HC101319QB141-0001.v0.pdf
PDF 12 KB Posted
- Solicitation number
- HC101319QB141
- Issued by
-
Defense Information Systems Agency
View the file
Other files
| File | Type | Posted |
|---|---|---|
| HC101319QB141.v1.pdf | ||
| Vendor sample maps version 2.pdf | ||
| Vendor Block Sample version 3.pptx | PPTX presentation |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
IQO INQUIRY
FM: PL8211
TO: Contractors
DATE (MM/DD/YYYY): 8/6/2020
SUBJECT: HC101319QB141-0001 Amend: 0001
A. TYPE ACTION: ADMIN AMEND
1. PURPOSE: THE PURPOSE OF AMEND 0001 IS TO UPDATE THE SERVICE DATE TO 22
DEC 2020 AND THE QUOTE DUE DATE TO 24 AUG 2020.
ALL ELSE REMAINS THE SAME.
SUBMIT A QUOTE TO PROVIDE, INSTALL, AND MAINTAIN A CHANNELIZED OC-12 (622.08MB)
BETWEEN BLDG 9, SERVER ROOM, 85 HASE ROAD, FORT STEWART, GA., AND BLDG 919,
2ND FLOOR TELCO ROOM, 919 LANGLEY STREET, JACKSONVILLE NAS, FL.
- THIS REQUIREMENTS HAS THE BELOW MANDATORY TECHNICAL REQUIREMENTS:
- SEE UNIQUE INSTALLATION FACTORS FOR EXTENSION INSIDE WIRING REQUIREMENTS
TASKED TO BE COMPLETED BY WINNING TELECOM PROVIDER.
GOVERNMENT REQUIRED CHANNELIZATION:
9 STS-1'S (TIMESLOTS 1-9)
1 STS-3C (TIMESLOTS 10-12)
- CONTRACTORS MUST COMPLY WITH TESTING & ACCEPTANCE REQUIREMENTS.
2. CONTRACTORS ARE RESPONSIBLE FOR READING AND ADDRESSING ALL TECHNICAL
REQUIREMENTS OF THIS SOLICITATION, READING AND AGREEING WITH THE STANDARD
PROVISIONS, PROVIDE PRICE QUOTATION IN ACCORDANCE WITH STANDARD PROVISION 4,
AND MEET THE REQUESTED SERVICE DATE.
3. THE SERVICE DATE TO BE MET IS: 29 OCT 20 (SIP) TO COMPLY WITH PROCUREMENT
ACQUISITION LEAD TIME (PALT) FOR THIS TIPE OF SERVICE. THE GOVERNMENT ASSUMES
THAT CONTRACTORS HAVE CONSIDERED ALL ISSUES THAT MAY DELAY THE DELIVERY
OF SERVICE ON REQUESTED SERVICE DATE AND MAY CANCEL, TERMINATE, OR REQUEST
CONSIDERATION IAW STANDARD PROVISION 42 FOR FAILURE TO MEET CONTRACTUAL
SERVICE DATE OR COMPLY WITH ANY CONTRACT TERMS OR CONDITIONS.
4. CONTRACTORS MUST ENSURE THAT QUOTES SHALL INCLUDE SUFFICIENT DETAIL
FOR EFFECTIVE EVALUATION AND SHOULD NOT SIMPLY REPHRASE OR RESTATE THE
GOVERNMENT REQUIREMENTS. RATHER, CONTRACTORS MUST PROVIDE CONVINCING
RATIONALE TO ADDRESS HOW THEY INTEND TO MEET THE REQUIREMENT.
HC101319QB141-0001
5. QUOTES MUST BE UPLOADED TO IDEAS. GOVERNMENT IS NOT RESPONSIBLE FOR
MISSING OR OVERLOOKED QUOTES.
