About this file
This document is an amendment to the Scope of Work for the Harrison #5 Project, a multi-site orphan well plugging program in Harrison County, Ohio, managed by the Ohio Department of Natural Resources (ODNR) Division of Oil & Gas Resources Management.
The amendment revises the project term to prohibit work at two well sites during deer season from September 24, 2024 to February 2, 2025. It also provides detailed specifications for the salvage, disposal, and reimbursement of materials with salvage value, including equipment, casing, and hydrocarbons. The amendment does not change the bid due date of September 26, 2024. The project involves plugging five orphaned wells, with detailed line item quantities provided. Additional/Contingency Services are also specified, covering items like road mats, well control, fishing, and cement. Pricing is on a fixed-price lump sum basis, with a Salvage Material Reimbursement line item.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| OWP_SORTING_ITEMS_OHIOBUYS.pdf | ||
| Harrison 5_SOW_Offer.pdf | ||
| OWP_SORTING_ITEMS_OHIOBUYS.pdf | ||
| Harrison 5_SOW_Offer.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
SCOPE OF WORK
HARRISON #5 PROJECT
Multiple Orphan Well Sites Harrison County, Archer & Stock Townships
AMENDMENT #1
DATE OF AMENDMENT: September 12, 2024
DIVISION OF OIL & GAS RESOURCES MANAGEMENT
OHIO DEPARTMENT OF NATURAL RESOURCES
2045 MORSE ROAD
BUILDING F-3
COLUMBUS, OHIO 43229-6693
To the Conditions and Specifications for:
HARRISON #5 PROJECT
Multiple Orphan Well Sites
All contractors are reminded to acknowledge receipt of the Amendment when submitting an offer by submitting the revised Offer Sheet through OhioBuys. Failure to acknowledge this Amendment will result in submittal of an unresponsive Offer. Any offers submitted prior to this amendment shall be deleted from the OhioBuys system.
TO ALL BIDDERS:
1) This amendment shall revise General Condition, Part 8: Effective Date and Term: “The effective date of this Project is the date of the Letter to Proceed that is sent to the Contractor. There will be no work at the Robert S. Busby #5 and Robert S. Busby #1 during deer season, September 24, 2024 – February 2, 2025.”
2) This amendment shall revise Detailed Specifications, Salvage Material Disposal:
SALVAGE MATERIAL DISPOSAL
A. Description: This item shall consist of preparing, removing, and salvaging all materials from the site that have a salvage value as shown on the Drawing Plan Set or as required by the Division. All items to be salvaged shall include all surface equipment, well casing, and production equipment. Salvage items shall also include any hydrocarbon materials (oil, condensate, etc.) that have a marketable value.
Salvage items shall be stored onsite within the construction project limits until removed for salvage.
B. Off-Site Disposal: Prior to removal from the site the Contractor shall supply in writing to the
Division an inventory of all materials to be salvaged. On the behalf of the Division the Contractor shall salvage materials inventoried. Once materials have been salvaged the contractor shall reimburse the Division for the salvage value per the line item "Salvage Material Reimbursement."
At the request of the Division, surface equipment deemed as reusable shall be forfeited directly to the Division’s onsite representative. This shall include but not be limited to swages, wellheads, fittings, appurtenances, etc. At no time shall salvageable material become property of the Contractor.
Prior to disposal of any salvage materials from the project site, the Division will complete a radiological assessment of salvage materials that have been provided on an inventory to the Division. The Division shall be given a minimum of two (2) working days notice to complete the assessment. Salvage materials staged on the project site shall be staged on a pipe rack where determined applicable by the Division. Salvage materials shall be on an impervious liner that will collect any residual fluids or scale.
Prior to disposal of any salvage materials the Contractor shall prepare, including cleaning, the salvage materials for lawful salvage.
All salvageable material shall be cleaned onsite. The final product shall be non-hazardous and, in a condition, to not cause offsite pollution/contamination during transport and/or disposal. Any downtime associated with proper decommissioning shall be considered incidental to this line item.
C. Execution: The Contractor shall include in this line item any expense incurred with the removal and the salvaging.
D. Measurement: Measurement for payment shall be made by field inspection of units satisfactorily completed and accepted by the Division.
E. Payment: Payment shall be made at the lump sum price for "Salvage Material Disposal."
3) The Offer due date has NOT been changed for this project. "Offers must be fully submitted online through OhioBuys (https://procure.ohio.gov/bidders-and-suppliers) not later than, 12:00 PM on September 26, 2024."
APPROVED:
James J. Judge, P.E.
