HC101320QB268-0002.v0.pdf
PDF 16 KB Posted
- Solicitation number
- HC101320QB268
- Issued by
-
Defense Information Systems Agency
View the file
Other files
| File | Type | Posted |
|---|---|---|
| HC101320QB268.v0.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
IQO INQUIRY
FM: PL8211
TO: Contractors
DATE (MM/DD/YYYY): 10/1/2020
SUBJECT: HC101320QB268-0002 Amend: 0002
A. TYPE ACTION: AMEND
1. PURPOSE: THE PURPOSE OF AMEND 0002 IS TO CHANGE THE COMMERCIAL
DEMARCATION POINT AT ROBINS AFB (LOCATION Z) TO BUILDING 228 VICE 214.
THE UNIQUE INSTALLATION FACTORS HAVE BEEN UPDATED TO IDENTIFY ROBINS AFB
RESPONSIBILITY FOR FIBER CONNECTION BETWEEN BLDG 228 AND BLDG 214.
THE QUOTE DUE DATE HAS BEEN UDPATED TO 15 OCT 2020.
THE SERVICE DATE HAS BEEN UPDATED TO 15 FEB 2021 TO COMPLY WITH PROCUREMENT
ACQUISITION LEAD TIMES FOR THIS TYPE OF SERVICE.
**THE COORDINATED REQUIREMENT, HC101320QB267, IS BEING AMENDED TO UPDATE THE
SERIVCE DATE AND QUOTE DUE DATE ONLY**
ALL ELSE REMAINS THE SAME.
THE PURPOSE OF AMEND 0001 IS TO EXTEND THE QUOTE DUE DATE TO 25 SEP 2020.
ALL ELSE REMAINS THE SAME.
SUBMIT A QUOTE TO PROVIDE, INSTALL, AND MAINTAIN A 10GB ETHERNET SERVICE
BETWEEN BLDG 102, RM 142, SWITCH ROOM, 102 BRISCOE DRIVE, MCGHEE TYSON ANG
BASE, LOUISVILLE, TN 37777(CCI) AND 214, FRAME ROOM, FL 1, 150 RICHARD RAY BLVD,
ROBINS AFB, GA 31098-1607(CCI).
- CONTRACTORS SHALL PROVIDE ETHERNET FRAME SIZE CONFIGURED TO SUPPORT
MAXIMUM TRANSMISSION UNIT (MTU) OF 9000 (BYTES) JUMBO FRAMES.
- CONTRACTORS SHALL MEET RTD OF 15 MILLISECONDS TO SUPPORT THE GOVERNMENT
MISSION. IF THE RTD CHANGES IT WOULD BE NOTIFIED VIA AMENDMENT TO SOLICITATION.
2. CONTRACTORS ARE RESPONSIBLE FOR READING AND ADDRESSING ALL TECHNICAL
REQUIREMENTS OF THIS INQUIRY/SOLICITATION, READING AND AGREEING WITH THE
HC101320QB268-0002
STANDARD PROVISIONS, PROVIDE PRICE QUOTATION IN ACCORDANCE WITH STANDARD
PROVISION 4, AND MEET THE REQUESTED SERVICE DATE.
3. THE SERVICE DATE TO BE MET IS: 15 FEB 21 (SIP) TO COMPLY WITH PROCUREMENT
ACQUISITION LEAD TIME (PALT) FOR THIS TYPE OF SERVICE. ANY CHANGES TO THE
ORIGINAL SERVICE DATE WILL BE NOTIFIED VIA AMENDMENT TO THE SOLICITATION AND
POSTED TO FBO. THE GOVERNMENT ASSUMES THAT CONTRACTORS HAVE CONSIDERED
ALL ISSUES THAT MAY DELAY THE DELIVERY OF CIRCUIT ON REQUESTED SERVICE
DATE. THE GOVERNMENT MAY CANCEL, TERMINATE, OR REQUEST CONSIDERATION IAW
STANDARD PROVISION 42 FOR FAILURE TO MEET CONTRACTUAL SERVICE.
