IQO INQUIRY
FM: PL8211
TO: Contractors
DATE (MM/DD/YYYY): 2/9/2020
SUBJECT: HC101319QA450-0001 Amend: 0001
A. TYPE ACTION: AMEND
1. PURPOSE: THE PURPOSE OF THIS AMENDMENT IS TO UPDATE LOC Z ADDRESS TO
SHOW "(BLDG) 271; (RM) B1-238; (FL) 1ST; 400 NORTH DOUGLAS STREET, EL SEGUNDO, CA 90245-2808," VICE "(BLDG) 271; (RM) B1-238; (FL) 1ST; 400 NORTH DOUGLAS AVENUE, EL
SEGUNDO, CA 90245-2808"
ALL ELSE REMAINS THE SAME.
1. PROVIDE, INSTALL, AND MAINTAIN A 1GB VPN AT (BLDG) 100; (RM) TELCO; (FL) BAS; 100
N. SEPULVEDA BLVD; EL SEGUNDO, CA, 90245 TO BLDG 271, 1ST FLOOR,ROOM B1-238, 400
NORTH DOUGLAS AVENUE, EL SEGUNDO, CA 90245-2808.
A. SEE UNIQUE INSTALL FACTORS AND TESTING REQUIREMENTS
B. CUSTOMER WILL ACCEPT SOONEST POSSIBLE SERVICE DATE.
2. EACH CONTRACTOR IS RESPONSIBLE FOR READING AND COMPLYING WITH ALL
TECHNICAL ASPECTS OF THIS SOLICITATION, TO INCLUDE READING AND AGREEING WITH
THE STANDARD PROVISIONS,
ATTACHMENTS LISTING SPECIFIC TECHNICAL REQUIREMENTS, PRICE QUOTE
REQUIREMENTS, AND REQUESTED SERVICE DATE. FAILURE TO READ AND ADHERE TO
ANY PORTION OF THE INQUIRY SHALL RENDER THE QUOTE NON-COMPLIANT AND RESULT
IN IT BEING EXCLUDED FROM EVALUATION AND AWARD.
3. THE SERVICE DATE TO BE MET IS: 18 MAY 20 (SIP). THE GOVERNMENT ASSUMES
THAT CONTRACTORS HAVE CONSIDERED ALL ISSUES THAT MAY IMPACT THE SERVICE
DATE. THE GOVERNMENT MAY CANCEL, TERMINATE, OR REQUEST CONSIDERATION
IAW STANDARD PROVISION 42 FOR FAILURE TO MEET CONTRACTUAL SERVICE DATE OR
COMPLY WITH ANY CONTRACT TERMS OR CONDITIONS.
4. CONTRACTORS SHALL SUBMIT QUOTES IAW STANDARD PROVISION 04. QUOTES SHALL
INCLUDE SUFFICIENT DETAIL FOR EFFECTIVE EVALUATION AND SHOULD NOT SIMPLY
REPHRASE OR RESTATE THE GOVERNMENT REQUIREMENTS. QUOTE MUST PROVIDE
CONVINCING RATIONALE TO ADDRESS HOW THE CONTRACTOR INTENDS TO MEET THE
REQUIREMENT. IN RESPONSE TO THIS SOLICITATION, NO TERMS OR CONDITIONS PLACED
UPON THE GOVERNMENT, NOR ASSUMPTIONS WILL BE ACCEPTED. CONTRACTORS
ARE ENCOURAGED TO SUBMIT QUESTIONS AND REQUEST CLARIFICATION OF THE
REQUIREMENT(S) BEFORE SUBMITTING QUOTES. QUESTIONS SHALL BE SUBMITTED TO
HC101319QA450-0001
CONTRACT SPECIALIST AND CONTRACTING OFFICER DURING THE SOLICITATION PHASE
ONLY, AND RESPONSES FOR ALL INTERESTED PARTIES WILL BE POSTED TO BETA.SAM.
