Purchase Request # 212340346193552002 Statement of Objectives

Fuel Polishing System

1. SCOPE

1.1 Intent: The Contractor shall provide a diesel fuel oil polishing system as described herein.

2. REFERENCES

COAST GUARD PUBLICATIONS

· None

OTHER REFERENCES

· None

3. REQUIREMENTS

3.1 The Contractor shall furnish the following items NLT JUNE 1st, 2023. If – due to availability – the following items cannot be supplied by JUNE 1st, 2023. Contractor shall provide estimated delivery dates upon bid submission. Timeliness of delivery will be considered in bid evaluation.

3.1.1 Fuel Polishing System must be designed to efficiently remove water, sludge, and other contaminants from fuel storage tanks. Once on site, the system will be operated to ensure fuel reliability through routine servicing of the fuel tank(s). The system’s fuel polishing process stabilizes diesel Ultra-low Sulphur or Marine grade by eliminating various contaminates, ensuring the fuel remains clean.

Feature to include:

Multi-Stage Fuel Filtration (Min of 2) Adjustable Flow Rate (VFD Controller) Portable System Design with integrated forklift pockets Locking Cam and Groove Connections Fine Filter Bypass Capability Smart Filtration Controller Unique Safety & Alarm Features Remote Pendant Operation

Specification:

Nominal Flow Rate: 10 - 90 GPM (37.9 - 340.7 LPM) Primary Filter: Bag Filter Vessel, Liner Basket for use with 4µ or less Filter Bags Water Separator: FP-90 Mechanical Water Separator Secondary Filter: Cartridge Filter Vessel, 4µ or less Particulate, 10-30µ Water Block Filters, or 3-10µ Micro-glass Filters Fuel Conditioner: Inline Magnetic Conditioner Pump: 3 HP Sliding Vane Pump Power: 480V/60Hz/3Ph Plumbing: Black Iron Ports: 2” Cam & Groove In, 2” Cam & Groove Out Suction Hose: Clear, 25ft (7.6 m), 2” Diameter Dimensions: ≤ 5’ x 3’ x 4’ (H x W x D) Weight: <1,000 lbs

3.2 Coordination with Coast Guard Requirements: The Contractor shall coordinate all work requirements, stated herein, with the US Coast Guard Yard, Ship Superintendent, Hau Trang, hau.d.trang@uscg.mil or 857-338-6432

3.3 Shipping cost shall be noted explicitly on bid as a separate line item. Deliveries shall be made to:

SFLC ALD LCB Retail Inv Mgmt Section 2401 Hawkins Point Road Building 88-2 Baltimore, MD 21226

3.4 Warranty: The warranty period is twelve (12) months. The warranty period begins on the date the CG Yard received the polishing system and other accessories.