This document is a request for quote for telecommunications services. It seeks quotes to provide, install, and maintain a 10 gigabit Ethernet circuit over optical transport network between two government buildings in Utah and Colorado. Quotes are due by January 31, 2020 and the selected vendor must install the circuit by June 30, 2020. The circuit must meet technical requirements for committed information rate, frame size, interface type, and testing criteria. Vendors must also address installation factors and coordination requirements. The associated North American Industry Classification System code is 517311 and the solicitation is issued under the Defense Information Systems Agency.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| HC101320QA041-0001.v1.pdf | ||
| Vendor Sample Maps Version2.pdf | ||
| Vendor Block Sample_Version3.pptx | PPTX presentation | |
| HC101320QA041.v1.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
IQO INQUIRY
FM: PL8211
TO: Contractors
DATE (MM/DD/YYYY): 1/14/2020
SUBJECT: HC101320QA041-0002 Amend: 0002
A. TYPE ACTION: ADMIN AMEND
1. PURPOSE: AMEND 0002 ISSUED TO UPDATE THE PROPOSAL DUE DATE TO 31 JAN 20.
THE SERVICE DATE CHANGES TO 30 JUN 20.
1. SUBMIT A QUOTE TO PROVIDE, INSTALL, AND MAINTAIN A 10GBE (GIGABIT ETHERNET)
OVER OTN (OTU-2) COMMERCIAL LEASE BETWEEN BLDG 12953, RM 0720, DRAPER ARMY
NATIONAL GUARD, 12953 MINUTE MAN DR., DRAPER, UT AND BLDG 730 RM 132, 84 NORTH
ASPEN STREET, BUCKLEY AFB, CO.
THE COMMITTED INFORMATION RATE (CIR) (10GBE) WILL REQUIRE VENDOR TO DELIVER
10GB ETHERNET LAN PHY INTERFACE AT THE DROP SIDE OF THE COMMERCIAL DEMARC'S
AT THE "A" AND "Z" LOCATIONS.
CONTRACTORS SHALL MEET RTD OF 10 MILLISECONDS TO SUPPORT THE GOVERNMENT
MISSION. IF THE RTD CHANGES IT WOULD BE NOTIFIED VIA AMENDMENT TO SOLICITATION.
2. CONTRACTORS ARE RESPONSIBLE FOR READING AND ADDRESSING ALL TECHNICAL
REQUIREMENTS OF THIS INQUIRY/SOLICITATION, READING AND AGREEING WITH THE
STANDARD PROVISIONS, PROVIDE PRICE QUOTATION IN ACCORDANCE WITH STANDARD
PROVISION 4, AND MEET THE REQUESTED SERVICE DATE.
3. THE SERVICE DATE TO BE MET IS: 30 JUN 20 (SIP) TO COMPLY WITH PROCUREMENT
ACQUISITION LEAD TIME (PALT) FOR THIS TYPE OF SERVICE. ANY CHANGES TO THE
ORIGINAL SERVICE DATE WILL BE NOTIFIED VIA AMENDMENT TO THE SOLICITATION AND
POSTED TO FBO. THE GOVERNMENT ASSUMES THAT CONTRACTORS HAVE CONSIDERED
ALL ISSUES THAT MAY DELAY THE DELIVERY OF CIRCUIT ON REQUESTED SERVICE
DATE. THE GOVERNMENT MAY CANCEL, TERMINATE, OR REQUEST CONSIDERATION IAW
STANDARD PROVISION 42 FOR FAILURE TO MEET CONTRACTUAL SERVICE.
4. CONTRACTORS MUST ENSURE THAT QUOTES SHALL INCLUDE SUFFICIENT DETAIL
FOR EFFECTIVE EVALUATION AND SHOULD NOT SIMPLY REPHRASE OR RESTATE THE
GOVERNMENT REQUIREMENTS. RATHER, CONTRACTORS MUST PROVIDE CONVINCING
RATIONALE TO ADDRESS HOW THEY INTEND TO MEET THE REQUIREMENT. IN RESPONSE
TO THIS SOLICITATION, NO TERMS OR CONDITIONS PLACED UPON THE GOVERNMENT,
NOR ASSUMPTIONS WILL BE ACCEPTED. CONTRACTORS ARE INSTRUCTED TO SUBMIT
QUESTIONS AND REQUEST CLARIFICATIONS OF THE REQUIREMENT (S) BEFORE
SUBMITTING QUOTES. QUOTES MUST BE UPLOADED TO IDEAS.
