HC101317QB098-0002.v0.pdf
PDF 100 KB Posted
- Solicitation number
- HC101317QB098
- Issued by
-
Defense Information Systems Agency
About this file
HC101317QB098-0002 dated 10/13/17
View the file
Other files
| File | Type | Posted |
|---|---|---|
| GGTG000179EBM.v0.zip | ZIP file | |
| HC101317QB098.v0.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
IQO INQUIRY
FM: PL8211
TO: Contractors
DATE (MM/DD/YYYY): 10/13/2017
SUBJECT: HC101317QB098-0002 Amend: 0002
A. TYPE ACTION: AMEND
1. PURPOSE: THE PURPOSE OF THIS AMENDMENT IS TO:
1. REVISE PURPOSE STATEMENT;
2. REVISE CIRCUIT REQUIREMENTS;
3. REVISE TESTING SPECIFICATIONS;
4. REVISE UNIQUE INSTALL FACTS AND AMPLIFYING INFO;
5. CHANGE COMMERCIAL DEMARCATION POINT TO "BLDG 891, ROOM 145
(COMPUTER), 7879 WARDLEIGH ROAD, HILL AFB, UT; AND
6. CHANGE SERVICE DELIVERY POINT TO "BLDG 891, ROOM 145 (COMPUTER),
7879 WARDLEIGH ROAD, HILL AFB, UT."
RECAP:
1. SUBMIT A QUOTE TO PROVIDE, INSTALL, AND MAINTAIN A LEASED 1.0GB
ETHERNET IP BACKBONE CIRCUIT BETWEEN DISA IE1 PROVIDED FIBER
TERMINATING PATCH PANEL BLDG 31A, ROOM R109, 217 DELL RANGE BLVD,
CHEYENNE, WY, AND DISA IE1 PROVIDED CISCO ASR-9010 ROUTER (UJEWHIL040)
(IPT-PE1) BLDG 891, ROOM 145, 7879 WARDLEIGH ROAD, HILL AFB, UT.**SEE
UNIQUE INSTALL FACTORS.**
A. THE COMMITTED INFORMATION RATE (CIR) (1.0GBE) WILL REQUIRE VENDOR
TO DELIVER 1.0GB ETHERNET INTERFACE (OPITCAL HANDOFF-1000BASE-LX-
SINGLE MODE FIBER) AT THE DROP SIDE OF THE COMMERCIAL DEMARC'S AT THE
"A" AND "Z" LOCATIONS.
B. TELECOMM PROVIDER MUST PROVIDE TOTAL FIBER MILES AND ROUND TRIP
DELAY (RTD) FROM THE CUSTOMER "A" LOCATION TO THE CUSTOMER "Z"
LOCATION.
C. VENDOR MUST DELIVER 1.0GBE CIRCUIT 2W (UNPROTECTED) FROM COML
DEMARC TO GOVERNMENT SERVICE DELIVERY POINT AT THE "Z" BOTH LOCATION.
FOR THE "A" LOCATION TELECOMM PROVIDER MUST TERMINATE CIRCUIT TO THE
DROP SIDE OF THE THEIR OR LOCAL ACCESS PROVIDER'S FDP.
2. EACH CONTRACTOR IS RESPONSIBLE FOR READING AND COMPLYING WITH ALL
TECHNICAL ASPECTS OF THIS SOLICITATION, TO INCLUDE READING AND
AGREEING WITH THE STANDARD PROVISIONS, ATTACHMENTS LISTING SPECIFIC
TECHNICAL REQUIREMENTS, PRICE QUOTE REQUIREMENTS, AND REQUESTED
SERVICE DATE. FAILURE TO READ AND ADHERE TO ANY PORTION OF THE
INQUIRY SHALL RENDER THE QUOTE NON-COMPLIANT AND RESULT IN IT BEING
EXCLUDED FROM EVALUATION AND AWARD.
HC101317QB098-0002
3. THE SERVICE DATE TO BE MET IS: 28 NOV 17 (SIP). THE GOVERNMENT
ASSUMES THAT CONTRACTORS HAVE CONSIDERED ALL ISSUES THAT MAY IMPACT
THE SERVICE DATE. THE GOVERNMENT MAY CANCEL, TERMINATE, OR REQUEST
CONSIDERATION IAW STANDARD PROVISION 42 FOR FAILURE TO MEET
CONTRACTUAL SERVICE DATE OR COMPLY WITH ANY CONTRACT TERMS OR
CONDITIONS.
