MINIMUM TECHNICAL SPECIFICATIONS:

SPECIFIC FORMAT TO BE USED IS: LINE RATE: OC-48C/ 20 PPM. LINE CODE: OPTIC FRAME FORMAT: SONET/STS-48C

1. TEST AND ACCEPTANCE: FIBER OPTIC OC-48C CIRCUITS SHALL PASS A FULLY DOCUMENTED SATISFACTORY 72 HOUR SOAK TEST BY THE CONUS AT SCOTT AFB, IL.

2. TESTING PARAMETERS AND THRESHOLDS: THE FOLLOWING TESTING PARAMETERS SHALL BE MEASURED DURING TEST AND ACCEPTANCE TESTING. ERROR PERFORMANCE (AVAILABILITY, SES, DM, EFS) AND LOSS OF BIT COUNT INTEGRITY SHALL BE MEASURED AND RECORDED OVER THE DURATION OF THE CONTIGUOUS 72 HOUR TESTING INTERVAL AND SHALL BE MEASURED AND RECORDED PER DEFINITION IN ITU RECOMMENDATION G.826 AND M.2100.

3. ERROR PERFORMANCE: ERROR PERFORMANCE SHALL BE BETTER THAN THE FOLLOWING PARAMETER THRESHOLDS TO BE ACCEPTABLE: AVAILABILITY SHALL BE GREATER THAN 99.5% OR BETTER SEVERELY ERRORED SECONDS (SES) SHALL BE LESS THAN 0.02% DEGRADED MINUTES (DM) SHALL BE LESS THAN 0.2% ERROR FREE SECONDS (EFS) SHALL BE GREATER THAN 99%

4. LOSS OF BIT COUNT INTEGRITY (LBCI): LOSS OF BIT COUNT INTEGRITY SHALL BE MONITORED ONLY BY THE FOLLOWING METHOD: USING TEST EQUIPMENT WHICH CAN DETECT AND MEASURE THE OCCURRENCE OF THE INSERTION OR DELETION OF ONE OR MORE BITS INTO THE DIGITAL BIT STREAM, ON MANY MANUFACTURERS BERT TEST EQUIPMENT THIS IS MONITORED USING THE "PATTERN SLIP" PARAMETER WHERE EVERY OCCURRENCE OF A PATTERN SLIP "EVENT" MARKS THE OCCURRENCE OF A LBCI (RATHER THAN THE RAW TOTAL NUMBER OF PATTERN SLIPS ACCUMULATED OVER A TESTING INTERVAL)

5. MEAN TIME TO LOSS OF BIT COUNT INTEGRITY (MTTLBCI) SHALL BE GREATER THAN 24 HOURS.

6. ROUND TRIP DELAY (RTD): RTD SHALL BE MEASURED OVER THE OC-48C CIRCUIT AND SHALL BE LESS THAN OR EQUAL TO (10) MILLISECONDS.

AMPLIFYING INFO:

A. VENDOR IS RESPONSIBLE FOR INSTALLATION AND MAINTENANCE SINGLE MODE FIBER FROM THE LINE SIDE OF THE DISA PROVIDED FIBER TERMINATING PATCH PANEL INSTALLED IN THE CISCO ASR-9010 ROUTER SUITE (UJEWKNO030) BLDG 1227, ROOM 109 TO THE DROP SIDE OF THE COMMERCIAL FIBER POINT OF PRESENCE FIBER DISTRIBUTION PANEL BLDG 1227, ROOM 109. COORDINATE TYPE OF CONNECTORS FOR TERMINATION TO THE DISA PROVIDED PATCH PANEL.

B. VENDOR MUST COORDINATE WITH GOVERNMENT SITE PERSONNEL TO CONDUCT WALK THROUGH SITE SURVEYS FOR EXACT CABLE FT. FROM THE DISA PROVIDED FIBER TERMINATING PATCH PANEL INSTALLED IN THE CISCO ASR-9010 ROUTER SUITE BLDG 1227, ROOM 109 TO THE COMMERCIAL FIBER POINT OF PRESENCE BLDG 1227, ROOM 109.

C. VENDOR MUST PROVIDE FIBER STRANDS FROM THE COMMERCIAL DEMARC TO THE CISCO SUITE LOCATION WITHOUT SPLICING AND OR USE OF CONNECTORS TO CONNECT 2 OR MORE FIBER STRANDS MEANING THE FIBER CANNOT BE BROKEN IN THE MIDDLE AND MUST BE CONTINUOUS.

D. THE LENGTH OF SINGLE-MODE FIBER JUMPERS REQUIRED WILL BE BASED ON THE LOCATION OF THE VENDOR'S FIBER MUX/FIBER DISTRIBUTION PANEL.

E. VENDOR MUST SCHEDULE/COORDINATE WITH THE POC'S LISTED ON THIS ORDER 72 HOURS IN ADVANCE PRIOR TO SITE SURVEYS OR INSTALLATIONS.

AMPLIFYING INFO:

A. VENDOR IS RESPONSIBLE FOR INSTALLATION AND MAINTENANCE OF SINGLE MODE FIBER FROM THE COMMERCIAL FIBER POINT OF PRESENCE FIBER DISTRIBUTION PANEL BLDG 1575, ROOM C-1B, TO LINE SIDE OF THE DISA IE1 PROVIDED FIBER TERMINATING PATCH PANEL INSTALLED IN THE CISCO ASR-9010 ROUTER SUITE (UJEWSCO030) BLDG 1575, ROOM C-1B. COORDINATE TYPE CONNECTORS FOR TERMINATION TO THE DISA PROVIDED PATCH PANEL.

B. VENDOR MUST COORDINATE WITH GOVERNMENT SITE PERSONNEL TO CONDUCT WALK THROUGH SITE SURVEYS FOR EXACT CABLE FT. FROM THE COMMERCIAL FIBER POINT OF PRESENCE BLDG 1575, ROOM C-1B TO THE DISA PROVIDED FIBER TERMINATING PATCH PANEL INSTALLED IN THE CISCO ASR-9010 ROUTER SUITE BLDG 1575,ROOM C-1B.

C. VENDOR MUST PROVIDE FIBER STRANDS FROM THE COMMERCIAL DEMARC TO THE CISCO SUITE LOCATION WITHOUT SPLICING AND OR USE OF CONNECTORS TO CONNECT 2 OR MORE FIBER STRANDS MEANING THE FIBER CANNOT BE BROKEN IN THE MIDDLE AND MUST BE CONTINUOUS.

D. THE LENGTH OF SINGLE-MODE FIBER JUMPERS REQUIRED WILL BE BASED ON THE LOCATION OF THE VENDOR'S FIBER MUX/FIBER DISTRIBUTION PANEL.

E. VENDOR MUST SCHEDULE/COORDINATE WITH THE POC'S LISTED ON THIS ORDER 72 HOURS IN ADVANCE PRIOR TO SITE SURVEYS OR INSTALLATIONS.