Harbor Fountain and Basin Liners RFP 2026-007

This Request for Proposal document is issued by the City of Rockwall, Texas for fountain and basin liner removal and installation services at The Harbor. The RFP solicits qualified firms to provide comprehensive liner services in accordance with specified terms, conditions, and instructions outlined in the RFP guidelines. The project scope encompasses the removal of existing fountain and basin liners and installation of replacement liners at the designated Harbor location. While specific quantities, response deadlines, site visit schedules, and bidder conference information are referenced as being contained within the RFP guidelines, the details of these procedural elements are not fully enumerated in this document summary.

The RFP guidelines establish the framework for pricing terms, contractor qualifications, insurance requirements, bonding obligations, and performance standards that bidders must satisfy. Interested firms must provide detailed proposals and evidence of experience with similar fountain and basin liner projects to be considered for award. Contract award timing, contract term duration, and any renewal options are governed by the terms set forth in the full RFP documentation. Funding sources, budget allocations, and any specific set-aside provisions are to be determined according to the City of Rockwall's procurement policies and the complete RFP materials.

View the file

Other files

File Type Posted
20260522 - Bid Documents.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

CITY OF ROCKWALL

385 SOUTH GOLIAD

ROCKWALL, TX 75087

972-771-7700

REQUEST FOR PROPOSAL

THE HARBOR FOUNTAIN LINERS PROJECT

RFP 2026-007

SUBMITTALS due 2:00 PM CST, JUNE 8, 2026

To Misty Farris, Purchasing Agent

City of Rockwall

CITY OF ROCKWALL

REQUEST FOR PROPOSAL

Public Notice

The City of Rockwall invites the submittal of responses to this RFP from qualified firms interested in providing fountain / basin liner removal and installation at The Harbor. Responses are solicited for this service in accordance with the terms, conditions and instructions set forth in the RFP guidelines.

The City will receive responses to this RFP# 2026-007 at the office of Misty Farris, Purchasing Agent, 385 S. Goliad, Rockwall, Texas 75087 until 2:00 pm, June 8, 2026. The Request for Proposal document may be obtained on the City’s website at www.rockwall.com/finance/asp.

Request for Proposal document will be emailed upon request; however, the City is not responsible to ensure timely delivery of emailed RFP documents. Performance and Payment bonds, liability and statutory worker’s compensation insurances are required for this project. Pre-proposal meeting begins at 10:00AM on June 1, 2026 at The Harbor Fountain, 2059 Summer Lee, Rockwall, TX.

Receipt of responses does not bind the City to any contract for said services, nor does it guarantee that a contract for the Project will be awarded. For additional information contact Misty Farris at mfarris@rockwall.com.

Publish Dates: May 21-22, 2026 May 28-29, 2026 http://www.rockwall.com/finance/asp mailto:mfarris@rockwall.com

REQUEST FOR PROPOSAL (RFP)

I. PURPOSE OF RFP

The City of Rockwall, Texas (City) invites the submittal of responses to this Request for Proposal (RFP) from qualified firms interested in providing fountain / basin liner removal and installation at The Harbor.

II. OBJECTIVES

The City proposes to retain a highly qualified, capable firm to act as the Respondent during the design and construction of the Project for a fixed price. The firm who participates in this RFP process may be referred to as “Respondent”. The City will give prime consideration to the Respondent with significant, current experience in the development, design, and construction of similar projects. The City reserves the right to negotiate with one or more parties and is not obligated to enter into any contract with any Respondent on any terms or conditions.

III. SCOPE OF WORK

Harbor Fountain Liners (removal of exiting liners and installation of new liners.

Appx 15,000sqft)

General Project Synopsis

This project is for the removal and installation of approximately 15,000 square feet of fountain / pond liners. This process is an all or nothing proposal and best value to the City of Rockwall.

Budget not to exceed $400,000.00

This is an active park that will remain open during construction and the contractor shall be responsible for providing a safe and secure job site at all times.

LABOR AND SUPPLIES PROVIDED BY ROCKWALL PARKS AND RECREATION

• Access

• Plans – (Attachment A)

REQUIRED SPECIFICATIONS FOR BASINS

• 30-day project timeline

• System will be Guardian-WF or Equal

• Must be a certified application with specialized equipment with the manufacturer

• Warranty shall include repair or replacement of defective waterproofing materials, system failures, leaks resulting from defective installation, and all associated labor necessary to restore the waterproofing system to proper operating condition. Proposer shall specify the length and terms of the warranty provided.

• See specifications (Attachment B) - Guardian-WF™ Polyurea Waterproofing Panels by Freedom Chemical Corporation are identified as the basis of design for purposes of establishing the quality, performance, and functional requirements of the system. The selected Contractor may use any product equal to that named in the specifications which is approved by the City and which meets the requirements of the specifications.

