HC101317QA069-0002.v0.pdf

PDF 40 KB Posted

Attached to
SOLICITATION HC101317QA069-0002 HAS BEEN AMENDED
Solicitation number
HC101317QA069
Issued by

About this file

Not Listed

View the file

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

IQO INQUIRY

FM: PL8211

TO: Contractors

DATE (MM/DD/YYYY): 7/13/2017

SUBJECT: HC101317QA069-0002 Amend: 0002

A. TYPE ACTION: ADMIN AMEND

1. PURPOSE: ********* SOLICITATION HC101317QA069-0002 HAS BEEN

AMENDED TO REMOVE DISN EQUIPMENT AT JKSVLNAS - MCDLLAFB. CORRECT

SECOND COMMERCIAL DEMARK ADDRESS TO READ: BLDG. 570, ROOM S-215 (SI1),

SECOND FLOOR, 7115 SOUTH BOUNDARY BLVD, MACDILL AFB, FL 33621-

1454/CC2. ADD INTERFACE; INSIDE WIRE, UNIQUE INSTALL FACTS AND REMOVE

TRANSPORT MEDIUM ENTRY. THE NEW QUOTE DUE DATE IS 26 JULY 2017. ALL

ELSE REMAINS THE SAME. *********

1. SUBMIT A QUOTE TO PROVIDE, INSTALL AND MAINTAIN A 1.0GB ETHERNET

SERVICE BETWEEN (BLDG) 2276; (RM) BCO; 3604 MAYPORT ROAD; MAYPORT

NAVAL STATION, FL, 32228 AND (BLDG) 570, (RM) S-215 (SI1), (FL) 2ND,

7115 SOUTH BOUNDARY BLVD, MACDILL AFB, FL 33621-1454.

2. ESTABLISH TSP: TSP0GG9DA-01 AND NSS: Y5.

3. CONTRACTORS SHALL MEET THE RTD OF 10 MILLISECONDS.

4. EACH CONTRACTOR IS RESPONSIBLE FOR READING AND COMPLYING WITH ALL

TECHNICAL ASPECTS OF THIS SOLICITATION, TO INCLUDE READING AND

AGREEING WITH THE STANDARD PROVISIONS, ATTACHMENTS LISTING SPECIFIC

TECHNICAL REQUIREMENTS, PRICE QUOTE REQUIREMENTS, AND REQUESTED

SERVICE DATE. FAILURE TO READ AND ADHERE TO ANY PORTION OF THE INQUIRY

SHALL RENDER THE QUOTE NON-COMPLIANT AND RESULT IN IT BEING EXCLUDED

FROM EVALUATION AND AWARD.

5. THE SERVICE DATE TO BE MET IS: 06 JUL 17 (SIP). THE GOVERNMENT

ASSUMES THAT CONTRACTORS HAVE CONSIDERED ALL ISSUES THAT MAY IMPACT

THE SERVICE DATE. THE GOVERNMENT MAY CANCEL, TERMINATE, OR REQUEST

CONSIDERATION IAW STANDARD PROVISION 42 FOR FAILURE TO MEET

CONTRACTUAL SERVICE DATE OR COMPLY WITH ANY CONTRACT TERMS OR

CONDITIONS.

6. CONTRACTORS SHALL SUBMIT QUOTES IAW STANDARD PROVISION 04. QUOTES

SHALL INCLUDE SUFFICIENT DETAIL FOR EFFECTIVE EVALUATION AND SHOULD

NOT SIMPLY REPHRASE OR RESTATE THE GOVERNMENT REQUIREMENTS. RATHER,

THEY MUST PROVIDE CONVINCING RATIONALE TO ADDRESS HOW THE CONTRACTOR

INTENDS TO MEET THE REQUIREMENT. IN RESPONSE TO THIS SOLICITATION, NO

TERMS OR CONDITIONS PLACED UPON THE GOVERNMENT, NOR ASSUMPTIONS WILL

BE ACCEPTED. CONTRACTORS ARE ENCOURAGED TO SUBMIT QUESTIONS AND

REQUEST CLARIFICATIONS OF THE REQUIREMENT (S) BEFORE SUBMITTING

HC101317QA069-0002

QUOTES. QUESTIONS SHALL BE SUBMITTED TO CONTRACT SPECIALIST AND

CONTRACTING OFFICER DURING THE SOLICITATION PHASE ONLY, AND RESPONSES

FOR ALL INTERESTED PARTIES WILL BE POSTED TO FEDBIZOPPS.

