HC101318QB024-0001.v0_6-27-18.pdf
PDF 14 KB Posted
- Attached to
- Amendment Solicitation
- Solicitation number
- HC101317QB024
- Issued by
-
Defense Information Systems Agency
About this file
Amendment Solicitation dated 6-27-18
View the file
Other files
| File | Type | Posted |
|---|---|---|
| HC101317QB024.v0.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
IQO INQUIRY
FM: PL8211
TO: Contractors
DATE (MM/DD/YYYY): 6/27/2018
SUBJECT: HC101318QB024-0001 Amend: 0001
A. TYPE ACTION: ADMIN AMEND
1. PURPOSE: THE PURPOSE OF THIS AMENDMENT IS TO CORRECT THE SERVICE
DELIVERY POINT (SDP) ADDRESSES FOR LOCATION A AND LOCATION Z, AS STATED IN THE
LOCATIONS SECTION OF THE SOLICITATION. WHILE THE ORIGINAL SOLICITATION DATED
6/5/18 CORRECTLY LISTED THE LOC A DEMARK AND LOC Z DEMARK, IT INCORRECTLY
LISTED THE SDP ADDRESSES FOR THE A LOC AND Z LOC.
1. A LOC SDP ADDRESS IS HEREBY CHANGED TO READ AS BLDG 1060, ROOM 97, 400
CANNON STREET, MAXWELL AFB, AL 36112.
2. Z LOC SDP ADDRESS IS HEREBY CHANGED TO READ AS BLDG 380, ROOM 308, 201 W.
EGLIN BLVD, EGLIN AFB, FL 32542.
RECAP:
SUBMIT A QUOTE TO PROVIDE, INSTALL, AND MAINTAIN THE NEW START OF A 10GB
ETHERNET IP BACKBONE CIRCUIT BETWEEN THE J-PE ROUTER (UJEWMAX040) IN
BLDG 1060, RM 97, 400 CANNON STREET, MAXWELL AFB, AL AND THE J-PE ROUTER
(UJEWEGL030) IN BLDG 380, RM 308, 201 WEST EGLIN BLVD, EGLIN AFB, FL. **SEE UNIQUE
INSTALL FACTORS.**
A. ESTABLISH TSP.
B. IN SUPPORT OF MPLS IMPLEMENTATION (D300).
C. CONTRACTORS SHALL MEET RTD OF 10 MILLISECONDS.
2. EACH CONTRACTOR IS RESPONSIBLE FOR READING AND COMPLYING WITH ALL
TECHNICAL ASPECTS OF THIS SOLICITATION, TO INCLUDE READING AND AGREEING
WITH THE STANDARD PROVISIONS, ATTACHMENTS LISTING SPECIFIC TECHNICAL
REQUIREMENTS, PRICE QUOTE REQUIREMENTS, AND REQUESTED SERVICE DATE.
FAILURE TO READ AND ADHERE TO ANY PORTION OF THE INQUIRY SHALL RENDER THE
QUOTE NON-COMPLIANT AND RESULT IN IT BEING EXCLUDED FROM EVALUATION AND
AWARD.
3. THE SERVICE DATE TO BE MET IS: 02 OCT 18 (SIP). THE GOVERNMENT ASSUMES
THAT CONTRACTORS HAVE CONSIDERED ALL ISSUES THAT MAY IMPACT THE SERVICE
DATE. THE GOVERNMENT MAY CANCEL, TERMINATE, OR REQUEST CONSIDERATION
IAW STANDARD PROVISION 42 FOR FAILURE TO MEET CONTRACTUAL SERVICE DATE OR
COMPLY WITH ANY CONTRACT TERMS OR CONDITIONS.
