Text version
IQO INQUIRY
FM: PL8211
TO: Contractors
DATE (MM/DD/YYYY): 6/29/2020
SUBJECT: HC101319QB317-0002 Amend: 0002
A. TYPE ACTION: ADMIN AMEND
1. PURPOSE: MOD 0002 ISSUED TO UPDATE PROPOSAL DATE IS 15 JUL 20. SERVICE DATE
CHANGES TO 30 NOV 20. ALL ELSE REMAINS THE SAME.
SUBMIT A QUOTE TO PROVIDE, INSTALL, AND MAINTAIN A 10 GB WAVE SERVICE BETWEEN
BLDG 65, ROOM 105 (SWITCH ROOM), 6610 HEADQUARTERS DRIVE, CHEYENNE, WY AND
BLDG 730, ROOM 132, 84 NORTH ASPEN STREET, BUCKLEY AFB, CO FOR 60 MONTHS WITH
NO BASIC TERMINATION LIABILITY (BTL).
CONTRACTORS SHALL MEET RTD OF 10 MILLISECONDS TO SUPPORT THE GOVERNMENT
MISSION. IF THE RTD CHANGES IT WOULD BE NOTIFIED VIA AMENDMENT TO INQUIRY/
SOLICITATION.
10GB WAVE SERVICE MUST BE ENGINEERED/PROVISIONED IN SUCH A WAY THAT THE
GOVERNMENT CAN CHANGE/REVISE CHANNELIZATION WITHOUT TELECOM PROVIDER
INTERVENTION.
NOTE 1 (JITTER): IN A STEADY-STATE CONDITION, THE PATTERN OF SYNCHRONOUS
TRANSPORT SIGNAL (STS) POINTER ADJUSTMENTS, SDN TO
SDN (END-TO-END THROUGH THE SERVICE PROVIDED NETWORK OUTPUTS), SHALL BE
NO MORE STRESSFUL (I.E. CREATE MORE JITTER THROUGH THE SESYNCHRONIZER
AS DESCRIBED IN TABLE 6 OF ANSI T1.105.03-1994) THAN THE POINTER ADJUSTMENT
SEQUENCE IN FIGURE 5 OF ANSI T1.105.03-1994. DURING TRANSIENT EVENTS (WHICH
SHALL OCCUR NO MORE THAN 2 TIMES PER DAY), THE PATTERN OF STS POINTER
ADJUSTMENTS, SDN TO SDN (END-TO-END THROUGH THE SERVICE PROVIDED NETWORK
OUTPUTS), SHALL BE FOUR OR LESS PER HOUR. ADDITIONALLY, THE MAXIMUM TIME
INTERVAL ERROR (MTIE) OVER A PERIOD OF S SECONDS, OR WANDER, SHALL NOT
EXCEED (.01S+ 10000) NANOSECONDS FOR VALUES OF S GREATER THAN 10,000.
WAVELENGTH TRANSMISSION SERVICES: WAVELENGTH TRANSMISSION SERVICES FOR
RATES OF 10GBPS SHALL BE IN ACCORDANCE WITH ITU-T
RECOMMENDATIONS G.709(03/2003), G.707(12/03), G.957(03/06), G.692(10/98) & TELCORDIA
GR253-IE4. THE PROVIDED WAVELENGTH TRANSMISSION SERVICE SHALL NOT INHIBIT
GOVERNMENT OPERATION OF UNDERLYING PROTOCOLS AND TRANSPORT SYSTEMS
SUCH AS, BUT NOT LIMITED TO, SONET/SDH, IP, ATM, GIGABIT ETHERNET, AND
ENCRYPTION. THE WAVELENGTH TRANSMISSION SERVICE PROVIDED SHALL PASS ALL
PAYLOAD, PATH AND LINE OVERHEAD BYTES TRANSPARENTLY (UNTOUCHED/UNALTERED)
AND WITHOUT MONITORING SDP TO SDP. THERE SHALL NOT BE ANY LINE TERMINATING
EQUIPMENT (LTE) BETWEEN SDP AND SDP. 10GB WAVE SERVICE MUST BE TERMINATED
HC101319QB317-0002
TO THE LINE SIDE OF THE FIBER TERMINATING PATCH PANEL INSTALLED IN THE DISA IE1
PROVIDED MSPP SUITE AT FE WARREN AFB AND THE FIBER TERMINATING PATCH PANEL
INSTALLED IN THE DISA IE1 PROVIDED ODXC SUITE AT BUCKLEY AFB.
