELS ARE WITHIN SPECS. LIGHT LEVELS MUST BE
ADJUSTED TO -3 TO -9 DBM. 9. THE VENDOR MUST TERMINATE 10GB ETHERNET
SERVICE AT SERVICE DELIVERY LOCATIONS, IAW UNIQUE INSTALLATION
FACTORS. 10. THE VENDOR MUST CONDUCT WALK-THROUGH SITE SURVEY
PRIOR TO INSTALLATION AT BOTH LOCATIONS. 11. THE VENDOR MUST CONTACT
DISA GOC IP BACKBONE ENGINEERING AND IMPLEMENTATION GROUP UPON
RECEIPT OF A VALID TSO TO ESTABLISH THE COORDINATION AND ACTIVATION
PROCESS. PHONE: (C) 618-418-8627, (D) 418-8627. 12. THE VENDOR MUST CONTACT
DISA GOC TIER-II ENGINEERING 48 HOURS PRIOR TO BEGINNING THEIR END-TO-
END TESTING. PHONE: (C) 618-418-8627, (D) 418-8627. 13. THE PROVIDER MUST
CONDUCT A SATISFACTORY 24-HOUR TEST FROM THE DROP SIDE OF THEIR OR
LOCAL EXCHANGE CARRIERS FDP INSTALLED IN THEIR EQUIPMENT SUITE AT
THE "A" LOCATION TO THEIR OR LOCAL EXCHANGE CARRIERS FDP INSTALLED
IN THEIR EQUIPMENT SUITE AT THE "Z" LOCATION AND MUST INCLUDE THE
EXTENSION BETWEEN THE COMMERCIAL DEMARC AND THE GOVERNMENT'S
SDP. VENDOR MUST ENSURE TEST SETS ARE PLACED AT THE DROP SIDE M.
REMARKS CONTINUED: AT THE "A" LOCATION AND AT THE "Z" LOCATION.
TESTING MUST BE SATISFACTORY PRIOR TO TURN OVER TO THE GOVERNMENT
FOR ACCEPTANCE TESTING. THE VENDOR MUST TEST THE CIRCUIT FOR 24
HOURS IAW THE FULL ITU-T.Y.1564 BENCH MARKING METHODOLOGY FOR
NETWORK INTERCONNECT DEVICES STANDARD, AND AT THE COMMITTED
INFORMATION RATE (CIR) IAW ITU-T-Y.1564.
1. CIRCUIT REQUIRES THE FOLLOWING PARAMETERS: (A) FIBER TERMINATION:
FRAME FORMAT: 10GB ETHERNET (OPTICAL HANDOFF-10GB ETHERNET-LAN-
PHY-SINGLE MODE FIBER), 1310NM. "SC" OR "LC" CONNECTORS AS DETERMINED
BY SITE SURVEY. NOTE: WHEN EXTENDED REACH OPTICS ARE USED THAT
CHANGE THE TX/RX WAVELENGTH OF THE OPTIC, THE VENDOR WILL NOTIFY
THE GOVERNMENT 30 DAYS PRIOR TO DELIVERY. (B) COMMITTED INFORMATION
RATE (CIR): 10GB. (C) ETHERNET FRAME SIZE WILL BE CONFIGURED TO SUPPORT
MAXIMUM TRANSMISSION UNIT (MTU) OF 9000 OCTETS (BYTES) JUMBO FRAMES.
