AMENDMENT 1
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Vendor_Block_Sample_Version2.pdf | ||
| Vendor_Sample_Maps_Version2.pdf | ||
| HC101318QA668.v1.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
IQO INQUIRY
FM: PL8211
TO: Contractors
DATE (MM/DD/YYYY): 8/9/2018
SUBJECT: HC101318QA668-0001 Amend: 0001
A. TYPE ACTION: AMEND
1. PURPOSE: ***AMENDMENT 0001 IS ISSUED TO CHANGE ETHERNET FRAME SIZE
TO BE CONFIGURED TO SUPPORT MAXIMUM TRANSMISSION UNIT (PHYSICAL MTU) OF
9100 OCTETS (BYTES) JUMBO FRAMES, ADD TSP CODE, ADD LIGHT LEVEL READING
REQUIREMENTS, ADD SITE SURVEY REQUIREMENTS, REVISE THE PROPOSAL DUE DATE
TO 28 AUG 18 AND SERVICE DATE TO 23 JAN 19 (SIP) TO COMPLY WITH PROCUREMENT
ACQUISITION LEAD TIME (PALT) FOR THIS TYPE OF SERVICE. SERVICE DATES AND/
OR LEAD TIMES BEYOND THE REQUESTED SERVICE DATE WILL NOT BE ACCEPTED.
OFFERORS MUST REVISE THEIR QUOTES TO ACCOUNT FOR CHANGES TO THE SERVICE
DATE, TO ENSURE THE MAPS/DRAWINGS SHOW ENOUGH DETAIL FOR EVALUATOR TO
DETERMINE THAT DIVERSITY IS MET. (SEE SAMPLE MAPS INCLUDED WITH SOLICITATION
TO ENSURE THAT THE LEVEL OF DETAIL IS INCLUDED). FAILURE TO PROVIDE DETAILED
MAPS/DRAWINGS TO DETERMINE THAT DIVERSITY IS MET WILL RENDER QUOTES
TECHNICALLY UNACCEPTABLE. VENDORS ARE DIRECTED TO REVISE MAPS/DRAWINGS
AND ENSURE THAT INFORMATION ABOUT FIBER ROUTE MILES, RTD, IS THE VENDOR ON
NET, LOCATION OF EQUIPMENT, 50 METER, SEPARATION REQUIRED FOR TRUE DIVERSITY
IS CLEARLY REFLECTED IN MAPS/DRAWINGS. MAPS WITH MISSING INFORMATION OR
INACCURATE INFORMATION WILL BE EVALUATED TECHNICALLY UNACCEPTABLE AND
NOT CONSIDER FOR AWARD. VENDORS NEED TO VALIDATE QUOTES AS STILL VALID. ALL
OTHER TECHNICAL SPECIFICATIONS MUST ALSO BE MET.***
SUBMIT A QUOTE TO PROVIDE, INSTALL, AND MAINTAIN A 1 GIGABIT ETHERNET CIRCUIT
BETWEEN BLDG 806, RM 106, 2395 KIRKBRIDGE DRIVE, NIAGARA FALLS, NY AND BLDG 9800, RM 2AB104-3, 9800 SAVAGE ROAD, FORT GEORGE G MEADE, MD.
ESTABLISH TSP: TSP0H91TP-01
THE COMMITTED INFORMATION RATE (CIR) (1.0GBE) WILL REQUIRE VENDOR TO DELIVER
1.0GB ETHERNET INTERFACE (OPITCAL HANDOFF-1000BASE-LX-SINGLE MODE FIBER) AT
THE DROP SIDE OF THE COMMERCIAL DEMARC'S AT THE "A" AND "Z" LOCATIONS.
RTD SHALL BE MEASURED OVER THE 1GB CIRCUIT AND SHALL BE LESS THAN OR EQUAL
TO 10 MILLISECONDS.
