ATTACHMENT 1 FOR SOLICITATION HC101321QA312

ATTENTION STENNIS SPACE CENTER LOCATION: THIS REQUIREMENT MUST BE

ENGINEERED AND PROVISIONED TOTALLY DIVERSE END TO END TO

GOVERNMENT'S SERVICE DELIVERY POINTS FROM TSR: RU19APR217054,

MEANING THAT PHYSICAL PATHS ARE TOTALLY SEPARATE INCLUDING MAN

HOLES, CONDUIT, (CENTRAL OFFICE LOCATIONS), AND FIBER BUILDS.

ADDITIONALLY AS A MINIMUM THERE MUST BE A 50 METER PHYSICAL

SEPARATION FROM TSR: RU19APR217054 7. THE TELECOM PROVIDER MUST

PROVIDE DITCO COLOR POWERPOINT DRAWINGS FOR TECHNICAL REVIEW

SHOWING THE ROUTES FROM THE COMMERCIAL DEMARCS TO THE SUPPORTING

CENTRAL OFFICES AND/OR L. REMARKS CONTINUED: WIRING CENTERS.

DRAWINGS MUST INCLUDE SEPARATION DISTANCES BETWEEN DIVERSE

REQUIREMENTS, TOTAL FIBER MILES AND ROUND TRIP DELAY (RTD), AND FIBER

ROUTES RED LINED END TO END SO THE GOVERNMENT CAN CONFIRM PHYSICAL

END TO END DIVERSITY REQUIREMENTS ARE MET. ADDITIONALLY, THE VENDOR

IS TO PROVIDE DITCO WITH DETAILED CIRCUIT/PATH CONNECTIVITY

DIAGRAMS, IN KMZ OR KML FORMAT, IDENTIFYING ALL POINTS OF PRESENCE

(POP) FOR EVALUATION AND AS A FINAL RECORD OF THE INSTALLED PATH.

THE VENDOR MUST PROVIDE LIGHT LEVEL READINGS (SIGNAL STRENGTH IN

DBM) ON THE EXTENSION FROM COMMERCIAL POP TO THE GOVERNMENT

SERVICE DELIVERY POINT (SDP) AT THE "A" AND "Z" LOCATION PRIOR TO

CIRCUIT TURN OVER TO THE GOVERNMENT ENSURING LEVELS ARE WITHIN

SPECS. LIGHT LEVELS MUST BE ADJUSTED TO -3 TO -9 DBM. 9. THE VENDOR

MUST TERMINATE 10GB ETHERNET SERVICE AT SERVICE DELIVERY LOCATIONS,

IAW UNIQUE INSTALLATION FACTORS. 10. THE VENDOR MUST CONDUCT WALK-

THROUGH SITE SURVEY PRIOR TO INSTALLATION AT BOTH LOCATIONS.

THE VENDOR MUST CONTACT DISA GOC IP BACKBONE ENGINEERING AND

IMPLEMENTATION GROUP UPON RECEIPT OF A VALID TSO TO ESTABLISH THE

COORDINATION AND ACTIVATION PROCESS. PHONE: (C) 618-418-8627, (D) 418-8627.

12. THE VENDOR MUST CONTACT DISA GOC TIER-II ENGINEERING 48 HOURS

PRIOR TO BEGINNING THEIR END-TO-END TESTING. PHONE: (C) 618-418-8627, (D)