M. ADDITIONAL INFORMATION:
3. TSR NUMBER: NH31JAN196644
4. CCSD: XXXX7WGJ
Z. DITCO CONTACT:
JOHN WARNER
618-418-6466 john.d.warner28.civ@mail.mil
KEVIN L. KNOWLES
DITCO Contracting Officer
Unless otherwise specified, all other terms and conditions are unchanged.
Paragraph E.SERVICE DATE change from:
May 18, 2020
To:
Mar 31, 2020
Paragraph M.3.TSR NUMBER change from:
NH31JAN196644A
NH31JAN196644
Paragraph M.10.TESTING REQUIREMENTS change from:
A. VENDOR WILL PERFORM ACCEPTANCE TESTING IN ACCORDANCE WITH EITHER
RFC-6815 OR ITU-T Y.1564. VENDOR MUST TEST THE CIRCUIT FOR 24
HOURS IAW ITU-T.Y.1564 SPECIFICALLY, FRAME SIZES OF
64,128,256,512,1024,1280 AND 1518 BYTES MUST BE USED. THE TEST
MUST VERIFY LENGTH OF RECEIVED FRAMES, INDICATE NUMBER OF FRAMES
DROPPED, NUMBER OF FRAMES RECEIVED OUT OF ORDER, AND DUPLICATE
FRAMES. TESTS MUST BE BI-DIRECTIONAL USING THE SAME DATA RATE IN
EACH DIRECTION. BURST TESTS MUST BE RUN TO DETERMINE MINIMUM
INTERVAL BETWEEN FRAMES THAT CAN BE PROCESSED WITHOUT FRAME LOSS.
A THROUGHPUT TEST IS REQUIRED INDICATING THE FASTEST RATE AT
WHICH TEST FRAMES CAN BE TRANSMITTED WITHOUT FRAME LOSS. A
SEPARATE THROUGHPUT TEST MUST BE RUN WITH FRAMES ADDRESSED TO THE
HARDWARE BROADCAST ADDRESS CONSTITUTING AT LEAST 1% OF THE TEST
STREAM AND BE EVENLY DISTRIBUTED THROUGHOUT THE TEST.
B. CIRCUIT SPECIFICATIONS CONTINUED: A LATENCY TEST MUST BE RUN FOR
A PERIOD OF NO LESS THAN 15 MINUTES, AND REPEATED NO LESS THAT 20
TIMES. THE TEST STREAM FOR THE LATENCY TEST SHOULD BE RUN AT
THE THROUGHPUT RATE FOR CORRESPONDING FRAME SIZES FROM THE
THROUGHPUT TEST. END TO END LATENCY WILL BE CALCULATED AS THE
AVERAGE OVER THE 20 TEST RUNS. FRAME LOSS RATE TESTS SHOULD BE
RUN AT THE FRAME RATE CORRESPONDING TO THE MAXIMUM FRAME RATE,
AND REDUCED BY 10% INTERVALS UNTIL THERE ARE AT LEAST TWO
CONSECUTIVE RUNS IN WHICH NO FRAMES ARE LOST.THROUGHPUT TEST
RESULTS: PASSING RATE 100% FOR ALL FRAME BYTE SIZES EXERCISED.
FRAME LOSS RATE (%) RESULTS: FRAME LOSS RATE LESS THAN 0.01% FOR
ALL FRAME BYTE SIZES EXERCISED. LATENCY WILL BE MEASURED WILL BE
ACCORDING TO THE FOLLOWING MAXIMUM TRANSMISSION DELAY FOR ANY
CIRCUIT UP TO 500 MILES AIR-MILES IN LENGTH SHALL BE NO GREATER
THAN 13MS ONE-WAY AND ANY POINT-TO-POINT CIRCUIT LONGER THAN 500
AIR-MILES SHALL BE NO GREATER THAN 50MS ONE WAY WITHIN THE 48
CONTINENTAL STATES. ANY APS SWITCHOVER SHALL TAKE LESS THAN 50
MILLISECONDS MONTHLY AVAILABILITY SHALL BE NO LESS THAN 99.5%.