VENDOR MUST PROVIDE LIGHT LEVEL READINGS (SIGNAL STRENGTH IN DBM) ON
EXTENSION FROM COMMERCIAL POP TO GOVERNMENT SERVICE DELIVERY POINT (SDP)
AT THE "A" AND "Z" LOCATION PRIOR TO CIRCUIT TURN OVER TO THE GOVERNMENT
ENSURING LEVELS ARE WITHIN SPECS. LIGHT LEVELS MUST BE ADJUSTED TO -3 TO -9
DBM.
HC101318QA668-0001
VENDOR MUST CONDUCT WALK-THROUGH SITE SURVEY PRIOR TO INSTALLATION AT THE
"A" AND "Z" LOCATIONS.
SEE UNIQUE INSTALL FACTORS.
VENDORS MUST CLEARLY STATE IN QUOTES THEIR COMPLIANCE WITH GOVERNMENT
TESTING AND ACCEPTANCE REQUIREMENTS
2. EACH CONTRACTOR IS RESPONSIBLE FOR READING AND COMPLYING WITH ALL
TECHNICAL ASPECTS OF THIS SOLICITATION, TO INCLUDE READING AND AGREEING
WITH THE STANDARD PROVISIONS, ATTACHMENTS LISTING SPECIFIC TECHNICAL
REQUIREMENTS, PRICE QUOTE REQUIREMENTS, AND REQUESTED SERVICE DATE.
FAILURE TO READ AND ADHERE TO ANY PORTION OF THE INQUIRY SHALL RENDER THE
QUOTE NON-COMPLIANT AND RESULT IN IT BEING EXCLUDED FROM EVALUATION AND
AWARD.
3. THE SERVICE DATE TO BE MET IS: 23 JAN 19 (SIP). THE GOVERNMENT ASSUMES THAT
CONTRACTORS HAVE CONSIDERED ALL ISSUES THAT MAY IMPACT THE SERVICE DATE.
THE GOVERNMENT MAY CANCEL, TERMINATE, OR REQUEST CONSIDERATION IAW
STANDARD PROVISION 42 FOR FAILURE TO MEET CONTRACTUAL SERVICE DATE OR
COMPLY WITH ANY CONTRACT TERMS OR CONDITIONS.
4. CONTRACTORS SHALL SUBMIT QUOTES IAW STANDARD PROVISION 04. QUOTES
SHALL INCLUDE SUFFICIENT DETAIL FOR EFFECTIVE EVALUATION AND SHOULD
NOT SIMPLY REPHRASE OR RESTATE THE GOVERNMENT REQUIREMENTS. RATHER,
THEY MUST PROVIDE CONVINCING RATIONALE TO ADDRESS HOW THE CONTRACTOR
INTENDS TO MEET THE REQUIREMENT. IN RESPONSE TO THIS SOLICITATION, NO
TERMS OR CONDITIONS PLACED UPON THE GOVERNMENT, NOR ASSUMPTIONS WILL BE
ACCEPTED. CONTRACTORS ARE ENCOURAGED TO SUBMIT QUESTIONS AND REQUEST
CLARIFICATIONS OF THE REQUIREMENT (S) BEFORE SUBMITTING QUOTES. QUESTIONS
SHALL BE SUBMITTED TO CONTRACT SPECIALIST AND CONTRACTING OFFICER DURING
THE SOLICITATION PHASE ONLY, AND RESPONSES FOR ALL INTERESTED PARTIES WILL BE
POSTED TO FEDBIZOPPS. QUOTES MUST BE UPLOADED TO IDEAS.
5. ETHERNET TESTING MUST BE COORDINATED WITH CUSTOMER ACCEPTANCE
AUTHORITY AT BOTH LOCATIONS BEFORE NOTICE OF COMPLETION IS SUBMITTED TO
DITCO.