IV. SELECTION PROCESS

The City will review and evaluate the statements of qualification and price proposal received, and may invite firms to be interviewed before making a final selection of a firm for this project. If the City desires to interview a firm, that firm will receive notification of the date and time of the interview.

The selected Respondent then may negotiate with the City on fee and contract conditions. If a reasonable fee cannot be achieved with the Respondent of choice, in the opinion of the City, negotiations will proceed with the second choice Respondent until a mutually agreed contract can be negotiated.

V. EVALUATION

City Staff will evaluate the submittals and make a recommendation to the City Council for formal selection of the Respondent with which contract negotiations may be initiated.

Evaluation Criteria:

• Price 50%

• Technical Compliance/System Performance 20%

• Experience and Qualifications 20%

• Project Schedule and Approach 10%

VI. ADDITIONAL INSTRUCTIONS, NOTIFICATIONS AND INFORMATION

A. No Gratuities – Respondents will not offer any gratuities, favors, or anything of monetary value to any official or employee of the City for the purpose of influencing this selection.

Any attempt by a Respondent to influence the selection process by any means, other than disclosure of Proposal and credentials through the proper channels, will be grounds for exclusion from the selection process. Accordingly, contacts with those involved in the selection process should not be initiated.

B. All Information True – By submitting a response, Respondents represent and warrant to the City that all information provided in the response submitted shall be true, correct and complete. Respondents who provide false, misleading or incomplete information, whether intentional or not, in any of the documents presented to the City of Rockwall for consideration in the selection process may be excluded.

C. Interviews – After the initial evaluation of the statements of Proposal, Respondents may be interviewed to discuss the Respondent’s program approach and design professionals who would be directly involved in the Project.

D. Inquiries – Do not contact the City to make inquiries about the progress of this selection process. Respondents will be contacted when it is appropriate to do so. Process inquiries should be directed to Misty Farris, Purchasing Agent for the City, mfarris@rockwall.com.

E. Cost of Responses – The City will not be responsible for the costs incurred by anyone in the submittal of responses.

F. Contract Negotiations – This RFP is not to be construed as a contract or as a commitment of any kind. If this RFP results in a contract offer by the City the specific scope of work, associated fees, and other contractual matters will be determined during contract negotiations. To ensure that the appropriate staff is assigned to the Project, the City intends to make the inclusion of a “key persons” clause a part of the contract negotiations.

G. No Obligation – The City reserves the right to: (1) evaluate the responses submitted; (2) waive any irregularities therein; (3) select candidates for the submittal of more detailed or alternate Proposal; (4) accept any submittal or portion of submittal; (5) reject any or all Respondents submitting responses; or (6) cancel the entire process.

H. Non Discrimination – The Respondent shall not deny employment to any person on the basis of race, creed or religion and will insure that all Federal and State laws pertaining to salaries, wages and operating requirements are met or exceeded.

I. Bonds and Insurance – The Respondent shall provide performance and payment bonds in the amount of 100% of the contract amount for this project. Liability and statutory worker’s compensation insurances are required, adding the City of Rockwall as an additional insured on the liability policy.

VII. SUBMITTAL INSTRUCTIONS

Sealed submittals are required. Submittals must be delivered to Misty Farris, Purchasing Agent, City of Rockwall, at the address set forth below at or before 2:00 pm on June 8, 2026. All submittals must be labeled on the outside with the Respondent’s name, the name of the Project “RFP 2026-007 – Harbor Fountain Liners”. Late submittals shall not be considered.

Provide three (3) copies of the response delivered to:

Misty Farris, Purchasing Agent City of Rockwall

385 S. Goliad Rockwall, TX 75087 mailto:mfarris@rockwall.com

To enable the City to efficiently evaluate the responses, it is important that Respondents follow the required format in preparing their responses. RESPONSES THAT DO NOT CONFORM TO

THE PRESCRIBED FORMAT MAY NOT BE EVALUATED.

Pre-Proposal Meeting – June 1, 2026, 10 AM to 11 AM, The Harbor, 2059 Summer Lee, Rockwall, Texas, 75032 (Located adjacent to the entrance of the Cinemark Theater)

Staff will be available to answer questions regarding this project.

VII. CONTENT OF SUBMITTAL

Each response shall be submitted as outlined in this section. The first page shall be a letter transmitting the response to the City and stating that the Proposal set forth in it remains effective for a period of 60 calendar days. At least one copy of the transmittal letter shall contain the original signature of a partner, principal, or officer of the Respondent.

A. General Company Information

1. General Information

Firm name, address, and telephone number;

Names of principles in the firm;

Primary contact

2. History and Experience

How many years has your organization been in business?

