- Solicitation number
- HC101320QA202
- Issued by
-
Defense Information Systems Agency
View the file
Other files
| File | Type | Posted |
|---|---|---|
| HC101320QA202-0002.v0.pdf | ||
| Vendor Block Sample_Version3.pptx | PPTX presentation | |
| HC101320QA202.v2.pdf | ||
| Vendor Sample Maps Version2.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
IQO INQUIRY
FM: PL8211
TO: Contractors
DATE (MM/DD/YYYY): 5/11/2020
SUBJECT: HC101320QA202-0003 Amend: 0003
A. TYPE ACTION: ADMIN AMEND
1. PURPOSE: AMENDMENT 0003 IS ISSUED TO EXTEND QUOTES DUE DATE 20 MAY 20.
THIS IS AN EXPEDITE ACTION WITH AN EXPEDITE LEAD TIME REQUEST.
DUE TO CRITICALITY OF REQUIREMENTS NO FURTHER EXTENSIONS WILL BE GRANTED.
1. SUBMIT A QUOTE TO PROVIDE, INSTALL, AND MAINTAIN A 1GB NIPRNET CIRCUIT FROM
(BLDG) 400; (RM) 1184; (FL) 1; 400 GIGLING ROAD; SEASIDE, CA, 93955 TO BLDG 2145, ROOM
105, FL 1; 5801 C STREET, BEALE AFB, CA 95903
AT SEASIDE, VENDOR WILL PROVIDE EXTENSION FROM DEMARK TO SERVICE DELIVERY
POINT.
CONTRACTORS SHALL MEET RTD OF 13 MILLISECONDS ONE- WAY TO SUPPORT THE
GOVERNMENT MISSION. IF THE RTD CHANGES IT WOULD BE NOTIFIED VIA AMENDMENT TO
SOLICITATION.
2. CONTRACTORS ARE RESPONSIBLE FOR READING AND ADDRESSING ALL TECHNICAL
REQUIREMENTS OF THIS INQUIRY/SOLICITATION, READING AND AGREEING WITH THE
STANDARD PROVISIONS, PROVIDE PRICE QUOTATION IN ACCORDANCE WITH STANDARD
PROVISION 4, AND MEET THE REQUESTED SERVICE DATE.
3. THE EXPEDITE SERVICE DATE TO BE MET IS: 30 JUL 20 (SIP). CONTRACTORS MUST
ADDRESS HOW THIS EXPEDITE INSTALL WILL BE ACCOMPLISHED. STANDARD LEAD
TIMES ARE NOT ACCEPTABLE. THE GOVERNMENT ASSUMES THAT CONTRACTORS
HAVE CONSIDERED ALL ISSUES THAT MAY DELAY THE DELIVERY OF CIRCUIT ON
REQUESTED SERVICE DATE. THE GOVERNMENT MAY CANCEL, TERMINATE, OR REQUEST
CONSIDERATION IAW STANDARD PROVISION 42 FOR FAILURE TO MEET CONTRACTUAL
SERVICE.
4. CONTRACTORS MUST ENSURE THAT QUOTES SHALL INCLUDE SUFFICIENT DETAIL
FOR EFFECTIVE EVALUATION AND SHOULD NOT SIMPLY REPHRASE OR RESTATE THE
GOVERNMENT REQUIREMENTS. RATHER, CONTRACTORS MUST PROVIDE CONVINCING
RATIONALE TO ADDRESS HOW THEY INTEND TO MEET THE REQUIREMENT. IN RESPONSE
TO THIS SOLICITATION, NO TERMS OR CONDITIONS PLACED UPON THE GOVERNMENT,
NOR ASSUMPTIONS WILL BE ACCEPTED. CONTRACTORS ARE INSTRUCTED TO SUBMIT
QUESTIONS AND REQUEST CLARIFICATIONS OF THE REQUIREMENT (S) BEFORE
SUBMITTING QUOTES. QUOTES MUST BE UPLOADED TO IDEAS.