To:
A. VENDOR WILL PERFORM ACCEPTANCE TESTING IN ACCORDANCE WITH EITHER RFC-6815 OR ITU-T Y.1564.
VENDOR MUST TEST THE CIRCUIT FOR 24 HOURS IAW ITU-T.Y.1564 SPECIFICALLY, FRAME SIZES OF
64,128,256,512,1024,1280 AND 1518 BYTES MUST BE USED. THE TEST MUST VERIFY LENGTH OF RECEIVED FRAMES, INDICATE NUMBER OF FRAMES DROPPED, NUMBER OF FRAMES RECEIVED OUT OF ORDER, AND DUPLICATE
FRAMES. TESTS MUST BE BI-DIRECTIONAL USING THE SAME DATA RATE IN EACH DIRECTION. BURST TESTS MUST
BE RUN TO DETERMINE MINIMUM INTERVAL BETWEEN FRAMES THAT CAN BE PROCESSED WITHOUT FRAME
LOSS. A THROUGHPUT TEST IS REQUIRED INDICATING THE FASTEST RATE AT WHICH TEST FRAMES CAN BE
TRANSMITTED WITHOUT FRAME LOSS. A SEPARATE THROUGHPUT TEST MUST BE RUN WITH FRAMES ADDRESSED
TO THE HARDWARE BROADCAST ADDRESS CONSTITUTING AT LEAST 1% OF THE TEST STREAM AND BE EVENLY
DISTRIBUTED THROUGHOUT THE TEST.
B. CIRCUIT SPECIFICATIONS CONTINUED: A LATENCY TEST MUST BE RUN FOR A PERIOD OF NO LESS THAN 15
MINUTES, AND REPEATED NO LESS THAT 20 TIMES. THE TEST STREAM FOR THE LATENCY TEST SHOULD BE RUN
AT THE THROUGHPUT RATE FOR CORRESPONDING FRAME SIZES FROM THE
THROUGHPUT TEST. END TO END LATENCY WILL BE CALCULATED AS THE AVERAGE OVER THE 20 TEST RUNS.
FRAME LOSS RATE TESTS SHOULD BE RUN AT THE FRAME RATE CORRESPONDING TO THE MAXIMUM FRAME
RATE, AND REDUCED BY 10% INTERVALS UNTIL THERE ARE AT LEAST TWO
CONSECUTIVE RUNS IN WHICH NO FRAMES ARE LOST.THROUGHPUT TEST RESULTS: PASSING RATE 100% FOR
ALL FRAME BYTE SIZES EXERCISED. FRAME LOSS RATE (%) RESULTS: FRAME LOSS RATE LESS THAN 0.01% FOR
ALL FRAME BYTE SIZES EXERCISED. LATENCY WILL BE MEASURED WILL BE ACCORDING TO THE FOLLOWING
MAXIMUM TRANSMISSION DELAY FOR ANY CIRCUIT UP TO 500 MILES AIR-MILES IN LENGTH SHALL BE NO GREATER
THAN 13MS ONE-WAY AND ANY POINT-TO-POINT CIRCUIT LONGER THAN 500 AIR-MILES SHALL BE NO GREATER
THAN 50MS ONE WAY WITHIN THE 48
CONTINENTAL STATES. ANY APS SWITCHOVER SHALL TAKE LESS THAN 50 MILLISECONDS MONTHLY AVAILABILITY
SHALL BE NO LESS THAN 99.5%.
Location A, UNIQUE INSTALLATION FACTORS change from:
1) FOR LOCAL COMMUNICATIONS UNIT: THE LOCAL COMM UNIT
WILL ASSIST SST IN EXTENDING SERVICE FROM THE COMMERCIAL
DEMARC TO THE SERVICE DELIVERY POINT (SDP).
FOR CIRCUIT ACTIVATION ASSISTANCE CONTACT DCP
COMMERICIAL ACTIVATION TEAM (CAT) AT D312-850-0820,
C614-692-0820.
