HC101317QA145-0001.v1.pdf
PDF 31 KB Posted
- Solicitation number
- HC101317QA145
- Issued by
-
Defense Information Systems Agency
About this file
Not Listed
View the file
Other files
| File | Type | Posted |
|---|---|---|
| HC101317QA145.v0.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
IQO INQUIRY
FM: PL8211
TO: Contractors
DATE (MM/DD/YYYY): 2/8/2017
SUBJECT: HC101317QA145-0001 Amend: 0001
A. TYPE ACTION: ADMIN AMEND
1. PURPOSE: *** THE PURPOSE OF THIS AMENDMENT IS TO UPDATE THE
SERVICE DATE AND PROPOSAL DUE DATE. THE ORIGINAL SOLICITATION HAS BEEN
EXTENDED BY 30 DAYS DUE TO IT TECHNICAL PROBLEMS LEADING TO THE
ORIGINAL SOLICITATION NOT BEING POSTED ON THE ORIGINAL SOLICITATION
DATE. THERE ARE NO OTHER CHANGES WITH THIS AMENDMENT.***
1. SUBMIT A QUOTE TO PROVIDE, INSTALL AND MAINTAIN A 2.5GB WAVE
SERVICE BETWEEN BLDG 533, ROOM 128, 1225 PERSING PLACE, PATRICK AFB,
FL, AND BLDG 570, ROOM DI-1, 7115 SOUTH BOUNDARY BLVD, MACDILL AFB,
FL.
2. CONTRACTORS SHALL MEET RTD OF 10 MILLISECONDS. ***SEE UNIQUE
INSTALL FACTORS***
3. EACH CONTRACTOR IS RESPONSIBLE FOR READING AND COMPLYING WITH ALL
TECHNICAL ASPECTS OF THIS SOLICITATION, TO INCLUDE READING AND
AGREEING WITH THE STANDARD PROVISIONS, ATTACHMENTS LISTING SPECIFIC
TECHNICAL REQUIREMENTS, PRICE QUOTE REQUIREMENTS, AND REQUESTED
SERVICE DATE. FAILURE TO READ AND ADHERE TO ANY PORTION OF THE
INQUIRY SHALL RENDER THE QUOTE NON-COMPLIANT AND RESULT IN IT BEING
EXCLUDED FROM EVALUATION AND AWARD.
4. THE SERVICE DATE TO BE MET IS: 03 AUG 17 (SIP). THE GOVERNMENT
ASSUMES THAT CONTRACTORS HAVE CONSIDERED ALL ISSUES THAT MAY IMPACT
THE SERVICE DATE. THE GOVERNMENT MAY CANCEL, TERMINATE, OR REQUEST
CONSIDERATION IAW STANDARD PROVISION 42 FOR FAILURE TO MEET
CONTRACTUAL SERVICE DATE OR COMPLY WITH ANY CONTRACT TERMS OR
CONDITIONS.
5. CONTRACTORS SHALL SUBMIT QUOTES IAW STANDARD PROVISION 04.
QUOTES SHALL INCLUDE SUFFICIENT DETAIL FOR EFFECTIVE EVALUATION AND
SHOULD NOT SIMPLY REPHRASE OR RESTATE THE GOVERNMENT REQUIREMENTS.
RATHER, THEY MUST PROVIDE CONVINCING RATIONALE TO ADDRESS HOW THE
CONTRACTOR INTENDS TO MEET THE REQUIREMENT. IN RESPONSE TO THIS
SOLICITATION, NO TERMS OR CONDITIONS PLACED UPON THE GOVERNMENT, NOR
ASSUMPTIONS WILL BE ACCEPTED. CONTRACTORS ARE ENCOURAGED TO SUBMIT
QUESTIONS AND REQUEST CLARIFICATIONS OF THE REQUIREMENT (S) BEFORE
SUBMITTING QUOTES. QUESTIONS SHALL BE SUBMITTED TO CONTRACT
SPECIALIST AND CONTRACTING OFFICER DURING THE SOLICITATION PHASE ONLY,
AND RESPONSES FOR ALL INTERESTED PARTIES WILL BE POSTED TO FEDBIZOPPS.
HC101317QA145-0001
6. THIS REQUIREMENT MUST BE WORKED IN CONJUNCTION WITH SOLICITATION
HC101317QA144/SG29NOV165088 AND MUST BE ENGINEERED AND PROVISIONED
TOTALLY DIVERSE END TO END FROM THE GOVERNMENT SERVICE DELIVERY POINTS
(SDP) FROM HC101317QA144/SG29NOV165088; MEANING THE PHYSICAL PATHS ARE
TOTALLY SEPARATE INCLUDING MAN HOLES, CONDUIT, CENTRAL OFFICE
LOCATIONS, AND FIBER BUILDS. ADDITIONALLY AS A MINIMUM MUST HAVE 50
METERS PHYSICAL SEPARATION FROM HC101317QA144/SG29NOV165088.
7. CONTRACTOR SHALL PROVIDE COLOR POWERPOINT DRAWINGS SHOWING THE
ROUTES FROM THE COMMERCIAL DEMARKS TO THE SUPPORTING CENTRAL OFFICES
AND/OR WIRING CENTERS, ENSURING THE PHYSICAL END TO END DIVERSITY
REQUIREMENTS ARE BEING MET. DRAWINGS MUST INCLUDE SEPARATION
DISTANCES, TOTAL FIBER MILES AND ROUND TRIP DELAY BASED ON ACTUAL
DISTANCE IN MILES. REFER TO STANDARD PROVISION 39 FOR SPECIFIC
DOCUMENTATION REQUIREMENTS. SAMPLE DRAWINGS ARE INCLUDED THE
ATTACHMENTS.
8. PRE AWARD SITE SURVEYS ARE AUTHORIZED (AT CONTRACTOR EXPENSE) WITH
LOCAL POCS AT EACH GOVERNMENT SITE. IT IS HIGHLY RECOMMENDED THAT AT
A MINIMUM, CONTRACTORS CONDUCT PHONE SURVEYS TO ADEQUATELY ASSESS THE
MAGNITUDE OF THE WORK TO BE PERFORMED IN DETERMINING THEIR PRICE
STRATEGY.
9. THIS IS A REAWARD OF A CURRENT SERVICE, CSA: LEVC W L8907. IF THE
INCUMBENT QUOTE IS EVALUATED AS THE LOWEST PRICE TECHNICABLE
ACCEPTABLE, THE CURRENT CSA WILL BE ADMINSTRATIVELY DISCONTINUED
WITHIN 30 DAYS OF INCUMBENT CONTRACTOR RECEIVING AWARD. INCUMBENT
CONTRACTORS SHALL SUBMIT NOTICE OF COMPLETION (NOC) WITHIN 30 DAYS.
M. ADDITIONAL INFORMATION:
3. TSR NUMBER: SG05DEC165100
4. CCSD: DIYU62DA
Z. DITCO CONTACT:
Andrew Fernandez 618-229-9414 andrew.r.fernandez.civ@mail.mil
Paul A. Heard
DITCO Contracting Officer
Unless otherwise specified, all other terms and conditions are unchanged.
Paragraph E.SERVICE DATE change from:
Jul 3, 2017
To:
Aug 3, 2017
Paragraph F.2.SIGNALING MODE change from:
RRRRR
No Signaling
Paragraph V.QUOTE DUE DATE AND TIME change from:
Feb 10, 2017 3:00:00 PM CST
Mar 8, 2017 3:00:00 PM CST
File details come from the government source that posted it. Updated .