4. CONTRACTORS SHALL SUBMIT QUOTES IAW STANDARD PROVISION 04. QUOTES
SHALL INCLUDE SUFFICIENT DETAIL FOR EFFECTIVE EVALUATION AND SHOULD
NOT SIMPLY REPHRASE OR RESTATE THE GOVERNMENT REQUIREMENTS. RATHER,
THEY MUST PROVIDE CONVINCING RATIONALE TO ADDRESS HOW THE CONTRACTOR
INTENDS TO MEET THE REQUIREMENT. IN RESPONSE TO THIS SOLICITATION, NO
TERMS OR CONDITIONS PLACED UPON THE GOVERNMENT, NOR ASSUMPTIONS WILL
BE ACCEPTED. RESPONSES TO CONTRACTORS ARE ENCOURAGED TO SUBMIT
QUESTIONS AND REQUEST CLARIFICATIONS OF THE REQUIREMENT (S) BEFORE
SUBMITTING QUOTES. QUESTIONS SHALL BE SUBMITTED TO CONTRACT
SPECIALIST AND CONTRACTING OFFICER DURING THE SOLICITATION PHASE ONLY,
AND RESPONSES FOR ALL INTERESTED PARTIES WILL BE POSTED TO FEDBIZOPPS.
QUOTES MUST BE UPLOADED TO IDEAS. IN THE EVENT IDEAS IS UNAVAILABLE OR
QUOTES FAIL TO UPLOAD, QUOTES MAY BE SENT TO THE FOLLOWING MAILBOX:
DISA.SCOTT.DITCO.MBX.VENDOR-QUOTES@MAIL.MIL
5. THIS REQUIREMENT MUST BE WORKED IN CONJUNCTION WITH SOLICITATION
HC101317QA944/TSR RU15FEB175107.
6. ESTABLISH TSP: TSP0GL3PQ-01
M. ADDITIONAL INFORMATION:
3. TSR NUMBER: RU15FEB175102A
4. CCSD: XXXXBGU3
Z. DITCO CONTACT:
Christopher OConnor christopher.t.oconnor2.civ@mail.mil
Paul A. Heard
DITCO Contracting Officer
Unless otherwise specified, all other terms and conditions are unchanged.
Paragraph E.SERVICE DATE change from:
Feb 2, 2018
To:
Nov 28, 2017
Paragraph V.QUOTE DUE DATE AND TIME change from:
Sep 25, 2017 4:00:00 PM CDT
Nov 13, 2017 4:00:00 PM CST
Location A, LOCATION OF TERMINATION A change from:
ADDRESS: (BLDG) 31A; 217 DELL RANGE BLVD; CHEYENNE, WY, 82009
ROOM: R109; 1 FL
LOCATION: CHEYENNE
ADDRESS: BLDG 31A; 217 DELL RANGE BLVD; CHEYENNE, WY, 82009
ROOM: 109; 1ST FL
LOCATION: CHEYENNE
Location A, DEMARK change from:
(BLDG) 31A; RM: R109,
217 DELL RANGE BLVD;
CHEYENNE, WY 82009
(PMRY POC) STAFF SERGEANT BENJAMIN N HEBERT;
(UNCLASS USER) BENJAMIN.N.HEBERT.MIL@MAIL.MIL;
(CMCL) 307-772-6796; (DSN) 388-6796
To:
BLDG 31A; RM: R109,
217 DELL RANGE BLVD;
CHEYENNE, WY 82009
(PMRY POC) STAFF SERGEANT BENJAMIN N HEBERT;
(UNCLASS USER) BENJAMIN.N.HEBERT.MIL@MAIL.MIL;
(CMCL) 307-772-6796; (DSN) 388-6796
Location A, UNIQUE INSTALLATION FACTORS change from:
UNIQUE INST FACT:
(1) COMMERCIAL FIBER POINT OF PRESENCE
AMPLIFYING INFO:
A. VENDOR IS RESPONSIBLE FOR INSTALLATION AND MAINTENANCE
OF SINGLE MODE FIBER TO DROP SIDE OF COMMERCIAL FIBER POINT OF PRESENCE FIBER DISTRIBUTION
PANEL BLDG 31A, ROOM R109. COORDINATE TYPE CONNECTORS FOR TERMINATION TO DISA PROVIDED
PATCH PANEL.
