IQO INQUIRY
FM: PL8211
TO: Contractors
DATE (MM/DD/YYYY): 5/5/2021
SUBJECT: HC101321QA121-0002 Amend: 0002
A. TYPE ACTION: AMEND
1. PURPOSE: *****AMEND 0002 IS TO CORRECT THE UNIQUE INSTALL FACTORS FOR BOTH
SITES. IT ALSO REMOVES CONTRACTORS RESPONSIBILITY OF EXTENDING FROM DEMARK
TO SDP AT SCOTT AFB. ALL ELSE REMAINS THE SAME.*****
*****AMEND 0001 IS TO CORRECT THE DEMARK AT FORT SMITH AR TO BLDG 182, RM 125,
4850 LEIGH AVENUE, FT SMITH, AR 72903(CC2). INSTEAD OF BLDG 208, ROOM 151, 4850
LEIGH AVENUE, FORT SMITH, AR. 72903, UPDATE THE POC AT SCOTT AFB, IL AND UPDATE
THE QUOTE DUE DATE AND SERVICE DATES.
VENDORS THAT HAVE SUBMITTTED PROPOSALS MUST REFRESH THEIR QUOTES WITH THE
UPDATED DEMARK.
ALL ELSE REMAIN THE SAME.*****
1. SUBMIT A QUOTE TO PROVIDE, INSTALL, AND MAINTAIN A LEASED 10GB WAVE BETWEEN
BLDG 1575, ROOM C-1B, 103 WEST LOSEY STREET, SCOTT AFB, IL., 62225 AND BLDG 182,
RM 125, 4850 LEIGH AVENUE, FT SMITH, AR 72903(CC2)
- CONTRACTORS SHALL MEET RTD OF 10 MILLISECONDS TO SUPPORT THE GOVERNMENT
MISSION. IF THE RTD CHANGES IT WOULD BE NOTIFIED VIA AMENDMENT TO SOLICITATION.
- SEE UNIQUE INSTALL FACTS
- CUSTOMER REQUESTS SOONER IF POSSIBLE SERVICE DATE (SIP)
GOVERNMENT REQUIRED CHANNELIZATION:
- VENDOR QUOTE MUST INCLUDE THE A LOC AND Z LOC LEC’S ALONG WITH THE
VENDOR’S SUB-CONTRACTOR/LONG-HAUL PROVIDER/CARRIERS FOR THE SERVICE
-VENDOR QUOTES MUST INDICATE IF LEC’S ARE CURRENTLY ON-NET OR IF A BUILD IS
REQUIRED TO COMPLETE THE SERVICE.
- IF A BUILD IS REQUIRED TO COMPLETE THE SERVICE, VENDOR MUST INDICATE THE
SCOPE OF THE BUILD (LENGTH, BURIED/AERIAL, TRENCHING/DIRECTIONAL BORING, NEW
CONDUIT, ETC), AND VENDOR MUST INDICATE IF THE SITE HAS GRANTED PERMISSION
FOR VENDOR TO BUILD INTO THE SITE (MUST ALSO PROVIDE THE SITE POC’S NAME THAT
HC101321QA121-0002
GRANTED PERMISSION) AND HAS SUFFICIENT SPACE, POWER AND HVAC CAPACITY TO
SUPPORT THE VENDOR EQUIPMENT AND CABLING.
2. CONTRACTORS ARE RESPONSIBLE FOR READING AND ADDRESSING ALL TECHNICAL
REQUIREMENTS OF THIS INQUIRY/SOLICITATION, READING AND AGREEING WITH THE
STANDARD PROVISIONS, PROVIDE PRICE QUOTATION IN ACCORDANCE WITH STANDARD
PROVISION 4, AND MEET THE REQUESTED SERVICE DATE.
