HC101318QA867:

OTHER IMPORTANT TECH SPECS

-CONTRACTORS SHALL MEET ROUND TRIP DELAY OF 10 MILLISECONDS OR LESS

-GOVERNMENT REQUIRED CHANNELIZATION: 12 STS-1'S (TIMESLOTS 1-12)

SEE UNIQUE INSTALL FACTORS.

AMPLIFYING INFO:

A. VENDOR IS RESPONSIBLE FOR INSTALLATION AND MAINTENANCE OF SINGLE MODE FIBER FROM THE LINE SIDE OF THE DISA IE1 PROVIDED FIBER TERMINATING PATCH PANEL INSTALLED IN THE MSPP SUITE (UMSWARG010) 200 12TH STREET, 5TH FLOOR COMPUTER ROOM TO THE DROP SIDE OF THE COMMERCIAL FIBER POINT OF PRESENCE [FIBER DISTRIBUTION PANEL (FDP)] 200 12TH STREET, 5TH FLOOR COMPUTER ROOM. "SC" TO "SC" CONNECTORS.

B. VENDOR MUST PROVIDE FIBER STRANDS FROM THE MSPP SUITE TO THE DROP SIDE OF THEIR POP/FIBER DISTRIBUTION PANEL WITHOUT SPLICING AND OR USE OF CONNECTORS TO CONNECT 2 OR MORE FIBER STRANDS MEANING THE FIBER CANNOT BE BROKEN IN THE MIDDLE AND MUST BE CONTINUOUS.

C. THE CIRCUIT MUST BE TAGGED WITH THE VENDOR'S CIRCUIT ID AS APPLICABLE AT THE DROP SIDE OF THEIR POINT OF PRESENCE (FIBER DISTRIBUTION PANEL) 200 12TH STREET, 5TH FLOOR COMPUTER ROOM. ADDITIONALLY, VENDOR MUST SHOW SITE PERSONNEL LISTED ON THIS ORDER THE EXACT TERMINATION POINT WHEN INSTALLATION IS COMPLETE.

D. VENDOR MUST SCHEDULE/COORDINATE WITH THE POC'S LISTED ON THIS ORDER 72 HOURS IN ADVANCE PRIOR TO SITE SURVEYS OR INSTALLATIONS.

CRYSTLCY 51BCCI :

(1) (A) VENDOR COMMERCIAL FIBER POINT OF PRESENCE; EQUIPMENT INFORMATION: COMMERCIAL FIBER POINT OF PRESENCE

(B) UNIQUE INST FACT:

(1) FIBER CABLE X-CONNECT, IN-HOUSE, INSIDE WIRE, SINGLE-MODE, 1310NM, TELCO

(2) COMMERCIAL FIBER POINT OF PRESENCE (COMMERCIAL CARRIER SYSTEM)

AMPLIFYING INFO:

A. VENDOR IS RESPONSIBLE FOR INSTALLATION AND MAINTENANCE OF SINGLE MODE FIBER FROM THE LINE SIDE OF THE DISA IE1 PROVIDED FIBER TERMINATING PATCH PANEL INSTALLED IN THE MSPP SUITE (UMSWARG010) 200 12TH STREET, 5TH FLOOR COMPUTER ROOM TO THE DROP SIDE OF THE COMMERCIAL FIBER POINT OF PRESENCE [FIBER DISTRIBUTION PANEL (FDP)] 200 12TH STREET, 5TH FLOOR COMPUTER ROOM. "SC" TO "SC" CONNECTORS.

B. VENDOR MUST PROVIDE FIBER STRANDS FROM THE MSPP SUITE TO THE DROP SIDE OF THEIR POP/FIBER DISTRIBUTION PANEL WITHOUT SPLICING AND OR USE OF CONNECTORS TO CONNECT 2 OR MORE FIBER STRANDS MEANING THE FIBER CANNOT BE BROKEN IN THE MIDDLE AND MUST BE CONTINUOUS.

C. THE CIRCUIT MUST BE TAGGED WITH THE VENDOR'S CIRCUIT ID AS APPLICABLE AT THE DROP SIDE OF THEIR POINT OF PRESENCE (FIBER DISTRIBUTION PANEL) 200 12TH STREET, 5TH FLOOR COMPUTER ROOM. ADDITIONALLY, VENDOR MUST SHOW SITE PERSONNEL LISTED ON THIS ORDER THE EXACT TERMINATION POINT WHEN INSTALLATION IS COMPLETE.