(D) NO NETWORK INTERFACE UNIT, DEDICATED PATH. (E) GFE CLOCKING:
VENDOR ESFU (OR EQUIVALENT) NOT TO BE ENGINEERED INTO CIRCUIT. (F)
TESTING CRITERIA: VENDOR MUST TEST THE CIRCUIT FOR 24 HOURS IAW THE
FULL ITU-T.Y.1564 BENCH MARKING METHODOLOGY FOR NETWORK
INTERCONNECT DEVICES STANDARD, AND AT THE COMMITTED INFORMATION
RATE (CIR) IAW ITU-T-Y.1564. NOTE: ETHERNET FRAME SIZE DESIGNATOR 'H'
(MTU) IS EQUAL TO 9000 BYTES. (G) LINE MUST REMAIN FULLY OPERATIONAL
AND AVAILABLE TO USERS 24 HOURS A DAY, SEVEN DAYS PER WEEK, MONTHLY
PERFORMANCE OF 99.5% AVAILABILITY OR BETTER. (H) 1 HOUR RESPONSE TIME
TO RESPOND TO CUSTOMER UPON RECEIPT OF TROUBLE. (I) VENDOR REQUIRED
TO HAVE CIRCUIT VISIBILITY TO ASSIST IN ANY CIRCUIT OUTAGES. (J) VENDOR
MUST HAVE A 24X7 NETWORK OPERATIONS CENTER. (K) TELECOM PROVIDER
MUST MAINTAIN OPERATIONS, MAINTENANCE AND ADMINISTRATION
MONITORING OF ETHERNET CIRCUIT. (L) THE COMMERCIAL CIRCUIT WILL BE
ACCEPTED ON BEHALF OF THE N. REMARKS CONTINUED: GOVERNMENT BY THE
DISA GOC IP BACKBONE ENGINEERING AND IMPLEMENTATION GROUP, SCOTT
AFB, IL. C618-418-8627, D418-8627. 2. VENDOR WINNING AWARD IS RESPONSIBLE
FOR INSTALLATION AND MAINTENANCE OF THE SERVICE IAW THE UNIQUE
INSTALLATION FACTORS. 3. INSIDE WIRING IS AUTHORIZED IAW THE UNIQUE
INSTALLATION FACTORS. 4. VENDOR MUST COORDINATE SITE VISIT WITH POC'S
72 HOURS IN ADVANCE PRIOR TO REQUIRING ACCESS TO FACILITIES AT BOTH
USER LOCATIONS. 5. VENDOR MUST CONTACT DISA GOC TIER-II ENGINEERING 48
HOURS PRIOR TO BEGINNING THEIR END-TO-END TESTING
MINIMUM TECHNICAL SPECIFICATIONS: SPECIFIC FORMAT TO BE USED IS: LINE
RATE: 10.3125 GIGABITS/S, +- 100 PPM LINE CODE: OPTICAL 1. TEST AND
ACCEPTANCE: THIS CIRCUIT SHALL PASS A FULLY DOCUMENTED,
SATISFACTORY, 72 HOUR SOAK TEST BY DISA GOC AT SCOTT AFB, IL. PRIMARY:
C618-418-8627 D418-8627. 2. ERROR PERFORMANCE: ERROR PERFORMANCE SHALL
BE BETTER THAN THE FOLLOWING PARAMETER THRESHOLDS TO BE
ACCEPTABLE: AVAILABILITY SHALL BE GREATER THAN 99.5% OR BETTER.
FRAME LOSS SHALL BE EQUAL TO ZERO WHEN TESTING AT 10 GIGABIT HIGHEST
FRAME RATE, AND SHALL MEET ITU-T-Y.1564 STANDARDS. JITTER SHALL BE
LESS THAN 3 MSEC. DELAY SHALL BE BETTER THAN 10 MSEC. 3. MEAN TIME TO
LOSS OF BIT COUNT INTEGRITY SHALL BE GREATER THAN 24 HOURS. 4. ROUND
TRIP DELAY FOR THIS DISA TRANSPORT TRUNK WILL BE MEASURED IN
MILLISECONDS FROM THE CUSTOMER'S SERVICE O. REMARKS CONTINUED:
DELIVERY POINT (SDP) SITE-A TO THE CUSTOMER'S SERVICE DELIVERY POINT
(SDP) SITE-Z. THE RTD SHALL BE LESS THAN OR EQUAL TO 10 MILLISECONDS TO
EFFECTIVELY SUPPORT THE GOVERNMENT'S MISSION. THE GOVERNMENT
ACCEPTING AUTHORITY WILL CONFIRM THE RTD DURING THE TURN-UP AND
TEST PHASE AND IF IT DOES NOT ALIGN WITH THE CONTRACTORS PROPOSAL,
DISA IE161 WILL NOTIFY DITCO IMMEDIATELY IN WRITING. (**UNIQ INSTALL
FACTORS**) (SP A) ATCH PANEL BLDG 1000, ROOM 211A TO THE LINE SIDE OF THE
SITE PROVIDED FIBER TERMINATING PATCH PANEL BLDG 9357, COMM ROOM,
USING EXISTING ON-BASE SINGLE-MODE FIBER.