B. VENDOR MUST SCHEDULE/COORDINATE WITH POC'S LISTED ON
THIS ORDER 72 HOURS IN ADVANCE PRIOR TO SITE SURVEYS OR
INSTALLATIONS.
(1) COMMERCIAL FIBER POINT OF PRESENCE
A. VENDOR TERMINATE 1GB ETHERNET INTERFACE TO THE DROP SIDE OF VENDOR'S FIBER DISTRIBUTION
PANEL (FDP) INSTALLED IN THEIR EQUIPMENT SUITE BLDG 31A, ROOM
R109;
B. TELECOM VENDOR'S RESPONSIBLITY STOPS AT THE COMMERCIAL DEMARC. NO INSIDE WIRE REQUIRED;
C. CIRCUIT MUST BE TAGGED WITH VENDOR'S LONG HUAL CIRCUIT ID AND LOCAL EXCHANGE CARRIER
CIRCUIT NO. AS APPLICABLE AT DROP SIDE OF THEIR POINT OF PRESENCE (FIBER DISTRIBUTION PANEL)
BLDG 31A, ROOM R109. ADDITIONALLY, VENDOR MUST SHOW SITE PERSONNEL LISTED ON THIS ORDER
THE EXACT TERMINATION POINT WHEN CIRCUIT INSTALLATION IS COMPLETE;
D. VENDOR MUST SCHEDULE/COORDINATE WITH POC'S LISTED ON THIS ORDER 72 HOURS IN ADVANCE
PRIOR TO SITE SURVEYS OR INSTALLATIONS.
Location A, CONTACT change from:
(PMRY POC) STAFF SERGEANT BENJAMIN N HEBERT;
(UNCLASS USER) BENJAMIN.N.HEBERT.MIL@MAIL.MIL;
(CMCL) 307-772-6796; (DSN) 388-6796
(ALT POC) TECHNICAL SERGEANT AIR FORCE CHARLES L LANDGRAF;
(UNCLASS USER) CHARLES.L.LANDGRAF.MIL@MAIL.MIL;
(CMCL) 307-772-6162; (DSN) 388-6162
To:
(PMRY POC)
STAFF SERGEANT BENJAMIN N HEBERT;
BENJAMIN.N.HEBERT.MIL@MAIL.MIL;
(CMCL) 307-772-6796; (DSN) 388-6796
(ALT POC)
TECHNICAL SERGEANT AIR FORCE CHARLES L LANDGRAF;
CHARLES.L.LANDGRAF.MIL@MAIL.MIL;
(CMCL) 307-772-6162; (DSN) 388-6162
Location A, INTERFACE change from:
INTERFACE: ELECTRICAL: OPTICAL; PHYSICAL: LC;; (PHYSICAL) LC;
(ELECTRICAL)
OPTICAL
ELECTRICAL: OPTICAL; PHYSICAL: LC;; (PHYSICAL) LC; (ELECTRICAL) OPTICAL
Location B, LOCATION OF TERMINATION B change from:
ADDRESS: (BLDG) 1038; 175 E STEWART AVE; PETERSON AFB, CO, 80914
ROOM: 35; 1 FL
LOCATION: PTRSNAFB
ADDRESS: 7879 WARDLEIGH ROAD; BLDG 891; HILL AFB, UT 84056
ROOM: 145
LOCATION: HILL AFB
Location B, DEMARK change from:
(BLDG) 1038, RM: 35
175 E STEWART AVE;
PETERSON AFB, CO, 80914
(PMRY POC) MR. KODY S MCNAIL;
(UNCLASS ORG) 21CS.SCOIN.CA@US.AF.MIL;
(UNCLASS USER) KODY.MCNAIL.2@US.AF.MIL;
(CMCL) 719-556-9665; (DSN) 312-834-9665
To:
BLDG 891, ROOM 145 (COMPUTER)
7879 WARDLEIGH ROAD, HILL AFB, UT 84056
Location B, UNIQUE INSTALLATION FACTORS change from:
(1) FIBER CABLE X-CONNECT, IN-HOUSE, INSIDE WIRE, SINGLE-MODE, 1310NM, TELCO; COMMERCIAL FIBER
POINT OF PRESENCE.
