HC101320QA981-0001.v0.pdf
PDF 12 KB Posted
- Solicitation number
- HC101320QA981
- Issued by
-
Defense Information Systems Agency
View the file
Other files
| File | Type | Posted |
|---|---|---|
| HC101320QA981-0002.v0.pdf | ||
| HC101320QA981.v0.pdf | ||
| SOLICITATION-HC101320QA981.xlsx | XLSX spreadsheet |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
IQO INQUIRY
FM: PL8211
TO: Contractors
DATE (MM/DD/YYYY): 7/21/2020
SUBJECT: HC101320QA981-0001 Amend: 0001
A. TYPE ACTION: AMEND
1. PURPOSE: AMEND 0001 TO ADD DIVERSITY AND ADJUST SERVICE DATE AND
PROPOSAL DUE DATE. ALL ELSE REMAINS THE SAME
1. SUBMIT A QUOTE TO PROVIDE, INSTALL, AND MAINTAIN A NEW 1GB ETHERNET LEASE
BETWEEN (BLDG) 241; (RM) SERVER; (FL) 8; 241 18TH ST. SUITE 800;
CRYSTAL CITY, VA, 22202/CCI, AND (BLDG) CRYSTAL GATEWAY 4; G2 GARAGE LEVEL,
MAIN TELEPHONE ROOM, 200 12TH STREET SOUTH, CRYSTAL CITY,
ARLINGTON, VA 22202-5000
THIS REQUIREMENTS HAS THE BELOW MANDATORY TECHNICAL REQUIREMENTS:
-PLEASE SEE UNIQUE INSTALLATION FACTORS & TESTING REQUIREMENTS
- INSTALL CIRCUIT SOONER IF POSSIBLE (SIP)
2. CONTRACTORS ARE RESPONSIBLE FOR READING AND ADDRESSING ALL TECHNICAL
REQUIREMENTS OF THIS SOLICITATION, READING AND AGREEING WITH THE STANDARD
PROVISIONS, PROVIDE PRICE QUOTATION IN ACCORDANCE WITH STANDARD PROVISION 4,
AND MEET THE REQUESTED SERVICE DATE.
3. THE SERVICE DATE TO BE MET IS: 18 DEC 2020 (SIP) TO COMPLY WITH PROCUREMENT
ACQUISITION LEAD TIME (PALT) FOR THIS TYPE OF SERVICE. SEE STANDARD PROVISION
04 FOR INSTRUCTION IF SERVICE DATE CANNOT BE MET.
4. CONTRACTORS MUST ENSURE THAT QUOTES SHALL INCLUDE SUFFICIENT DETAIL
FOR EFFECTIVE EVALUATION AND SHOULD NOT SIMPLY REPHRASE OR RESTATE THE
GOVERNMENT REQUIREMENTS. RATHER, CONTRACTORS MUST PROVIDE CONVINCING
RATIONALE TO ADDRESS HOW THEY INTEND TO MEET THE REQUIREMENT.
5. PREFERRED METHOD OF QUOTE SUBMISSION IS TO UPLOAD QUOTES VIA IDEAS.
- CONTRACTORS SHALL MEET RTD OF LESS THAN OR EQUAL TO 10 MILLISECONDS PER
350 MILES MEASURED AS THE GREAT CIRCLE DISTANCE BETWEEN THE "A" AND "Z"
LOCATIONS TO SUPPORT THE GOVERNMENT MISSION. IF THE RTD CHANGES IT WOULD BE
NOTIFIED VIA AMENDMENT TO SOLICITATION.
6. THIS REQUIREMENT MUST BE WORKED IN CONJUNCTION WITH SOLICITATION
HC101320QA924 / DM01MAY206736 AND MUST BE ENGINEERED AND PROVISIONED
HC101320QA981-0001
TOTALLY DIVERSE END TO END FROM THE GOVERNMENT SERVICE DELIVERY POINTS
(SDP) FROM SOLICITATIONHC101320QA924 / DM01MAY206736 ; MEANING THE PHYSICAL
PATHS ARE TOTALLY SEPARATE INCLUDING MAN HOLES, CONDUIT, CENTRAL OFFICE
LOCATIONS, AND FIBER BUILDS. ADDITIONALLY AS A MINIMUM MUST HAVE 50 METERS /
164 FEET PHYSICAL SEPARATION FROM SOLICITATION HC101320QA924 / DM01MAY206736 .
*****BOTH CIRCUITS SHOULD BE IDENTICAL BUT PROVIDE DIVERSE PATHS TO PROVIDE
REQUIRED DIVERSITY TO PREVENT TOTAL "COMM OUT" SITUATION*****
7. TO DETERMINE THE AWARDEE(S) OF DIVERSE REQUIREMENTS, THE GOVERNMENT WILL
FIRST EVALUATE THE LOWEST PRICED SOLUTION FOR EACH SOLICITATION. IF THOSE
TWO SOLUTIONS ARE DIVERSE FROM EACH OTHER AND MEET ALL REQUIREMENTS,
AWARD WILL BE MADE TO THE CONTRACTOR OR CONTRACTORS THAT PROPOSED
THE TWO SOLUTIONS. IF THE TWO LOWEST PRICED SOLUTIONS ARE NOT AWARDABLE
BECAUSE THEY ARE NOT DIVERSE FROM EACH OTHER OR DO NOT MEET REQUIREMENTS,
THE GOVERNMENT WILL EVALUATE THE NEXT LOWEST PRICED COMBINATION FOR
BOTH SOLICITATIONS UNTIL IT DETERMINES THE LOWEST PRICED COMBINATION THAT
MEETS ALL REQUIREMENTS. AWARDS WILL BE MADE AS A PAIR TO ONE CONTRACTOR
ONLY OR SPLIT THE AWARD BETWEEN TWO CONTRACTORS THAT MEET ALL TECHNICAL
REQUIREMENTS, REQUESTED SERVICE DATE AND PROPOSE THE LOWEST PRICE.
