Text version
IQO INQUIRY
FM: PL8211
TO: Contractors
DATE (MM/DD/YYYY): 12/2/2019
SUBJECT: HC101319QA815-0002 Amend: 0002
A. TYPE ACTION: AMEND
1. PURPOSE: AMEND 0002 ISSUED TO REMOVE DIVERSITY REQUIREMENTS. PROPOSAL
DUE DATE IS 05 DEC 19. SERVICE DATE IS 15 APR 19.
1. SUBMIT A QUOTE TO PROVIDE, INSTALL, AND MAINTAIN A NEW 20MB ETHERNET
BETWEEN (BLDG) 10; (RM) 110; (FLR) 1ST; 7200 RADIO STATION ROAD, DIXON, CA; DIXON, CA, 95620 (NAVALRTF/CCI) AND (BLDG) 2145; (RM) 105; (FLR) 1ST; 5801 C STREET, BEALE
AFB, CA 95903-1517 (BEALEAFB/CCI).
2. CONTRACTORS ARE RESPONSIBLE FOR READING AND ADDRESSING ALL TECHNICAL
REQUIREMENTS OF THIS INQUIRY/SOLICITATION, READING AND AGREEING WITH THE
STANDARD PROVISIONS, PROVIDE PRICE QUOTATION IN ACCORDANCE WITH STANDARD
PROVISION 4, AND MEET THE REQUESTED SERVICE DATE.
3. THE SERVICE DATE TO BE MET IS: 02 JAN 19 (SIP) TO COMPLY WITH PROCUREMENT
ACQUISITION LEAD TIME (PALT) FOR THIS TYPE OF SERVICE. ANY CHANGES TO THE
ORIGINAL SERVICE DATE WILL BE NOTIFIED VIA AMENDMENT TO THE SOLICITATION AND
POSTED TO FBO. THE GOVERNMENT ASSUMES THAT CONTRACTORS HAVE CONSIDERED
ALL ISSUES THAT MAY DELAY THE DELIVERY OF CIRCUIT ON REQUESTED SERVICE
DATE. THE GOVERNMENT MAY CANCEL, TERMINATE, OR REQUEST CONSIDERATION IAW
STANDARD PROVISION 42 FOR FAILURE TO MEET CONTRACTUAL SERVICE.
4. CONTRACTORS MUST ENSURE THAT QUOTES SHALL INCLUDE SUFFICIENT DETAIL
FOR EFFECTIVE EVALUATION AND SHOULD NOT SIMPLY REPHRASE OR RESTATE THE
GOVERNMENT REQUIREMENTS. RATHER, CONTRACTORS MUST PROVIDE CONVINCING
RATIONALE TO ADDRESS HOW THEY INTEND TO MEET THE REQUIREMENT. IN RESPONSE
TO THIS SOLICITATION, NO TERMS OR CONDITIONS PLACED UPON THE GOVERNMENT,
NOR ASSUMPTIONS WILL BE ACCEPTED. CONTRACTORS ARE INSTRUCTED TO SUBMIT
QUESTIONS AND REQUEST CLARIFICATIONS OF THE REQUIREMENT (S) BEFORE
SUBMITTING QUOTES. QUOTES MUST BE UPLOADED TO IDEAS.
5. THIS REQUIREMENT MUST BE WORKED IN CONJUNCTION WITH SOLICITATION
HC101319QA817/TSR RG30APR195104.
6. TO DETERMINE THE AWARDEE(S) OF DIVERSE REQUIREMENTS, THE GOVERNMENT WILL
FIRST EVALUATE THE LOWEST PRICED SOLUTION FOR EACH SOLICITATION. IF THOSE
TWO SOLUTIONS ARE DIVERSE FROM EACH OTHER AND MEET ALL REQUIREMENTS,
AWARD WILL BE MADE TO THE CONTRACTOR OR CONTRACTORS THAT PROPOSED
THE TWO SOLUTIONS. IF THE TWO LOWEST PRICED SOLUTIONS ARE NOT AWARDABLE
BECAUSE THEY ARE NOT DIVERSE FROM EACH OTHER OR DO NOT MEET REQUIREMENTS,
HC101319QA815-0002
THE GOVERNMENT WILL EVALUATE THE NEXT LOWEST PRICED COMBINATION FOR
BOTH SOLICITATIONS UNTIL IT DETERMINES THE LOWEST PRICED COMBINATION THAT
MEETS ALL REQUIREMENTS. AWARDS WILL BE MAKE AS A PAIR TO ONE CONTRACTOR
ONLY OR SPLIT THE AWARD BETWEEN TWO CONTRACTORS THAT MEET ALL TECHNICAL
REQUIREMENTS, REQUESTED SERVICE DATE AND PROPOSE THE LOWEST PRICE.