3. THE SERVICE DATE TO BE MET IS: 15 OCT 2021 (SIP) TO COMPLY WITH PROCUREMENT
ACQUISITION LEAD TIME (PALT) FOR THIS TYPE OF SERVICE. ANY CHANGES TO THE
ORIGINAL SERVICE DATE WILL BE NOTIFIED VIA AMENDMENT TO THE SOLICITATION AND
POSTED TO FBO. THE GOVERNMENT ASSUMES THAT CONTRACTORS HAVE CONSIDERED
ALL ISSUES THAT MAY DELAY THE DELIVERY OF CIRCUIT ON REQUESTED SERVICE
DATE. THE GOVERNMENT MAY CANCEL, TERMINATE, OR REQUEST CONSIDERATION IAW
STANDARD PROVISION 42 FOR FAILURE TO MEET CONTRACTUAL SERVICE.
4. CONTRACTORS MUST ENSURE THAT QUOTES SHALL INCLUDE SUFFICIENT DETAIL
FOR EFFECTIVE EVALUATION AND SHOULD NOT SIMPLY REPHRASE OR RESTATE THE
GOVERNMENT REQUIREMENTS. RATHER, CONTRACTORS MUST PROVIDE CONVINCING
RATIONALE TO ADDRESS HOW THEY INTEND TO MEET THE REQUIREMENT. IN RESPONSE
TO THIS SOLICITATION, NO TERMS OR CONDITIONS PLACED UPON THE GOVERNMENT,
NOR ASSUMPTIONS WILL BE ACCEPTED. CONTRACTORS ARE INSTRUCTED TO SUBMIT
QUESTIONS AND REQUEST CLARIFICATIONS OF THE REQUIREMENT (S) BEFORE
SUBMITTING QUOTES. QUOTES MUST BE UPLOADED TO IDEAS.
5. THIS REQUIREMENT MUST BE WORKED IN CONJUNCTION WITH SOLICITATION
HC101321QA123/ TSR SG23DEC206679AND MUST BE ENGINEERED AND PROVISIONED
TOTALLY DIVERSE END TO END FROM THE GOVERNMENT SERVICE DELIVERY POINTS
(SDP) FROM SOLICITATION HC101321QA123 / TSR SG23DEC206679; MEANING THE
PHYSICAL PATHS ARE TOTALLY SEPARATE INCLUDING MAN HOLES, CONDUIT, CENTRAL
OFFICE LOCATIONS, AND FIBER BUILDS. ADDITIONALLY AS A MINIMUM MUST HAVE 50
METERS / 164 FEET PHYSICAL SEPARATION FROM SOLICITATION HC101321QA123 / TSR
SG23DEC206679
6. TO DETERMINE THE AWARDEE(S) OF DIVERSE REQUIREMENTS, THE GOVERNMENT WILL
FIRST EVALUATE THE LOWEST PRICED SOLUTION FOR EACH SOLICITATION. IF THOSE
TWO SOLUTIONS ARE DIVERSE FROM EACH OTHER AND MEET ALL REQUIREMENTS,
AWARD WILL BE MADE TO THE CONTRACTOR OR CONTRACTORS THAT PROPOSED
THE TWO SOLUTIONS. IF THE TWO LOWEST PRICED SOLUTIONS ARE NOT AWARDABLE
BECAUSE THEY ARE NOT DIVERSE FROM EACH OTHER OR DO NOT MEET REQUIREMENTS,
THE GOVERNMENT WILL EVALUATE THE NEXT LOWEST PRICED COMBINATION FOR
BOTH SOLICITATIONS UNTIL IT DETERMINES THE LOWEST PRICED COMBINATION THAT
MEETS ALL REQUIREMENTS. AWARDS WILL BE MADE AS A PAIR TO ONE CONTRACTOR
ONLY OR SPLIT THE AWARD BETWEEN TWO CONTRACTORS THAT MEET ALL TECHNICAL
REQUIREMENTS, REQUESTED SERVICE DATE AND PROPOSE THE LOWEST PRICE.
