HC101317QA070-0002.v0.pdf

PDF 38 KB Posted

Attached to
SOLICITATION HC101317QA069-0002 HAS BEEN AMENDED
Solicitation number
HC101317QA070
Issued by

About this file

Not Listed

View the file

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

IQO INQUIRY

FM: PL8211

TO: Contractors

DATE (MM/DD/YYYY): 7/13/2017

SUBJECT: HC101317QA070-0002 Amend: 0002

A. TYPE ACTION: ADMIN AMEND

1. PURPOSE: ********* SOLICITATION HC101317QA069-0002 HAS BEEN

AMENDED TO CORRECT MAYPORT COMMERCIAL DEMARCATION ADDRESS TO (BLDG)

2276; (RM) BCO ROOM; 2276 OLD MAINE STREET; MAYPORT NAVAL STATION, FL,

32228 AND (BLDG) 919; (RM) TELCO ROOM; (FL) 1; 919 LANGLEY STREET;

JACKSONVILLE NAS, FL, 32212. REVISED UNIQUE INSTALL FACTS AND

AMPLIFYING INFO - REMOVING SITE PROVIDED PATCH PANELS AND ON BASE

FIBER CABLE. THE NEW QUOTE DUE DATE IS 26 JULY 2017. ALL ELSE REMAINS

THE SAME. *********

1. SUBMIT A QUOTE TO PROVIDE, INSTALL AND MAINTAIN A 1.0GB ETHERNET

SERVICE BETWEEN (BLDG) 2276; (RM) 38; (FL) 1; 1488 MASSEY AVENUE;

MAYPORT NAVAL STATION, FL, 32228 AND (BLDG) 919; (RM) TELCO ROOM; (FL)

1; 919 LANGLEY STREET; JACKSONVILLE NAS, FL, 32212.

2. ESTABLISH TSP: TSP0GG9EW-01 AND NSS: Y5

3. CONTRACTORS SHALL MEET THE RTD OF 10 MILLISECONDS. VENDOR IS

RESPONSIBLE FOR FIBER JUMPER IN LOCATION 3.A. (MAYPORT BCO ROOM).

4. EACH CONTRACTOR IS RESPONSIBLE FOR READING AND COMPLYING WITH ALL

TECHNICAL ASPECTS OF THIS SOLICITATION, TO INCLUDE READING AND

AGREEING WITH THE STANDARD PROVISIONS, ATTACHMENTS LISTING SPECIFIC

TECHNICAL REQUIREMENTS, PRICE QUOTE REQUIREMENTS, AND REQUESTED

SERVICE DATE. FAILURE TO READ AND ADHERE TO ANY PORTION OF THE

INQUIRY SHALL RENDER THE QUOTE NON-COMPLIANT AND RESULT IN IT BEING

EXCLUDED FROM EVALUATION AND AWARD.

5. THE SERVICE DATE TO BE MET IS: 06 JUL 17 (SIP). THE GOVERNMENT

ASSUMES THAT CONTRACTORS HAVE CONSIDERED ALL ISSUES THAT MAY IMPACT

THE SERVICE DATE. THE GOVERNMENT MAY CANCEL, TERMINATE, OR REQUEST

CONSIDERATION IAW STANDARD PROVISION 42 FOR FAILURE TO MEET

CONTRACTUAL SERVICE DATE OR COMPLY WITH ANY CONTRACT TERMS OR

CONDITIONS.

6. CONTRACTORS SHALL SUBMIT QUOTES IAW STANDARD PROVISION 04. QUOTES

SHALL INCLUDE SUFFICIENT DETAIL FOR EFFECTIVE EVALUATION AND SHOULD

NOT SIMPLY REPHRASE OR RESTATE THE GOVERNMENT REQUIREMENTS. RATHER,

THEY MUST PROVIDE CONVINCING RATIONALE TO ADDRESS HOW THE CONTRACTOR

INTENDS TO MEET THE REQUIREMENT. IN RESPONSE TO THIS SOLICITATION, NO

TERMS OR CONDITIONS PLACED UPON THE GOVERNMENT, NOR ASSUMPTIONS WILL

HC101317QA070-0002

BE ACCEPTED. CONTRACTORS ARE ENCOURAGED TO SUBMIT QUESTIONS AND

REQUEST CLARIFICATIONS OF THE REQUIREMENT (S) BEFORE SUBMITTING

QUOTES. QUESTIONS SHALL BE SUBMITTED TO CONTRACT SPECIALIST AND

CONTRACTING OFFICER DURING THE SOLICITATION PHASE ONLY, AND RESPONSES

FOR ALL INTERESTED PARTIES WILL BE POSTED TO FEDBIZOPPS.

7. THIS REQUIREMENT MUST BE WORKED IN CONJUNCTION WITH SOLICITATION

HC101317QA0369 / TSR RU20OCT168393 AND MUST BE ENGINEERED AND

PROVISIONED TOTALLY DIVERSE END TO END FROM THE GOVERNMENT SERVICE

DELIVERY POINTS (SDP) FROM HC101317QA0369 / TSR RU20OCT168393;

MEANING THE PHYSICAL PATHS ARE TOTALLY SEPARATE INCLUDING MAN HOLES,

CONDUIT, CENTRAL OFFICE LOCATIONS, AND FIBER BUILDS. ADDITIONALLY AS

A MINIMUM MUST HAVE 50 METERS PHYSICAL SEPARATION FROM HC101317QA0369

/ TSR RU20OCT168393.