HC101320QA041-0002
5. THIS REQUIREMENT MUST BE WORKED IN CONJUNCTION WITH SOLICITATION
HC101320QA040/TSR RU05SEP196374 AND MUST BE ENGINEERED AND PROVISIONED
TOTALLY DIVERSE END TO END FROM THE GOVERNMENT SERVICE DELIVERY POINTS
(SDP) FROM TSR RU05SEP196374; MEANING THE PHYSICAL PATHS ARE TOTALLY
SEPARATE INCLUDING MAN HOLES, CONDUIT, CENTRAL OFFICE LOCATIONS, AND FIBER
BUILDS. ADDITIONALLY AS A MINIMUM MUST HAVE 50 METERS PHYSICAL SEPARATION
FROM TSR RU05SEP196374.
6. TO DETERMINE THE AWARDEE(S) OF DIVERSE REQUIREMENTS, THE GOVERNMENT WILL
FIRST EVALUATE THE LOWEST PRICED SOLUTION FOR EACH SOLICITATION. IF THOSE
TWO SOLUTIONS ARE DIVERSE FROM EACH OTHER AND MEET ALL REQUIREMENTS,
AWARD WILL BE MADE TO THE CONTRACTOR OR CONTRACTORS THAT PROPOSED
THE TWO SOLUTIONS. IF THE TWO LOWEST PRICED SOLUTIONS ARE NOT AWARDABLE
BECAUSE THEY ARE NOT DIVERSE FROM EACH OTHER OR DO NOT MEET REQUIREMENTS,
THE GOVERNMENT WILL EVALUATE THE NEXT LOWEST PRICED COMBINATION FOR
BOTH SOLICITATIONS UNTIL IT DETERMINES THE LOWEST PRICED COMBINATION THAT
MEETS ALL REQUIREMENTS. AWARDS WILL BE MAKE AS A PAIR TO ONE CONTRACTOR
ONLY OR SPLIT THE AWARD BETWEEN TWO CONTRACTORS THAT MEET ALL TECHNICAL
REQUIREMENTS, REQUESTED SERVICE DATE AND PROPOSE THE LOWEST PRICE.
7. CONTRACTOR SHALL PROVIDE COLOR POWERPOINT DRAWINGS SHOWING THE ROUTES
FROM THE COMMERCIAL DEMARKS TO THE SUPPORTING CENTRAL OFFICES AND/OR
WIRING CENTERS, ENSURING THE PHYSICAL END TO END DIVERSITY REQUIREMENTS ARE
BEING MET. DRAWINGS MUST INCLUDE SEPARATION DISTANCES, TOTAL FIBER MILES
AND ROUND TRIP DELAY BASED ON ACTUAL DISTANCE IN MILES. REFER TO STANDARD
PROVISION 39 FOR SPECIFIC DOCUMENTATION REQUIREMENTS. SAMPLE DRAWINGS
INCLUDED WITH INQUIRY/SOLICITATION SHALL BE FOLLOWED IN ORDER TO PROVIDE THE
REQUIRED TECHNICAL INFORMATION. MAPS AND DRAWINGS WITH ERRORS, MISMATCH
INFORMATION, MISSING RTD, AND NOT ENOUGH DETAIL TO DETERMINE DIVERSITY
THROUHGOUT THE FIBER PATH WILL BE FOUND TECHNICALLY DEFFICIENT AND WILL NOT
BE ACCEPTED.
8. PRE AWARD SITE SURVEYS ARE AUTHORIZED (AT CONTRACTOR EXPENSE) AND
SHOULD BE CONDUCTED IN COORDINATION WITH LOCAL POCS AT EACH GOVERNMENT
SITE. IT IS HIGHLY RECOMMENDED THAT AT A MINIMUM, CONTRACTORS CONDUCT PHONE
SURVEYS TO ADEQUATELY ASSESS THE MAGNITUDE OF THE WORK TO BE PERFORMED IN
DETERMINING THEIR PRICE STRATEGY.