7. THIS REQUIREMENT MUST BE WORKED IN CONJUNCTION WITH SOLICITATION

HC101317QA070 / TSR RU20OCT168394 AND MUST BE ENGINEERED AND

PROVISIONED TOTALLY DIVERSE END TO END FROM THE GOVERNMENT SERVICE

DELIVERY POINTS (SDP) FROM TSR HC101317QA070 / TSR RU20OCT168394 ;

MEANING THE PHYSICAL PATHS ARE TOTALLY SEPARATE INCLUDING MAN HOLES,

CONDUIT, CENTRAL OFFICE LOCATIONS, AND FIBER BUILDS. ADDITIONALLY AS

A MINIMUM MUST HAVE 50 METERS PHYSICAL SEPARATION FROM TSR

HC101317QA070 / TSR RU20OCT168394.

8. CONTRACTOR SHALL PROVIDE COLOR POWERPOINT DRAWINGS SHOWING THE

ROUTES FROM THE COMMERCIAL DEMARKS TO THE SUPPORTING CENTRAL OFFICES

AND/OR WIRING CENTERS, ENSURING THE PHYSICAL END TO END DIVERSITY

REQUIREMENTS ARE BEING MET. DRAWINGS MUST INCLUDE SEPARATION

DISTANCES, TOTAL FIBER MILES AND ROUND TRIP DELAY BASED ON ACTUAL

DISTANCE IN MILES. REFER TO STANDARD PROVISION 39 FOR SPECIFIC

DOCUMENTATION REQUIREMENTS. SAMPLE DRAWINGS ARE INCLUDED THE

ATTACHMENTS.

9. PRE AWARD SITE SURVEYS ARE AUTHORIZED (AT CONTRACTOR EXPENSE) WITH

LOCAL POCS AT EACH GOVERNMENT SITE. IT IS HIGHLY RECOMMENDED THAT AT

A MINIMUM, CONTRACTORS CONDUCT PHONE SURVEYS TO ADEQUATELY ASSESS THE

MAGNITUDE OF THE WORK TO BE PERFORMED IN DETERMINING THEIR PRICE

STRATEGY.

10. *****SEE UNIQUIE INSTALL FACTORS*****

M. ADDITIONAL INFORMATION:

3. TSR NUMBER: RU20OCT168393A

4. CCSD: DBH3BVT2

Z. DITCO CONTACT:

Andrew Fernandez 618-229-9414 andrew.r.fernandez.civ@mail.mil

Paul A. Heard

DITCO Contracting Officer

Unless otherwise specified, all other terms and conditions are unchanged.

Paragraph V.QUOTE DUE DATE AND TIME change from:

Mar 2, 2017 4:00:00 PM CST

To:

Jul 26, 2017 3:00:00 PM CDT

Attachments Begin After This Page.

HC101317QA069-0002- ATTACHMENT 1- UNIQUE INSTALL FACTS

(A) COMMERCIAL FIBER POINT OF PRESENCE

(B) UNIQUE INST FACT:

(1) COMMERCIAL FIBER POINT OF PRESENCE

(2) FIBER CABLE X-CONNECT, IN-HOUSE, INSIDE WIRE,

SINGLE-MODE, 1310NM, TELCO

AMPLIFYING INFO:

A. VENDOR IS RESPONSIBLE FOR INSTALLATION AND

MAINTENANCE OF SINGLE MODE FIBER FROM DROP SIDE OF

COMMERCIAL FIBER POINT OF PRESENCE [FIBER

DISTRIBUTION PANEL (FDP)] BLDG 570, ROOM S-215 TO

LINE SIDE OF DISA IE1 PROVIDED FIBER TERMINATING

PATCH PANEL INSTALLED IN CISCO ROUTER SUITE

(UJEWMAC030) BLDG 570, ROOM S-215. TERMINATE WITH

"SC" CONNECTORS TO DISA PROVIDED FIBER TERMINATING

PATCH PANEL.

B. VENDOR MUST PROVIDE FIBER STRANDS FROM THEIR POINT

OF PRESENCE TO CISCO ROUTER SUITE WITHOUT SPLICING

AND OR USE OF CONNECTORS TO CONNECT 2 OR MORE FIBER

STRANDS MEANING FIBER CANNOT BE BROKEN IN THE

MIDDLE AND MUST BE CONTINUOUS.