7. CONTRACTOR SHALL PROVIDE COLOR POWERPOINT DRAWINGS SHOWING THE ROUTES
FROM THE COMMERCIAL DEMARKS TO THE SUPPORTING CENTRAL OFFICES AND/OR
WIRING CENTERS, ENSURING THE PHYSICAL END TO END DIVERSITY REQUIREMENTS ARE
BEING MET. DRAWINGS MUST INCLUDE SEPARATION DISTANCES, TOTAL FIBER MILES
AND ROUND TRIP DELAY BASED ON ACTUAL DISTANCE IN MILES. REFER TO STANDARD
PROVISION 39 FOR SPECIFIC DOCUMENTATION REQUIREMENTS. SAMPLE DRAWINGS
INCLUDED WITH INQUIRY/SOLICITATION SHALL BE FOLLOWED IN ORDER TO PROVIDE THE
REQUIRED TECHNICAL INFORMATION. MAPS AND DRAWINGS WITH ERRORS, MISMATCH
INFORMATION, MISSING RTD, AND NOT ENOUGH DETAIL TO DETERMINE DIVERSITY
THROUGHOUT THE FIBER PATH WILL BE FOUND TECHNICALLY DEFICIENT AND WILL NOT
BE ACCEPTED.
8. PRE AWARD SITE SURVEYS ARE AUTHORIZED (AT CONTRACTOR EXPENSE) AND
SHOULD BE CONDUCTED IN COORDINATION WITH LOCAL POCS AT EACH GOVERNMENT
SITE. IT IS HIGHLY RECOMMENDED THAT AT A MINIMUM, CONTRACTORS CONDUCT PHONE
SURVEYS TO ADEQUATELY ASSESS THE MAGNITUDE OF THE WORK TO BE PERFORMED IN
DETERMINING THEIR PRICE STRATEGY.
9. CONTRACTORS MUST ADDRESS IN QUOTES COMPLIANCE WITH TESTING AND
ACCEPTANCE REQUIREMENTS.
10. TESTING & ACCEPTANCE REQUIREMENTS MUST BE COORDINATED WITH CUSTOMER
ACCEPTANCE AUTHORITY BEFORE NOTICE OF COMPLETION IS SUBMITTED TO DITCO. (IF
WORKING DISA ETHERNET, WAVE, SONET (OC-03 AND HIGHER REQUIREMENTS INCLUDE
THE BELOW INFO AND ANY OTHER POC NAMES, PHONE NUMBERS AND EMAIL ADDRESSES
AS THIS MAY CHANGE IN THE FUTURE)
FOR DISA REQUIREMENTS THE TESTING AND ACCEPTING AUTHORITY IS: DISA DSCC IE
Mailbox DCP Commercial Activation
11. ESTABLISH TSP: TSP0KUYB8-01
M. ADDITIONAL INFORMATION:
3. TSR NUMBER: SG23DEC206678
4. CCSD: DEDO0J
Z. DITCO CONTACT:
Renee Lintz
618-418-6190 renee.a.lintz.civ@mail.mil
Robert E Spencer
DITCO Contracting Officer
Unless otherwise specified, all other terms and conditions are unchanged.
Paragraph E.SERVICE DATE change from:
Oct 15, 2021
To:
Aug 2, 2021
Paragraph M.3.TSR NUMBER change from:
SG23DEC206678A
SG23DEC206678
Paragraph V.QUOTE DUE DATE AND TIME change from:
May 18, 2021 11:00:00 AM CDT
May 18, 2021 4:00:00 PM GMT
Location A, UNIQUE INSTALLATION FACTORS change from:
(1) COMMERCIAL FIBER POINT OF PRESENCE (COMMERCIAL CARRIER SYSTEM)
(2) FIBER CABLE X-CONNECT, IN-HOUSE, INSIDE WIRE, SINGLE-MODE, 1310NM, TELCO AMPLIFYING INFO:
A. VENDOR IS RESPONSIBLE FOR INSTALLATION AND
MAINTENANCE OF SINGLE MODE FIBER FROM THE DROP SIDE OF THE
COMMERCIAL FIBER POINT OF PRESENCE [FIBER DISTRIBUTION
PANEL (FDP)] BLDG 208, ROOM 151 TO THE LINE SIDE OF
THE DISA IE1 PROVIDED FIBER TERMINATING PATCH PANEL
INSTALLED IN THE ODXC SUITE (UODWEBB010) BLDG 182,
ROOM 125. TERMINATE WITH "SC" CONNECTORS TO DISA
PROVIDED FIBER TERMINATING PATCH PANEL.