FOR DISA ETHERNET REQUIREMENTS THE ACCEPTING AUTHORITY IS:
Michael Reeves - michael.b.reeves.ctr@mail.mil, 618-220-8973
Clarence Moore - clarence.s.moore.ctr@mail.mil, 618-220-9935
6. THIS REQUIREMENT MUST BE WORKED IN CONJUNCTION WITH SOLICITATION
HC101318QA989/TSR RU13FEB185753 AND MUST BE ENGINEERED AND PROVISIONED
TOTALLY DIVERSE END TO END FROM THE GOVERNMENT SERVICE DELIVERY POINTS
(SDP) FROM TSR RU13FEB185753; MEANING THE PHYSICAL PATHS ARE TOTALLY
SEPARATE INCLUDING MAN HOLES, CONDUIT, CENTRAL OFFICE LOCATIONS, AND FIBER
BUILDS. ADDITIONALLY AS A MINIMUM MUST HAVE 50 METERS PHYSICAL SEPARATION
FROM TSR RU13FEB185753.
7. CONTRACTOR SHALL PROVIDE COLOR POWERPOINT DRAWINGS SHOWING THE ROUTES
FROM THE COMMERCIAL DEMARKS TO THE SUPPORTING CENTRAL OFFICES AND/OR
WIRING CENTERS, ENSURING THE PHYSICAL END TO END DIVERSITY REQUIREMENTS ARE
BEING MET. DRAWINGS MUST INCLUDE SEPARATION DISTANCES, TOTAL FIBER MILES
AND ROUND TRIP DELAY BASED ON ACTUAL DISTANCE IN MILES. REFER TO STANDARD
PROVISION 39 FOR SPECIFIC DOCUMENTATION REQUIREMENTS. SAMPLE DRAWINGS ARE
INCLUDED THE ATTACHMENTS.
8. PRE AWARD SITE SURVEYS ARE AUTHORIZED (AT CONTRACTOR EXPENSE) WITH LOCAL
POCS AT EACH GOVERNMENT SITE. IT IS HIGHLY RECOMMENDED THAT AT A MINIMUM,
CONTRACTORS CONDUCT PHONE SURVEYS TO ADEQUATELY ASSESS THE MAGNITUDE OF
THE WORK TO BE PERFORMED IN DETERMINING THEIR PRICE STRATEGY.
9. CIRCUIT PARAMETERS:
(A) FIBER TERMINATION: FRAME FORMAT: 1.0GB ETHERNET (OPITCAL
HANDOFF-1000BASE-LX-SINGLE MODE FIBER), 802.3Z, 1310NM. "SC" CONNECTORS;
(B) COMMITTED INFORMATION RATE (CIR) - 1GB.
(C) 1.0GB ETHERNET FRAMING REQUIRED AT COMMERCIAL DEMARC AT THE A AND Z
LOCATIONS.
(D) ETHERNET FRAME SIZE WILL BE CONFIGURED TO SUPPORT MAXIMUM TRANSMISSION
UNIT (MTU) OF 9100 OCTETS (BYTES).
(E) NO NETWORK INTERFACE UNIT, DEDICATED PATH
(F) GFE CLOCKING: VENDOR ESFU (OR EQUIVALENT) NOT TO BE ENGINEERED INTO
CIRCUIT.
(G) TESTING CRITERIA: VENDOR MUST TEST THE CIRCUIT FOR 24 HOURS IAW ITU-T.Y.1564
BENCH MARKING CONFIGURATION AND PERFORMANCE OF ETHERNET SERVICE. NOTE-
ETHERNET FRAME SIZE DESIGNATOR 'H' (MTU) IS EQUAL TO 9100 BYTES.
(H) LINE MUST REMAIN FULLY OPERATIONAL AND AVAILABLE TO USERS 24 HOURS A DAY,
SEVEN DAYS PER WEEK, AT LEAST 99.5% OR BETTER.
(I) 1 HOUR RESPONSE TIME TO RESPOND TO CUSTOMER UPON RECIEPT OF TROUBLE.
(J) VENDOR REQUIRED TO HAVE CIRCUIT VISIBILITY TO ASSIST IN ANY CIRCUIT OUTAGES.
(K) VENDOR MUST HAVE A 24X7 NETWORK OPERATIONS CENTER.
