ATTACHMENT 1 FOR SOLICITATION HC101320QA221.pdf
PDF 385 KB Posted
- Solicitation number
- HC101320QA221
- Issued by
-
Defense Information Systems Agency
About this file
This solicitation requests quotes to provide a 1 Gigabit Ethernet circuit between two specified buildings in Florida. Quotes are due by January 27, 2020 and should include monthly recurring charges and non-recurring charges broken out by CLIN/SLIN. The selected vendor must comply with commercial item terms and conditions and submit representations and certifications if no basic agreement exists. The circuit must meet the technical specifications in Attachment 1, including acceptance testing according to RFC-6815 or ITU-T Y.1564 for throughput, frame loss rate, latency, and availability. The Defense Information Systems Agency is the issuing agency, with Andrew Fernandez as the point of contact.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| HC101320QA221- Amendment 0002.pdf | ||
| HC101320QA221-0001.pdf | ||
| Solicitation HC101320QA221.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
ATTACHMENT 1 FOR SOLICITATION HC101320QA221
CIRCUIT SPECIFICATIONS:
CONUS NO JUMBO FRAME ETHERNET
VENDOR WILL PERFORM ACCEPTANCE TESTING IN ACCORDANCE WITH EITHER
RFC-6815 OR ITU-T Y.1564. VENDOR MUST TEST THE CIRCUIT FOR 24
HOURS IAW ITU-T.Y.1564 SPECIFICALLY, FRAME SIZES OF
64,128,256,512,1024,1280 AND 1518 BYTES MUST BE USED. THE TEST
MUST VERIFY LENGTH OF RECEIVED FRAMES, INDICATE NUMBER OF FRAMES
DROPPED, NUMBER OF FRAMES RECEIVED OUT OF ORDER, AND DUPLICATE
FRAMES. TESTS MUST BE BI-DIRECTIONAL USING THE SAME DATA RATE IN
EACH DIRECTION. BURST TESTS MUST BE RUN TO DETERMINE MINIMUM
INTERVAL BETWEEN FRAMES THAT CAN BE PROCESSED WITHOUT FRAME LOSS.
A THROUGHPUT TEST IS REQUIRED INDICATING THE FASTEST RATE AT
WHICH TEST FRAMES CAN BE TRANSMITTED WITHOUT FRAME LOSS. A
SEPARATE THROUGHPUT TEST MUST BE RUN WITH FRAMES ADDRESSED TO THE
HARDWARE BROADCAST ADDRESS CONSTITUTING AT LEAST 1% OF THE TEST
STREAM AND BE EVENLY DISTRIBUTED THROUGHOUT THE TEST.
A LATENCY TEST MUST BE RUN FOR A PERIOD OF NO LESS THAN 120
SECONDS, AND REPEATED NO LESS THAT 20 TIMES. THE TEST STREAM FOR
THE LATENCY TEST SHOULD BE RUN AT THE THROUGHPUT RATE FOR
CORRESPONDING FRAME SIZES FROM THE THROUGHPUT TEST. END TO END
LATENCY WILL BE CALCULATED AS THE AVERAGE OVER THE 20 TEST RUNS.
FRAME LOSS RATE TESTS SHOULD BE RUN AT THE FRAME RATE
CORRESPONDING TO THE MAXIMUM FRAME RATE, AND REDUCED BY 10%
INTERVALS UNTIL THERE ARE AT LEAST TWO CONSECUTIVE RUNS IN WHICH
NO FRAMES ARE LOST.THROUGHPUT TEST RESULTS: PASSING RATE 100% FOR
ALL FRAME BYTE SIZES EXERCISED.
FRAME LOSS RATE (%) RESULTS:
FRAME LOSS RATE LESS THAN 0.01% FOR ALL FRAME BYTE SIZES
EXERCISED. LATENCY WILL BE MEASURED WILL BE ACCORDING TO THE
FOLLOWING MAXIMUM TRANSMISSION DELAY FOR ANY CIRCUIT UP TO 500
MILES AIR-MILES IN LENGTH SHALL BE NO GREATER THAN 13MS ONE-WAY
AND ANY POINT-TO-POINT CIRCUIT LONGER THAN 500 AIR-MILES SHALL BE
NO GREATER THAN 50MS ONE WAY WITHIN THE 48 CONTINENTAL STATES.
ANY APS SWITCHOVER SHALL TAKE LESS THAN 50 MILLISECONDS MONTHLY
AVAILABILITY SHALL BE NO LESS THAN 99.5%.
File details come from the government source that posted it. Updated .