DISA REQUIRES THAT CIRCUIT VENDOR OBTAIN A SIGNATURE
FROM A RESPONSIBLE SITE POC CERTIFYING THAT THE VENDOR
PROVIDED THE CONNECTIVITY AND THAT THE CIRCUIT IS PROPERLY
TAGGED WITH CIRCUIT ID AND TSR NUMBER OR CCSD
2) FOR SST: PROVIDE NECESSARY EQUIPMENT AND EXTEND SERVICE
FROM THE COMMERCIAL DEMARC TO THE SDP.
3) FOR THE VENDOR: VENDOR WILL DELIVER SERVICE TO THE
COMMERCIAL DEMARC IDENTIFIED IN THE DOCUMENT.
4) COML ACCESS: WILL NOT LEAK CAT - 5
5) INTERFACE: ELECTRICAL: 1000BASE-LX; PHYSICAL: LC; (PHYSICAL) LC;
(ELECTRICAL) 1000BASE-LX
1) FOR LOCAL COMMUNICATIONS UNIT: THE LOCAL COMM UNIT WILL ASSIST SST IN EXTENDING SERVICE FROM
THE COMMERCIAL DEMARC TO THE SERVICE DELIVERY POINT (SDP). FOR CIRCUIT ACTIVATION ASSISTANCE
CONTACT DCP COMMERICIAL ACTIVATION TEAM (CAT) AT D312-850-0820,
C614-692-0820. DISA REQUIRES THAT CIRCUIT VENDOR OBTAIN A SIGNATURE FROM A RESPONSIBLE SITE POC
CERTIFYING THAT THE VENDOR PROVIDED THE CONNECTIVITY AND THAT THE CIRCUIT IS PROPERLY TAGGED
WITH CIRCUIT ID AND TSR NUMBER OR CCSD.
2) FOR SST: PROVIDE NECESSARY EQUIPMENT AND EXTEND SERVICE FROM THE COMMERCIAL DEMARC TO THE
SDP.
3) FOR THE VENDOR: VENDOR WILL DELIVER SERVICE TO THE COMMERCIAL DEMARC IDENTIFIED IN THE
DOCUMENT.
4) COML ACCESS: WILL NOT LEAK CAT - 5
Location A, INSIDE WIRE INSTALLATION / MAINTENANCE REQUIRED change from:
INSIDE WIRE INSTL/MAINT: CPIWI-YES/CPIWM-NO
CPIWI-YES/CPIWM-NO
Location A, TERMINAL EQUIPMENT change from:
REUSE: CISCO ROUTER 2921/K9 CISCO 9010 IPT-PE ASR ROUTER (DISA PROVIDED)
RE USE: CISCO ROUTER 2921/K9 CISCO 9010 IPT-PE ASR ROUTER (DISA PROVIDED)
Location B, LOCATION OF TERMINATION B change from:
ADDRESS: 271,400 NORTH DOUGLAS AVENUE, ELSEGUNDO, CA 90245-2808
ROOM: 1ST FLOOR ROOM B1-238;
LOCATION: LSAGLAFB
ADDRESS: BLDG 271,400 NORTH DOUGLAS STREET, EL SEGUNDO, CA 90245-2808
ROOM: 1ST FLOOR ROOM B1-238;
LOCATION: LSAGLAFB
Location B, DEMARK change from:
BLDG 271
1ST FLOOR
ROOM B1-238
400 NORTH DOUGLAS AVENUE
EL SEGUNDO, CA 90245-2808
PRI: TODD BARTON, D633-3313, C310-653-3313
EMAIL: TODD.BARTON.1@US.AF.MIL
ORG EMAIL: SMC.TSR.TSO@US.AF.MIL
To:
BLDG 271
1ST FLOOR
ROOM B1-238
400 NORTH DOUGLAS STREET
EL SEGUNDO, CA 90245-2808
PRI: TODD BARTON, D633-3313, C310-653-3313
EMAIL: TODD.BARTON.1@US.AF.MIL
ORG EMAIL: SMC.TSR.TSO@US.AF.MIL
Location B, UNIQUE INSTALLATION FACTORS change from:
1) FOR LOCAL COMMUNICATIONS UNIT: THE LOCAL COMM UNIT
WILL EXTEND SERVICE FROM THE COMMERCIAL DEMARC TO THE
SERVICE DELIVERY POINT (SDP).