4. CONTRACTORS MUST ENSURE THAT QUOTES SHALL INCLUDE SUFFICIENT DETAIL
FOR EFFECTIVE EVALUATION AND SHOULD NOT SIMPLY REPHRASE OR RESTATE THE
GOVERNMENT REQUIREMENTS. RATHER, CONTRACTORS MUST PROVIDE CONVINCING
RATIONALE TO ADDRESS HOW THEY INTEND TO MEET THE REQUIREMENT. IN RESPONSE
TO THIS SOLICITATION, NO TERMS OR CONDITIONS PLACED UPON THE GOVERNMENT,
NOR ASSUMPTIONS WILL BE ACCEPTED. CONTRACTORS ARE INSTRUCTED TO SUBMIT
QUESTIONS AND REQUEST CLARIFICATIONS OF THE REQUIREMENT (S) BEFORE
SUBMITTING QUOTES. QUOTES MUST BE UPLOADED TO IDEAS.
5. THIS REQUIREMENT MUST BE WORKED IN CONJUNCTION WITH SOLICITATION
HC101320QB267 / TSR RU16JUL206705 AND MUST BE ENGINEERED AND PROVISIONED
TOTALLY DIVERSE END TO END FROM THE GOVERNMENT SERVICE DELIVERY POINTS
(SDP) FROM SOLICITATION HC101320QB267 / TSR RU16JUL206705; MEANING THE PHYSICAL
PATHS ARE TOTALLY SEPARATE INCLUDING MAN HOLES, CONDUIT, CENTRAL OFFICE
LOCATIONS, AND FIBER BUILDS. ADDITIONALLY AS A MINIMUM MUST HAVE 50 METERS
PHYSICAL SEPARATION FROM SOLICITATION HC101320QB267 / TSR RU16JUL206705.
6. TO DETERMINE THE AWARDEE(S) OF DIVERSE REQUIREMENTS, THE GOVERNMENT WILL
FIRST EVALUATE THE LOWEST PRICED SOLUTION FOR EACH SOLICITATION. IF THOSE
TWO SOLUTIONS ARE DIVERSE FROM EACH OTHER AND MEET ALL REQUIREMENTS,
AWARD WILL BE MADE TO THE CONTRACTOR OR CONTRACTORS THAT PROPOSED
THE TWO SOLUTIONS. IF THE TWO LOWEST PRICED SOLUTIONS ARE NOT AWARDABLE
BECAUSE THEY ARE NOT DIVERSE FROM EACH OTHER OR DO NOT MEET REQUIREMENTS,
THE GOVERNMENT WILL EVALUATE THE NEXT LOWEST PRICED COMBINATION FOR
BOTH SOLICITATIONS UNTIL IT DETERMINES THE LOWEST PRICED COMBINATION THAT
MEETS ALL REQUIREMENTS. AWARDS WILL BE MAKE AS A PAIR TO ONE CONTRACTOR
ONLY OR SPLIT THE AWARD BETWEEN TWO CONTRACTORS THAT MEET ALL TECHNICAL
REQUIREMENTS, REQUESTED SERVICE DATE AND PROPOSE THE LOWEST PRICE.
7. CONTRACTOR SHALL PROVIDE COLOR POWERPOINT DRAWINGS SHOWING THE ROUTES
FROM THE COMMERCIAL DEMARKS TO THE SUPPORTING CENTRAL OFFICES AND/OR
WIRING CENTERS, ENSURING THE PHYSICAL END TO END DIVERSITY REQUIREMENTS ARE
BEING MET. DRAWINGS MUST INCLUDE SEPARATION DISTANCES, TOTAL FIBER MILES
AND ROUND TRIP DELAY BASED ON ACTUAL DISTANCE IN MILES. REFER TO STANDARD
PROVISION 39 FOR SPECIFIC DOCUMENTATION REQUIREMENTS. SAMPLE DRAWINGS
INCLUDED WITH INQUIRY/SOLICITATION SHALL BE FOLLOWED IN ORDER TO PROVIDE THE
REQUIRED TECHNICAL INFORMATION. MAPS AND DRAWINGS WITH ERRORS, MISMATCH
INFORMATION, MISSING RTD, AND NOT ENOUGH DETAIL TO DETERMINE DIVERSITY
THROUHGOUT THE FIBER PATH WILL BE FOUND TECHNICALLY DEFFICIENT AND WILL NOT
BE ACCEPTED.
8. PRE AWARD SITE SURVEYS ARE AUTHORIZED (AT CONTRACTOR EXPENSE) AND
SHOULD BE CONDUCTED IN COORDINATION WITH LOCAL POCS AT EACH GOVERNMENT
SITE. IT IS HIGHLY RECOMMENDED THAT AT A MINIMUM, CONTRACTORS CONDUCT PHONE
SURVEYS TO ADEQUATELY ASSESS THE MAGNITUDE OF THE WORK TO BE PERFORMED IN
DETERMINING THEIR PRICE STRATEGY.