8. CONTRACTOR SHALL PROVIDE COLOR POWERPOINT DRAWINGS SHOWING THE

ROUTES FROM THE COMMERCIAL DEMARKS TO THE SUPPORTING CENTRAL OFFICES

AND/OR WIRING CENTERS, ENSURING THE PHYSICAL END TO END DIVERSITY

REQUIREMENTS ARE BEING MET. DRAWINGS MUST INCLUDE SEPARATION

DISTANCES, TOTAL FIBER MILES AND ROUND TRIP DELAY BASED ON ACTUAL

DISTANCE IN MILES. REFER TO STANDARD PROVISION 39 FOR SPECIFIC

DOCUMENTATION REQUIREMENTS. SAMPLE DRAWINGS ARE INCLUDED THE

ATTACHMENTS.

9. PRE AWARD SITE SURVEYS ARE AUTHORIZED (AT CONTRACTOR EXPENSE) WITH

LOCAL POCS AT EACH GOVERNMENT SITE. IT IS HIGHLY RECOMMENDED THAT AT

A MINIMUM, CONTRACTORS CONDUCT PHONE SURVEYS TO ADEQUATELY ASSESS THE

MAGNITUDE OF THE WORK TO BE PERFORMED IN DETERMINING THEIR PRICE

STRATEGY.

10. ********SEE UNIQUE INSTALL FACTORS*******

M. ADDITIONAL INFORMATION:

3. TSR NUMBER: RU20OCT168394A

4. CCSD: DBH3BWT2

Z. DITCO CONTACT:

Andrew Fernandez 618-229-9414 andrew.r.fernandez.civ@mail.mil

Paul A. Heard

DITCO Contracting Officer

Unless otherwise specified, all other terms and conditions are unchanged.

Paragraph V.QUOTE DUE DATE AND TIME change from:

Mar 2, 2017 4:00:00 PM CST

To:

Jul 26, 2017 3:00:00 PM CDT

Attachments Begin After This Page.

HC101317QA070-0002- ATTACHMENT 1- UNIQUE INSTALL FACTS

UNIQUE INST FACT: BACKBONE WILL TERMINATE ON UJEWMPT030,

PORT: GI-0/2/1/0, NODE IP: 33.20.14.198, SUBNET MASK:

255.255.255.252

(1) OPTICAL INTERFACE CARD (GFE)(DISA IE1 PROVIDED)

(2) FIBER CABLE X-CONNECT, IN-HOUSE, INSIDE WIRE,

SINGLE-MODE, 1310NM, DISA IE4

(3) FIBER TERMINATING PATCH PANEL (GFE)(DISA IE1

PROVIDED)

RACK/SHELF/PORT - TBD

(4) FIBER CABLE X-CONNECT, IN-HOUSE, INSIDE WIRE,

SINGLE-MODE, 1310NM, TELCO

(5) FIBER TERMINATING PATCH PANEL (GFE)(SITE PROVIDED)

RACK/SHELF/PORT - TBD

(6) FIBER CABLE, ON-BASE, SINGLE-MODE, 1310NM,

NCSTI N9 PERSONNEL

AMPLIFYING INFO:

A. DISA IE4 IS RESPONSIBLE FOR INSTALLATION AND GSM-O

FOR MAINTENANCE OF CISCO ASR-9006 ROUTER, OPTICAL

INTERFACE CARD BLDG 2276, BCO ROOM.

B. DISA IE4 IS RESPONSIBLE FOR INSTALLATION AND GSM-O

FOR SINGLE MODE FIBER FROM OPTICAL INTERFACE CARD

INSTALLED IN CISCO ASR-9006 ROUTER TO DROP SIDE OF

DISA IE1 PROVIDED FIBER TERMINATING PATCH PANEL

INSTALLED IN CISCO ASR-9006 ROUTER. COORDINATE TYPE

OF CONNECTORS.

C. VENDOR IS RESPONSIBLE FOR INSTALLATION AND

MAINTENANCE OF SINGLE MODE FIBER FROM LINE SIDE OF

DISA IE1 PROVIDED FIBER TERMINATING PATCH PANEL

INSTALLED IN CISCO ASR-9006 ROUTER SUITE

(UJEWMPT030) BLDG 2276, BCO ROOM TO DROP SIDE OF

COMMERCIAL FIBER POINT OF PRESENCE FIBER

DISTRIBUTION PANEL BLDG 2276, BCO ROOM. COORDINATE

TYPE CONNECTORS FOR TERMINATION TO DISA PROVIDED

PATCH PANEL.;

D. VENDOR MUST PROVIDE FIBER STRANDS FROM CISCO ROUTER

SUITE FIBER PATCH PANEL TO SITE PROVIDED FIBER

PATCH PANEL WITHOUT SPLICING AND OR USE OF

CONNECTORS TO CONNECT 2 OR MORE FIBER STRANDS

MEANING THE FIBER CANNOT BE BROKEN IN THE MIDDLE

AND MUST BE CONTINUOUS.

E. CIRCUIT MUST BE

(C) INSIDE WIRE INSTL/MAINT: CPIWI-YES/CPIWM-YES

(D) TERM: 2W

(E) INTERFACE: (PHYSICAL) LC; (ELECTRICAL) OPTICAL

File details come from the government source that posted it. Updated .