HC101320QA202-0003
5. THIS REQUIREMENT MUST BE WORKED IN CONJUNCTION WITH SOLICITATION
HC101320QA829/TSR DM30OCT196635. FULL DIVERSITY IS PREFERRED BUT PARTIAL OR
COLLAPSE DIVERSITY IS ACCEPTABLE IN AREAS OF THE PATH WHERE FULL DIVERSITY IS
NOT POSSIBLE. NOTE THAT DUE TO EXISTING LIMITATIONS AT THE SITE, 100% DIVERSITY
IS NOT POSSIBLE. THAT IS, THE CIRCUITS WILL SHARE A COMMON ROUTE WITHIN THE
BUILDING, TO THE DEMARCATION POINT, OUT TO THE STREET, AND FOR A CERTAIN
DISTANCE ALONG GIGLING ROAD. HOWEVER, ONCE DIVERSITY IS POSSIBLE, PATHS
SHOULD
MAINTAIN AT LEAST FIFTEEN (15) METERS OF SEPARATION UNTIL THEY DIVERGE FULLY TO
THEIR RESPECTIVE DISN NODES. IF QUESTIONS ARISE, FOLLOW DISA AND/OR INDUSTRY
"BEST PRACTICES" FOR DIVERSITY REQUIREMENTS.
7. CONTRACTOR SHALL PROVIDE COLOR POWERPOINT DRAWINGS SHOWING THE ROUTES
FROM THE COMMERCIAL DEMARKS TO THE SUPPORTING CENTRAL OFFICES AND/OR
WIRING CENTERS.
8. PRE AWARD SITE SURVEYS ARE AUTHORIZED (AT CONTRACTOR EXPENSE) AND
SHOULD BE CONDUCTED IN COORDINATION WITH LOCAL POCS AT EACH GOVERNMENT
SITE. IT IS HIGHLY RECOMMENDED THAT AT A MINIMUM, CONTRACTORS CONDUCT PHONE
SURVEYS TO ADEQUATELY ASSESS THE MAGNITUDE OF THE WORK TO BE PERFORMED IN
DETERMINING THEIR PRICE STRATEGY.
9. CONTRACTORS MUST ADDRESS IN QUOTES COMPLIANCE WITH TESTING AND
ACCEPTANCE REQUIREMENTS AS UNDERSTAND AND WILL COMPLY.
10. TESTING & ACCEPTANCE REQUIREMENTS MUST BE COORDINATED WITH CUSTOMER
ACCEPTANCE AUTHORITY BEFORE NOTICE OF COMPLETION IS SUBMITTED TO DITCO.
11. EXPEDITE/OVERTIME CHARGES ARE AUTHORIZED IF REQUIRED TO MEET THE
REQUESTED SERVICE DATE. CONTRACTOR MUST CLEARLY STATE EXPEDITE/OVERTIME
CHARGES IN QUOTE.
****VENDORS MUST ADDRESS THEIR COMPLIANCE WITH CIRCUIT TESTING AND
ACCEPTANCE REQUIREMENTS INCLUDED IN SOLICITATION****
FAILURE TO READ AND ADDRESS ANY OF THE TECHNICAL REQUIREMENTS AND SERVICE
DATE REQUESTED IN THIS INQUIRY SHALL RENDER THE QUOTE NON-COMPLIANT AND
RESULT IN IT BEING EXCLUDED FROM EVALUATION AND AWARD.
M. ADDITIONAL INFORMATION:
3. TSR NUMBER: DM30OCT196634
4. CCSD: SPN17A5M
Z. DITCO CONTACT:
Jennifer Voss
618-418-6641 jennifer.n.voss.civ@mail.mil
Angelina Hutson
DITCO Contracting Officer
Unless otherwise specified, all other terms and conditions are unchanged.
Paragraph V.QUOTE DUE DATE AND TIME change from:
May 11, 2020 12:30:00 PM CDT
To:
May 20, 2020 12:30:00 PM CDT