9. CONTRACTORS MUST ADDRESS IN QUOTES COMPLIANCE WITH TESTING AND
ACCEPTANCE REQUIREMENTS.
10. TESTING & ACCEPTANCE REQUIREMENTS MUST BE COORDINATED WITH CUSTOMER
ACCEPTANCE AUTHORITY BEFORE NOTICE OF COMPLETION IS SUBMITTED TO DITCO.
FOR DISA REQUIREMENTS THE TESTING AND ACCEPTING AUTHORITY IS:
DISA Global < disa.scott.global.mbx.casa-infrastructure-integration-lease-bb-t@mail.mil>
11. ESTABLISH TSP: TSP0KL8XQ-01
FAILURE TO READ AND ADDRESS ANY OF THE TECHNICAL REQUIREMENTS AND SERVICE
DATE REQUESTED IN THIS INQUIRY SHALL RENDER THE QUOTE NON-COMPLIANT AND
RESULT IN IT BEING EXCLUDED FROM EVALUATION AND AWARD.
CIRCUIT REQUIRES THE FOLLOWING PARAMETERS:
(A) FIBER TERMINATION: FRAME FORMAT: 10GB ETHERNET (OPTICAL HANDOFF-10GB
ETHERNET-LAN-PHY-SINGLE MODE FIBER), 1310NM. "SC" OR "LC" CONNECTORS AS
DETERMINED BY SITE SURVEY. NOTE: WHEN EXTENDED REACH OPTICS ARE USED
THAT CHANGE THE TX/RX WAVELENGTH OF THE OPTIC, THE VENDOR WILL NOTIFY THE
GOVERNMENT 30 DAYS PRIOR TO DELIVERY.
(B) COMMITTED INFORMATION RATE (CIR): 10GB.
(C) ETHERNET FRAME SIZE WILL BE CONFIGURED TO SUPPORT MAXIMUM TRANSMISSION
UNIT (MTU) OF 9000 OCTETS (BYTES) JUMBO FRAMES.
(D) NO NETWORK INTERFACE UNIT, DEDICATED PATH.
(E) GFE CLOCKING: VENDOR ESFU (OR EQUIVALENT) NOT TO BE ENGINEERED INTO
CIRCUIT.
(F) TESTING CRITERIA: VENDOR MUST TEST THE CIRCUIT FOR 24 HOURS IAW THE FULL
ITU-T.Y.1564 BENCH MARKING METHODOLOGY FOR NETWORK INTERCONNECT DEVICES
STANDARD, AND AT THE COMMITTED INFORMATION RATE (CIR) IAW ITU-T-Y.1564. NOTE:
ETHERNET FRAME SIZE DESIGNATOR 'H' (MTU) IS EQUAL TO 9000 BYTES.
(G) LINE MUST REMAIN FULLY OPERATIONAL AND AVAILABLE TO USERS 24 HOURS A DAY,
SEVEN DAYS PER WEEK, MONTHLY PERFORMANCE OF 99.5% AVAILABILITY OR BETTER.
(H) 1 HOUR RESPONSE TIME TO RESPOND TO CUSTOMER UPON RECIEPT OF TROUBLE.
(I) VENDOR REQUIRED TO HAVE CIRCUIT VISIBILITY TO ASSIST IN ANY CIRCUIT OUTAGES.
(J) VENDOR MUST HAVE A 24X7 NETWORK OPERATIONS CENTER. M. REMARKS
CONTINUED:
(K) TELECOMM PROVIDER MUST MAINTAIN OPERATIONS, MAINTENANCE AND
ADMINISTRATION MONITORING OF ETHERNET CIRCUIT.
(L) THE COMMERCIAL CIRCUIT WILL BE ACCEPTED ON BEHALF OF THE GOVERNMENT BY
THE DISA GOC IP BACKBONE ENGINEERING AND IMPLEMENTATION GROUP, SCOTT AFB, IL.
(C) 618-418-8627, (D) 418-8627.
2. VENDOR WINNING AWARD IS RESPONSIBLE FOR INSTALLATION AND MAINTENANCE OF
THE SERVICE IAW THE UNIQUE INSTALLATION FACTORS.
