_HC101320QA922-0001.v0 Contents.pdf
PDF 9 KB Posted
- Solicitation number
- HC101320QA922
- Issued by
-
Defense Information Systems Agency
View the file
Other files
| File | Type | Posted |
|---|---|---|
| HC101320QA922.v0.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
IQO INQUIRY
FM: PL8211
TO: Contractors
DATE (MM/DD/YYYY): 5/26/2020
SUBJECT: HC101320QA922-0001 Amend: 0001
A. TYPE ACTION: ADMIN AMEND
1. PURPOSE: AMEND 0001 IS ISSUED TO INCLUDE TESTING REQUIREMENTS.
ALL ELSE REMAINS THE SAME.
SUBMIT A QUOTE TO PROVIDE, INSTALL, AND MAINTAIN A 200MB CIRCUIT BETWEEN (BLDG)
1000; (RM) 120; (FL) 1; 1000 AIRBASE BLVD, ABSTON ANGS; MONTGOMERY, AL, 36108 /CCI
AND BLDG 859, DIAL CENTRAL OFFICE (DCO), 325 EAST MOORE DRIVE, GUNTER ANNEX, AL
36114-3001//CCI.
- THIS REQUIREMENTS HAS THE BELOW MANDATORY TECHNICAL REQUIREMENTS:
- CONTRACTORS MUST COMPLY WITH TESTING & ACCEPTANCE REQUIREMENTS.
2. CONTRACTORS ARE RESPONSIBLE FOR READING AND ADDRESSING ALL TECHNICAL
REQUIREMENTS OF THIS SOLICITATION, READING AND AGREEING WITH THE STANDARD
PROVISIONS, PROVIDE PRICE QUOTATION IN ACCORDANCE WITH STANDARD PROVISION 4,
AND MEET THE REQUESTED SERVICE DATE.
3. THE SERVICE DATE TO BE MET IS: 30 OCT 20 (SIP) TO COMPLY WITH PROCUREMENT
ACQUISITION LEAD TIME (PALT) FOR THIS TIPE OF SERVICE. THE GOVERNMENT ASSUMES
THAT CONTRACTORS HAVE CONSIDERED ALL ISSUES THAT MAY DELAY THE DELIVERY
OF SERVICE ON REQUESTED SERVICE DATE AND MAY CANCEL, TERMINATE, OR REQUEST
CONSIDERATION IAW STANDARD PROVISION 42 FOR FAILURE TO MEET CONTRACTUAL
SERVICE DATE OR COMPLY WITH ANY CONTRACT TERMS OR CONDITIONS.
4. CONTRACTORS MUST ENSURE THAT QUOTES SHALL INCLUDE SUFFICIENT DETAIL
FOR EFFECTIVE EVALUATION AND SHOULD NOT SIMPLY REPHRASE OR RESTATE THE
GOVERNMENT REQUIREMENTS. RATHER, CONTRACTORS MUST PROVIDE CONVINCING
RATIONALE TO ADDRESS HOW THEY INTEND TO MEET THE REQUIREMENT.
5. QUOTES MUST BE UPLOADED TO IDEAS. GOVERNMENT IS NOT RESPONSIBLE FOR
MISSING OR OVERLOOKED QUOTES.
M. ADDITIONAL INFORMATION:
3. TSR NUMBER: AQ03APR205283
HC101320QA922-0001
4. CCSD: JPN1HBC1
Z. DITCO CONTACT:
Edward Midkiff
618-418-6481
Edward.w.midkiff.civ@mail.mil
Angelina Hutson
DITCO Contracting Officer
Unless otherwise specified, all other terms and conditions are unchanged.
Paragraph M.10.TESTING REQUIREMENTS change from:
To:
ACCEPTANCE TESTING SHALL BE PERFORMED BY VENDOR IN ACCORDANCE WITH ITU-T Y.1564. TEST PERIOD 24
HOURS. TESTS COVERED IN SECTIONS 9.1, 10, 11.1, 14, 20, 21, 26.1, 26.2, AND 26.3 OF RFC 6815 MUST BE
PERFORMED AND RESULTS REPORTED IN THE FORMAT SPECIFIED BY THE RFC OR ITU-T Y.
SPECIFICALLY FRAMES SIZE OF 1500 BYTES MUST BE USED. THE TEST MUST VERIFY LENGTH OF RECEIVED
FRAMES, INDICATE NUMBER OF FRAMES DROPPED, NUMBER OF FRAMES RECEIVED OUT OF ORDER, AND
DUPLICATE FRAMES. TESTS MUST BE BI-DIRECTIONAL USING THE SAME DATA RATE IN EACH DIRECTION. BURST
TESTS MUST BE RUN TO DETERMINE MINIMUM INTERVAL BETWEEN FRAMES THAT CAN BE PROCESSED WITHOUT
FRAME LOSS.
A THROUGHPUT TEST IS REQUIRED INDICATING THE FASTEST RATE AT WHICH TEST FRAMES CAN BE
TRANSMITTED WITHOUT FRAME LOSS. A SEPARATE THROUGHPUT TEST MUST BE RUN WITH FRAMES ADDRESSED
TO THE HARDWARE BROADCAST ADDRESS CONSTITUTING AT LEAST 1% OF THE TEST STREAM AND BE EVENLY
DISTRIBUTED THROUGHOUT THE TEST. LATENCY TEST MUST BE RUN FOR A PERIOD OF NO LESS THAN 120
SECONDS, AND REPEATED NO LESS THAT 20 TIMES. THE TEST STREAM FOR THE LATENCY TEST SHOULD BE RUN
AT THE THROUGHPUT RATE FOR CORRESPONDING FRAME SIZES FROM THE THROUGHPUT TEST. END TO END
LATENCY WILL BE CALCULATED AS THE AVERAGE OVER THE 20 TEST RUNS. FRAME LOSS RATE TESTS SHOULD
BE RUN AT THE FRAME RATE CORRESPONDING TO THE MAXIMUM FRAME RATE, AND REDUCED BY 10%
INTERVALS UNTIL THERE ARE AT LEAST TWO CONSECUTIVE RUNS IN WHICH NO FRAMES ARE LOST.
THROUGHPUT TEST RESULTS: PASSING RATE 100% FOR ALL FRAME BYTE SIZES EXERCISED. FRAME LOSS RATE
(%) RESULTS: FRAME LOSS RATE LESS THAN 0.01% FOR ALL FRAME BYTE SIZES EXERCISED. LATENCY WILL BE
MEASURED WILL BE ACCORDING TO THE FOLLOWING ANY APS SWITCHOVER SHALL TAKE LESS THAN 50
MILLISECONDS MONTHLY AVAILABILITY SHALL BE NO LESS THAN 99.5%.
File details come from the government source that posted it. Updated .