(L) TELECOMM PROVIDER MUST MAINTAIN OPERATIONS, MAINTENANCE AND
ADMINISTRATION MONITORING OF ETHERNET CIRCUIT IAW ITU-T-Y.1731.
(M) THE COMMERCIAL CIRCUIT WILL BE ACCEPTED ON BEHALF OF THE GOVERNMENT BY
THE DISA GOC IP BACKBONE ENGINEERING AND IMPLEMENTATION GROUP, SCOTT AFB, IL.
(C) 618-220-8627 (D) 770-8627.
(N) VENDOR MUST PROVIDE:
1. THE LONG-HAUL CIRCUIT NO. AND LEC CKT ID'S AS APPLICABLE TO THE DISA IE161
PROGRAM OFFICE PRIOR TO TURN UP TO THE GOVERNMENT. PRIMARY: KEN DIEF (301)
225-2416.
2. VENDOR WINNING AWARD IS RESPONSIBLE FOR INSTALLATION AND MAINTENANCE OF
1GBE SERVICE IAW THE UNIQUE INSTALLATION FACTORS.
3. INSIDE WIRING IS AUTHORIZED IAW THE UNIQUE INSTALLATION FACTORS.
4. VENDOR MUST COORDINATE SITE VISIT WITH POC'S 72 HOURS IN ADVANCE PRIOR TO
REQUIRING ACCESS TO FACILITIES AT BOTH USER LOCATIONS.
5. ALL EQUIPMENT AND CIRCUIT PROBLEMS WILL BE REPORTED BY PHONE TO THE
DISA GOC IP BACKBONE ENGINEERING AND IMPLEMENTATION GROUP, SCOTT AFB, IL.
PRIMARY: (C) 618-220-9950, (D)770-9950 TOLL FREE: 855-868-9950
6. DD FORM 1368 WILL BE SUBMITTED ON THIS TRUNK IAWDISAC-DITCO 350-135-1 BY
RNSOC, SCOTT AFB, IL. GUIDANCE ON SUBMISSION IS AVAILABLE AT CLICK ON "DISA-
DITCO CIRCULAR, 350-135-1, DEFENSE COMMERCIAL COMMUNICATIONS ACQUISITION
PROCEDURES."
M. ADDITIONAL INFORMATION:
3. TSR NUMBER: RU13FEB185752
4. CCSD: XXXXBB8J
Z. DITCO CONTACT:
Robin Schuster
618-229-9649 robin.n.schuster.civ@mail.mil
Angelina Hutson
DITCO Contracting Officer
Unless otherwise specified, all other terms and conditions are unchanged.
Paragraph E.SERVICE DATE change from:
Nov 26, 2018
To:
Jan 23, 2019
Paragraph M.3.TSR NUMBER change from:
RU13FEB185752A
RU13FEB185752
Paragraph M.10.TESTING REQUIREMENTS change from:
VENDOR MUST COORDINATE SITE VISIT WITH POC'S 72 HOURS IN ADVANCE PRIOR TO REQUIRING ACCESS TO
FACILITIES AT BOTH USER LOCATIONS.
PROVIDER MUST CONDUCT A SATISFACTORY 24-HOUR TEST FROM THE DROP SIDE OF THEIR OR LOCAL
EXCHANGE CARRIERS FDP INSTALLED IN THEIR EQUIPMENT SUITE AT THE "A" LOCATION TO THE GOVERNMENT'S
SDP AT THE "Z" LOCATION AND MUST INCLUDE THE EXTENSION BETWEEN THE COMMERCIAL DEMARC AND THE
GOVERNMENT'S SDP AT THE "Z" LOCATION. VENDOR MUST ENSURE A TEST SET IS PLACED AT THE DROP SIDE OF
TELECOMM PROVIDER'S OR LOCAL ACCESS PROVIDERS FDP AS APPLICABLE AT THE "A" LOCATION AND A
SECOND TEST SET AT THE END OF THE FIBER JUMPERS TO BE USED FOR TERMINATION TO THE GOVERNMENT'S
SDP AT THE "Z" LOCATION. TESTING MUST BE SATISFACTORY PRIOR TO TURN OVER TO THE GOVERNMENT FOR
ACCEPTANCE TESTING.