6. TELECOM PROVIDER MUST PROVIDE DITCO COLOR POWERPOINT DRAWINGS FOR
TECHNICAL REVIEW SHOWING THE ROUTES FROM THE COMMERCIAL DEMARCS TO THE
SUPPORTING CENTRAL OFFICES AND OR WIRING CENTERS. DRAWINGS ALSO TO INCLUDE
TOTAL FIBER MILES AND ROUND TRIP DELAY (RTD). ADDITIONALLY MUST PROVIDE COLOR
CODED MAPS AND MUST BE RED LINED SHOWING HOW THE CIRCUIT WILL BE ROUTED END
TO END FROM THE CUSTOMER A LOCATION TO THE CUSTOMER Z LOCATION.
7. THIS IS A REAWARD/REPLACEMENT OF A CURRENT SERVICE, ASTI000017EBM. IF THE
INCUMBENT QUOTE IS EVALUATED AS THE LOWEST PRICE TECHNICABLE ACCEPTABLE,
THE CURRENT CSA WILL BE ADMINSTRATIVELY DISCONTINUED WITHIN 30 DAYS OF
INCUMBENT CONTRACTOR RECEIVING AWARD. THE DISCONTINUE DATE OF OLD CSA WILL
BE THE DAY PRIOR TO THE START DATE OF NEW CSA.
8. CIRCUIT PARAMETERS:
1) VENDOR MUST DELIVER OC-12 SERVICE 2W (UNPROTECTED) FROM LOCATION STATED
IN PARAGRAPH 3.
2) REQUEST VENDOR PROVIDE LIGHT LEVEL READINGS (DB LOSS) ON EXTENSION FROM
THE COMMERCIAL POP TO THE GOVERNMENT SERVICE DELIVERY POINT (SDP) AT BOTH
LOCATIONS. LIGHT LEVELS MUST BE ADJUSTED TO -10 TO -18.
3) VENDOR MUST CONDUCT WALK-THROUGH SITE SURVEY PRIOR TO INSTALLATION AT
ALL TERMINATING GOVERNMENT LOCATIONS. VENDOR MUST COORDINATE SITE VISIT
WITH POC'S 72 HOURS IN ADVANCE PRIOR TO REQUIRING ACCESS TO FACILITIES AT BOTH
USER LOCATIONS.
4) VENDOR MUST CONTACT IMPLEMENTATION ASSISTANCE TO ESTABLISH THE
COORDINATION AND ACTIVATION PROCESS FOR TURN-UP OR ANY SITE CONTACT ISSUES.
5) INSTALLATION AND MAINTENANCE: IAW THE UNIQUE INSTALLATION FACTORS IN
PARAGRAPH 3.
6) VENDOR REQUIRED TO HAVE CIRCUIT VISIBILITY TO ASSIST IN ANY CIRCUIT OUTAGES.
7) VENDOR MUST HAVE A 24X7 NETWORK OPERATIONS CENTER.
8) REQUEST ONE-HOUR RESPONSE TIME TURN-AROUND TO REPAIR ONCE TROUBLE-CALL
HAS BEEN REPORTED.
9) TECHNICAL SPECIFICATIONS
FIBER TERMINATION: OPTICAL, SINGLE MODE, 1310NM
PHYSICAL TERMINATION: SC/SC CONNECTORS
FRAME FORMAT: STS-12
RATE: PLUS OR MINUS 20 PPM
CHANNELIZATION REQUIRED: NO
CONCATENATION REQUIRED: NO
GFE CLOCKING: VENDOR ESFU (OR EQUIVALENT) NOT TO BE ENGINEERED INTO CIRCUIT.
10) NO NETWORK INTERFACE UNIT
11) DEDICATED PATH
12) LINE MUST REMAIN FULLY OPERATIONAL AND AVAILABLE TO USERS 24 HOURS A DAY,
SEVEN DAYS PER WEEK, AT LEAST 99.5% OR BETTER.
13) TESTING PARAMETERS AND THRESHOLDS: ERROR PERFORMANCE (AVAILABILITY,
SES, DM, EFS) AND LOSS OF BIT COUNT INTEGRITY SHALL BE MEASURED AND RECORDED
OVER THE DURATION OF THE CONTIGUOUS 72 HOUR TESTING INTERVAL AND SHALL BE
MEASURED AND RECORDED PER DEFINITION IN ITU RECOMMENDATION G.826 AND M.2100.