(2) FIBER TERMINATING PATCH PANEL (GFE) (DISA IE1 PROVIDED)
RACK/SHELF/PORT - TBD
(3) FIBER CABLE X-CONNECT, IN-HOUSE, INSIDE WIRE, SINGLE-MODE, 1310NM, DISA IE4
(4) OPTICAL INTERFACE CARD (GFE)(DISA IE1 PROVIDED) RACK/SHELF/SLOT/PORT - TBD
(5) CISCO ASR-9010 ROUTER (GFE)(DISA IE1 PROVIDED) NODE ID: UJEWPET030
A. VENDOR IS RESPONSIBLE FOR INSTALLATION AND MAINTENANCE
OF SINGLE MODE FIBER FROM THE DROP SIDE OF COMMERCIAL FIBER POINT OF PRESENCE FIBER
DISTRIBUTION PANEL BLDG 1038, ROOM 35, TO LINE SIDE OF DISA IE1 PROVIDED FIBER TERMINATING
PATCH PANEL INSTALLED IN CISCO ASR-9010 ROUTER SUITE
(UJEWPET030) BLDG 1038, ROOM 35. COORDINATE
TYPE CONNECTORS FOR TERMINATION TO DISA PROVIDED PATCH PANEL.
B. VENDOR MUST PROVIDE FIBER STRANDS FROM THE DISA PROVIDED
FIBER PATCH PANEL TO THE DROP SIDE OF THEIR POP/FIBER
DISTRIBUTION PANEL WITHOUT SPLICING AND OR USE OF
CONNECTORS TO CONNECT 2 OR MORE FIBER STRANDS MEANING THE FIBER CANNOT BE BROKEN IN THE
MIDDLE AND MUST BE CONTINUOUS.
C. THE CIRCUIT MUST BE TAGGED WITH THE VENDOR'S CIRCUIT ID AS APPLICABLE AT THE DROP SIDE OF
THEIR POINT OF PRESENCE (FIBER DISTRIBUTION PANEL) BLDG 1038, ROOM 35.
ADDITIONALLY, VENDOR MUST SHOW SITE PERSONNEL LISTED ON THIS ORDER THE EXACT
TERMINATION POINT WHEN INSTALLATION IS COMPLETE.THE CIRCUIT MUST BE TAGGED WITH THE
LOCAL CIRCUIT ID AND LONG HAUL CIRCUIT NO. AT THE LINE SIDE OF THE DISA PROVIDED FIBER
TERMINATING PATCH PANEL BLDG 1038, ROOM 35.
D. VENDOR MUST SCHEDULE/COORDINATE WITH THE POC'S LISTED ON THIS ORDER 72 HOURS IN
ADVANCE PRIOR TO SITE SURVEYS OR INSTALLATIONS.
(1) COMMERCIAL FIBER POINT OF PRESENCE;
(2) FIBER CABLE X-CONNECT, IN-HOUSE, INSIDE WIRE, SINGLE-MODE, 1310NM, TELCO;
A. VENDOR IS RESPONSIBLE FOR INSTALLATION AND MAINTENANCE OF SINGLE MODE FIBER FROM THE
DROP SIDE OF COMMERCIAL FIBER POINT OF PRESENCE FIBER DISTRIBUTION PANEL BLDG 891, ROOM 145
TO LINE SIDE OF DISA IE1 PROVIDED FIBER TERMINATING PATCH PANEL INSTALLED IN CISCO ASR-9010
ROUTER SUITE (UJEWHIL040) BLDG 891, ROOM 145. TERMINATE WITH "SC" CONNECTORS TO DISA
PROVIDED FIBER TERMINATING PATCH PANEL;
B. VENDOR MUST PROVIDE FIBER STRANDS FROM THE DISA PROVIDED FIBER PATCH PANEL TO THE DROP
SIDE OF THEIR POP/FIBER DISTRIBUTION PANEL WITHOUT SPLICING AND OR USE OF CONNECTORS TO
CONNECT 2 OR MORE FIBER STRANDS MEANING THE FIBER CANNOT BE BROKEN IN THE MIDDLE AND
MUST BE CONTINUOUS;
C. CIRCUIT MUST BE TAGGED WITH VENDOR'S LONG HUAL CIRCUIT ID AND LOCAL EXCHANGE CARRIER
CIRCUIT NO. AS APPLICABLE AT DROP SIDE OF THEIR POINT OF PRESENCE (FIBER DISTRIBUTION PANEL)
BLDG 891, ROOM 145. ADDITIONALLY, VENDOR MUST SHOW SITE PERSONNEL LISTED ON THIS ORDER THE
EXACT TERMINATION POINT WHEN CIRCUIT INSTALLATION IS COMPLETE;
D. VENDOR MUST SCHEDULE/COORDINATE WITH THE POC'S LISTED ON THIS ORDER 72 HOURS IN
ADVANCE PRIOR TO SITE SURVEYS OR INSTALLATIONS.