B. VENDOR MUST PROVIDE FIBER STRANDS FROM THEIR POINT
OF PRESENCE TO THE ODXC SUITE WITHOUT SPLICING AND OR
USE OF CONNECTORS TO CONNECT 2 OR MORE FIBER STRANDS
MEANING THE FIBER CANNOT BE BROKEN IN THE MIDDLE AND
MUST BE CONTINUOUS.
C. THE CIRCUIT MUST BE TAGGED WITH THE VENDOR'S CIRCUIT
ID AS APPLICABLE AT THE DROP SIDE OF THEIR POINT OF
PRESENCE (FIBER DISTRIBUTION PANEL) BLDG 208, ROOM
151. ADDITIONALLY, VENDOR MUST SHOW SITE PERSONNEL
LISTED ON THIS ORDER THE EXACT TERMINATION POINT
WHEN SERVICE IS COMPLETE.
D. VENDOR MUST SCHEDULE/COORDINATE WITH THE POC'S
LISTED ON THIS ORDER 72 HOURS IN ADVANCE PRIOR TO
SITE SURVEYS OR INSTALLATIONS.
A. VENDOR IS RESPONSIBLE FOR INSTALLATION AND
MAINTENANCE OF SINGLE MODE FIBER FROM THE LINE SIDE OF THE
DISA IE1 PROVIDED FIBER TERMINATING PATCH PANEL INSTALLED
IN THE ODXC SUITE (UODWSCO010) BLDG 1575, ROOM C-1B
TO THE DROP SIDE OF THE COMMERCIAL FIBER POINT OF
PRESENCE [FIBER DISTRIBUTION PANEL (FDP)] BLDG 1575, ROOM
C-1B "SC" TO "SC" CONNECTORS. SITE WILL COORDINATE AND EXTEND FROM DMARK TO SDP ON BASE FIBER.
B. VENDOR MUST PROVIDE FIBER STRANDS FROM THE DISA
PROVIDED FIBER PATCH PANELTO THE DROP SIDE OF
THEIR POP/FIBER DISTRIBUTION PANEL WITHOUT SPLICING
AND OR USE OF CONNECTORS TO CONNECT 2 OR MORE FIBER
STRANDS MEANING THE FIBER CANNOT BE BROKEN IN THE
MIDDLE AND MUST BE CONTINUOUS.
C. THE LENGTH OF SINGLE MODE FIBER JUMPERS REQUIRED
WILL BE BASED ON THE LOCATION OF THE VENDORS POINT OF
PRESENCE.
D. THE CIRCUIT MUST BE TAGGED WITH THE VENDOR'S CIRCUIT
PRESENCE (FIBER DISTRIBUTION PANEL) BLDG 1575, ROOM
C-1B. ADDITIONALLY, VENDOR MUST SHOW SITE PERSONNEL
WHEN INSTALLATION IS COMPLETE.