418-8627. THE PROVIDER MUST CONDUCT A SATISFACTORY 24-HOUR TEST FROM

THE DROP SIDE OF THEIR OR LOCAL EXCHANGE CARRIERS FDP INSTALLED IN

THEIR EQUIPMENT SUITE AT THE "A" LOCATION TO THEIR OR LOCAL EXCHANGE

CARRIERS FDP INSTALLED IN THEIR EQUIPMENT SUITE AT THE "Z" LOCATION

AND MUST INCLUDE THE EXTENSION BETWEEN THE COMMERCIAL DEMARC

AND THE GOVERNMENT'S SDP. VENDOR MUST ENSURE TEST SETS ARE PLACED

AT THE DROP SIDE M. REMARKS CONTINUED: AT THE "A" LOCATION AND AT THE

"Z" LOCATION. TESTING MUST BE SATISFACTORY PRIOR TO TURN OVER TO THE

GOVERNMENT FOR ACCEPTANCE TESTING. THE VENDOR MUST TEST THE

CIRCUIT FOR 24 HOURS IAW THE FULL ITU-T.Y.1564 BENCH MARKING

METHODOLOGY FOR NETWORK INTERCONNECT DEVICES STANDARD, AND AT

THE COMMITTED INFORMATION RATE (CIR) IAW ITU-T-Y.1564.

CIRCUIT REQUIRES THE FOLLOWING PARAMETERS:

(A) FIBER TERMINATION: FRAME FORMAT: 10GB ETHERNET (OPTICAL HANDOFF-

10GB ETHERNET-LAN-PHY-SINGLE MODE FIBER), 1310NM. "SC" OR "LC"

CONNECTORS AS DETERMINED BY SITE SURVEY. NOTE: WHEN EXTENDED

REACH OPTICS ARE USED THAT CHANGE THE TX/RX WAVELENGTH OF THE

OPTIC, THE VENDOR WILL NOTIFY THE GOVERNMENT 30 DAYS PRIOR TO

DELIVERY. (B) COMMITTED INFORMATION RATE (CIR): 10GB. (C) ETHERNET

FRAME SIZE WILL BE CONFIGURED TO SUPPORT MAXIMUM TRANSMISSION UNIT

(MTU) OF 9000 OCTETS (BYTES) JUMBO FRAMES. (D) NO NETWORK INTERFACE

UNIT, DEDICATED PATH. (E) GFE CLOCKING: VENDOR ESFU (OR EQUIVALENT)

NOT TO BE ENGINEERED INTO CIRCUIT. (F) TESTING CRITERIA: VENDOR MUST

TEST THE CIRCUIT FOR 24 HOURS IAW THE FULL ITU-T.Y.1564 BENCH MARKING

METHODOLOGY FOR NETWORK INTERCONNECT DEVICES STANDARD, AND AT

THE COMMITTED INFORMATION RATE (CIR) IAW ITU-T-Y.1564. NOTE: ETHERNET

FRAME SIZE DESIGNATOR 'H' (MTU) IS EQUAL TO 9000 BYTES. (G) LINE MUST

REMAIN FULLY OPERATIONAL AND AVAILABLE TO USERS 24 HOURS A DAY,

SEVEN DAYS PER WEEK, MONTHLY PERFORMANCE OF 99.5% AVAILABILITY OR

BETTER. (H) 1 HOUR RESPONSE TIME TO RESPOND TO CUSTOMER UPON RECEIPT

OF TROUBLE. (I) VENDOR REQUIRED TO HAVE CIRCUIT VISIBILITY TO ASSIST IN

ANY CIRCUIT OUTAGES. (J) VENDOR MUST HAVE A 24X7 NETWORK OPERATIONS

CENTER. (K) TELECOM PROVIDER MUST MAINTAIN OPERATIONS, MAINTENANCE

AND ADMINISTRATION MONITORING OF ETHERNET CIRCUIT. (L) THE

COMMERCIAL CIRCUIT WILL BE ACCEPTED ON BEHALF OF THE N. REMARKS

CONTINUED: GOVERNMENT BY THE DISA GOC IP BACKBONE ENGINEERING AND

IMPLEMENTATION GROUP, SCOTT AFB, IL. C618-418-8627, D418-8627. 2. VENDOR

WINNING AWARD IS RESPONSIBLE FOR INSTALLATION AND MAINTENANCE OF

THE SERVICE IAW THE UNIQUE INSTALLATION FACTORS. 3. INSIDE WIRING IS

AUTHORIZED IAW THE UNIQUE INSTALLATION FACTORS. 4. VENDOR MUST

COORDINATE SITE VISIT WITH POC'S 72 HOURS IN ADVANCE PRIOR TO

REQUIRING ACCESS TO FACILITIES AT BOTH USER LOCATIONS. 5. VENDOR MUST

CONTACT DISA GOC TIER-II ENGINEERING 48 HOURS PRIOR TO BEGINNING THEIR

END-TO-END TESTING.

