ADDITIONAL REQUIREMENTS FOR HC101318QA683
***ATTENTION WHITE SANDS LOCATION***
1. TELECOMM PROVIDER MUST PROVIDE DITCO COLOR POWERPOINT
DRAWINGS FOR TECHNICAL REVIEW SHOWING THE ROUTES FROM
THE COMMERCIAL DEMARCS TO THE SUPPORING CENTRAL
OFFICES AND OR WIRING CENTERS. DRAWINGS ALSO TO
INCLUDE TOTAL FIBER MILES AND ROUND TRIP DELAY (RTD).
2. VENDOR MUST DELIVER OC-48C SERVICE 2W (UNPROTECTED)
FROM THE COML DEMARC TO THE GOVERNMENT SERVICE
DELIVERY POINT AT BOTH LOCATIONS.
3. REQUEST VENDOR PROVIDE LIGHT LEVEL READINGS (DB LOSS)
ON EXTENSION FROM THE COMMERCIAL POP TO THE GOVERNMENT
SERVICE DELIVERY POINT (SDP) AT BOTH LOCATIONS PRIOR
TO CIRCUIT TURN UP TO THE GOVERNMENT ENSURING
OPERATIONAL SERVICE DATE: 310800Z JUL 18 SIP
ANY ADDRESSEE ON THE TSO WILL NOTIFY ALL
ADDRESSEES IMMEDIATELY BY MESSAGE IDENTIFYING ANY ISSUES,
PROBLEMS, OR SITUATIONS WHICH MAY PREVENT OR DELAY THE
IMPLEMENTATION OF THIS TELECOMMUNICATIONS SERVICE ORDER (TSO).
ALL STATIONS WILL REVIEW THE CONFIGURATION, EQUIPMENT, CONTACT
NUMBERS AND ADDRESSES CONTAINED IN THIS TSO AND PROVIDE UPDATES
TO ORIGINATOR OF TSO ANY ERRORS SO THAT SUBSEQUENT TSOS MAY BE
UPDATED. THE LEVELS ARE WITHIN SPECS. LIGHT LEVELS MUST
BE ADJUSTED TO -5 TO -13.
***VENDOR MUST TERMINATE OC-48C SERVICE AT THE JUNIPER SUITE
LOCATIONS IAW UNIQUE INSTALLATION FACTORS.***
4. VENDOR MUST CONDUCT WALK-THROUGH SITE SURVEY PRIOR TO
INSTALLATION AT BOTH LOCATIONS.
5. VENDOR MUST CONTACT CONUS IP BACKBONE ENGINEERING AND
IMPLEMENTATION GROUP UPON RECEIPT OF A VALID TSO TO ESTABLISH THE
COORDINATION AND ACTIVATION PROCESS. (C) 618-220-8843 (D)
770-8843
6. VENDOR MUST CONDUCT A SATISFACTORY 72 HOUR END TO END TEST
PRIOR TO TURN OVER TO THE GOVERNMENT FOR ACCEPTANCE TESTING.
7. THE OC-48C SERVICE MUST PASS A DOCUMENTED SATISFACTORY 72
HOUR END TO END TEST IAW ITU STANDARD M.2101 PRIOR TO TURN UP TO
THE GOVERNMENT.
REMARKS:
1. CIRCUIT REQUIRES THE FOLLOWING PARAMETERS:
(A) FIBER TERMINATION: FRAME FORMAT: STS-48C, 1310NM
RATE: PLUS OR MINUS 20 PPM USER PROVIDED STS-48C FRAMING FROM
GOVT JUNIPER SWITCH
(B) NO CHANNELIZATION REQUIRED.
(C) LINE MUST REMAIN FULLY OPERATIONAL AND AVAILABLE TO USERS 24
HOURS A DAY, SEVEN DAYS PER WEEK, AT LEAST 99.5% OR BETTER.
(D) REQUEST ONE-HOUR RESPONSE TIME TURN-AROUND TO REPAIR ONCE
TROUBLE-CALL HAS BEEN REPORTED.
(E) GFE CLOCKING: VENDOR ESFU (OR EQUIVALENT) NOT TO BE
ENGINEERED INTO CIRCUIT.
(F) SINGLE MODE FIBER TERMINATIONS SC/SC CONNECTORS
(G) NO NETWORK INTERFACE UNIT.
(H) DEDICATED PATH.
(I) VENDOR REQUIRED TO HAVE CIRCUIT VISIBILITY TO ASSIST IN ANY
CIRCUIT OUTAGES.
(J) VENDOR MUST TEST THE CIRCUIT END TO END FOR 72 HOURS
UTILIZING A 2E23 TEST PATTERN.