4. CONTRACTORS SHALL SUBMIT QUOTES IAW STANDARD PROVISION 04. QUOTES
SHALL INCLUDE SUFFICIENT DETAIL FOR EFFECTIVE EVALUATION AND SHOULD
HC101318QB024-0001
NOT SIMPLY REPHRASE OR RESTATE THE GOVERNMENT REQUIREMENTS. RATHER,
THEY MUST PROVIDE CONVINCING RATIONALE TO ADDRESS HOW THE CONTRACTOR
INTENDS TO MEET THE REQUIREMENT. IN RESPONSE TO THIS SOLICITATION, NO
TERMS OR CONDITIONS PLACED UPON THE GOVERNMENT, NOR ASSUMPTIONS WILL BE
ACCEPTED. CONTRACTORS ARE ENCOURAGED TO SUBMIT QUESTIONS AND REQUEST
CLARIFICATIONS OF THE REQUIREMENT (S) BEFORE SUBMITTING QUOTES. QUESTIONS
SHALL BE SUBMITTED TO CONTRACT SPECIALIST AND CONTRACTING OFFICER DURING
THE SOLICITATION PHASE ONLY, AND RESPONSES FOR ALL INTERESTED PARTIES WILL BE
POSTED TO FEDBIZOPPS. QUOTES MUST BE UPLOADED TO IDEAS. IN THE EVENT IDEAS IS
UNAVAILABLE OR QUOTES FAIL TO UPLOAD, QUOTES MAY BE SENT TO THE FOLLOWING
MAILBOX:
DISA.SCOTT.DITCO.MBX.VENDOR-QUOTES@MAIL.MIL
QUOTES MUST BE UPLOADED TO IDEAS. IN THE EVENT IDEAS IS UNAVAILABLE OR
QUOTES FAIL TO UPLOAD, QUOTES MAY BE SENT TO THE FOLLOWING MAILBOX:
disa.scott.ditco.mbx.pl8211@mail.mil
5. THIS REQUIREMENT MUST BE WORKED IN CONJUNCTION WITH SOLICITATION
HC101318QA812/ TSR# RU27SEP175587 AND MUST BE ENGINEERED AND PROVISIONED
TOTALLY DIVERSE END TO END FROM THE GOVERNMENT SERVICE DELIVERY POINTS
(SDP) FROM TSR# RU27SEP175587; MEANING THE PHYSICAL PATHS ARE TOTALLY
SEPARATE INCLUDING MAN HOLES, CONDUIT, CENTRAL OFFICE LOCATIONS, AND FIBER
BUILDS. ADDITIONALLY AS A MINIMUM MUST HAVE 50 METERS PHYSICAL SEPARATION
FROM TSR# RU27SEP175587.
6. CONTRACTOR SHALL PROVIDE COLOR POWERPOINT DRAWINGS SHOWING THE ROUTES
FROM THE COMMERCIAL DEMARKS TO THE SUPPORTING CENTRAL OFFICES AND/OR
WIRING CENTERS, ENSURING THE PHYSICAL END TO END DIVERSITY REQUIREMENTS ARE
BEING MET. DRAWINGS MUST INCLUDE SEPARATION DISTANCES, TOTAL FIBER MILES
AND ROUND TRIP DELAY BASED ON ACTUAL DISTANCE IN MILES. REFER TO STANDARD
PROVISION 39 FOR SPECIFIC DOCUMENTATION REQUIREMENTS. SAMPLE DRAWINGS ARE
INCLUDED THE ATTACHMENTS.
7. PRE AWARD SITE SURVEYS ARE AUTHORIZED (AT CONTRACTOR EXPENSE) WITH LOCAL
POCS AT EACH GOVERNMENT SITE. IT IS HIGHLY RECOMMENDED THAT AT A MINIMUM,
CONTRACTORS CONDUCT PHONE SURVEYS TO ADEQUATELY ASSESS THE MAGNITUDE OF
THE WORK TO BE PERFORMED IN DETERMINING THEIR PRICE STRATEGY.
