ATTACHMENT 1 FOR SOLICITATION HC101321QA312.pdf
PDF 12 KB Posted
- Solicitation number
- HC101321QA312
- Issued by
-
Defense Information Systems Agency
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
ATTACHMENT 1 FOR SOLICITATION HC101321QA312
ATTENTION STENNIS SPACE CENTER LOCATION: THIS REQUIREMENT MUST BE
ENGINEERED AND PROVISIONED TOTALLY DIVERSE END TO END TO
GOVERNMENT'S SERVICE DELIVERY POINTS FROM TSR: RU19APR217054,
MEANING THAT PHYSICAL PATHS ARE TOTALLY SEPARATE INCLUDING MAN
HOLES, CONDUIT, (CENTRAL OFFICE LOCATIONS), AND FIBER BUILDS.
ADDITIONALLY AS A MINIMUM THERE MUST BE A 50 METER PHYSICAL
SEPARATION FROM TSR: RU19APR217054 7. THE TELECOM PROVIDER MUST
PROVIDE DITCO COLOR POWERPOINT DRAWINGS FOR TECHNICAL REVIEW
SHOWING THE ROUTES FROM THE COMMERCIAL DEMARCS TO THE SUPPORTING
CENTRAL OFFICES AND/OR L. REMARKS CONTINUED: WIRING CENTERS.
DRAWINGS MUST INCLUDE SEPARATION DISTANCES BETWEEN DIVERSE
REQUIREMENTS, TOTAL FIBER MILES AND ROUND TRIP DELAY (RTD), AND FIBER
ROUTES RED LINED END TO END SO THE GOVERNMENT CAN CONFIRM PHYSICAL
END TO END DIVERSITY REQUIREMENTS ARE MET. ADDITIONALLY, THE VENDOR
IS TO PROVIDE DITCO WITH DETAILED CIRCUIT/PATH CONNECTIVITY
DIAGRAMS, IN KMZ OR KML FORMAT, IDENTIFYING ALL POINTS OF PRESENCE
(POP) FOR EVALUATION AND AS A FINAL RECORD OF THE INSTALLED PATH.
THE VENDOR MUST PROVIDE LIGHT LEVEL READINGS (SIGNAL STRENGTH IN
DBM) ON THE EXTENSION FROM COMMERCIAL POP TO THE GOVERNMENT
SERVICE DELIVERY POINT (SDP) AT THE "A" AND "Z" LOCATION PRIOR TO
CIRCUIT TURN OVER TO THE GOVERNMENT ENSURING LEVELS ARE WITHIN
SPECS. LIGHT LEVELS MUST BE ADJUSTED TO -3 TO -9 DBM. 9. THE VENDOR
MUST TERMINATE 10GB ETHERNET SERVICE AT SERVICE DELIVERY LOCATIONS,
IAW UNIQUE INSTALLATION FACTORS. 10. THE VENDOR MUST CONDUCT WALK-
THROUGH SITE SURVEY PRIOR TO INSTALLATION AT BOTH LOCATIONS.
THE VENDOR MUST CONTACT DISA GOC IP BACKBONE ENGINEERING AND
IMPLEMENTATION GROUP UPON RECEIPT OF A VALID TSO TO ESTABLISH THE
COORDINATION AND ACTIVATION PROCESS. PHONE: (C) 618-418-8627, (D) 418-8627.