(K) VENDOR MUST HAVE A 24X7 NETWORK OPERATIONS CENTER.
(L) THE COMMERCIAL CIRCUIT WILL BE ACCEPTED ON BEHALF OF THE
GOVERNMENT BY THE CONUS IP BACKBONE ENGINEERING AND
IMPLEMENTATION GROUP, SCOTT AFB, IL. (C) 618-220-8843 (D)
770-8843
(M) VENDOR MUST PROVIDE: 1) THE LONG HAUL CIRCUIT NO. AND LEC
CKT ID. PRIOR TO TURN UP TO THE GOVERNMENT.
2. VENDOR WINNING AWARD IS RESPONSIBLE FOR INSTALLATION AND
MAINTENANCE OF OC-48C SERVICE IAW THE UNIQUE INSTALLATION
FACTORS.
3. INSIDE WIRING IS AUTHORIZED IAW WITH THE UNIQUE INSTALLATION
FACTORS.
4. VENDOR MUST COORDINATE SITE VISIT WITH POC'S 72 HOURS IN
ADVANCE PRIOR TO REQUIRING ACCESS TO FACILITIES AT BOTH USER
LOCATIONS. IF UNABLE TO REACH SITE POC'S CONTACT KEN DIEF OR RAY
BURKE IMMEDIATELY FOR ASSISTANCE AT: (301) 225-2416/2550
5. ALL EQUIPMENT AND CIRCUIT PROBLEMS WILL BE REPORTED BY PHONE
TO THE CONUS IP BACKBONE ENGINEERING AND IMPLEMENTATION GROUP,
SCOTT AFB, IL. PRIMARY: (C) 618-220-9950(D) 770-9950 TOLL FREE:
855-868-9950
6. DD FORM 1368 WILL BE SUBMITTED ON THIS TRUNK IAW DISAC-DITCO
350-135-1 BY RNSOC, SCOTT AFB, IL. GUIDANCE ON SUBMISSION IS
AVAILABLE AT
<HTTP://WWW.DITCO.DISA.MIL/ASP/PUBLICATIONS.ASP>.
CLICK ON "DISA-DITCO CIRCULAR, 350-135-1, DEFENSE COMMERCIAL
COMMUNICATIONS ACQUISITION PROCEDURES."
MINIMUM TECHNICAL SPECIFICATIONS:
SPECIFIC FORMAT TO BE USED IS:
LINE RATE: OC-48C/ 20 PPM.
LINE CODE: OPTIC
FRAME FORMAT: SONET/STS-48C
1. TEST AND ACCEPTANCE: FIBER OPTIC OC-48C CIRCUITS SHALL PASS A
FULLY DOCUMENTED SATISFACTORY 72 HOUR SOAK TEST BY THE CONUS AT
SCOTT AFB, IL. PRIMARY: (C) 618-229-8691 (D) 779-8691
2. TESTING PARAMETERS AND THRESHOLDS: THE FOLLOWING TESTING
PARAMETERS SHALL BE MEASURED DURING TEST AND ACCEPTANCE TESTING.
ERROR PERFORMANCE (AVAILABILITY, SES, DM, EFS) AND LOSS OF BIT
COUNT INTEGRITY SHALL BE MEASURED AND RECORDED OVER THE DURATION
OF THE CONTIGUOUS 72 HOUR TESTING INTERVAL AND SHALL BE MEASURED
AND RECORDED PER DEFINITION IN ITU
RECOMMENDATION G.826 AND M.2100.
3. ERROR PERFORMANCE: ERROR PERFORMANCE SHALL BE BETTER THAN THE
FOLLOWING PARAMETER THRESHOLDS TO BE ACCEPTABLE:
AVAILABILITY SHALL BE GREATER THAN 99.5% OR BETTER SEVERELY
ERRORED SECONDS (SES) SHALL BE LESS THAN 0.02% DEGRADED MINUTES (DM) SHALL BE LESS THAN 0.2% ERROR FREE SECONDS (EFS) SHALL BE GREATER THAN 99%
4. LOSS OF BIT COUNT INTEGRITY (LBCI): LOSS OF BIT
COUNT INTEGRITY SHALL BE MONITORED ONLY BY THE
FOLLOWING METHOD: USING TEST EQUIPMENT WHICH CAN
DETECT AND MEASURE THE OCCURRENCE OF THE INSERTION
OR DELETION OF ONE OR MORE BITS INTO THE DIGITAL
BIT STREAM, ON MANY MANUFACTURERS BERT TEST
EQUIPMENT THIS IS MONITORED USING THE "PATTERN
SLIP" PARAMETER WHERE EVERY OCCURRENCE OF A PATTERN
SLIP "EVENT" MARKS THE OCCURRENCE OF A LBCI (RATHER
THAN THE RAW TOTAL NUMBER OF PATTERN SLIPS
ACCUMULATED OVER A TESTING INTERVAL)
5. MEAN TIME TO LOSS OF BIT COUNT INTEGRITY (MTTLBCI)
SHALL BE GREATER THAN 24 HOURS.