TESTING CRITERIA: VENDOR MUST TEST THE CIRCUIT FOR 24 HOURS IAW ITU-T.Y.1564 BENCH MARKING
CONFIGURATION AND PERFORMANCE OF ETHERNET SERVICE. NOTE-ETHERNET FRAME SIZE DESIGNATOR 'H'
(MTU) IS EQUAL TO 9192 BYTES.
TEST & ACCEPTANCE INSTRUCTIONS: VENDOR MUST COORDINATE SITE VISIT WITH POC'S 72 HOURS IN ADVANCE
PRIOR TO REQUIRING ACCESS TO FACILITIES AT BOTH USER LOCATIONS.
ALL EQUIPMENT AND CIRCUIT PROBLEMS WILL BE REPORTED BY PHONE TO THE DISA GOC IP BACKBONE
ENGINEERING AND IMPLEMENTATION GROUP, SCOTT AFB, IL. PRIMARY: (C) 618-220-9950, (D)770-9950 TOLL FREE:
855-868-9950
MINIMUM TECHNICAL SPECIFICATIONS:
SPECIFIC FORMAT TO BE USED IS:
LINE RATE: 1.0709 GIGABITS/S, +- 100 PPM LINE CODE: OPTIC
ETHERNET FRAME: 9192 OCTETS (BYTES)
1. TEST AND ACCEPTANCE: FIBER OPTIC 1.0GB CIRCUITS SHALL PASS A FULLY DOCUMENTED SATISFACTORY 72
HOUR SOAK TEST BY DISA GOC AT SCOTT AFB, IL. PRIMARY: (C) 618-229-8691 (D) 779-8691;
2. TESTING PARAMETERS AND THRESHOLDS: THE FOLLOWING TESTING PARAMETERS SHALL BE MEASURED
DURING TEST AND ACCEPTANCE TESTING. ERROR PERFORMANCE SHALL BE MEASURED AND RECORDED OVER
THE DURATION OF THE CONTIGUOUS 24-HOUR TESTING INTERVAL AND SHALL BE MEASURED AND RECORDED
PER DEFINITION IN ITU-T-Y.1564.
3. ERROR PERFORMANCE: ERROR PERFORMANCE SHALL BE BETTER THAN THE FOLLOWING PARAMETER
THRESHOLDS TO BE ACCEPTABLE: AVAILABILITY SHALL BE GREATER THAN 99.5% OR BETTER. FRAME LOSS SHALL
BE EQUAL TO ZERO WHEN TESTING AT 1.0 GIGABIT HIGHEST FRAME RATE, AND SHALL MEET ITU-T-Y.1564
STANDARDS. JITTER SHALL BE LESS THAN 3 MSEC. DELAY SHALL BE BETTER THAN 10 MSEC
4. MEAN TIME TO LOSS OF BIT COUNT INTEGRITY (MTTLBCI) SHALL BE GREATER THAN 24 HOURS.
5. ROUND TRIP DELAY (RTD): RTD SHALL BE MEASURED OVER THE 1GB CIRCUIT AND SHALL BE LESS THAN OR
EQUAL TO 10 MILLISECONDS.
To:
VENDOR MUST COORDINATE SITE VISIT WITH POC'S 72 HOURS IN ADVANCE PRIOR TO REQUIRING ACCESS TO
FACILITIES AT BOTH USER LOCATIONS.
