CIRCUIT_SPECS_AND_TESTING_FOR_HC101319QA679_-_RU09JAN196158_(HC101319QA514).pdf
PDF 96 KB Posted
- Solicitation number
- HC101319QA679
- Issued by
-
Defense Information Systems Agency
About this file
Circuit Specs
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
HC101319QA514 – RU09JAN196158
1. PROVIDE, INSTALL AND MAINTAIN A LEASED 10GBE (GIGABIT ETHERNET) IP BACKBONE
CIRCUIT BETWEEN THE J-PE ROUTER (UJEWRIL030) IN BLDG 213, RM COMM, 213 CUSTER
AVENUE, FT RILEY, KS AND J-PE ROUTER (UJEWOFF130) IN BLDG 1000, RM 222, 900 SAC
BLVD, OFFUTT AFB, NE. ESTABLISH TSP.IN SUPPORT OF MPLS IMPLEMENTATION (D300). 2.
EACH CONTRACTOR IS RESPONSIBLE FOR READING AND COMPLYING WITH ALL
TECHNICAL ASPECTS OF THIS SOLICITATION, TO INCLUDE READING AND AGREEING WITH
THE STANDARD PROVISIONS, ATTACHMENTS LISTING SPECIFIC TECHNICAL
REQUIREMENTS, PRICE QUOTE REQUIREMENTS, AND REQUESTED SERVICE DATE.
FAILURE TO READ AND ADHERE TO ANY PORTION OF THE INQUIRY SHALL RENDER THE
QUOTE NON-COMPLIANT AND RESULT IN IT BEING EXCLUDED FROM EVALUATION AND
AWARD. 3. CONTRACTORS ARE RESPONSIBLE FOR READING AND ADDRESSING ALL
TECHNICAL REQUIREMENTS OF THIS INQUIRY/SOLICITATION, READING AND AGREEING
WITH THE STANDARD PROVISIONS, PROVIDE PRICE QUOTATION IN ACCORDANCE WITH
STANDARD PROVISION 4, AND MEET THE REQUESTED SERVICE DATE. 4. TTHE SERVICE
DATE TO BE MET IS: 16 AUG 19 (SIP) TO COMPLY WITH PROCUREMENT ACQUISITION LEAD
TIME (PALT) FOR THIS TYPE OF SERVICE. ANY CHANGES TO THE REQUESTED SERVICE
DATE WILL BE NOTIFIED VIA AMENDMENT TO THE SOLICITATION AND POSTED TO FBO.
IAW STANDARD PROVISION 42 THE GOVERNMENT MAY CANCEL, TERMINATE, OR
REQUEST CONSIDERATION FOR FAILURE TO MEET CONTRACTUAL SERVICE DATE. 5.
CONTRACTORS SHALL SUBMIT QUOTES IAW STANDARD PROVISION 04. QUOTES SHALL
INCLUDE SUFFICIENT DETAIL FOR EFFECTIVE EVALUATION AND SHOULD NOT SIMPLY
REPHRASE OR RESTATE THE GOVERNMENT REQUIREMENTS. QUOTES MUST PROVIDE
CONVINCING RATIONALE TO ADDRESS HOW THE CONTRACTOR INTENDS TO MEET THE
REQUIREMENT. IN RESPONSE TO THIS SOLICITATION, NO TERMS OR CONDITIONS
PLACED UPON THE GOVERNMENT, NOR ASSUMPTIONS WILL BE ACCEPTED.