THE TELECOM PROVIDER MUST CONTACT DISA GOC TIER-II ENGINEERING UPON
RECEIPT OF A VALID TSO TO ESTABLISH THE COORDINATION AND ACTIVATION
PROCESS. PRI POC: DISA GLOBAL CASA INFRASTRUCTURE INTEGRATION LEASE BB
TEAM PHONE: (C) 618-418-9813, (D) 418-9813; EMAIL: DISA.SCOTT.GLOBAL.MBX.CASA-
INFRASTRUCTURE-INTEGRATION-LEAS E-BB-T@MAIL.MIL ALT POC: ORGANIZATIONAL
NUMBER (CASA RF CIRCUIT ACTIVATIONS) PHONE: (C) 618-418-8691, (D) 418-8691 EMAIL:
DISA.SCOTT.GLOBAL.MBX.RF-CIRCUIT-ACTIVATIONS@MAIL.MIL ONCE TELECOM PROVIDER
HAS COMPLETED INSIDE WIRING FROM THEIR FIBER DISTRIBUTION PANEL INSTALLED
IN THEIR DWDM EQUIPMENT SUITE TO THE GOVERNMENT SERVICE DELIVERY POINT
(SDP) AT EACH LOCATION, THEY MUST ENSURE THE LIGHT LEVEL READINGS (DB
LOSS) ARE ADJUSTED TO READ -3 TO -9 LOSS. ADDITIONALLY, THESE LEVELS MUST BE
DOCUMENTED ON THE NOTICE OF COMPLETION (NOC) SENT TO DITCO.
***THE VENDOR MUST TERMINATE SINGLE MODE FIBER AT BOTH LOCATIONS IAW
UNIQUE INSTALLATION FACTORS.***
THE SINGLE MODE FIBER MUST PASS A DOCUMENTED SATISFACTORY 72 HOUR END TO
END TEST IAW ITU STANDARD M.2101 PRIOR TO TURN UP TO THE GOVERNMENT.
2. CONTRACTORS ARE RESPONSIBLE FOR READING AND ADDRESSING ALL TECHNICAL
REQUIREMENTS OF THIS INQUIRY/SOLICITATION, READING AND AGREEING WITH THE
STANDARD PROVISIONS, PROVIDE PRICE QUOTATION IN ACCORDANCE WITH STANDARD
PROVISION 4, AND MEET THE REQUESTED SERVICE DATE.
3. THE SERVICE DATE TO BE MET IS: 30 SEP 20 (SIP) TO COMPLY WITH PROCUREMENT
ACQUISITION LEAD TIME (PALT) FOR THIS TYPE OF SERVICE. THE GOVERNMENT ASSUMES
THAT CONTRACTORS HAVE CONSIDERED ALL ISSUES THAT MAY DELAY THE DELIVERY OF
CIRCUIT ON REQUESTED SERVICE DATE. THE GOVERNMENT MAY CANCEL, TERMINATE,
OR REQUEST CONSIDERATION IAW STANDARD PROVISION 42 FOR FAILURE TO MEET
CONTRACTUAL SERVICE.
4. CONTRACTORS MUST ENSURE THAT QUOTES SHALL INCLUDE SUFFICIENT DETAIL
FOR EFFECTIVE EVALUATION AND SHOULD NOT SIMPLY REPHRASE OR RESTATE THE
GOVERNMENT REQUIREMENTS. RATHER, CONTRACTORS MUST PROVIDE CONVINCING
RATIONALE TO ADDRESS HOW THEY INTEND TO MEET THE REQUIREMENT.
5. IN RESPONSE TO THIS SOLICITATION, NO TERMS OR CONDITIONS PLACED UPON THE
GOVERNMENT, NOR ASSUMPTIONS WILL BE ACCEPTED.
6. CONTRACTORS ARE INSTRUCTED TO SUBMIT QUESTIONS AND REQUEST
CLARIFICATIONS OF THE REQUIREMENT (S) BEFORE SUBMITTING QUOTES.
7. QUOTES MUST BE UPLOADED TO IDEAS.
8. THIS REQUIREMENT MUST BE WORKED IN CONJUNCTION WITH SOLICITATION
HC101319QB285/TSR SG13AUG196262 AND MUST BE ENGINEERED AND PROVISIONED
TOTALLY DIVERSE END TO END FROM THE GOVERNMENT SERVICE DELIVERY POINTS
(SDP) FROM TSR SG13AUG196262; MEANING THE PHYSICAL PATHS ARE TOTALLY
SEPARATE INCLUDING MAN HOLES, CONDUIT, CENTRAL OFFICE LOCATIONS, AND FIBER
BUILDS. ADDITIONALLY AS A MINIMUM MUST HAVE 50 METERS PHYSICAL SEPARATION
FROM TSR SG13AUG196262.