3. INSIDE WIRING IS AUTHORIZED IAW THE UNIQUE INSTALLATION FACTORS.
4. VENDOR MUST COORDINATE SITE VISIT WITH POC'S 72 HOURS IN ADVANCE PRIOR TO
REQUIRING ACCESS TO FACILITIES AT BOTH USER LOCATIONS.
MINIMUM TECHNICAL SPECIFICATIONS: SPECIFIC FORMAT TO BE USED IS: LINE RATE:
10.3125 GIGABITS/S, +- 100 PPM LINE CODE: OPTICAL
1. TEST AND ACCEPTANCE: THIS CIRCUIT SHALL PASS A FULLY DOCUMENTED,
SATISFACTORY, 72 HOUR SOAK TEST BY DISA GOC AT SCOTT AFB, IL. PRIMARY: (C)
618-418-8627 (D) 418-8627.
2. ERROR PERFORMANCE: ERROR PERFORMANCE SHALL BE BETTER THAN THE
FOLLOWING PARAMETER THRESHOLDS TO BE ACCEPTABLE: AVAILABILITY SHALL
BE GREATER THAN 99.5% OR BETTER. FRAME LOSS SHALL BE EQUAL TO ZERO
WHEN TESTING AT 10 GIGABIT HIGHEST FRAME RATE, AND SHALL MEET ITU-T-Y.1564
STANDARDS. JITTER SHALL BE LESS THAN 3 MSEC. N. REMARKS CONTINUED: DELAY
SHALL BE BETTER THAN 10 MSEC.
3. MEAN TIME TO LOSS OF BIT COUNT INTEGRITY (MTTLBCI) SHALL BE GREATER THAN 24
HOURS.
4. ROUND TRIP DELAY (RTD) FOR THIS DISA TRANSPORT TRUNK WILL BE MEASURED IN
MILLISECONDS FROM THE CUSTOMER'S SERVICE DELIVERY POINT (SDP) SITE-A TO THE
CUSTOMER'S SERVICE DELIVERY POINT (SDP) SITE-Z. THE RTD SHALL BE LESS THAN OR
EQUAL TO 15 MILLISECONDS TO EFFECTIVELY SUPPORT THE GOVERNMENT'S MISSION.
THE GOVERNMENT ACCEPTING AUTHORITY WILL CONFIRM THE RTD DURING THE TURN-UP
AND TEST PHASE AND IF IT DOES NOT ALIGN WITH THE CONTRACTORS PROPOSAL, DISA
IE161 WILL NOTIFY DITCO IMMEDIATELY IN WRITING.
M. ADDITIONAL INFORMATION:
3. TSR NUMBER: RU22JUL206706
4. CCSD: DIR3BEH8
Z. DITCO CONTACT:
Edward Midkiff
618-418-6481
Edward.w.midkiff.civ@mail.mil
Angelina Hutson
DITCO Contracting Officer
Unless otherwise specified, all other terms and conditions are unchanged.
Paragraph E.SERVICE DATE change from:
Jan 22, 2021
To:
Feb 15, 2021
Paragraph M.3.TSR NUMBER change from:
RU22JUL206706A
RU22JUL206706
Paragraph V.QUOTE DUE DATE AND TIME change from:
Sep 25, 2020 12:00:00 PM CDT
Oct 15, 2020 12:00:00 PM CDT
Location B, UNIQUE INSTALLATION FACTORS change from:
(1) COMMERCIAL FIBER POINT OF PRESENCE
(2) FIBER CABLE X-CONNECT, IN-HOUSE, INSIDE WIRE, SINGLE-MODE, 1310NM, TELCO
AMPLIFYING INFO:
A. VENDOR IS RESPONSIBLE FOR INSTALLATION AND MAINTENANCE OF SINGLE MODE FIBER FROM THE DROP
SIDE OF COMMERCIAL FIBER POINT OF PRESENCE FIBER DISTRIBUTION PANEL BLDG 214, FRAME ROOM TO LINE
SIDE OF DISA IE1 PROVIDED FIBER TERMINATING PATCH PANEL INSTALLED IN CISCO ASR-9010 ROUTER SUITE
(UJEWROB040) BLDG 214, FRAME ROOM. TERMINATE WITH "SC" CONNECTORS TO DISA PROVIDED FIBER
TERMINATING PATCH PANEL.