6. ROUND TRIP DELAY (RTD): RTD SHALL BE MEASURED OVER THE
OC-48C CIRCUIT AND SHALL BE LESS THAN OR EQUAL TO
(10) MILLISECONDS.
CISCO ASR-9010 ROUTER (GFE)(DISA IE1 PROVIDED)
OPTICAL INTERFACE CARD (SPA-2XOC48POS/RPR)
(GFE)(DISA IE1 PROVIDED)
RACK/SHELF/SLOT/PORT - TBD
FIBER TERMINATING PATCH PANEL (GFE)(DISA IE1 PROVIDED)
RACK/SHELF/PORT - TBD
(1) CISCO ASR-9010 ROUTER (GFE)(DISA IE1 PROVIDED)
NODE ID: UJEWKEL030
(2) OPTICAL INTERFACE CARD (SPA-2XOC48POS/RPR)
(GFE)(DISA IE1 PROVIDED)
RACK/SHELF/SLOT/PORT - TBD
(3) FIBER CABLE X-CONNECT, IN-HOUSE, INSIDE WIRE,
SINGLE-MODE, 1310NM, DISA IE4
(4) FIBER TERMINATING PATCH PANEL (GFE)(DISA IE1 PROVIDED)
RACK/SHELF/PORT - TBD
(5) FIBER CABLE X-CONNECT, IN-HOUSE, INSIDE WIRE,
SINGLE-MODE, 1310NM, TELCO
AMPLIFYING INFO:
A. DISA IE4 IS RESPONSIBLE FOR INSTALLATION AND GSM-O
FOR MAINTENANCE OF THE CISCO ASR-9010 ROUTER, OPTICAL
INTERFACE CARD BLDG 200, COMPUTER ROOM #2.
B. DISA IE4 IS RESPONSIBLE FOR INSTALLATION AND GSM-O OF
SINGLE MODE FIBER FROM THE OPTICAL INTERFACE CARD
INSTALLED IN THE CISCO ASR-9010 ROUTER TO THE DROP
SIDE OF THE DISA IE1 PROVIDED FIBER TERMINATING PATCH
PANEL INSTALLED IN THE CISCO ASR-9010 SUITE. TYPE
CONNECTORS TBD.
C. VENDOR IS RESPONSIBLE FOR INSTALLATION AND MAINTENANCE
OF SINGLE MODE FIBER FROM THE LINE SIDE OF THE DISA
PROVIDED FIBER TERMINATING PATCH PANEL INSTALLED IN THE
CISCO ASR-9010 ROUTER SUITE (UJEWKEL030) BLDG 200,
COMPUTER ROOM #2 TO THE DROP SIDE OF THE COMMERCIAL
FIBER POINT OF PRESENCE FIBER DISTRIBUTION PANEL BLDG
200, COMPUTER ROOM #2. COORDINATE TYPE OF CONNECTORS
FOR TERMINATION TO THE DISA PROVIDED PATCH PANEL.
D. THE LENGTH OF SINGLE MODE FIBER JUMPERS REQUIRED
WILL BE BASED ON THE LOCATION OF THE VENDOR'S FIBER
MUX/FIBER DISTRIBUTION PANEL.
E. THE CIRCUIT MUST BE TAGGED WITH THE LOCAL CIRCUIT ID
AND LONG HAUL CIRCUIT NO. AT THE LINE SIDE OF THE DISA
PROVIDED FIBER TERMINATING PATCH PANEL BLDG 200,
COMPUTER ROOM #2 AND AT THE DROP SIDE OF THE VENDOR'S
FIBER DISTRIBUTION PANEL INSTALLED IN THEIR SONET
EQUIPMENT SUITE. ADDITIONALLY, VENDOR MUST SHOW SITE
PERSONNEL LISTED ON THIS ORDER THE EXACT TERMINATION
POINT WHEN SERVICE IS COMPLETE.
(** ADDITIONAL PROVISIONING INFORMATION **) (ORG ACCT) DISA
(DISN IP ROUTER NETWORK BACKBONE AND BACKBONE HOSTS)(CONUS
AND OCONUS)
R. REMARKS CONTINUED: FUNDING TCO APL: (** ON BEHALF OF **) DEFENSE
INFORMATION SYSTEMS AGENCY