Location B, CONTACT change from:
(PMRY POC) MR. KODY S MCNAIL;
(UNCLASS ORG) 21CS.SCOIN.CA@US.AF.MIL;
(UNCLASS USER) KODY.MCNAIL.2@US.AF.MIL;
(CMCL) 719-556-9665; (DSN) 312-834-9665
(ALT POC) STAFF SERGEANT NOAH PETRAMALE;
(UNCLASS USER) NOAH.PETRAMALE@US.AF.MIL;
(CMCL) 719-556-8357
To:
(PRI)
MR. DENNIS E VOIGT
DISA.HILL.EIS.LIST.FACILITIES-MGMT-NETWORK-TEAM@MAIL.MIL
DENNIS.E.VOIGT.CIV@MAIL.MIL
(C) 801-605-7464; (D) 388-7464
(ALT)
MR. BRIAN D RASBAND;
DISA.OGDEN.EIS.LIST.NETWORK-TEAM@MAIL.MIL;
BRIAN.D.RASBAND.CIV@MAIL.MIL
(C) 801-605-7608; (D) 388-7608
Location B, INTERFACE change from:
INTERFACE: ELECTRICAL: OPTICAL; PHYSICAL: LC;; (PHYSICAL) LC;
(ELECTRICAL)
OPTICAL
INTERFACE: ELECTRICAL: OPTICAL; PHYSICAL: SC; OPTICAL
Location B, INSIDE WIRE INSTALLATION / MAINTENANCE REQUIRED change from:
INSIDE WIRE INSTL/MAINT: CPIWI-YES/CPIWM-YES
YES/YES
Location B, NPA/NXX change from:
719/556
To:
801/605
Location B, COUNTRY CODE change from:
Location B, TERMINAL EQUIPMENT change from:
CISCO ASR 9010 IPT-PE ROUTER (GFE - DISA) EQUIPMENT
CML FIBER POP EQUIPMENT INFORMATION: COMMERCIAL FIBER POINT OF PRESENCE
STANDARD PROVISION - 30, TEXT change from:
This contract for this telecommunications service shall have an estimated contract period of 36 months. However, this estimated contract period is not guaranteed. The minimum service period shall be one month. Accordingly, after meeting minimum service period, U.S. Government may discontinue service, at no additional cost to U.S. Government. U.S.
Government will provide Contractor/Telecommunications Provider (TP) 30 days notice prior to discontinuing service.
Quotes that do not accept the minimum one month service period may be excluded from the competition and found unacceptable. In the event U.S. Government is unable to obtain quotes that meet this minimum service period, U.S.
Government may consider quotes with a minimum service period greater than one month.
The Government reserves the right to re-solicit these contracted services prior to the end of the estimated contract period when commercial market pricing demonstrates these services become available at lower prices.
ACCEPTABLE CONTRACTOR/TELECOMMUNICATIONS PROVIDER (TP) RESPONSE: "UNDERSTAND/WILL
COMPLY."
This telecommunications service contract shall continue on a month to month basis with a not to exceed date of 27 NOV 20.