9. CONTRACTORS MUST ADDRESS IN QUOTES COMPLIANCE WITH TESTING AND
ACCEPTANCE REQUIREMENTS.
10. TESTING & ACCEPTANCE REQUIREMENTS MUST BE COORDINATED WITH CUSTOMER
ACCEPTANCE AUTHORITY BEFORE NOTICE OF COMPLETION IS SUBMITTED TO DITCO.
FOR DISA REQUIREMENTS THE TESTING AND ACCEPTING AUTHORITY IS:
THE DISA ACTIVATIONS TEAM.
11. ESTABLISH TSP: TSP0JYQV7-01
VENDOR MUST PROVIDE LIGHT LEVEL READINGS (SIGNAL STRENGTH IN DBM) ON
EXTENSION FROM COMMERCIAL POP TO GOVERNMENT SERVICE DELIVERY POINT (SDP)
AT THE "A" AND "Z" LOCATION PRIOR TO CIRCUIT TURN OVER TO THE GOVERNMENT
ENSURING LEVELS ARE WITHIN SPECS.
LIGHT LEVELS MUST BE ADJUSTED TO -3 TO -9 DBM.
VENDOR MUST CONDUCT WALK-THROUGH SITE SURVEY PRIOR TO INSTALLATION AT THE
"A" AND "Z" LOCATIONS.
VENDOR MUST CONTACT DISA GOC IP BACKBONE ENGINEERING AND IMPLEMENTATION
GROUP UPON RECEIPT OF A VALID TSO TO ESTABLISH THE COORDINATION AND
ACTIVATION PROCESS. (C) 618-418-8627 (D) 418-8627
PROVIDER MUST CONDUCT A SATISFACTORY 24-HOUR TEST FROM THE DROP SIDE OF
THEIR OR LOCAL EXCHANGE CARRIERS FDP INSTALLED IN THEIR EQUIPMENT SUITE AT
THE "A" LOCATION TO THEIR OR LOCAL EXCHANGE CARRIERS FDP INSTALLED IN THEIR
EQUIPMENT SUITE AT THE "Z" LOCATION AND MUST INCLUDE THE EXTENSION BETWEEN
THE COMMERCIAL DEMARC AND THE GOVERNMENT'S SDP. VENDOR MUST ENSURE TEST
SETS ARE PLACED AT THE DROP SIDE AT THE "A" LOCATION AND AT THE "Z" LOCATION.
TESTING MUST BE SATISFACTORY PRIOR TO TURN OVER TO THE GOVERNMENT FOR
ACCEPTANCE TESTING.
1. CIRCUIT REQUIRES THE FOLLOWING PARAMETERS:
VENDOR PROVIDED 10G ETHERNET SIGNAL TO THE DISA ROUTERS.
10GIGABIT ETHERNET OVER OTN (OTU2), OTU2 CIRCUIT WILL CARRY 10GBE LAN PHY
PAYLOAD, THE VENDOR WILL DEMONSTRATE THAT THE PAYLOAD STRUCTURE IDENTIFIER
(PSI) BYTE IN COLUMN 15, ROW 4 OF THE OTU2 FRAME CAN TRANSPORT VALUE 0X09
BIDIRECTIONALLY ERROR FREE.
REFERENCE: PARA 17.4.1, ITU-T G.709/Y.1331 (06/2016) MAPPING OF GFP FRAMES INTO AN
EXTENDED OPU2 PAYLOAD AREA. 10GIGABIT ETHERNET - LAN PHY INTERFACE REQUIRED
AT COMMERCIAL DEMARC AT THE "A" AND "Z "LOCATIONS.
FIBER TERMINATION: FRAME FORMAT: 10GB ETHERNET (OPTICAL HANDOFF-10GB
ETHERNET-LAN-PHY-SINGLE MODE FIBER), 1310NM. "SC" OR "LC" CONNECTORS AS
DETERMINED BY SITE SURVEY. NOTE: WHEN EXTENDED REACH OPTICS ARE USED
THAT CHANGE THE TX/RX WAVELENGTH OF THE OPTIC, THE VENDOR WILL NOTIFY THE
GOVERNMENT 30 DAYS PRIOR TO DELIVERY.