7. CONTRACTOR SHALL PROVIDE COLOR POWERPOINT DRAWINGS SHOWING THE ROUTES
FROM THE COMMERCIAL DEMARKS TO THE SUPPORTING CENTRAL OFFICES AND/OR
WIRING CENTERS, ENSURING THE PHYSICAL END TO END DIVERSITY REQUIREMENTS ARE
BEING MET. DRAWINGS MUST INCLUDE SEPARATION DISTANCES, TOTAL FIBER MILES
AND ROUND TRIP DELAY BASED ON ACTUAL DISTANCE IN MILES. REFER TO STANDARD
PROVISION 39 FOR SPECIFIC DOCUMENTATION REQUIREMENTS. SAMPLE DRAWINGS
INCLUDED WITH INQUIRY/SOLICITATION SHALL BE FOLLOWED IN ORDER TO PROVIDE THE
REQUIRED TECHNICAL INFORMATION. MAPS AND DRAWINGS WITH ERRORS, MISMATCH
INFORMATION, MISSING RTD, AND NOT ENOUGH DETAIL TO DETERMINE DIVERSITY
THROUHGOUT THE FIBER PATH WILL BE FOUND TECHNICALLY DEFFICIENT AND WILL NOT
BE ACCEPTED.
8. PRE AWARD SITE SURVEYS ARE AUTHORIZED (AT CONTRACTOR EXPENSE) AND
SHOULD BE CONDUCTED IN COORDINATION WITH LOCAL POCS AT EACH GOVERNMENT
SITE. IT IS HIGHLY RECOMMENDED THAT AT A MINIMUM, CONTRACTORS CONDUCT PHONE
SURVEYS TO ADEQUATELY ASSESS THE MAGNITUDE OF THE WORK TO BE PERFORMED IN
DETERMINING THEIR PRICE STRATEGY.
9. CONTRACTORS MUST ADDRESS IN QUOTES COMPLIANCE WITH TESTING AND
ACCEPTANCE REQUIREMENTS.
10. TESTING & ACCEPTANCE REQUIREMENTS MUST BE COORDINATED WITH CUSTOMER
ACCEPTANCE AUTHORITY BEFORE NOTICE OF COMPLETION IS SUBMITTED TO DITCO.
FOR DISA REQUIREMENTS THE TESTING AND ACCEPTING AUTHORITY IS: THE DISA
ACTIVATIONS TEAM.
11. ESTABLISH TSP: TSP0JN909-01
IMPLEMENTATION ASSISTANCE: FOR DISN CORE / DEDICATED / NIPRNET / SIPRNET /
VPN CIRCUIT ACTIVATION ASSISTANCE OR SERVICE IMPLEMENTATION INQUIRIES/
SCHEDULING, CONTACT THE DISA GLOBAL RF ACTIVATIONSTEAM VIA EMAIL,
DISA.SCOTT.GLOBAL.MBX.RF-CIRCUIT-ACTIVATIONS@MAIL.MIL, OR CALL DSN 418-8627;
COML 618-418-8627.
FOR CIRCUIT INSTALLATION ASSISTANCE WITH THE COMMERCIAL LEASED PATH,
CONTACT DCP COMMERICIAL ACTIVATION TEAM (CAT) AT D312-850-0820, C614-692-0820
FAILURE TO READ AND ADDRESS ANY OF THE TECHNICAL REQUIREMENTS AND SERVICE
DATE REQUESTED IN THIS INQUIRY SHALL RENDER THE QUOTE NON-COMPLIANT AND
RESULT IN IT BEING EXCLUDED FROM EVALUATION AND AWARD.
M. ADDITIONAL INFORMATION:
3. TSR NUMBER: RG01MAY195111
4. CCSD: DIZ2HGE0
Z. DITCO CONTACT:
Jennifer Voss
618-418-6641 jennifer.n.voss.civ@mail.mil
Angelina Hutson
DITCO Contracting Officer
Unless otherwise specified, all other terms and conditions are unchanged.
Paragraph E.SERVICE DATE change from:
Mar 6, 2020
To:
Apr 15, 2020
Paragraph V.QUOTE DUE DATE AND TIME change from:
Nov 1, 2019 12:30:00 PM CDT
To:
Dec 5, 2019 12:30:00 PM CST