C. LENGTH OF SINGLE MODE FIBER JUMPERS REQUIRED WILL

BE BASED ON LOCATION OF THEIR POINT OF PRESENCE.

D. CIRCUIT MUST BE TAGGED WITH VENDOR'S CIRCUIT ID AS

APPLICABLE AT DROP SIDE OF THEIR POINT OF PRESENCE

(FIBER DISTRIBUTION PANEL) BLDG 570, ROOM S-215.

ADDITIONALLY, VENDOR MUST SHOW SITE PERSONNEL

LISTED ON THIS ORDER THE EXACT TERMINATION POINT

WHEN SERVICE IS COMPLETE.

(D) COML ACCESS: WILL NOT LEAK - CAT 6

(E) INTERFACE: (PHYSICAL) SINGLE-MODE 1310NM, SC CONNECTORS;

(ELECTRICAL) OPTICAL.

A) FIBER TERMINATING PATCH PANEL (GFE)(DISA IE1 PROVIDED)

OPTICAL INTERFACE CARD (GFE)(DISA IE1 PROVIDED)

CISCO ASR-9010 ROUTER (GFE)(DISA IE1 PROVIDED)

(B) INSIDE WIRE INSTL/MAINT: CPIWI-YES/CPIWM-YES

(C) TERM: 2W

(D) COML ACCESS: WILL NOT LEAK - CAT 6

(E) INTERFACE: (PHYSICAL) LC; (ELECTRICAL) OPTICAL

(F) UNIQUE INST FACT: BACKBONE WILL TERMINATE ON UJEWMAC030,

PORT:

GI-0/2/1/17, NODE IP: 33.20.14.189, SUBNET MASK:

255.255.255.252

(1) FIBER CABLE X-CONNECT, IN-HOUSE, INSIDE WIRE,

SINGLE-MODE, 1310NM, TELCO

(2) FIBER TERMINATING PATCH PANEL (GFE)

(DISA IE1 PROVIDED)

RACK/SHELF/PORT - TBD

(3) FIBER CABLE X-CONNECT, IN-HOUSE, INSIDE WIRE,

SINGLE-MODE, 1310NM, DISA IE4

(4) OPTICAL INTERFACE CARD (GFE)(DISA IE1 PROVIDED)

AMPLIFYING INFO:

A. VENDOR IS RESPONSIBLE FOR INSTALLATION AND

MAINTENANCE OF SINGLE MODE FIBER FROM COMMERCIAL

FIBER POINT OF PRESENCE FIBER DISTRIBUTION PANEL

BLDG 570, ROOM S-215 TO LINE SIDE OF DISA IE1

PROVIDED FIBER TERMINATING PATCH PANEL INSTALLED IN

CISCO ASR-9010 ROUTER SUITE (UJEWMAC030) BLDG 570,

ROOM S-215. COORDINATE TYPE CONNECTORS FOR

TERMINATION TO DISA PROVIDED PATCH PANEL.

B. CIRCUIT MUST BE TAGGED WITH LOCAL CIRCUIT ID AND

LONG HAUL CIRCUIT NO. AS APPLICABLE AT DROP SIDE OF

VENDOR'S FIBER DISTRIBUTION PANEL INSTALLED IN

THEIR EQUIPMENT SUITE AND AT LINE SIDE OF DISA

PROVIDED FIBER TERMINATING PATCH PANEL BLDG 570,

ROOM S-215. ADDITIONALLY, VENDOR MUST SHOW SITE

PERSONNEL LISTED ON THIS ORDER THE EXACT

TERMINATION POINT WHEN SERVICE IS COMPLETE.

C. DISA IE4 IS RESPONSIBLE FOR INSTALLATION AND GSM-O

FOR MAINTENANCE OF SINGLE MODE FIBER FROM DROP SIDE

OF DISA IE1 PROVIDED FIBER TERMINATING PATCH PANEL

INSTALLED IN CISCO ASR-9010 ROUTER SUITE TO OPTICAL

INTERFACE CARD INSTALLED IN CISCO ASR-9010 ROUTER.

TERMINATE "SC" TO "LC" CONNECTORS.

D. DISA IE4 IS RESPONSIBLE FOR INSTALLATION AND GSM-O

FOR MAINTENANCE OF CISCO ASR-9010 ROUTER, OPTICAL

INTERFACE CARD BLDG 570, ROOM S-215.

File details come from the government source that posted it. Updated .