Harkness State Park Mansion Wastewater Repairs.pdf
PDF 49 KB Posted
- Solicitation number
- TTR-031-060526
- Issued by
- Middlesex County, Connecticut
About this file
This solicitation document pertains to tree trimming and removal services for the City of Torrington, Connecticut, issued under solicitation number TTR-031-060526. The City seeks one or multiple licensed and insured contractors to provide tree work services including routine tree pruning, tree removal categorized by diameter at breast height (DBH) in four tiers ranging from 12 inches or less to 37 inches and above, hazard tree assessments by licensed arborists, and 24-hour emergency tree removal services with a mandatory one-hour response time. Standard service hours are Monday through Friday, 7:00 AM to 3:00 PM, with additional hours available if pre-authorized. Sealed proposals must include one original and two exact copies submitted by June 5, 2026, at 11:00 AM to City Hall, Room 206, 140 Main Street, Torrington, Connecticut. Written questions must be submitted by May 27, 2026, at 12:00 noon to Pennie Zucco at 860-489-2225 or pennie_zucco@torringtonct.org. The contract period runs from July 1, 2026, through June 30, 2027, with options for annual renewal for a maximum of five years contingent upon mutual agreement.
Bidders must provide unit pricing for specified tree work categories, hourly rates for urgent services and assessments, and maintain at least one Certified Arborist on staff who must perform or supervise all onsite work. References from at least three previous clients and certification numbers of ISA Certified Arborists or Tree Workers are required. Contractors must obtain and maintain Worker's Compensation insurance, Comprehensive General Liability insurance with minimum coverage of $1,000,000 per person and $2,000,000 per accident, vehicle insurance, and a performance bond throughout the contract term. All tree material must be removed and disposed of at the contractor's expense, and the contractor assumes responsibility for any property damage caused during operations. Pricing must be F.O.B. Destination (Torrington). No specific contract value or budget is disclosed; contract services are contingent upon sufficient funds being available, with purchase orders issued on a per-location basis as funding becomes available. The City reserves the right to award the bid that best serves the public interest rather than necessarily selecting the lowest bidder and may award line items separately. The City actively encourages Minority Business Enterprises (MBEs), Women Business Enterprises (WBEs), and Small Business Enterprises (SBEs) to apply. Bids cannot be withdrawn for 60 days following submission, and faxed or emailed proposals will not be accepted.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Harkness State Park Mansion Wastewater Repairs
The Harkness Memorial State Park Mansion has an aging sewer line system that is beginning to fail. The purpose of this project is to maintain functional waste water system to sustain the desired use of the building .
Scope #1 Bridal Suite:
Installation of 35' of CIPP/SIPP in the 4", cast iron, sanitary sewer line from the 3" toilet flange in the Bridal Suite to end at the base of the vertical stack overlapping into the newly installed PVC in the basement.
Scope #2 Basement Cleanout to Trap:
Excavating and removing the existing building trap, replacing it with new Schedule 40
PVC piping and a brass floor cleanout. Once the replacement is complete, the area will be backfilled, compacted, and finished with concrete to match the existing floor grade. Following the excavation work, the team will install 55' of CIPP within the 4"- 6", cast iron, sanitary sewer line, starting at the PVC transition in the basement and ending at and overlapping the existing downstream CIPP liner.
Scope #3 Jetting and Screening
As needed, per pipe camera inspection, we will use high-pressure hydro jetting to clean and sweep downstream any debris and/or clogged pipes and cut and descale blockages as discovered and necessary. Anything other than roots/rocks/ dirt and debris that cannot be removed using standard drain cleaning jetting and descaling equipment will require an additional Robotic cutting service below.
Scope #4 Robotic Cutting/Reinstatement
After the cured in place pipe liner is installed inside the pipe, we will use our robotic cutting tools and equipment tocut out all tied in service laterals where we had lined over. This will put the entire piping system back in full use service. The total number of reinstatements is to be determined once the final jetting and descaling is performed (as often build up and debris hide the reinstatements) Unit Price required per reinstatement