Division of Oil & Gas Resources Management
DATE: ____________________________
9/13/2024
1 Mobilization 4 Lump Sum
2 Clearing & Grubbing (Busby #1) 1 Lump Sum
3 Clearing & Grubbing (Mizer #1 (2-0077)) 1 Lump Sum
4 Clearing & Grubbing (Wells #1) 1 Lump Sum
5 Site Safety 5 Lump Sum
6 Road Mats 2730 Sq. Ft.
7 Timber Mats 1216 Sq. Ft.
8 Secondary Containment 5 Lump Sum
9 Silt Fence 500 Linear Ft
10 Earthwork (Wells #1, +/-120 Cu. Yd.) 1 Lump Sum
11 No. 4 Stone 85 Ton
12 No. 57 Stone 105 Ton
13 Filter Fabric 175 Sq. Yd.
14 Well Head Control 5 Lump Sum
15 Well Control Fluid 500 BBL
16 Well Prep & Plugging (Busby #5) 1 Lump Sum
17 Well Prep & Plugging (Busby #1) 1 Lump Sum
18 Well Prep & Plugging (Mizer #1 (2-0077)) 1 Lump Sum
19 Well Prep & Plugging (Wells #1) 1 Lump Sum
20 Well Prep & Plugging (Mizer #1 (2-0080)) 1 Lump Sum
21 Washover Pipe 1150 Linear Ft
22 Conductor Casing (10.0") 30 Linear Ft
23 Conductor Casing (13.0") 38 Linear Ft
24 Surface Casing (6.0") 300 Linear Ft
25 Surface Casing (8.63") 300 Linear Ft
26 Surface Casing (13.38") 30 Linear Ft
27 Logging (GR/CCL/Temp/Bond/Caliper) 1 Each
28 Logging (CCL/Bond) 3 Each
29 Shooting 6 Each
30 Perforating 3 Each
31 Tubing (1") 1 Lump Sum
32 Tubing 1 Lump Sum
33 Approved Cement 2650 Sack
34 Cement Mixing & Pumping 28 Each
35 Fluid Disposal 750 BBL
Quantity Sheet
AMENDMENT #1
TD = 1400', 1431', 1021', 1300'
Scope of Work
Harrison #5 Project Harrison County, Archer & Stock Townships
Well Name: Robert S. Busby #5, #1, Emerson Mizer #1, JW Wells #1, Emerson Mizer #1
Line Number
Description Quantity Unit
Permit Number: 34-067-6-0102, 6-0113, 2-0077, 2-0083, 2-0080-00-00
36 Contaminated Material Disposal 100 Ton
37 Salvage Material Disposal 1 Lump Sum
38 Gas Line Abandonment 1 Lump Sum
39 Fence Repair 125 Linear Ft
40 Approved Resoil 25 Ton
41 Site Restoration (Busby) 1 Lump Sum
42 Site Restoration (Mizer #1 (2-0077)) 1 Lump Sum
43 Site Restoration (Wells #1) 1 Lump Sum
44 Site Restoration (Mizer #1 (2-0080)) 1 Lump Sum
45 Demobilization 4 Lump Sum
Fixed Price Items
46 Salvage Material Reimbursement N/A N/A Each N/A
Additional/Contingency Services
47 Road Mats 150 Mat/Day
48 Alternative Well Control Fluid 500 BBL
49 Fishing 32 Hour
50 Magnet 2 Each
51 Milling/Drillout 32 Hour
52 Severing 3 Each
53 Shooting 3 Each
54 Lost Circulation Materials 125 Sack
55 Drilling Mud 125 Sack
56 H2S Safety Team 5 Days
57 H2s Safety Team Standby 2 Days
58 Hydrogen Sulfide Scavenger 55 Gallons
59 Well Head Control (For H2S) 1 Lump Sum
60 Class "H" Cement 125 Sack
61 Nine Sack Grout 27 Cubic Yard
62 Downhole Videography 2 Each
63 Well Casing Tap 3 Each
Offers must be fully submitted online through OhioBuys (https://procure.ohio.gov/bidders-and-suppliers) not later than, 12:00 PM on September 26, 2024.
Note: This quantity sheet is provided for reference only. The Contractor's Offer must be submitted online through OhioBuys (https://procure.ohio.gov/bidders-and-suppliers). Quantities are only an estimate. Payment shall be based on quantities satisfactorily completed.
Each contractor is responsible for logging into OhioBuys and submitting an offer that is responsive to all amendments issued. All offers submitted prior to an amendment being issued shall become null/void and not considered in the opening. All amendments shall become part of the Scope of Work.
| BUILDING F-3 |
| COLUMBUS, OHIO 43229-6693 |
| SALVAGE MATERIAL DISPOSAL |
| E. Payment: Payment shall be made at the lump sum price for "Salvage Material Disposal." |