9. TO DETERMINE THE AWARDEE(S) OF DIVERSE REQUIREMENTS, THE GOVERNMENT WILL
FIRST EVALUATE THE LOWEST PRICED SOLUTION FOR EACH SOLICITATION. IF THOSE
TWO SOLUTIONS ARE DIVERSE FROM EACH OTHER AND MEET ALL REQUIREMENTS,
AWARD WILL BE MADE TO THE CONTRACTOR OR CONTRACTORS THAT PROPOSED
THE TWO SOLUTIONS. IF THE TWO LOWEST PRICED SOLUTIONS ARE NOT AWARDABLE
BECAUSE THEY ARE NOT DIVERSE FROM EACH OTHER OR DO NOT MEET REQUIREMENTS,
THE GOVERNMENT WILL EVALUATE THE NEXT LOWEST PRICED COMBINATION FOR
BOTH SOLICITATIONS UNTIL IT DETERMINES THE LOWEST PRICED COMBINATION THAT
MEETS ALL REQUIREMENTS. AWARDS WILL BE MAKE AS A PAIR TO ONE CONTRACTOR
ONLY OR SPLIT THE AWARD BETWEEN TWO CONTRACTORS THAT MEET ALL TECHNICAL
REQUIREMENTS, REQUESTED SERVICE DATE AND PROPOSE THE LOWEST PRICE.
10. CONTRACTOR SHALL PROVIDE COLOR POWERPOINT DRAWINGS SHOWING THE
ROUTES FROM THE COMMERCIAL DEMARKS TO THE SUPPORTING CENTRAL OFFICES AND/
OR WIRING CENTERS, ENSURING THE PHYSICAL END TO END DIVERSITY REQUIREMENTS
ARE BEING MET. DRAWINGS MUST INCLUDE SEPARATION DISTANCES, TOTAL FIBER MILES
AND ROUND TRIP DELAY BASED ON ACTUAL DISTANCE IN MILES. REFER TO STANDARD
PROVISION 39 FOR SPECIFIC DOCUMENTATION REQUIREMENTS. SAMPLE DRAWINGS
INCLUDED WITH INQUIRY/SOLICITATION SHALL BE FOLLOWED IN ORDER TO PROVIDE THE
REQUIRED TECHNICAL INFORMATION. MAPS AND DRAWINGS WITH ERRORS, MISMATCH
INFORMATION, MISSING RTD, AND NOT ENOUGH DETAIL TO DETERMINE DIVERSITY
THROUGHOUT THE FIBER PATH WILL BE FOUND TECHNICALLY DEFICIENT AND WILL NOT
BE ACCEPTED.
11. PRE AWARD SITE SURVEYS ARE AUTHORIZED (AT CONTRACTOR EXPENSE) AND
SHOULD BE CONDUCTED IN COORDINATION WITH LOCAL POCS AT EACH GOVERNMENT
SITE. IT IS HIGHLY RECOMMENDED THAT AT A MINIMUM, CONTRACTORS CONDUCT PHONE
SURVEYS TO ADEQUATELY ASSESS THE MAGNITUDE OF THE WORK TO BE PERFORMED IN
DETERMINING THEIR PRICE STRATEGY.
12. CONTRACTORS MUST ADDRESS IN QUOTES COMPLIANCE WITH TESTING AND
ACCEPTANCE REQUIREMENTS. (PER TIM RECOMMENDATION).
13. TESTING REQUIREMENTS MUST BE COORDINATED WITH CUSTOMER ACCEPTANCE
AUTHORITY BEFORE NOTICE OF COMPLETION IS SUBMITTED TO DITCO.
DISA Scott AFB Global Mailbox RF Activations Backbone Lease Team michael.b.reeves.ctr@mail.mil
14. ESTABLISH TSP: TSP0JV8V5-01
15. CIRCUIT PARAMETERS: CIRCUIT REQUIRES THE FOLLOWING PARAMETERS:
2. CIRCUIT REQUIRES THE FOLLOWING PARAMETERS:
FIBER TERMINATION: SINGLE-MODE INTERFACE REQUIREMENT/INTERFACE DATA RATE:
LINE CODING, FRAME FORMAT, PHYSICAL CONNECTOR, 10GBPS, NRZ, SCRAMBLED PER
ANSI T1.104-1991 (R2003). ALL OPTIONS DEFINED SC CONNECTOR, SINGLE-MODE FIBER
PER ANSI T1.105.06-2002 (SR-0, SR-1, IR-1, IR-2, LR-1, LR-2, LR-3).