Please describe the last five renovation construction projects of a similar scope that your organization has recently completed, giving the name and location of project, name of the entity, and date of completion.

B. References

Please provide references for at least three (3) similar projects completed within the last five (5) years.

C. Design

Provide material documents with submittal based on Item III Scope of Work. Include warranty information.

D. Cost Proposal

Provide renovation cost proposal document with submittal based on Item III Scope of Work.

VIII. REPRESENTATIONS

By signing below, Respondent represents and warrants that:

A. The Qualifications and all statements and information prepared and submitted in response to this RFP are current, complete, true, and correct;

B. It is not given, nor intends to give at any time hereafter, any economic opportunity, future employment, gift, loan, gratuity, special discount trip, favor, or service to a public servant in connection with the submitted proposal or any subsequent proposal. Failure to sign below, or signing a false statement, may void the Response or any resulting contracts at the City’s option, and the Respondent may be removed from all future proposal lists at this City;

C. The individual signing this document and the documents made part of the RFP is authorized to sign such documents on behalf of the Respondent and to bind the Respondent under any contract which may result from the submission of the Response;

D. No relationship, whether as a relative or business associate, by capital funding agreement or by any other such kinship, exists between Respondent and an employee of The City of Rockwall, Texas;

E. No compensation has been received for participation in the preparation of this RFP (ref.

Section 2155.004 Texas Government Code);

F. Respondent complies with all federal laws and regulations pertaining to Equal Employment Opportunities and Affirmative Action;

G. To the best of its knowledge, no member of the City of Rockwall Commission or Elected official has a financial interest, directly or indirectly, in the Project.

TYPE OR PRINT:

COMPANY NAME AUTHORIZED REPRESENTATIVE & TITLE

PHONE:

STREET ADDRESS and/or P.O. BOX NO. TELEPHONE NUMBER

FAX:

CITY/STATE/ZIP CODE FAX NUMBER

E-MAIL ADDRESS

SIGNATURE DATE

Attachm ent A

Attachment A

Attachment A

Attachment B

Guardian-WF™ Polyurea Waterproofing Panels Water Features

GENERAL

SECTION INCLUDES

A. Installation of pre-fabricated waterproofing panels composed of geotextile fabric with pre-sprayed polyurea coating

RELATED SECTIONS

B. Section 00 00 00 – Section Title: Section Description

REFERENCES

C. ICRI No. 310.2R-2013, Selecting and Specifying Concrete Surface Preparation for Sealers, Coatings, Polymer Overlays, and Concrete Repair

D. SSPC-SP10/NACE No. 2 Near-White Blast Cleaning

E. SSPC-SP13/NACE No. 6 Surface Preparation of Concrete

F. ASTM D4258 – Standard Practice for Surface Cleaning Concrete for Coating

G. ASTM D4263 – Standard Test Method for Indicating Moisture in Concrete by the Plastic Sheet Method

H. ASTM F21 – Standard Test Method for Hydrophobic Surface Films by the Atomizer Test

I. SSPC-PA2 Measurement of Dry Coating Thickness with Magnetic Gages

J. SSPC-PA9 Measurement of Dry Coating Thickness on Cementitious Substrates Using Ultrasonic Gages

K. ASTM D1005 – Standard Test Method for Measurement of Dry-Film Thickness of Organic Coatings Using Micrometers

L. ASTM D412 – Standard Test Method for Tensile Properties of Plastics

M. ASTM D624 – Standard Test Method for Tear Strength of Conventional Vulcanized Rubber and Thermoplastic Elastomers

N. ASTM D2240 – Standard Test Method for Rubber Property-Durometer Hardness

O. ASTM D7234 – Standard Test Method for Pull-Off Strength of Coatings on Concrete Using Portable Pull-Off Adhesion Testers

SUBMITTALS

P. Product Data: Submit technical data, SDS, and product literature indicated that the submitted products comply with specified requirements.

Q. Samples: Submit one (1) membrane sample that is representative of the finished membrane surface, texture, and color. Sample shall be used as a visual representation to be compared to the finished membrane surface installed in the field.

R. Applicator Approval from Manufacturer: Submit certificate signed by the manufacturer certifying that applicator is an approved installer of manufacturer’s products.

S. Project References: Submit reference list from applicator that includes specific projects previously completed that are similar in size and scope.

QUALITY ASSURANCE

T. Applicator Qualifications: Engage an experienced applicator who is authorized in writing by the manufacturer for installation of the specified waterproofing system. The applicator shall be an established firm regularly engaged in satisfactory installations of similar materials on projects similar in nature and complexity. The applicator shall have been in business under the current business name for a minimum of five (5) years.