B. VENDOR MUST PROVIDE FIBER STRANDS FROM THE DISA PROVIDED FIBER PATCH PANEL TO THE DROP SIDE
OF THEIR POP/FIBER DISTRIBUTION PANEL WITHOUT SPLICING AND OR USE OF CONNECTORS TO CONNECT 2 OR
MORE FIBER STRANDS MEANING THE FIBER CANNOT BE BROKEN IN THE MIDDLE AND MUST BE CONTINUOUS.
C. CIRCUIT MUST BE TAGGED WITH VENDOR'S LONG HUAL CIRCUIT ID AND LOCAL EXCHANGE CARRIER CIRCUIT
NO. AS APPLICABLE AT DROP SIDE OF THEIR POINT OF PRESENCE (FIBER DISTRIBUTION PANEL) BLDG 214, FRAME
ROOM. ADDITIONALLY, VENDOR MUST SHOW SITE PERSONNEL LISTED ON THIS ORDER THE EXACT TERMINATION
POINT WHEN CIRCUIT INSTALLATION IS COMPLETE.
D. VENDOR MUST SCHEDULE/COORDINATE WITH POC'S LISTED ON THIS ORDER 72 HOURS IN ADVANCE PRIOR TO
SITE SURVEYS OR INSTALLATIONS.
(1) COMMERCIAL FIBER POINT OF PRESENCE
(2) FIBER CABLE X-CONNECT, IN-HOUSE, INSIDE WIRE, SINGLE-MODE, 1310NM, TELCO
(3) FIBER TERMINATING PATCH PANEL (SITE PROVIDED)
(4) FIBER CABLE, ON-BASE, SINGLE-MODE, 1310NM, ROBINS AFB PERSONNEL
AMPLIFYING INFO:
A. VENDOR IS RESPONSIBLE FOR INSTALLATION AND MAINTENANCE OF SINGLE MODE FIBER FROM COMMERCIAL
FIBER POINT OF PRESENCE FIBER DISTRIBUTION PANEL BLDG 228, ROOM 128 TO DROP SIDE OF SITE PROVIDED
FIBER TERMINATING PANEL BLDG 228, ROOM 128. COORDINATE TYPE CONNECTORS FOR TERMINATION TO SITE
PROVIDED FIBER PATCH PANEL.
B. VENDOR MUST COORDINATE WITH GOVERNMENT SITE PERSONNEL TO CONDUCT WALK THROUGH SITE
SURVEY FOR THE EXACT CABLE FT. FROM COMMERCIAL POP (FDP) INSTALLED IN THEIR EQUIPMENT SUITE TO
SITE PROVIDED FIBER PATCH ALL IN BLDG 228, ROOM 128.
C. VENDOR MUST PROVIDE FIBER STRANDS FROM DROP SIDE OF COMMERCIAL POINT OF PRESENCE (FIBER
DISTRIBUTION PANEL) TO GOVERNMENT SITE PATCH PANEL ALL IN BLDG 228, ROOM 128 WITHOUT SPLICING AND
OR USE OF CONNECTORS TO CONNECT 2 OR MORE FIBER STRANDS MEANING THE FIBER CANNOT BE BROKEN IN
THE MIDDLE AND MUST BE CONTINUOUS.
D. CIRCUIT MUST BE TAGGED WITH LOCAL CIRCUIT ID AND LONG HAUL CIRCUIT NO. AT DROP SIDE OF
COMMERCIAL DEMARC AND SITE PROVIDED FIBER PATCH PANEL BLDG 228, ROOM 128. ADDITIONALLY, VENDOR
MUST SHOW SITE PERSONNEL LISTED ON THIS ORDER THE EXACT TERMINATION POINT WHEN INSTALLATION IS
COMPLETE.
E. VENDOR MUST SCHEDULE/COORDINATE WITH POC'S LISTED ON THIS ORDER 72 HOURS IN ADVANCE PRIOR TO
SITE SURVEYS OR INSTALLATIONS.
F. ROBINS AFB PERSONNEL ARE RESPONSIBLE FOR INSTALLATION AND MAINTENANCE OF SINGLE MODE FIBER
FROM LINE SIDE OF SITE PROVIDED FIBER TERMINATING PATCH PANEL BLDG 228, ROOM 128 TO LINE SIDE OF SITE
PROVIDED FIBER TERMINATING PATCH PANEL BLDG 214, ROOM FRAME.
File details come from the government source that posted it. Updated .