MINIMUM TECHNICAL SPECIFICATIONS: SPECIFIC FORMAT TO BE USED IS: LINE

RATE: 10.3125 GIGABITS/S, +- 100 PPM LINE CODE: OPTICAL 1. TEST AND

ACCEPTANCE: THIS CIRCUIT SHALL PASS A FULLY DOCUMENTED,

SATISFACTORY, 72 HOUR SOAK TEST BY DISA GOC AT SCOTT AFB, IL. PRIMARY:

(C) 618-418-8627 (D) 418-8627. 2. ERROR PERFORMANCE: ERROR PERFORMANCE

SHALL BE BETTER THAN THE FOLLOWING PARAMETER THRESHOLDS TO BE

ACCEPTABLE: AVAILABILITY SHALL BE GREATER THAN 99.5% OR BETTER.

FRAME LOSS SHALL BE EQUAL TO ZERO WHEN TESTING AT 10 GIGABIT HIGHEST

FRAME RATE, AND SHALL MEET ITU-T-Y.1564 STANDARDS. JITTER SHALL BE

LESS THAN 3 MSEC. DELAY SHALL BE BETTER THAN 10 MSEC. 3. MEAN TIME TO

LOSS OF BIT COUNT INTEGRITY (MTTLBCI) SHALL BE GREATER THAN 24 HOURS.

4. ROUND TRIP DELAY (RTD) FOR THIS DISA TRANSPORT TRUNK WILL BE

MEASURED IN MILLISECONDS FROM THE CUSTOMER'S SERVICE O. REMARKS

CONTINUED: DELIVERY POINT (SDP) SITE-A TO THE CUSTOMER'S SERVICE

DELIVERY POINT (SDP) SITE-Z. THE RTD SHALL BE LESS THAN OR EQUAL TO 10

MILLISECONDS TO EFFECTIVELY SUPPORT THE GOVERNMENT'S MISSION. THE

GOVERNMENT ACCEPTING AUTHORITY WILL CONFIRM THE RTD DURING THE

TURN-UP AND TEST PHASE AND IF IT DOES NOT ALIGN WITH THE CONTRACTORS

PROPOSAL, DISA IE161 WILL NOTIFY DITCO IMMEDIATELY IN WRITING.

(**UNIQ INSTALL FACTORS**) (SP A) ATCH PANEL BLDG 1000A, ROOM 139 TO THE

LINE SIDE OF THE SITE PROVIDED FIBER TERMINATING PATCH PANEL BLDG 1000,

ROOM 211A, USING EXISTING ON-BASE SINGLE-MODE FIBER.(SP D)

MAINTENANCE OF SINGLE MODE FIBER FROM DROP SIDE OF DISA IE1 PROVIDED

FIBER TERMINATING PATCH PANEL INSTALLED IN CISCO ASR-9010 ROUTER

SUITE TO OPTICAL INTERFACE CARD INSTALLED IN CISCO ROUTER.

COORDINATE TYPE OF CONNECTORS. G. DISA IE4 IS RESPONSIBLE FOR

INSTALLATION AND GSM-O FOR MAINTENANCE OF CISCO ASR-9010 ROUTER,

OPTICAL INTERFACE CARD BLDG 857, RM 123. (** DIVERSITY INFO **) SERVICE

DIVERSITY REQUESTED; DUAL HOMING CCSD: TBD1; DUAL HOMING REMARKS:

TBD1 IS A PLACE HOLDER FOR THE CCSD OF THE FORTHCOMING DIVERSE

CIRCUIT.; (** ADDITIONAL PROVISIONING INFORMATION **) (ORG ACCT) DISA

(DISN IP ROUTER NETWORK BACKBONE AND BACKBONE HOSTS)(CONUS AND

OCONUS)