12. THE VENDOR MUST CONTACT DISA GOC TIER-II ENGINEERING 48 HOURS
PRIOR TO BEGINNING THEIR END-TO-END TESTING. PHONE: (C) 618-418-8627, (D)
418-8627. THE PROVIDER MUST CONDUCT A SATISFACTORY 24-HOUR TEST FROM
THE DROP SIDE OF THEIR OR LOCAL EXCHANGE CARRIERS FDP INSTALLED IN
THEIR EQUIPMENT SUITE AT THE "A" LOCATION TO THEIR OR LOCAL EXCHANGE
CARRIERS FDP INSTALLED IN THEIR EQUIPMENT SUITE AT THE "Z" LOCATION
AND MUST INCLUDE THE EXTENSION BETWEEN THE COMMERCIAL DEMARC
AND THE GOVERNMENT'S SDP. VENDOR MUST ENSURE TEST SETS ARE PLACED
AT THE DROP SIDE M. REMARKS CONTINUED: AT THE "A" LOCATION AND AT THE
"Z" LOCATION. TESTING MUST BE SATISFACTORY PRIOR TO TURN OVER TO THE
GOVERNMENT FOR ACCEPTANCE TESTING. THE VENDOR MUST TEST THE
CIRCUIT FOR 24 HOURS IAW THE FULL ITU-T.Y.1564 BENCH MARKING
METHODOLOGY FOR NETWORK INTERCONNECT DEVICES STANDARD, AND AT
THE COMMITTED INFORMATION RATE (CIR) IAW ITU-T-Y.1564.
CIRCUIT REQUIRES THE FOLLOWING PARAMETERS:
(A) FIBER TERMINATION: FRAME FORMAT: 10GB ETHERNET (OPTICAL HANDOFF-
10GB ETHERNET-LAN-PHY-SINGLE MODE FIBER), 1310NM. "SC" OR "LC"
CONNECTORS AS DETERMINED BY SITE SURVEY. NOTE: WHEN EXTENDED
REACH OPTICS ARE USED THAT CHANGE THE TX/RX WAVELENGTH OF THE
OPTIC, THE VENDOR WILL NOTIFY THE GOVERNMENT 30 DAYS PRIOR TO
DELIVERY. (B) COMMITTED INFORMATION RATE (CIR): 10GB. (C) ETHERNET
FRAME SIZE WILL BE CONFIGURED TO SUPPORT MAXIMUM TRANSMISSION UNIT
(MTU) OF 9000 OCTETS (BYTES) JUMBO FRAMES. (D) NO NETWORK INTERFACE
UNIT, DEDICATED PATH. (E) GFE CLOCKING: VENDOR ESFU (OR EQUIVALENT)
NOT TO BE ENGINEERED INTO CIRCUIT. (F) TESTING CRITERIA: VENDOR MUST
TEST THE CIRCUIT FOR 24 HOURS IAW THE FULL ITU-T.Y.1564 BENCH MARKING
METHODOLOGY FOR NETWORK INTERCONNECT DEVICES STANDARD, AND AT
THE COMMITTED INFORMATION RATE (CIR) IAW ITU-T-Y.1564. NOTE: ETHERNET
FRAME SIZE DESIGNATOR 'H' (MTU) IS EQUAL TO 9000 BYTES. (G) LINE MUST
REMAIN FULLY OPERATIONAL AND AVAILABLE TO USERS 24 HOURS A DAY,
SEVEN DAYS PER WEEK, MONTHLY PERFORMANCE OF 99.5% AVAILABILITY OR
BETTER. (H) 1 HOUR RESPONSE TIME TO RESPOND TO CUSTOMER UPON RECEIPT
OF TROUBLE. (I) VENDOR REQUIRED TO HAVE CIRCUIT VISIBILITY TO ASSIST IN
ANY CIRCUIT OUTAGES. (J) VENDOR MUST HAVE A 24X7 NETWORK OPERATIONS
CENTER. (K) TELECOM PROVIDER MUST MAINTAIN OPERATIONS, MAINTENANCE
AND ADMINISTRATION MONITORING OF ETHERNET CIRCUIT. (L) THE
COMMERCIAL CIRCUIT WILL BE ACCEPTED ON BEHALF OF THE N. REMARKS
CONTINUED: GOVERNMENT BY THE DISA GOC IP BACKBONE ENGINEERING AND
IMPLEMENTATION GROUP, SCOTT AFB, IL. C618-418-8627, D418-8627. 2. VENDOR
WINNING AWARD IS RESPONSIBLE FOR INSTALLATION AND MAINTENANCE OF
THE SERVICE IAW THE UNIQUE INSTALLATION FACTORS. 3. INSIDE WIRING IS
AUTHORIZED IAW THE UNIQUE INSTALLATION FACTORS. 4. VENDOR MUST
COORDINATE SITE VISIT WITH POC'S 72 HOURS IN ADVANCE PRIOR TO
REQUIRING ACCESS TO FACILITIES AT BOTH USER LOCATIONS. 5. VENDOR MUST
CONTACT DISA GOC TIER-II ENGINEERING 48 HOURS PRIOR TO BEGINNING THEIR
END-TO-END TESTING.