FOR CIRCUIT ACTIVATION ASSISTANCE CONTACT DCP
COMMERICIAL ACTIVATION TEAM (CAT) AT D312-850-0820,
C614-692-0820.
DISA REQUIRES THAT CIRCUIT VENDOR OBTAIN A SIGNATURE
FROM A RESPONSIBLE SITE POC CERTIFYING THAT THE VENDOR
PROVIDED THE CONNECTIVITY AND THAT THE CIRCUIT IS PROPERLY
TAGGED WITH CIRCUIT ID AND TSR NUMBER OR CCSD
2) FOR THE VENDOR: VENDOR WILL DELIVER SERVICE TO THE
COMMERCIAL DEMARC IDENTIFIED IN THE DOCUMENT. 3) AN ESCORT IS REQUIRED. ALL VISITORS MUST
CONTACT THE
SITE POC'S FOR ACCESS AT LEAST 48 HOURS PRIOR TO ANY SITE
VISITS. THIS ADVANCE NOTICE WILL BE WAIVED IN THE EVENT OFA CIRCUIT OUTAGE.
4) THE APPROXIMATE DISTANCE FROM THE COMMERCIAL DEMARC
(BLDG 271, ROOM B1238) TO THE DISA HUB ROUTER (BLDG 271, ROOM B1239) IS ABOUT 50 FEET.
1) FOR LOCAL COMMUNICATIONS UNIT: THE LOCAL COMM UNIT WILL EXTEND SERVICE FROM THE COMMERCIAL
DEMARC TO THE SERVICE DELIVERY POINT (SDP). FOR CIRCUIT ACTIVATION ASSISTANCE CONTACT DCP
COMMERICIAL ACTIVATION TEAM (CAT) AT D312-850-0820, C614-692-0820. DISA REQUIRES THAT CIRCUIT VENDOR
OBTAIN A SIGNATURE FROM A RESPONSIBLE SITE POC CERTIFYING THAT THE VENDOR PROVIDED THE
CONNECTIVITY AND THAT THE CIRCUIT IS PROPERLY TAGGED WITH CIRCUIT ID AND TSR NUMBER OR CCSD.
2) FOR THE VENDOR: VENDOR WILL DELIVER SERVICE TO THE COMMERCIAL DEMARC IDENTIFIED IN THE
DOCUMENT.
3) AN ESCORT IS REQUIRED. ALL VISITORS MUST CONTACT THE SITE POC'S FOR ACCESS AT LEAST 48 HOURS
PRIOR TO ANY SITE VISITS. THIS ADVANCE NOTICE WILL BE WAIVED IN THE EVENT OFA CIRCUIT OUTAGE.
4) THE APPROXIMATE DISTANCE FROM THE COMMERCIAL DEMARC (BLDG 271, ROOM B1238) TO THE DISA HUB
ROUTER (BLDG 271, ROOM B1239) IS ABOUT 50 FEET.
Location B, INTERFACE change from:
INTERFACE: 1000BASELX, SM FIBER, SC CONNECTOR
1000BASELX, SM FIBER, SC CONNECTOR
Location B, INSIDE WIRE INSTALLATION / MAINTENANCE REQUIRED change from:
INSIDE WIRE INSTL/MAINT: CPIWI-NO/CPIWM-NO
CPIWI-NO/CPIWM-NO
Location B, TERMINAL EQUIPMENT change from:
COMMERCIAL DEMARK
COMMERCIAL DEMARK; CISCO 9010 IPT-PE ASR ROUTER (DISA PROVIDED)