U. Manufacturer Qualifications: Manufacturer shall be a primary blender with proprietary formulations, a “Preferred Applicator” program, and have the capacity to provide field technical support as required.

All primers and membranes shall be provided from the same manufacturer.

V. Schedule pre-installation meeting to review the installation schedule, shut down, and restricted access procedures. Indicate project owner’s representative and applicator’s superintendent.

DELIVERY, STORAGE, AND HANDLING

W. Deliver liquid products in manufacturer’s original containers labeled with manufacturer’s name, product brand name, batch/lot numbers, and date of manufacture.

X. Deliver panels in manufacturer's original packaging.

Y. Store materials as required by contract documents and manufacturer in a clean, dry, protected location and within temperature range required by product data sheet.

Z. Replace product damaged by shipment, weather, or job conditions.

AA. Applicator should at all times observe the personal protective equipment requirements as detailed in the relevant product’s Safety Data Sheet(s). Applicator should also perform all work in accordance with applicable rules and regulations of local, state, and federal authorities having jurisdiction.

PROJECT CONDITIONS

BB. Do not install panels if substrate contains standing water or is visibly damp.

CC. Adjacent areas not to be waterproofed shall be protected. Apply or erect masking, spray curtains, and partitions as necessary to prevent overspray.

DD. For areas where polyurea membrane will be spray-applied directly to concrete substrates, only install system when air and substrate temperature is between 32°F (0°C) and 104°F (40°C) and substrate temperature is 6°F above the dew point and rising1. Installation of system outside of these parameters shall be approved in writing by the manufacturer.

EE. Substrate moisture content shall be 5.0% or less. Test concrete moisture content with a non-destructive concrete moisture meter such as Tramex CME4 or CMEX II.

FF. Concrete shall have less than 3 pounds of moisture vapor emissions when tested per ASTM F1869 (for indoor testing only), ASTM F2170, or other approved tested method.

GG. Do not install coating over metal pan decks, split slab membranes, or other locations containing trapped moisture without prior written approval from the manufacturer.

HH. Do not install system over frozen or ice-capped surfaces.

1 Refer to Commentary Regarding Dew Point Meter Accuracy at the end of this document for additional information on the effect that relative humidity has on the accuracy of dew point meters.

PRODUCTS

Manufacturer:

II. Freedom Chemical Corporation 19685 Descartes Foothill Ranch, CA 92610

(562) 343-9697 sales@freedomchemicalusa.com https://freedomchemicalcorp.com

Waterproofing Systems

JJ. General: Provide a spray applied, 100% solids, fast cure, high build polymer system that prevents the passage of water and complies with the physical property requirements specified herein. Use materials specified below.

KK. Primer: FreedomTuff™ 100% solids, two component, solvent-free epoxy or urethane primer with the material properties shown in Error! Reference source not found..

Table 1 Physical Property Test Method Requirement

Mixing Ratio Per manufacturer

Solids Content 100%

Adhesion to Concrete ASTM D7234 150 psi, minimum, or failure in concrete substrate

LL. Prefabricated Polyurea Waterproofing Panels:

1. Fabric: Nonwoven polyester or polypropylene geotextile fabric, minimum 6 oz/y².

2. Coating: 100 mil thick polyurea membrane to be applied in two (2) separate layers consisting of the following:

a. Base Coat: 100% solids aromatic polyurea spray-applied onto fabric to minimum thickness of 60 mils.

b. Top Coat: 100% solids aliphatic polyurea spray-applied onto aromatic polyurea base coat to minimum thickness of 40 mils.

MM. Spray Applied Aromatic Polyurea Base Coat Membrane for Fabricating Panels: FreedomTuff™ FT- 2216 100% solids, rapid curing elastomer with the material properties shown in Table 2.

Table 2 Physical Property Test Method Requirement

Solids Content 100%

Gel Time 20 seconds, maximum

Tack Free Time 40 seconds, maximum

Shore Hardness ASTM D2240 50D, minimum mailto:sales@freedomchemicalusa.com https://freedomchemicalcorp.com/

Physical Property Test Method Requirement

Adhesion to Concrete ASTM D7234 150 psi, minimum, or failure in concrete substrate

Tensile Strength ASTM D412 3,000 psi, minimum

Elongation at Break ASTM D412 300%, minimum

Tear Strength (Die C) ASTM D624 450 pli, minimum

NN. Spray Applied Aliphatic, Chemical Resistant Polyurea Top Coat for Fabricating Panels, Seaming, Terminations, and Field Patches: FreedomTuff™ FT-1501 100% solids, rapid curing elastomer with the material properties shown in Error! Reference source not found..