M. ADDITIONAL INFORMATION:
3. TSR NUMBER: RU03OCT175637B
4. CCSD: XXXXB0B0
Z. DITCO CONTACT:
Christopher OConnor
618-229-9712 christopher.t.oconnor2.civ@mail.mil
Paul A. Heard
DITCO Contracting Officer
Add the following:
LOCATION OF TERMINATION A:
ADDRESS: BLDG 1060
400 CANNON STREET
MAXWELL AFB, AL 36112
ROOM: 97
LOCATION: CCC
EXTENSION OF TELECOMMUNICATIONS SERVICE: All facilities between vendor's commercial communications interface point and termination location shall be provided by vendor. All cables shall be run in accordance with local site standards
INTERFACE: INTERFACE: GIGABIT ETHERNET; ELECTRICAL: 10GBASE-LR; PHYSICAL: SC
DEMARK: BLDG 942, ROOM 115, OPEN BAY FRAME ROOM
101 WEST KIRKPATRICK AVENUE,
MAXWELL AFB, AL 36112-6610
NPA/NXX: 334/953
UNIQUE INSTALLATION FACTORS: (1) FIBER CABLE X-CONNECT, IN-HOUSE, INSIDE WIRE,
SINGLE-MODE, 1310NM, TELCO
(2) TELCO MULTIPLEX (COMMERCIAL FIBER POINT OF PRESENCE)
COMMERCIAL CARRIER SYSTEM (LOCAL EXCHANGE CARRIER)
AMPLIFYING INFO:
A. VENDOR IS RESPONSIBLE FOR INSTALLATION AND MAINTENANCE
OF THE SERVICE FROM THE LINE SIDE OF THE DISA IE1 PROVIDED FIBER TERMINATING PATCH PANEL INSTALLED
IN THE JUNIPER MX-240 ROUTER SUITE (UJEWMAX040) BLDG 1060, RM 97 TO THE DROP SIDE OF THE COMMERCIAL
FIBER POINT OF PRESENCE FIBER DISTRIBUTION PANEL BLDG 942, ROOM 115 USING SINGLE MODE FIBER.
COORDINATE TYPE CONNECTORS TO BE USED FOR TERMINATION TO THE DISA PROVIDED PATCH PANEL.
B. VENDOR MUST COORDINATE WITH GOVERNMENT SITE PERSONNEL TO CONDUCT WALK THROUGH SITE
SURVEYS FOR EXACT CABLE FT. FROM THE DISA PROVIDED FIBER TERMINATING PATCH PANEL INSTALLED IN THE
JUNIPER MX-240 ROUTER SUITE BLDG 1060, RM 97 TO THE COMMERCIAL FIBER POINT OF PRESENCE BLDG 942, ROOM 115.
C. VENDOR MUST PROVIDE FIBER STRANDS FROM THE DISA PROVIDED FIBER PATCH PANEL INSTALLED IN THE
JUNIPER MX-240 ROUTER TO THE COMMERCIAL DEMARC LOCATION WITHOUT SPLICING AND OR USE OF
CONNECTORS TO CONNECT 2 OR MORE FIBER STRANDS MEANING THE FIBER CANNOT BE BROKEN IN THE MIDDLE
AND MUST BE CONTINUOUS.
D. VENDOR MUST SCHEDULE/COORDINATE WITH THE POC'S LISTED ON THIS ORDER 72 HOURS IN ADVANCE PRIOR
TO SITE SURVEYS OR INSTALLATIONS.
