HB Statement of Work February - March 2022.pdf

PDF 421 KB Posted

Attached to
Vessel Rental
Solicitation number
70Z084-22-Q-DL94-0009
Issued by

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

STATEMENT OF WORK

GENERAL INFORMATION: Target vessels to conduct Day/Night underway South Bay and offshore 3-5 Nautical Miles, At-Sea Hook & Climb, Close Quarters Combat tactics with Simmunitions scenarios.

Title of Project: USCG MSRT West Day/Night At-Sea BAF 101, Hook & Climb Insertion, CQC & CBRNE Mission Profile

Contractor’s specifications:

Vessel must be at least 120’ feet in length Vessel must have at least a 12 foot by 12 foot open area deck space Vessel must have a minimum of 15 feet of freeboard for hook and climb maneuvers Vessel must be capable to transit a minimum of 10 nautical miles off shore.

The area above the deck space will be free of superstructures, antenna or other obstacles to minimize risk to both the aircraft and the assault team A flat freeboard that presents no obstruction to the climbers is required No lips or protrusions from the hull that run the length of the ship The vessel must be able to accommodate approximately 35 passengers who will serve as safety observers, evaluators and other required training positions.

Vessel must have multiple internal spaces capable of being configured to resemble a Passenger ferry.

Vessel must have at a minimum the following interior spaces: Bridge, Engine Room, Machinery Room, and Passenger Seating similar to a Ferry

Supporting Information:

The Coast Guard Team will deploy members alongside via small boat to hook a ladder and climb up the side of the vessel.

Protrusions or lips that run the length of the hull would result in hook and climb on the vessel being impractical and unsafe to climbers.

Allow CG Members full access to the ship to facility realistic Team Moment Allow use of Simmunitions in most spaces within the interior and exterior of the VSL.

Delivery Requirements:

RDD: February 11th, 2022 (Underway in the South Bay)

Times: 1600-2200 (6 Hours)

San Diego, CA. 02/11/2022

RDD: February 16th, 2022 (Underway 3-5NM Offshore of Point Loma)

Times: 1500-2100 (6 Hours)

San Diego, CA. 02/16/2022

RDD: February 17th, 2022 (Underway in the South Bay)

Times: 1430-2030 (6 Hours)

San Diego, CA. 02/17/2022

RDD: February 28th, 2022 (Pierside)

Times: 1100-1600 (5 Hours)

San Diego, CA. 02/28/2022

RDD: March 1st, 2022 (Pierside)

Times: 0900-1600 (7 Hours)

San Diego, CA. 03/01/2022

RDD: March 2nd, 2022 (Pierside)

Times: 0900-1600 (7 Hours)

San Diego, CA. 03/02/2022

RDD: March 4th, 2022 (Underway in the South Bay)

Times: 1200-1600 (4 Hours)

San Diego, CA. 03/04/2022

File details come from the government source that posted it. Updated .