Table 3 Physical Property Test Method Requirement

Solids Content 100%

Gel Time 30 seconds, maximum

Tack Free Time 40 seconds, maximum

Shore Hardness ASTM D2240 50D, minimum

Tensile Strength ASTM D412 1,700 psi, minimum

Elongation ASTM D412 250%, minimum

Tear Strength (Die C) ASTM D624 200 pli, minimum

QUV 1,000 hours ASTM G154 DeltaE: 1.03

OO. Ancillary Products

1. FreedomTuff™ FT-1056 “Activating” Primer: Specialty primer used to promote adhesion between layers of polyurea after polyurea’s recoat window has been exceeded.

2. FreedomTuff™ FT-9227-NS: Non-sag sealant used to pre-treat cracks and joints, and as a “coving” material in corners and sharp transitions from horizontal to vertical substrates.

3. FreedomTuff™ FT-9115-TX and FT-9500-QF: Rapid-setting polymer concrete patching materials.

EXECUTION

Preparation:

PP. Provide clean, sound, and dry substrate(s).

QQ. Repair spalls and other defects with FT-9115-TX, FT-9500-QF, or Freedom Chemical Corporation-approved cementitious material such as Five Star Structural Concrete or Rapid Set DOT Mix.

RR. Prepare concrete surfaces to SSPC-SP13/NACE No. 6 Surface Preparation of Concrete and achieve a Concrete Surface Profile (“CSP”) of at least 3 measured using ICRI CSP chips.

SS. Prepare metal components (i.e., flashings, drains, etc.) in accordance with SSPC-SP3 and wiped with solvent using clean, lint-free rags. Use of a wire-wheel brush is NOT acceptable.

TT. Treat cracks, joints, pipe penetrations, walls and curbs, etc. in accordance with Freedom Chemical Corporation’s standard details.

UU. Ensure all drains are free flowing prior to commencement of work. Prior to commencement of any portion of work specified in this section, all drains must be blocked/protected during duration of work being performed in the areas adjacent to the drain to prevent the drains from being clogged with waterproofing components being installed.

Inspection:

VV. Prior to application of primer, applicator shall inspect substrate preparation.

WW. The acceptance criteria for prepared concrete substrates shall be in accordance with SSPC- SP13/NACE No. 6. Refer to Section 6 and Table 2. SSPC-SP13/NACE No. 6 provides minimum acceptance criteria for concrete surfaces after surface preparation. For reference only, a subset of the acceptance criteria is listed in the table below.

Property Test Method Severe Service Surface tensile strength ASTM D7234 and/or ASTM

C1583

2.1 MPa (300 psi) min.

Surface profile ICRI No. 310.2 CSP 3 min.

Surface cleanliness ASTM D4258 (visible dust) No significant dust Residual contaminates ASTM F21 Water droplets wet surface immediately forming a continuous film

Moisture content ASTM D42632 No visible moisture

XX. The acceptance criteria for prepared metal substrates shall be in accordance with SSPC- SP10/NACE No. 2.

Installation:

YY. Cant Bead at Floor-to-Wall Transition

1. Prior to the installation of Panels, apply a continuous bead of FT-9227-NS polyurethane sealant along the entire perimeter of the pond at all horizontal-to-vertical interfaces (i.e., floor-to-wall).

2. Tool the sealant to create a 45° “cant” or “chamfer”. The face of the cant shall be a minimum of one (1) inch wide, extending approximately 0.75-inch onto both the horizontal floor and vertical wall.

3. Ensure the cant is smooth, free of ridges or voids, and feathered at the edges to allow the Panels to transition over the joint without lifting.

4. Allow the sealant to skin over and cure sufficiently per the manufacturer’s data sheet prior to proceeding with Panel installation.

ZZ. Horizontal Panel Installation

1. Unroll Prefabricated Polyurea Waterproofing Panels (“Panels”) and place in final position without stretching or tensioning the geotextile.

2. Orient Panels to minimize seams at critical transitions (i.e., wall-to-floor transitions).

3. Overlap adjacent Panels by a minimum of six (6) inches.

2 It may not be practical to perform ASTM D4263 in some circumstances due to the cautions listed in Section 4 of the ASTM document. Section 4.1 states “This test method shall be conducted when the surface temperature and ambient conditions are within the established parameters for application of the coating system.” Section 4.2 states “Avoid direct sunlight, direct heat, or damage to the plastic sheet, as such treatment affects the reliability of the results.” In such circumstances, owner, general contractor, and applicator shall discuss and approve an alternative method of evaluating substrate moisture content. It is recommended that such a contingency be discussed during the pre-construction meeting(s).

4. Installer shall ensure that the overlap areas of all Panels are free of folds, bridging, or tenting.

5. Installer shall ensure that Panels are offset as required to avoid more than three (3) layers are adhered together in any area.

6. If six (6) inch overlap area of Panels is not factory abraded, abrade the polyurea surface to create a visible profile.