MINIMUM TECHNICAL SPECIFICATIONS: SPECIFIC FORMAT TO BE USED IS: LINE
RATE: 10.3125 GIGABITS/S, +- 100 PPM LINE CODE: OPTICAL 1. TEST AND
ACCEPTANCE: THIS CIRCUIT SHALL PASS A FULLY DOCUMENTED,
SATISFACTORY, 72 HOUR SOAK TEST BY DISA GOC AT SCOTT AFB, IL. PRIMARY:
(C) 618-418-8627 (D) 418-8627. 2. ERROR PERFORMANCE: ERROR PERFORMANCE
SHALL BE BETTER THAN THE FOLLOWING PARAMETER THRESHOLDS TO BE
ACCEPTABLE: AVAILABILITY SHALL BE GREATER THAN 99.5% OR BETTER.
FRAME LOSS SHALL BE EQUAL TO ZERO WHEN TESTING AT 10 GIGABIT HIGHEST
FRAME RATE, AND SHALL MEET ITU-T-Y.1564 STANDARDS. JITTER SHALL BE
LESS THAN 3 MSEC. DELAY SHALL BE BETTER THAN 10 MSEC. 3. MEAN TIME TO
LOSS OF BIT COUNT INTEGRITY (MTTLBCI) SHALL BE GREATER THAN 24 HOURS.
4. ROUND TRIP DELAY (RTD) FOR THIS DISA TRANSPORT TRUNK WILL BE
MEASURED IN MILLISECONDS FROM THE CUSTOMER'S SERVICE O. REMARKS
CONTINUED: DELIVERY POINT (SDP) SITE-A TO THE CUSTOMER'S SERVICE
DELIVERY POINT (SDP) SITE-Z. THE RTD SHALL BE LESS THAN OR EQUAL TO 10
MILLISECONDS TO EFFECTIVELY SUPPORT THE GOVERNMENT'S MISSION. THE
GOVERNMENT ACCEPTING AUTHORITY WILL CONFIRM THE RTD DURING THE
TURN-UP AND TEST PHASE AND IF IT DOES NOT ALIGN WITH THE CONTRACTORS
PROPOSAL, DISA IE161 WILL NOTIFY DITCO IMMEDIATELY IN WRITING.
(**UNIQ INSTALL FACTORS**) (SP A) ATCH PANEL BLDG 1000A, ROOM 139 TO THE
LINE SIDE OF THE SITE PROVIDED FIBER TERMINATING PATCH PANEL BLDG 1000,
ROOM 211A, USING EXISTING ON-BASE SINGLE-MODE FIBER.(SP D)
MAINTENANCE OF SINGLE MODE FIBER FROM DROP SIDE OF DISA IE1 PROVIDED
FIBER TERMINATING PATCH PANEL INSTALLED IN CISCO ASR-9010 ROUTER
SUITE TO OPTICAL INTERFACE CARD INSTALLED IN CISCO ROUTER.
COORDINATE TYPE OF CONNECTORS. G. DISA IE4 IS RESPONSIBLE FOR
INSTALLATION AND GSM-O FOR MAINTENANCE OF CISCO ASR-9010 ROUTER,
OPTICAL INTERFACE CARD BLDG 857, RM 123. (** DIVERSITY INFO **) SERVICE
DIVERSITY REQUESTED; DUAL HOMING CCSD: TBD1; DUAL HOMING REMARKS:
TBD1 IS A PLACE HOLDER FOR THE CCSD OF THE FORTHCOMING DIVERSE
CIRCUIT.; (** ADDITIONAL PROVISIONING INFORMATION **) (ORG ACCT) DISA
(DISN IP ROUTER NETWORK BACKBONE AND BACKBONE HOSTS)(CONUS AND
OCONUS)
File details come from the government source that posted it. Updated .