14) ERROR PERFORMANCE SHALL BE BETTER THAN THE FOLLOWING PARAMETER
THRESHOLDS TO BE ACCEPTABLE: AVAILABILITY SHALL BE GREATER THAN 99.5% OR
BETTER SEVERELY ERRORED SECONDS (SES) SHALL BE LESS THAN 0.02% DEGRADED
MINUTES (DM) SHALL BE LESS THAN 0.2% ERROR FREE SECONDS (EFS) SHALL BE
GREATER THAN 99%
15) LOSS OF BIT COUNT INTEGRITY (LBCI): LOSS OF BIT COUNT INTEGRITY SHALL BE
MONITORED ONLY BY THE FOLLOWING METHOD: USING TEST EQUIPMENT WHICH CAN
DETECT AND MEASURE THE OCCURRENCE OF THE INSERTION OR DELETION OF ONE
OR MORE BITS INTO THE DIGITAL BIT STREAM, ON MANY MANUFACTURERS BERT TEST
EQUIPMENT THIS IS MONITORED USING THE "PATTERN SLIP" PARAMETER WHERE EVERY
OCCURRENCE OF A PATTERN SLIP "EVENT" MARKS THE OCCURRENCE OF A LBCI (RATHER
THAN THE RAW TOTAL NUMBER OF PATTERN SLIPS ACCUMULATED OVER A TESTING
INTERVAL) MEAN TIME TO LOSS OF BIT COUNT INTEGRITY (MTTLBCI) SHALL BE GREATER
THAN 24 HOURS.
ROUND TRIP DELAY (RTD): UP TO 500 AIR-MILES THE RTD SHALL BE LESS THAN OR EQUAL
TO (10) MILLISECONDS. ABOVE 500 AIR-MILES THERTD SHALL BE LESS THAN OR EQUAL
TO 1 MILLISECOND DELAY PER (120 ROUND TRIP)/(60 ONE WAY) AIR-MILES. THE VENDOR'S
FDP INSTALLED IN THEIR COMMERCIAL SUITE.
VENDOR MUST SHOW SITE PERSONNEL LISTED ON THIS ORDER THE EXACT TERMINATION
POINT WHEN SERVICE IS COMPLETE.
VENDOR MUST CONDUCT A SATISFACTORY 72 HOUR END TO END TEST IAW ITU
STANDARD M.2101 PRIOR TO TURN OVER TO THE GOVERNMENT FOR ACCEPTANCE
TESTING. THE END TO END TEST WILL NOT BE COMPLETED WITH LOOPS.
THE VENDOR TEST SET/SETS MUST HAVE THE ABILITY TO PRINT OR ELECTRONICALLY
OUTPUT THE TEST RESULTS AND THOSE RESULTS MUST BE E-MAILED TO THE ACCEPTING
AUTHORITY FOR REVIEW.
FAILURE TO READ AND ADDRESS ANY OF THE TECHNICAL REQUIREMENTS AND SERVICE
DATE REQUESTED IN THIS INQUIRY SHALL RENDER THE QUOTE NON-COMPLIANT AND
RESULT IN IT BEING EXCLUDED FROM EVALUATION AND AWARD.
M. ADDITIONAL INFORMATION:
3. TSR NUMBER: SG12JUL196246
4. CCSD: DIYU6UDH
Z. DITCO CONTACT:
Edward Midkiff
618-418-6481
Edward.w.midkiff.civ@mail.mil
Angelina Hutson
DITCO Contracting Officer
Unless otherwise specified, all other terms and conditions are unchanged.
Paragraph E.SERVICE DATE change from:
Oct 29, 2020
To:
Dec 22, 2020
Paragraph V.QUOTE DUE DATE AND TIME change from:
Jun 30, 2020 12:00:00 PM CDT
To:
Aug 24, 2020 12:00:00 PM CDT
File details come from the government source that posted it. Updated .