8. CONTRACTOR SHALL PROVIDE COLOR POWERPOINT DRAWINGS SHOWING THE ROUTES
FROM THE COMMERCIAL DEMARKS TO THE SUPPORTING CENTRAL OFFICES AND/OR
WIRING CENTERS, ENSURING THE PHYSICAL END TO END DIVERSITY REQUIREMENTS ARE
BEING MET. DRAWINGS MUST INCLUDE SEPARATION DISTANCES, TOTAL FIBER MILES
AND ROUND TRIP DELAY BASED ON ACTUAL DISTANCE IN MILES. REFER TO STANDARD
PROVISION 39 FOR SPECIFIC DOCUMENTATION REQUIREMENTS. SAMPLE DRAWINGS
INCLUDED WITH INQUIRY/SOLICITATION SHALL BE FOLLOWED IN ORDER TO PROVIDE THE
REQUIRED TECHNICAL INFORMATION. MAPS AND DRAWINGS WITH ERRORS, MISMATCH
INFORMATION, MISSING RTD, AND NOT ENOUGH DETAIL TO DETERMINE DIVERSITY
THROUGHOUT THE FIBER PATH WILL BE FOUND TECHNICALLY DEFICIENT AND WILL NOT
BE ACCEPTED.
9. PRE AWARD SITE SURVEYS ARE AUTHORIZED (AT CONTRACTOR EXPENSE) AND
SHOULD BE CONDUCTED IN COORDINATION WITH LOCAL POCS AT EACH GOVERNMENT
SITE. IT IS HIGHLY RECOMMENDED THAT AT A MINIMUM, CONTRACTORS CONDUCT PHONE
SURVEYS TO ADEQUATELY ASSESS THE MAGNITUDE OF THE WORK TO BE PERFORMED IN
DETERMINING THEIR PRICE STRATEGY.
10. CONTRACTORS MUST ADDRESS IN QUOTES COMPLIANCE WITH TESTING AND
ACCEPTANCE REQUIREMENTS
11. TESTING & ACCEPTANCE REQUIREMENTS MUST BE COORDINATED WITH CUSTOMER
ACCEPTANCE AUTHORITY BEFORE NOTICE OF COMPLETION IS SUBMITTED TO DITCO.
M. ADDITIONAL INFORMATION:
3. TSR NUMBER: DM05MAY206740
4. CCSD: SVI6H2F1
Z. DITCO CONTACT:
Tammy Basson
TAMMY.A.BASSON.CIV@MAIL.MIL
Robert E Spencer
DITCO Contracting Officer
Unless otherwise specified, all other terms and conditions are unchanged.
Paragraph E.SERVICE DATE change from:
Oct 19, 2020
To:
Dec 18, 2020
Paragraph M.3.TSR NUMBER change from:
DM05MAY206740A
DM05MAY206740
Paragraph V.QUOTE DUE DATE AND TIME change from:
Jul 3, 2020 4:00:00 PM CDT
Aug 20, 2020 4:00:00 PM CDT
Add the Following:
STANDARD PROVISION - 39 - CIRCUIT DOCUMENTATION - AUG 2017
Contractor/Telecommunications Provider (TP) shall provide complete circuit routing maps for the end-to-end circuit documenting physical routing and location of supporting equipment and facilities. Contractor/TP maps/diagrams provided for quotes must reflect the most accurate information and route details available at the time the quote is submitted. Information provided in the maps will be used to determine if the Contractor/TP's quote meets the technical requirements identified in the Inquiry. Lack of required information or detail may result in the vendor solution to be determined technically unacceptable.
Contractor/TP will provide updated maps/diagrams to DITCO no later than 30 days after the vendor sends the Notice of
Completion (NOC), if there have been any authorized changes made to the original fiber path/routes or any technical details
(including round-trip latency) provided in the original quote. If no changes have been made, vendor will include a statement on their NOC that the original diagrams/maps provided reflect the as-built route/path/configuration.
Such documentation shall be provided to the DITCO contracting office and contact at each service point post award and prior to acceptance by the U.S. Government acceptance activity.
Specific documentation requirements:
A. Customer premise equipment (CPE) and interface at each termination location.
B. Route maps showing the physical diversity requirements are being met.
C. Major equipment and facilities locations (i.e., multiplexers, switches, central offices, etc.) location and precise fiber distance between the commercial demark and the nearest Servicing Wire Center (SWC) or Central Office (CO) must be included for each end of the leased portion of the circuit.
D. Location and address of all gateway Central Offices (hand-off between carriers).
E. Cable head, cable landing stations, and cable stations, if applicable.
F. Location of manholes and handholes in relationship to physical landmarks such as buildings, streets, bridges, etc. (where diversity requirements necessitate that level of detail).
G. Locations of slack coils to facilitate response to maintenance requirements.
H. Earth stations and satellite, if applicable.
This documentation must be provided in electronic format. Acceptable formats are Microsoft Office (PowerPoint, Word, and
Excel), Visio, AutoCAD and Adobe PDF. DITCO Europe requires that electronic documentation be provided in .KMZ or .KML file formats.
ACCEPTABLE CONTRACTOR/TELECOMMUNICATIONS PROVIDER (TP) RESPONSE: "UNDERSTAND/WILL COMPLY."
And provide the required information and maps/drawings.
File details come from the government source that posted it. Updated .