E. VENDOR MUST SCHEDULE/COORDINATE WITH THE POC'S
LISTED ON THIS ORDER 72 HOURS IN ADVANCE PRIOR TO SITE
SURVEYS OR INSTALLATIONS
Location B, UNIQUE INSTALLATION FACTORS change from:
(1) FIBER CABLE X-CONNECT, IN-HOUSE, INSIDE WIRE, SINGLE-MODE, 1310NM, TELCO
(2) COMMERCIAL FIBER POINT OF PRESENCE (COMMERCIAL CARRIER SYSTEM)
AMPLIFYING INFO:
A. VENDOR IS RESPONSIBLE FOR INSTALLATION AND
MAINTENANCE OF SINGLE MODE FIBER FROM THE LINE SIDE OF THE
DISA IE1 PROVIDED FIBER TERMINATING PATCH PANEL INSTALLED
IN THE ODXC SUITE (UODWSCO010) BLDG 1575, ROOM C-1B
TO THE DROP SIDE OF THE COMMERCIAL FIBER POINT OF
PRESENCE [FIBER DISTRIBUTION PANEL (FDP)] BLDG 1575, ROOM
C-1B "SC" TO "SC" CONNECTORS.
B. VENDOR MUST PROVIDE FIBER STRANDS FROM THE DISA
PROVIDED FIBER PATCH PANELTO THE DROP SIDE OF
THEIR POP/FIBER DISTRIBUTION PANEL WITHOUT SPLICING
AND OR USE OF CONNECTORS TO CONNECT 2 OR MORE FIBER
STRANDS MEANING THE FIBER CANNOT BE BROKEN IN THE
MIDDLE AND MUST BE CONTINUOUS.
C. THE LENGTH OF SINGLE MODE FIBER JUMPERS REQUIRED
WILL BE BASED ON THE LOCATION OF THE VENDORS POINT OF
PRESENCE.
D. THE CIRCUIT MUST BE TAGGED WITH THE VENDOR'S CIRCUIT
PRESENCE (FIBER DISTRIBUTION PANEL) BLDG 1575, ROOM
C-1B. ADDITIONALLY, VENDOR MUST SHOW SITE PERSONNEL
WHEN INSTALLATION IS COMPLETE.
E. VENDOR MUST SCHEDULE/COORDINATE WITH THE POC'S
LISTED ON THIS ORDER 72 HOURS IN ADVANCE PRIOR TO SITE
SURVEYS OR INSTALLATIONS.
FIBER CABLE X-CONNECT, IN-HOUSE, INSIDE WIRE, SINGLE-MODE, 1310NM, TELCO AMPLIFYING INFO:
A. VENDOR IS RESPONSIBLE FOR INSTALLATION AND
MAINTENANCE OF SINGLE MODE FIBER FROM THE DROP SIDE OF THE
COMMERCIAL FIBER POINT OF PRESENCE [FIBER DISTRIBUTION
PANEL (FDP)] BLDG 208, ROOM 151 TO THE LINE SIDE OF
THE DISA IE1 PROVIDED FIBER TERMINATING PATCH PANEL
INSTALLED IN THE ODXC SUITE (UODWEBB010) BLDG 182,
ROOM 125. TERMINATE WITH "SC" CONNECTORS TO DISA
PROVIDED FIBER TERMINATING PATCH PANEL.
B. VENDOR MUST PROVIDE FIBER STRANDS FROM THEIR POINT
OF PRESENCE TO THE ODXC SUITE WITHOUT SPLICING AND OR
USE OF CONNECTORS TO CONNECT 2 OR MORE FIBER STRANDS
MEANING THE FIBER CANNOT BE BROKEN IN THE MIDDLE AND
MUST BE CONTINUOUS.
C. THE CIRCUIT MUST BE TAGGED WITH THE VENDOR'S CIRCUIT
PRESENCE (FIBER DISTRIBUTION PANEL) BLDG 208, ROOM
151. ADDITIONALLY, VENDOR MUST SHOW SITE PERSONNEL
WHEN SERVICE IS COMPLETE.
D. VENDOR MUST SCHEDULE/COORDINATE WITH THE POC'S
LISTED ON THIS ORDER 72 HOURS IN ADVANCE PRIOR TO
SITE SURVEYS OR INSTALLATIONS.