D. VENDOR MUST SCHEDULE/COORDINATE WITH THE POC'S LISTED ON THIS ORDER 72 HOURS IN ADVANCE PRIOR TO SITE SURVEYS OR INSTALLATIONS.

FTBELVOR 51BCCI:

UNIQUE INST FACT:

(1) COMMERCIAL FIBER POINT OF PRESENCE (COMMERCIAL CARRIER SYSTEM)

(2) FIBER CABLE X-CONNECT, IN-HOUSE, INSIDE WIRE, SINGLE-MODE, 1310NM, TELCO

AMPLIFYING INFO:

A. VENDOR IS RESPONSIBLE FOR INSTALLATION AND MAINTENANCE OF SINGLE MODE FIBER FROM THE DROP SIDE OF THE COMMERCIAL FIBER POINT OF PRESENCE [FIBER DISTRIBUTION PANEL (FDP)] BLDG 246, ROOM 203 TO THE LINE SIDE OF THE DISA IE1 PROVIDED FIBER TERMINATING PATCH PANEL INSTALLED IN THE ODXC SUITE (UODWBEL020) BLDG 246, ROOM 210. TERMINATE WITH "SC" CONNECTORS TO DISA PROVIDED FIBER TERMINATING PATCH PANEL.

B. VENDOR MUST PROVIDE FIBER STRANDS FROM THEIR POINT OF PRESENCE TO THE ODXC SUITE WITHOUT SPLICING AND OR USE OF CONNECTORS TO CONNECT 2 OR MORE FIBER STRANDS MEANING THE FIBER CANNOT BE BROKEN IN THE MIDDLE AND MUST BE CONTINUOUS.

C. THE CIRCUIT MUST BE TAGGED WITH THE VENDOR'S CIRCUIT ID AS APPLICABLE AT THE DROP SIDE OF THEIR POINT OF PRESENCE (FIBER DISTRIBUTION PANEL) BLDG 246, ROOM 203. ADDITIONALLY, VENDOR MUST SHOW SITE PERSONNEL LISTED ON THIS ORDER THE EXACT TERMINATION POINT WHEN SERVICE IS COMPLETE.

D. VENDOR MUST SCHEDULE/COORDINATE WITH THE POC'S LISTED ON THIS ORDER 72 HOURS IN ADVANCE PRIOR TO SITE SURVEYS OR INSTALLATIONS.

1. CIRCUIT REQUIRES THE FOLLOWING PARAMETERS:

(A) FIBER TERMINATION: FRAME FORMAT: STS-12, 1310NM RATE: PLUS OR MINUS 20 PPM

(B) GOVERNMENT PROPOSED CHANNELIZATION: 12 STS-1'S (TIMESLOTS 1-12)

(C) LINE MUST REMAIN FULLY OPERATIONAL AND AVAILABLE TO USERS 24 HOURS A DAY, SEVEN DAYS PER WEEK, AT LEAST 99.5% OR BETTER.

(D) REQUEST ONE-HOUR RESPONSE TIME TURN-AROUND TO REPAIR ONCE TROUBLE-CALL HAS BEEN REPORTED.

(E) GFE CLOCKING: VENDOR ESFU (OR EQUIVALENT) NOT TO BE ENGINEERED INTO CIRCUIT.

(F) SINGLE MODE FIBER TERMINATIONS SC/SC CONNECTORS

(G) NO NETWORK INTERFACE UNIT.

(H) DEDICATED PATH.

(I) VENDOR REQUIRED TO HAVE CIRCUIT VISIBILITY TO ASSIST IN ANY CIRCUIT OUTAGES.

(J) VENDOR MUST CONDUCT A SATISFACTORY 72 HOUR END TO END TEST UTILIZING A 2E23 TEST PATTERN IAW ANSI STANDARD T1.514. ADDITIONALLY, VENDOR MUST CONDUCT SATISFACTORY CONUTITY CHECKS AND INITIAL 15 MINUTE END TO END TEST ON EACH STS-1 AND STS-3C. AFTER COMPLETION OF CONUTITY CHECKS AND INITIAL TESTING, VENDOR MUST COMPLETE A SATISFACTORY 72 HOUR END TO END TEST ON THE FIRST STS-1 (TIME-SLOT NUMBER 1) END TO END PRIOR TO TURNING OVER THE OC-12 TO THE ACCEPTING AUTHORITY. THE VENDOR TEST SET/SETS MUST HAVE THE ABILITY TO PRINT THE TEST RESULTS AND THOSE RESULTS MUST BE E-MAILED TO THE ACCEPTING AUTHORITY FOR REVIEW.