CONTRACTORS ARE ENCOURAGED TO SUBMIT QUESTIONS AND REQUEST
CLARIFICATIONS OF THE REQUIREMENT(S) BEFORE SUBMITTING QUOTES. QUESTIONS
SHALL BE SUBMITTED TO CONTRACT SPECIALIST AND CONTRACTING OFFICER DURING
THE SOLICITATION PHASE ONLY, AND RESPONSES FOR ALL INTERESTED PARTIES WILL
BE POSTED TO FEDBIZOPPS. 6. IN RESPONSE TO THIS SOLICITATION, NO TERMS OR
CONDITIONS PLACED UPON THE GOVERNMENT WILL BE ACCEPTED. 7. CONTRACTORS
ARE INSTRUCTED TO SUBMIT QUESTIONS AND REQUEST CLARIFICATIONS OF THE
REQUIREMENT (S) BEFORE SUBMITTING QUOTES. QUESTIONS SHALL BE SUBMITTED TO
CONTRACT SPECIALIST AND CONTRACTING OFFICER DURING THE INQUIRY/SOLICITATION
PHASE ONLY. 8. QUOTES MUST BE UPLOADED TO IDEAS. 9. THIS REQUIREMENT MUST BE
WORKED IN CONJUNCTION WITH INQUIRY HC101319QA311/TSR RU09JAN196155 AND
MUST BE ENGINEERED AND PROVISIONED TOTALLY DIVERSE END TO END FROM THE
GOVERNMENT SERVICE DELIVERY POINTS (SDP) FROM INQUIRY HC101319QA311/TSR
RU09JAN196155; MEANING THE PHYSICAL PATHS ARE TOTALLY SEPARATE INCLUDING
MAN HOLES, CONDUIT, CENTRAL OFFICE LOCATIONS, AND FIBER BUILDS. ADDITIONALLY
AS A MINIMUM MUST HAVE 50 METERS PHYSICAL SEPARATION FROM TSR INQUIRY
HC101319QA311/TSR RU09JAN196155. 10. TO DETERMINE THE AWARDEE(S) OF THESE
DIVERSE REQUIREMENTS, THE GOVERNMENT WILL FIRST EVALUATE THE LOWEST
PRICED SOLUTION FOR EACH SOLICITATION. IF THOSE TWO SOLUTIONS ARE DIVERSE
FROM EACH OTHER AND MEET ALL REQUIREMENTS, AWARD WILL BE MADE TO THE
CONTRACTOR OR CONTRACTORS THAT PROPOSED THE TWO SOLUTIONS. IF THE TWO
LOWEST PRICED SOLUTIONS ARE NOT AWARD-ABLE BECAUSE THEY ARE NOT DIVERSE
FROM EACH OTHER OR DO NOT MEET REQUIREMENTS, THE GOVERNMENT WILL
EVALUATE THE NEXT LOWEST PRICED COMBINATION FOR BOTH SOLICITATIONS UNTIL IT
DETERMINES THE LOWEST PRICED COMBINATION THAT MEETS ALL REQUIREMENTS.
AWARDS WILL BE MAKE AS A PAIR TO ONE CONTRACTOR ONLY OR SPLIT THE AWARD
BETWEEN TWO CONTRACTORS THAT MEET ALL TECHNICAL REQUIREMENTS,
REQUESTED SERVICE DATE AND PROPOSE THE LOWEST PRICE. 11. CONTRACTOR SHALL
PROVIDE COLOR POWERPOINT DRAWINGS SHOWING THE ROUTES FROM THE
COMMERCIAL DEMARKS TO THE SUPPORTING CENTRAL OFFICES AND/OR WIRING
CENTERS, ENSURING THE PHYSICAL END TO END DIVERSITY REQUIREMENTS ARE BEING
MET. DRAWINGS MUST INCLUDE SEPARATION DISTANCES, TOTAL FIBER MILES AND
ROUND TRIP DELAY BASED ON ACTUAL DISTANCE IN MILES. REFER TO STANDARD
PROVISION 39 FOR SPECIFIC DOCUMENTATION REQUIREMENTS. SAMPLE DRAWINGS
INCLUDED WITH INQUIRY/SOLICITATION SHALL BE FOLLOWED IN ORDER TO PROVIDE THE
REQUIRED TECHNICAL INFORMATION. MAPS AND DRAWINGS WITH ERRORS, MISMATCH
INFORMATION, MISSING RTD, AND NOT ENOUGH DETAIL TO DETERMINE DIVERSITY
THROUGHOUT THE FIBER PATH WILL BE FOUND TECHNICALLY DEFICIENT AND WILL NOT
BE ACCEPTED. (DO NOT INCLUDE THIS PARAGRAPH IN REQUIREMENTS TO BE WORKED IN
CONJUNCTION/COORDINATION UNLESS MAPS/DRAWINGS ARE REQUIRED). 12. PRE
AWARD SITE SURVEYS ARE AUTHORIZED (AT CONTRACTOR EXPENSE) WITH LOCAL POCS
AT EACH GOVERNMENT SITE. IT IS HIGHLY RECOMMENDED THAT, AT A MINIMUM,
CONTRACTORS CONDUCT PHONE SURVEYS TO ADEQUATELY ASSESS THE MAGNITUDE
OF THE WORK TO BE PERFORMED IN DETERMINING THEIR PRICE STRATEGY. 13.
CONTRACTORS MUST ADDRESS IN QUOTES COMPLIANCE WITH TESTING AND
ACCEPTANCE REQUIREMENTS. FAILURE TO READ AND ADHERE TO ANY PORTION OF THE
SOLICITATION SHALL RENDER THE QUOTE NON-COMPLIANT AND RESULT IN IT BEING
EXCLUDED FROM EVALUATION AND AWARD.
File details come from the government source that posted it.