PROVIDER MUST CONDUCT A SATISFACTORY 24-HOUR TEST FROM THE DROP SIDE OF THEIR OR LOCAL
EXCHANGE CARRIERS FDP INSTALLED IN THEIR EQUIPMENT SUITE AT THE "A" LOCATION TO THE GOVERNMENT'S
SDP AT THE "Z" LOCATION AND MUST INCLUDE THE EXTENSION BETWEEN THE COMMERCIAL DEMARC AND THE
GOVERNMENT'S SDP AT THE "Z" LOCATION. VENDOR MUST ENSURE A TEST SET IS PLACED AT THE DROP SIDE OF
TELECOMM PROVIDER'S OR LOCAL ACCESS PROVIDERS FDP AS APPLICABLE AT THE "A" LOCATION AND A
SECOND TEST SET AT THE END OF THE FIBER JUMPERS TO BE USED FOR TERMINATION TO THE GOVERNMENT'S
SDP AT THE "Z" LOCATION. TESTING MUST BE SATISFACTORY PRIOR TO TURN OVER TO THE GOVERNMENT FOR
ACCEPTANCE TESTING.
TESTING CRITERIA: VENDOR MUST TEST THE CIRCUIT FOR 24 HOURS IAW ITU-T.Y.1564 BENCH MARKING
CONFIGURATION AND PERFORMANCE OF ETHERNET SERVICE. NOTE-ETHERNET FRAME SIZE DESIGNATOR 'H'
(MTU) IS EQUAL TO 9100 BYTES.
TEST & ACCEPTANCE INSTRUCTIONS: VENDOR MUST COORDINATE SITE VISIT WITH POC'S 72 HOURS IN ADVANCE
PRIOR TO REQUIRING ACCESS TO FACILITIES AT BOTH USER LOCATIONS.
ALL EQUIPMENT AND CIRCUIT PROBLEMS WILL BE REPORTED BY PHONE TO THE DISA GOC IP BACKBONE
ENGINEERING AND IMPLEMENTATION GROUP, SCOTT AFB, IL. PRIMARY: (C) 618-220-9950, (D)770-9950 TOLL FREE:
855-868-9950
MINIMUM TECHNICAL SPECIFICATIONS:
SPECIFIC FORMAT TO BE USED IS:
LINE RATE: 1.0709 GIGABITS/S, +- 100 PPM LINE CODE: OPTIC
ETHERNET FRAME: 9100 OCTETS (BYTES)
1. TEST AND ACCEPTANCE: FIBER OPTIC 1.0GB CIRCUITS SHALL PASS A FULLY DOCUMENTED SATISFACTORY 72
HOUR SOAK TEST BY DISA GOC AT SCOTT AFB, IL. PRIMARY: (C) 618-229-8691 (D) 779-8691;
2. TESTING PARAMETERS AND THRESHOLDS: THE FOLLOWING TESTING PARAMETERS SHALL BE MEASURED
DURING TEST AND ACCEPTANCE TESTING. ERROR PERFORMANCE SHALL BE MEASURED AND RECORDED OVER
THE DURATION OF THE CONTIGUOUS 24-HOUR TESTING INTERVAL AND SHALL BE MEASURED AND RECORDED
PER DEFINITION IN ITU-T-Y.1564.
3. ERROR PERFORMANCE: ERROR PERFORMANCE SHALL BE BETTER THAN THE FOLLOWING PARAMETER
THRESHOLDS TO BE ACCEPTABLE: AVAILABILITY SHALL BE GREATER THAN 99.5% OR BETTER. FRAME LOSS SHALL
BE EQUAL TO ZERO WHEN TESTING AT 1.0 GIGABIT HIGHEST FRAME RATE, AND SHALL MEET ITU-T-Y.1564
STANDARDS. JITTER SHALL BE LESS THAN 3 MSEC. DELAY SHALL BE BETTER THAN 10 MSEC
4. MEAN TIME TO LOSS OF BIT COUNT INTEGRITY (MTTLBCI) SHALL BE GREATER THAN 24 HOURS.
5. ROUND TRIP DELAY (RTD): RTD SHALL BE MEASURED OVER THE 1GB CIRCUIT AND SHALL BE LESS THAN OR
EQUAL TO 10 MILLISECONDS.
Paragraph V.QUOTE DUE DATE AND TIME change from:
Jul 12, 2018 12:30:00 PM CDT
Aug 28, 2018 12:30:00 PM CDT