LINE MUST REMAIN FULLY OPERATIONAL AND AVAILABLE TO USERS 24 HOURS A DAY,
SEVEN DAYS PER WEEK, AT LEAST 99.5% OR BETTER.
ONE-HOUR RESPONSE TIME TURN-AROUND MUST OCCUR TO REPAIR ONCE TROUBLE-
CALL HAS BEEN REPORTED.
GFE CLOCKING: VENDOR ESFU (OR EQUIVALENT) NOT TO BE ENGINEERED INTO CIRCUIT.
SINGLE MODE FIBER TERMINATIONS "SC" CONNECTORS.
NO NETWORK INTERFACE UNIT.
DEDICATED PATH.
CARRIER REQUIRED TO HAVE CIRCUIT VISIBILITY TO ASSIST IN ANY CIRCUIT OUTAGES.
THE VENDOR MUST CONDUCT A 72 HOUR SATISFACTORY END TO END TEST ON THE 10GB
WAVE SERVICE IAW ITU STANDARD M.2101. ADDITIONALLY, THE VENDOR TEST SET/SETS
MUST HAVE THE ABILITY TO PRINT THE TEST RESULTS AND THOSE RESULTS MUST BE
EMAILED TO THE ACCEPTING AUTHORITY FOR REVIEW.
VENDOR MUST HAVE A 24X7 NETWORK OPERATIONAL CENTER OF THIS 10GB WAVE
SERVICE.
THE COMMERCIAL CIRCUIT WILL BE ACCEPTED ON BEHALF OF THE GOVERNMENT BY THE
GOC GNOSC: PRI POC: DISA GLOBAL CASA INFRASTRUCTURE INTEGRATION LEASE BB
TEAM PHONE: (C) 618-418-9813, (D) 418-9813
EMAIL: DISA.SCOTT.GLOBAL.MBX.CASA-INFRASTRUCTURE-INTEGRATION-LEASE-BB-
T@MAIL.MIL ALT POC: ORGANIZATIONAL NUMBER (CASA RF CIRCUIT ACTIVATIONS)
PHONE: (C) 618-418-8691, (D) 418-8691
EMAIL: DISA.SCOTT.GLOBAL.MBX.RF-CIRCUIT-ACTIVATIONS@MAIL.MIL
THE VENDOR MUST PROVIDE THE LONG HAUL CIRCUIT NUMBER AND THE 1-800 TROUBLE
REPORT NUMBER TO THE ACCEPTING AUTHORITY PRIOR TO THE GOVERNMENT
ACCEPTING SERVICE. INSIDE WIRING MUST BE COMPLETED AND TESTED PROPERLY IAW
THE ORDER PRIOR TO TURN-UP TO THE GOVERNMENT.
VENDOR IS RESPONSIBLE FOR INSTALLATION AND MAINTENANCE OF 10GB WAVE SERVICE
IAW UNIQUE INSTALLATION FACTORS.
INSIDE WIRING IS AUTHORIZED IAW WITH THE UNIQUE INSTALLATION FACTORS.
VENDOR MUST COORDINATE SITE VISIT WITH POC'S 72 HOURS IN ADVANCE PRIOR TO
REQUIRING ACCESS TO FACILITIES AT BOTH USER LOCATIONS.
FAILURE TO READ AND ADDRESS ANY OF THE TECHNICAL REQUIREMENTS AND SERVICE
DATE REQUESTED IN THIS INQUIRY SHALL RENDER THE QUOTE NON-COMPLIANT AND
RESULT IN IT BEING EXCLUDED FROM EVALUATION AND AWARD.
M. ADDITIONAL INFORMATION:
3. TSR NUMBER: SG13AUG196263
4. CCSD: DIYU6VX6
Z. DITCO CONTACT:
Jennifer Voss
618-418-6641 jennifer.n.voss.civ@mail.mil
Angelina Hutson
DITCO Contracting Officer
Unless otherwise specified, all other terms and conditions are unchanged.
Paragraph E.SERVICE DATE change from:
Sep 30, 2020
To:
Nov 30, 2020
Paragraph V.QUOTE DUE DATE AND TIME change from:
Jun 26, 2020 12:30:00 PM CDT
To:
Jul 15, 2020 12:30:00 PM CDT
File details come from the government source that posted it. Updated .