INSIDE WIRE INSTALLATION / MAINTENANCE REQUIRED: CPIWI-YES/CPIWM-YES
CONTACT: PRI: SEAN BOWDEN
D493-5338/9777
C334-953-5338/9777
EMAIL: SEAN.BOWDEN.CTR@US.AF.MIL
ALT: GREGORY FENN
D493-6022/9777
C334-953-6022/9777
EMAIL: GREGORY.FENN.CTR@US.AF.MIL
ALT: DANIELLE RIES
D493-8868/9777
C334-953-8868/9777
EMAIL: DANIELLE.RIES.1.CTR@US.AF.MIL
ALT: COMM FOCAL POINT (24/7)
D493-1000
C334-953-1000
ORG EMAIL: MSD.ITIN@US.AF.MIL
Add the following:
LOCATION OF TERMINATION B:
ADDRESS: BLDG 380
201 WEST EGLIN BLVD
EGLIN AFB, FL 32542
ROOM: 308
LOCATION: CCC
EXTENSION OF TELECOMMUNICATIONS SERVICE: All facilities between vendor's commercial communications interface point and termination location shall be provided by vendor. All cables shall be run in accordance with local site standards
INTERFACE: INTERFACE: GIGABIT ETHERNET; ELECTRICAL: 10GBASE-LR; PHYSICAL: SC
DEMARK: BLDG 44, ROOM 9
104 WEST CHOCTAWHATCHE AVENUE
EGLIN AFB, FL 32542
PRI: BILL JOHNSON, D872-6747/6748, C850-882-6747/6748 EMAIL:
WILSON.JOHNSON.1.CTR@US.AF.MIL
NPA/NXX: 850/882
UNIQUE INSTALLATION FACTORS: (1) FIBER CABLE X-CONNECT, IN-HOUSE, INSIDE WIRE, SINGLE-MODE, 1310NM, TELCO
(2) TELCO MULTIPLEX (COMMERCIAL FIBER POINT OF PRESENCE)
COMMERCIAL CARRIER SYSTEM (LOCAL EXCHANGE CARRIER)
AMPLIFYING INFO:
A. VENDOR IS RESPONSIBLE FOR INSTALLATION AND MAINTENANCE OF THE SERVICE FROM THE LINE SIDE OF
THE DISA IE1 PROVIDED FIBER TERMINATING PATCH PANEL INSTALLED IN THE CISCO ASR-9010 ROUTER SUITE
(UJEWEGL030) BLDG 380, RM 308 TO THE DROP SIDE OF THE COMMERCIAL FIBER POINT OF PRESENCE FIBER
DISTRIBUTION PANEL BLDG 44, RM 9 USING SINGLE MODE FIBER. COORDINATE TYPE CONNECTORS TO BE USED
FOR TERMINATION TO THE DISA PROVIDED PATCH PANEL.
B. VENDOR MUST COORDINATE WITH GOVERNMENT SITE PERSONNEL TO CONDUCT WALK THROUGH SITE
SURVEYS FOR EXACT CABLE FT. FROM THE DISA PROVIDED FIBER TERMINATING PATCH PANEL INSTALLED IN THE
CISCO ASR-9010 ROUTER SUITE BLDG 380, RM 308 TO THE COMMERCIAL FIBER POINT OF PRESENCE BLDG 44, RM
9.
C. VENDOR MUST PROVIDE FIBER STRANDS FROM THE DISA PROVIDED FIBER PATCH PANEL INSTALLED IN THE
CISCO ASR-9010 ROUTER TO THE COMMERCIAL DEMARC LOCATION WITHOUT SPLICING AND OR USE OF
CONNECTORS TO CONNECT 2 OR MORE FIBER STRANDS MEANING THE FIBER CANNOT BE BROKEN IN THE MIDDLE
AND MUST BE CONTINUOUS.
D. VENDOR MUST SCHEDULE/COORDINATE WITH THE POC'S LISTED ON THIS ORDER 72 HOURS IN ADVANCE PRIOR
TO SITE SURVEYS OR INSTALLATIONS.
INSIDE WIRE INSTALLATION / MAINTENANCE REQUIRED: CPIWI-YES/CPIWM-YES
CONTACT: (PMRY POC) CIRCUIT ACTIONS
(UNCLASS ORG) CIRCUIT1@US.AF.MIL
(CMCL) 850-882-9950
(DSN) 872-9950
(ALT POC) 24-HR ON-CALL
(UNCLASS ORG) CIRCUIT1@US.AF.MIL
(CMCL) 850-882-2666
(DSN) 872-2666
File details come from the government source that posted it.