After this period the contract will be considered expired with no authority for service to continue unless mutually agreeable by both parties. Should service continue through the end of this contract period, no modification will be issued to authorize discontinuance of service. The minimum service period shall be one month. Accordingly the U.S. Government may discontinue service, at no additional cost to U.S. Government. U.S. Government will provide Contractor/Telecommunications
Provider (TP) 30 days notice prior to discontinuing service before the not to exceed period. Contractors shall consider the ability of the Government to discontinue service with 30 days notice when determining the reasonableness of incurring any costs. See DFARS 252.239-7007, Cancellation Or Termination Of Orders.
Quotes that do not accept the minimum one month service period may be excluded from the competition and found unacceptable. In the event U.S. Government is unable to obtain quotes that meet this minimum service period, U.S.
Government may consider quotes with a minimum service period greater than one month.
The Government reserves the right to re-solicit these contracted services prior to the end of the not to exceed contract period when commercial market pricing demonstrates these services become available at lower prices.
ACCEPTABLE CONTRACTOR/TELECOMMUNICATIONS PROVIDER (TP) RESPONSE: "UNDERSTAND/WILL
COMPLY."
STANDARD PROVISION - 30, PRESCRIPTION change from:
In Inquiries & Orders for START. DO NOT USE with SP-31 or SP-32
To:
Include in Inquiries and Orders or Circuit Demands for the START of new service (including REAWARD) when an indefinite term contract is to be established (month-to-month contract). The “fill-in” information required to complete this SP is the not to exceed service date. This is the date that the service will expire. Unless otherwise specified in the Quote, the minimum service period shall be one month (30 days). Remove paragraph 2 on Order or Circuit Demand. Cannot be used with SP 31 or
32.
STANDARD PROVISION - 30, LAST UPDATED change from:
FEB 2017
AUG 2017
Attachments Begin After This Page.
CIRCUIT PARAMETERS FOR SOLICITATION HC101317QB098
CIRCUIT REQUIRES THE FOLLOWING PARAMETERS:
(A) FIBER TERMINATION: FRAME FORMAT: 1.0GB ETHERNET (OPITCAL HANDOFF-
1000BASE-LX-SINGLE MODE FIBER), 802.3Z, 1310NM. "SC" CONNECTORS;
(B) COMMITTED INFORMATION RATE (CIR)-1.0GB;
(C) 1.0GB ETHERNET FRAMING REQUIRED AT COMMERCIAL DEMARC AT THE A
AND Z LOCATIONS;
(D) NO NETWORK INTERFACE UNIT, DEDICATED PATH;
(E) GFE CLOCKING: VENDOR ESFU (OR EQUIVALENT) NOT TO BE ENGINEERED
INTO CIRCUIT;
(F) TESTING CRITERIA: VENDOR MUST TEST THE CIRCUIT END TO END FOR 24
HOURS IAW THE FULL ITU-T.Y.1564 BENCH MARKING METHODOLOGY FOR
NETWORK INTERCONNECT DEVICES STANDARD, AND AT THE COMMITTED
INFORMATION RATE (CIR) IAW ITU-T-Y.1564 FOR AN ADDITIONAL 48 HOURS;
(G) LINE MUST REMAIN FULLY OPERATIONAL AND AVAILABLE TO USERS 24
HOURS A DAY, SEVEN DAYS PER WEEK, AT LEAST 99.5% OR BETTER;
(H) 1 HOUR RESPONSE TIME TO RESPOND TO CUSTOMER UPON RECIEPT OF
TROUBLE;
(I) VENDOR REQUIRED TO HAVE CIRCUIT VISIBILITY TO ASSIST IN ANY CIRCUIT
OUTAGES;
(J) VENDOR MUST HAVE A 24X7 NETWORK OPERATIONS CENTER;
(K) TELECOMM PROVIDER MUST MAINTAIN OPERATIONS, MAINTENANCE AND
ADMINISTRATION MONITORING OF ETHERNET CIRCUIT IAW ITU-T-Y.1731;
(L) THE COMMERCIAL CIRCUIT WILL BE ACCEPTED ON BEHALF OF THE
GOVERNMENT BY THE DISA GOC IP BACKBONE ENGINEERING AND
IMPLEMENTATION GROUP, SCOTT AFB, IL; (C) 618-220-8627 (D) 770-8627; AND
(M) VENDOR MUST PROVIDE THE LONG HAUL CIRCUIT NO. AND LEC CKT ID'S AS
APPLICABLE TO THE DISA IE161 PROGRAM OFFICE PRIOR TO TURN UP TO THE
GOVERNMENT; PRIMARY: RAY BURKE (301) 225-2550; ALTERNATE: KEN DIEF (301)
225-2416.