(K) VENDOR MUST HAVE A 24X7 NETWORK OPERATIONS CENTER.

(M) THE VENDOR MUST PROVIDE:

1) THE LONG HAUL CIRCUIT NUMBER;

2) THE 1-800 TROUBLE REPORT NUMBER; AND

3) THE LOCAL CIRCUIT IDENTIFIER FOR EACH LOCATION TO THE ACCEPTING AUTHORITY PRIOR TO THE GOVERNMENT ACCEPTING SERVICE. INSIDE WIRING MUST BE COMPLETED AND TESTED PROPERLY PRIOR TO TURNUP TO THE GOVERNMENT.

2. VENDOR WINNING AWARD IS RESPONSIBLE FOR INSTALLATION AND MAINTENANCE OF OC-12 SERVICE IAW THE UNIQUE INSTALLATION FACTORS.

O. REMARKS CONTINUED:

3. INSIDE WIRING IS AUTHORIZED IAW WITH THE UNIQUE INSTALLATION FACTORS.

MINIMUM TECHNICAL SPECIFICATIONS:

SPECIFIC FORMAT TO BE USED IS: LINE RATE: 622.08MB/S 20 PPM. LINE CODE: OPTIC FRAME FORMAT: SONET/STS-12

1. TEST AND ACCEPTANCE: FIBER OPTIC OC-12 CIRCUITS SHALL PASS A FULLY DOCUMENTED SATISFACTORY 72 HOUR SOAK TEST BY THE CONUS AT SCOTT AFB, IL. PRIMARY: (C) 618-229-8691 (D) 779-8691

2. TESTING PARAMETERS AND THRESHOLDS: THE FOLLOWING TESTING PARAMETERS SHALL BE MEASURED DURING TEST AND ACCEPTANCE TESTING. ERROR PERFORMANCE (AVAILABILITY, SES, DM, EFS) AND LOSS OF BIT COUNT INTEGRITY SHALL BE MEASURED AND RECORDED OVER THE DURATION OF THE CONTIGUOUS 72 HOUR TESTING INTERVAL AND SHALL BE MEASURED AND RECORDED PER DEFINITION IN ITU RECOMMENDATION G.826 AND M.2100.

Q. REMARKS CONTINUED:

3. ERROR PERFORMANCE: SHALL BE BETTER THAN THE FOLLOWING PARAMETER THRESHOLDS TO BE ACCEPTABLE:

AVAILABILITY SHALL BE GREATER THAN 99.5% SEVERELY ERRORED SECONDS (SES) SHALL BE LESS THAN 0.02% DEGRADED MINUTES (DM) SHALL BE LESS THAN 0.2% ERROR FREE SECONDS (EFS) SHALL BE GREATER THAN 99%

4. LOSS OF BIT COUNT INTEGRITY (LBCI): LOSS OF BIT COUNT INTEGRITY SHALL BE MONITORED ONLY BY THE FOLLOWING METHOD: USING TEST EQUIPMENT WHICH CAN DETECT AND MEASURE THE OCCURRENCE OF THE INSERTION OR DELETION OF ONE OR MORE BITS INTO THE DIGITAL BIT STREAM, ON MANY MANUFACTURERS BERT TEST EQUIPMENT THIS IS MONITORED USING THE "PATTERN SLIP" PARAMETER WHERE EVERY OCCURRENCE OF A PATTERN SLIP "EVENT" MARKS THE OCCURRENCE OF A LBCI (RATHER THAN THE RAW TOTAL NUMBER OF PATTERN SLIPS ACCUMULATED OVER A TESTING INTERVAL)

5. MEAN TIME TO LOSS OF BIT COUNT INTEGRITY (MTTLBCI) SHALL BE GREATER THAN 24 HOURS.

6. ROUND TRIP DELAY (RTD) SHALL BE LESS THAN OR EQUAL TO 10 MILLISECONDS.

(**UNIQ INSTALL FACTORS**) ADDITIONALLY, VENDOR MUST SHOW SITE PERSONNEL LISTED ON THIS ORDER THE EXACT TERMINATION POINT WHEN SERVICE IS COMPLETED.