7. Wipe overlap areas using acetone or MEK and clean, lint-free rags. Allow solvent to completely evaporate.

8. Apply FT-1056 Activator to tie-in and “cap strip” areas and allow to go tack free.

9. Adhering Seams Together

a. Carefully fold back or temporarily lift the upper panel to expose the mating surface underneath. While the upper panel is held or temporarily weighted back, spray the field-applied polyurea onto the bottom panel’s seam area at approximately 27 ft² per gallon to achieve a theoretical dry film thickness of 60 mils.

b. Extend the adhesive zone slightly beyond the intended overlap edge (approximately 0.5 inch) to ensure full bonding at the perimeter.

c. Immediately lower the top panel into the adhesive, applying uniform pressure and ensuring the upper panel is completely embedded into the field-applied polyurea.

The use of a heavy hand roller or weighted tamping bar may be used as required.

d. Continue to apply even pressure across the seam until the polyurea adhesive has become tack-free.

e. After the overlap is fully bonded, apply a twelve (12) inch wide polyurea “cap strip” centered over the seam at 20 ft ² per gallon to achieve a theoretical dry film thickness of 80 mils.

AAA. Floor-to-Wall Transition and Vertical Termination

1. Prior to placing Panels in this area, install Primer in accordance with the following section.

Allow primer to cure in accordance with this section and install subsequent layers of coating within the stated recoat window.

2. At perimeter wall areas, loose-lay Panels over horizontal surfaces. Extend panels up vertical perimeter walls a minimum of seven (7) inches.

3. At all horizontal-to-vertical corners (previously treated with a sealant cant), ensure the Panels are installed relaxed to prevent “bridging” (i.e., creating air pockets under the Panels).

4. Panels may be secured to the walls at their termination point using fasteners and washers, or by adhering to the primed walls using FT-1501 spray-applied polyurea.

5. Abrade the vertical faces of the Panels from the top edge down a minimum of seven (7) inches to create a visible surface profile.

6. Wipe the abraded Panel surfaces using acetone or MEK and clean, lint-free rags. Allow solvent to fully evaporate before proceeding with subsequent steps.

7. Apply FT-1056 activator to the abraded Panel surfaces. Allow the FT-1056 Activator to fully dry and become tack-free before proceeding with subsequent steps.

8. Begin spraying FT-1501 polyurea to the primed wall surfaces, beginning at the designated termination line or overflow weir, in accordance with the subsequent section.

9. FT-1501 polyurea must overlap onto the vertically terminated Panels a minimum of six (6) inches. Care shall be taken to ensure that the spray-applied FT-1501 does not extend beyond the termination point of the FT-1056 Activator.

BBB. Direct-to-Substrate Installation (i.e., concrete, steel, etc.)

1. Primer:

a. Do not begin membrane installation until all materials and equipment necessary to perform the installation are at the job site and all required repairs have been completed.

b. Applicator shall maintain spray and other installation equipment in proper operating condition throughout installation. Applicator shall provide reserve equipment as required.

c. Applicator shall perform and record relevant field quality control tests and readings throughout the installation process in accordance with Section 3.4 of this document.

d. Apply primer at approximately 130-200 ft² per gallon over surfaces to receive spray applied polyurea waterproofing membrane.

e. If one (1) coat of primer is required, applicator shall broadcast a washed, rounded, dry, and contamination free silica sand into primer surface prior to the primer achieving full set.

f. If two (2) coats of primer is required, do not install sand broadcast into first layer and allow the first coat to become tack free. Apply second coat of primer at approximately 400 ft² per gallon. Applicator shall broadcast a washed, rounded, dry, and contamination free silica sand into second coat primer surface prior to the primer achieving full set.

g. Allow primer to go tack free and remove excess loose aggregate before proceeding to subsequent steps.

h. Do not apply more primer than can be overcoated with polyurea within eighteen

(18) hours of set time. If primer is not overcoated within the recoat window, primer must be re-applied.

2. Spray Applied Aromatic Polyurea Membrane:

a. Spray FT-1501 at 16 ft² per gallon over primed surfaces to achieve a theoretical dry film thickness of 100 mils.

b. Spray additional coats as required to achieve the specified thickness.

Field Quality Control

CCC. All work in this section to be completed by applicator. Applicator shall record all readings and test results into a daily quality control log (“QC Log”). A copy of each QC Log shall be submitted to the Engineer at the end of each day.

DDD. Record environmental condition readings at least once every four (4) hours, when ambient conditions significantly change, or immediately prior to Installer performing new task (prior to installing primer, primer to installing base membrane, etc.), whichever is more frequent.