Testing Requirements for Solicitation HC101317QB098
A. COMPLETION REPORT: SERVICE WILL BE ACCEPTED ON BEHALF OF THE U.S.
GOVERNMENT BY DISA CONUS IP/D312-770-8627,C618-220-8627 WHO WILL SUBMIT
A COMPLETION REPORT IAW DISAC 310-130-1, CHAP 2 OF DISAC 310-70-1, CHAP 8.
B. VENDOR MUST PROVIDE LIGHT LEVEL READINGS (DB LOSS) ON EXTENSION
FROM COMMERCIAL POP TO GOVERNMENT SERVICE DELIVERY POINT (SDP) AT
THE "Z" LOCATION PRIOR TO CIRCUIT TURN UP TO THE GOVERNMENT ENSURING
LEVELS ARE WITHIN SPECS. LIGHT LEVELS MUST BE ADJUSTED TO -5 TO -13.
C. VENDOR MUST CONDUCT WALK-THROUGH SITE SURVEY PRIOR TO
INSTALLATION AT THE "Z" LOCATION ONLY.
D. VENDOR MUST CONTACT DISA GOC IP BACKBONE ENGINEERING AND
IMPLEMENTATION GROUP UPON RECEIPT OF A VALID TSO TO ESTABLISH THE
COORDINATION AND ACTIVATION PROCESS.; (C) 618-220-8627 (D) 770-8627.
E. PROVIDER MUST CONDUCT A SATISFACTORY 72 HOUR TEST FROM THE DROP
SIDE OF THEIR OR LOCAL EXCHANGE CARRIERS FDP INSTALLED IN THEIR
EQUIPMENT SUITE AT THE "A" LOCATION TO THE GOVERNMENT'S SDP AT THE "Z"
LOCATION AND MUST INCLUDE THE EXTENSION BETWEEN THE COMMERCIAL
DEMARC AND THE GOVERNMENT'S SDP AT THE "Z" LOCATION. VENDOR MUST
ENSURE A TEST SET IS PLACED AT THE DROP SIDE OF TELECOMM PROVIDER'S OR
LOCAL ACCESS PROVIDERS FDP AS APPLICABLE AT THE "A" LOCATION AND A
SECOND TEST SET AT THE END OF THE FIBER JUMPERS TO BE USED FOR
TERMINATION TO THE GOVERNMENT'S SDP AT THE "Z" LOCATION. TESTING
MUST BE SATISFACTORY PRIOR TO TURN OVER TO THE GOVERNMENT FOR
ACCEPTANCE TESTING. TESTING CRITERIA:; VENDOR MUST TEST THE CIRCUIT
FOR 24 HOURS IAW THE FULL ITU-T.Y.1564 BENCH MARKING METHODOLOGY FOR
NETWORK INTERCONNECT DEVICES STANDARD, AND AT THE COMMITTED
INFORMATION RATE (CIR) IAW ITU-T-Y.1564 FOR AN ADDITIONAL 48 HOURS.
F. VENDOR WINNING AWARD IS RESPONSIBLE FOR INSTALLATION AND
MAINTENANCE OF 1.0GBE CIRCUIT IAW THE UNIQUE INSTALLATION FACTORS.
G. INSIDE WIRING IS AUTHORIZED IAW THE UNIQUE INSTALLATION FACTORS.
H. VENDOR MUST COORDINATE SITE VISIT WITH POC'S 72 HOURS IN ADVANCE
PRIOR TO REQUIRING ACCESS TO FACILITIES AT BOTH USER LOCATIONS. IF
UNABLE TO REACH SITE POC'S CONTACT KEN DIEF OR RAY BURKE IMMEDIATELY
FOR ASSISTANCE AT: (301) 225-2416/2550.
I. ALL EQUIPMENT AND CIRCUIT PROBLEMS WILL BE REPORTED BY PHONE TO
THE DISA GOC IP BACKBONE ENGINEERING AND IMPLEMENTATION GROUP,
SCOTT AFB, IL.; PRIMARY: (C) 618-220-9950, (D) 770-9950; TOLL FREE: 855-868-9950.