COMMITTED INFORMATION RATE (CIR): 10GB
ETHERNET FRAME SIZE WILL BE CONFIGURED TO SUPPORT MAXIMUM TRANSMISSION
UNIT (MTU) OF 9000 OCTETS (BYTES) JUMBO FRAMES.
NO NETWORK INTERFACE UNIT, DEDICATED PATH
TESTING CRITERIA: VENDOR MUST TEST THE CIRCUIT FOR 24 HOURS IAW ITU-T.Y.1564
(02/2016) ETHERNET SERVICE ACTIVATION
SIMPLE CIR VALIDATION TEST WITH EMIX PATTERN ADDFH. NOTE: ETHERNET FRAME SIZE
DESIGNATOR 'H' (PHYSICAL MTU) IS EQUAL TO 9000 BYTES.
LINE MUST REMAIN FULLY OPERATIONAL AND AVAILABLE TO USERS 24 HOURS A DAY,
SEVEN DAYS PER WEEK, MONTHLY PERFORMANCE OF 99.5% AVAILABILITY OR BETTER.
1 HOUR RESPONSE TIME TO RESPOND TO CUSTOMER UPON RECIEPT OF TROUBLE.
VENDOR REQUIRED TO HAVE CIRCUIT VISIBILITY TO ASSIST IN ANY CIRCUIT OUTAGES.
VENDOR MUST HAVE A 24X7 NETWORK OPERATIONS CENTER.
TELECOMM PROVIDER MUST MAINTAIN OPERATIONS, MAINTENANCE AND
ADMINISTRATION MONITORING OF ETHERNET CIRCUIT.
THE COMMERCIAL CIRCUIT WILL BE ACCEPTED ON BEHALF OF THE GOVERNMENT BY THE
DISA GOC IP BACKBONE ENGINEERING AND IMPLEMENTATION GROUP, SCOTT AFB, IL. (C)
618-418-8627 (D) 418-8627.
VENDOR MUST PROVIDE:
VENDOR WINNING AWARD IS RESPONSIBLE FOR INSTALLATION AND MAINTENANCE OF
THE SERVICE IAW THE UNIQUE INSTALLATION FACTORS.
INSIDE WIRING IS AUTHORIZED IAW THE UNIQUE INSTALLATION FACTORS.
VENDOR MUST COORDINATE SITE VISIT WITH POC'S 72 HOURS IN ADVANCE PRIOR TO
REQUIRING ACCESS TO FACILITIES AT BOTH USER LOCATIONS.
IMPLEMENTATION ASSISTANCE: FOR DISN CORE / DEDICATED / NIPRNET / SIPRNET /
VPN CIRCUIT ACTIVATION ASSISTANCE OR SERVICE IMPLEMENTATION INQUIRIES/
SCHEDULING, CONTACT THE DISA GLOBAL RF ACTIVATIONS TEAM VIA EMAIL,
DISA.SCOTT.GLOBAL.MBX.RF-CIRCUIT-ACTIVATIONS@MAIL.MIL, OR CALL DSN 418-8627;
COML 618-418-8627.
IMPLEMENTATION ASSISTANCE CONTINUED: FOR CIRCUIT INSTALLATION ASSISTANCE
WITH THE COMMERCIAL LEASED PATH, CONTACT DCP COMMERICIAL ACTIVATION TEAM
(CAT) AT D312-850-0820, C614-692-0820
FAILURE TO READ AND ADDRESS ANY OF THE TECHNICAL REQUIREMENTS AND SERVICE
DATE REQUESTED IN THIS INQUIRY SHALL RENDER THE QUOTE NON-COMPLIANT AND
RESULT IN IT BEING EXCLUDED FROM EVALUATION AND AWARD.
M. ADDITIONAL INFORMATION:
3. TSR NUMBER: RU04SEP196372
4. CCSD: BE76
Z. DITCO CONTACT:
Jennifer Voss
618-418-6641 jennifer.n.voss.civ@mail.mil
Angelina Hutson
DITCO Contracting Officer
Unless otherwise specified, all other terms and conditions are unchanged.
Paragraph E.SERVICE DATE change from:
Jun 5, 2020
To:
Jun 30, 2020
Paragraph V.QUOTE DUE DATE AND TIME change from:
Jan 6, 2020 12:30:00 PM CST
To:
Jan 31, 2020 12:30:00 PM CST