EEE. Concrete Surface Tensile Strength Testing

1. General: For concrete substrates only, the prepared concrete shall be tested for surface tensile strength to ensure the integrity of the prepared concrete. Testing shall be in accordance with ASTM D7234 and/or ASTM C1583.

2. Applicability: Surface tensile strength testing is only required under the following conditions:

a. Existing/Aged Concrete: Where the substrate is not newly poured or has a history of chemical exposure.

b. Aggressive Preparation: Where surface preparation involves milling, heavy scarification, or high-pressure water jetting that increases the risk of sub-surface “bruising” (i.e., near-surface micro-fracturing).

c. Suspect Integrity: Where the Engineer, installer, or QAP identifies areas of potential weakness, dusting, or carbonation.

3. If 50mm dollies are utilized, frequency of testing shall be one (1) test per 5,000 ft², or fraction thereof, or a minimum of three (3) tests per day, whichever is greater.

4. If 20mm dollies are utilized, frequency of testing shall be three (3) individual tests within a 12-inch diameter “grouping”. There shall be a minimum of three (3) “groupings” per 5,000 ft² (i.e., nine (9) individual tests) or fraction thereof, or a minimum of three (3) groupings per day, whichever is greater.

5. The minimum value is 300 psi. Values below this may indicate unsound or bruised concrete.

If test values are below the minimum requirement, cease work and obtain further instruction from Engineer3.

FFF. Record material batch numbers, processing information, and quantity of each material used.

GGG. Direct-to-Substrate Installation (i.e., concrete, steel, etc.)

1. Perform adhesion strength testing of primer bond to substrate and polyurea membrane bond to primer. On concrete substrates, testing shall be performed in accordance with ASTM D7234. On metal substrates, testing shall be performed in accordance with ASTM D4541. On concrete surfaces, the minimum adhesion value shall be 150 psi or failure within the concrete substrate4. On metal surfaces, the minimum adhesion value is 300 psi.

Frequency of testing shall be one test per 5,000 ft² or fraction thereof, or a minimum of three

(3) tests per day, whichever is greater.

2. For components of waterproofing system that gel too quickly to perform wet film thickness testing, perform dry film thickness testing of spray polyurea membrane in accordance with SSPC-PA2, SSPC-PA9, or ASTM D1005. Frequency of testing shall be one (1) test per 100 ft².

a. If applicator uses non-destructive magnetic test equipment, testing shall be performed in accordance with SSPC-PA2 Measurement of Dry Coating Thickness with Magnetic Gages.

b. If applicator uses non-destructive ultrasonic test equipment, testing shall be performed in accordance with SSPC-PA9 Measurement of Dry Coating Thickness of Cementitious Substrates Using Ultrasonic Gages. Ultrasonic testing is usually accurate to +/- 5%.

c. If applicator uses destructive test equipment, testing shall be performed in accordance with ASTM D1005 and this section:

3 Refer to SSPC-SP13, Appendix A.8.5 for additional information. Appendix A.8.5 states “Because of the variability in concrete, the surface preparation methods used and the choice and operation of the instruments, there is a large margin of error in the pull-off strength results obtained from these methods. Therefore, it is incumbent on all persons performing the testing and/or specifying the numeric results that equal attention is paid to the mode of failure and it is observed, interpreted, and the consequences understood.”

If on site personnel (Owner, General Contractor, and/or Installer) suspect a pull-off value is erroneous, additional testing should be performed in the general vicinity of this test location to validate the results.

4 Each result should be evaluated based on duration of cure, mode of failure, and force at failure. Refer to ASTM D7234, Appendix X.1 for additional information regarding interpretation of results.

i. Remove a sample of membrane from the substrate by cutting or use of a hollow punch.

ii. Remove any excess substrate residue from the backside of the sample.

iii. Measure thickness of the sample at the thinnest point using a handheld micrometer or dial caliper.

HHH. Applicator shall perform visual inspections throughout installation process. Holidays or other defects in the waterproofing system shall be marked and repaired.

III. Prior to performing electronic leak detection, Applicator shall water test the drains for a minimum of sixteen (16) hours. At least sixteen (16) hours prior to electronic leak detection, plug the drain and fill with sufficient water to completely cover the clamping ring. The company performing electronic leak detection shall inspect each drain for leaks upon their arrival to the job site.

JJJ. Prior to returning the structure to service, perform electronic leak detection. Any voids or defects detected during testing shall be repaired in accordance with waterproofing manufacturer’s published guidelines. Copies of the report shall be provided to applicator, contractor, owner, and waterproofing manufacturer.

Protection and Cleaning

KKK. Protection: Protect installed work prior to acceptance by owner.

LLL. Cleaning: Clean spills and overspray as they occur. Consult manufacturer’s product literature and SDS for proper cleaning products and methods. Clean site to owner’s satisfaction prior to final acceptance.