J. DD FORM 1368 WILL BE SUBMITTED ON THIS TRUNK IAW DISAC-DITCO 350-135-1
BY RNSOC, SCOTT AFB, IL. GUIDANCE ON SUBMISSION IS AVAILABLE AT
CLICK ON "DISA-DITCO CIRCULAR, 350-135-1, DEFENSE COMMERCIAL
COMMUNICATIONS ACQUISITION PROCEDURES."
K. MINIMUM TECHNICAL SPECIFICATIONS:; SPECIFIC FORMAT TO BE USED IS:;
LINE RATE: 1.0709 GIGABITS/S, +- 100 PPM ; LINE CODE: OPTIC.
L. TEST AND ACCEPTANCE: 1.0GB ETHERNET CIRCUITS SHALL PASS A FULLY
DOCUMENTED SATISFACTORY 72 HOUR SOAK TEST BY DISA GOC AT SCOTT AFB,
IL.; PRIMARY: (C) 618-229-8691 (D) 779-8691.
M. TESTING PARAMETERS AND THRESHOLDS: THE FOLLOWING TESTING
PARAMETERS SHALL BE MEASURED DURING TEST AND ACCEPTANCE TESTING.
ERROR PERFORMANCE SHALL BE MEASURED AND RECORDED OVER THE
DURATION OF THE CONTIGUOUS 72 HOUR TESTING INTERVAL AND SHALL BE
MEASURED AND RECORDED PER DEFINITION IN ITU-T.Y.1564.
N. ERROR PERFORMANCE: ERROR PERFORMANCE SHALL BE BETTER THAN THE
FOLLOWING PARAMETER THRESHOLDS TO BE ACCEPTABLE:; AVAILABILITY
SHALL BE GREATER THAN 99.5% OR BETTER.; FRAME LOSS SHALL BE EQUAL TO
ZERO WHEN TESTING AT 1.0 GIGABIT HIGHEST FRAME RATE, AND SHALL MEET
ITU-T.Y.1564 STANDARDS.; JITTER SHALL BE LESS THAN 3 MSEC.; DELAY SHALL
BE BETTER THAN 10 MSEC.
O. MEAN TIME TO LOSS OF BIT COUNT INTEGRITY (MTTLBCI) SHALL BE GREATER
THAN 24 HOURS.
P. ROUNDRIP DELAY (RTD): THE ROUND TRIP DELAY (RTD) FOR THIS DISA
TRANSPORT TRUNK WILL BE MEASURED IN MILLISECONDS FROM THE
CUSTOMERS SERVICE DELIVERY POINT (SDP) SITE-A TO THE CUSTOMERS
SERVICE DELIVERY POINT (SDP) SITE-Z. THE RTD SHALL BE LESS THAN OR EQUAL
TO 11 MILLISECONDS TO EFFECTIVELY SUPPORT THE GOVERNMENT'S MISSION.
THE GOVERNMENT RESERVES THE RIGHT TO ACCEPT A HIGHER RTD ONLY IF
SUPPORTED BY ACTUAL PHYSICAL FIBER DISTANCE BETWEEN THE TWO END
LOCATIONS. ADDITIONALLY THE GOVERNMENT RESERVES THE RIGHT TO REJECT
A PROPOSED PATH IF DEEMED EXCESSIVELY LONG WITHOUT WRITTEN
JUSTIFICATION IN THE PROPOSAL. JUSTIFICATION FOR EXCESSIVE FIBER
MILEAGE COULD BE DIVERSITY/AVOIDANCE REQUIREMENTS, LIMITED
INFRASTRUCTURE, AVAILABLE PROVIDERS, GEOGRAPHIC AND PHYSICAL
LIMITATION. THE GOVERNMENT ACCEPTING AUTHORITY WILL CONFIRM THE
RTD DURING THE TURN-UP AND TEST PHASE AND IF IT DOES NOT ALIGN WITH
THE CONTRACTORS PROPOSAL DISA IE161 WILL NOTIFY DITCO IMMEDIATELY
IN WRITING.
File details come from the government source that posted it.