END OF SECTION

C

CIQ

Certificate of Interested Parties Form 1295

Pursuant to Section 2252 of the Texas Government Code, any business entity entering into a contract with a local government that requires approval of the governing body must submit a Disclosure of Interested Parties to the local government prior to the execution of the contract. The Texas Ethics Commission (TEC) has adopted a form for the Disclosure of Interested Parties (Form 1295) and has created a website application for business entities to submit the required information.

The City of Rockwall may not enter into a contract that requires the approval of the City Council until the business entity that is a party to the contract files a Form 1295 with the Texas Ethics Commission and the City of Rockwall Purchasing Department.

1. Upon being notified of a proposal/recommended award, the award recipient, the business entity, must go the following website: https://www.ethics.state.tx.us/filinginfo/1295/ and follow the login directions on the website application to complete a Form 1295. If this is a business entity’s first login on to the website application, the business entity must create a login Username and Password then follow the application’s instructions to complete a Form 1295.

2. The City does not have a Contract ID Number System. Please insert the City of Rockwall’s proposal or project number in this box RFP NO: 2026-XXX.

3. Once confirmation is received, that the information has been submitted with the Texas Ethics Commission, the business entity MUST print, sign and date Form 1295.

4. Form 1295 must be filed with the Texas Ethics Commission within seven (7) business days of the date of notification of recommended award. The contract will not be presented to City Council until the form has been filed with the Texas Ethics Commission and the City of Rockwall has received Form 1295.

5. In no way does a request for filing of Form 1295 with the Texas Ethics Commission commit the City to any type of award whatsoever.

6. Once the City of Rockwall Purchasing Department receives Form 1295, the Purchasing Department will submit confirmation of receipt through the Texas Ethics Commission website within thirty (30) days.

7. This process must be followed for each contract requiring City of Rockwall Council approval.

8. A Form 1295 cannot be hand written. It must be completed electronically through the Texas Ethics Commission website application.

If you have any questions contact the City of Rockwall Purchasing Agent at (972) 771-7700, 385 S. Goliad St., Rockwall, Texas 75087.

https://www.ethics.state.tx.us/filinginfo/1295/

CERTIFICATION AND ACKNOWLEDGMENT

The undersigned, as an authorized agent of the Respondent, hereby certifies:

Please check each box below.

☐The Respondent certifies:

• That (i) it does not Boycott Israel; and (ii) will not Boycott Israel during the term of the Contract. This section does not apply if the Company is a sole proprietor, a non-profit entity or a governmental entity; and only applies if: (i) the Company has ten (10) or more full-time employees and (ii) this Contract has a value of $100,000.00 or more to be paid under the terms of this Contract pursuant to Texas Government Code, Chapter 2271, Section 2271.002.

• That it does not do business with Iran, Sudan, or a foreign terrorist organization pursuant to Texas Government Code, Chapter 2252, Section 2252.153.

• That it does not boycott energy companies and will not boycott energy companies during the term of the Contract pursuant to Texas Government Code, Chapter 2274, Section 2274.002.

• That it (i) does not have a practice, policy, guidance or directive that discriminates against a firearm entity or firearm trade association; and (ii) will not discriminate against a firearm entity or firearm trade association during the term of the Contract pursuant to Texas Government Code, Chapter 2274, Section 2274.002.

• That it is not (i) owned or controlled by (a) individuals who are citizens of China, Iran, North Korea, Russia, or a designated country; or (b) a company or other entity, including a governmental entity, that is owned or controlled by citizens of or is directly controlled by the government of China, Iran, North Korea, Russia, or a designated country; or (ii) headquartered in China, Iran, North Korea, Russia or a designated country pursuant to Texas Government Code, Chapter 2274.

Signature:

Printed Name:

Title:

THE VENDOR/CONTRACTOR SHALL DEFEND, INDEMNIFY, AND HOLD HARMLESS

THE CITY OF ROCKWALL, ALL OF THEIR OFFICERS, AGENTS AND EMPLOYEES

FROM AND AGAINST ALL CLAIMS, ACTIONS, SUITS, DEMANDS, PROCEEDINGS,

COSTS, DAMAGES, AND LIABILITIES, ARISING OUT OF, CONNECTED WITH, OR

RESULTING FROM ANY NEGLIGENT ACTS OR OMISSIONS OF CONTRACTOR OR

ANY AGENT, EMPLOYEE, SUBCONTRACTOR, OR SUPPLIER OF CONTRACTOR IN

THE EXECUTION OR PERFORMANCE OF THIS PROPOSAL.

Attachment A
GENERAL
PRODUCTS
EXECUTION

Certificate of Interested Parties Form 1295

File details come from the government source that posted it. Updated .