This document outlines a kitchen equipment replacement project for the Houghton Portage Township Schools in Houghton, Michigan. The project involves the replacement of various kitchen equipment items at the high school, including a new make-up air unit, walk-in cooler/freezer, dishwasher, serving stations, work tables, and merchandisers. The project also includes associated mechanical, electrical, and plumbing work. The bid set is dated April 5, 2024, and the project location is the Houghton High School in Houghton, Michigan.
The contract provides detailed specifications and drawings for the kitchen equipment and associated systems, as well as a kitchen equipment schedule listing the specific items to be provided. The kitchen equipment is being procured under a separate contract by the owner, while the general contractor will be responsible for providing the installation, electrical, and plumbing work. Key project details, including submittal requirements, coordination with the owner, and sequence of operations, are also included in the specifications.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| RFP Kitchen Project Bid Specs.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
BUILDING CODE SUMMARY
USE GROUP: E
CONSTRUCTION TYPE: II-B
BUILDING AREA TO BE RENOVATED: APPROXIMATELY 1000 SF.
G5
30 65
17 139
55 52
CEDARVILLE
HESSEL
WHITEFISH
POINT
SAULT
STE
MARIE
NATIONAL PARK
ISLE ROYALE
NORWAY
MARENISCO
WHITE PINE
BERGLAND
NEWBERRY
SILVER
CITY
BESSEMER
IRONWOOD
WAKEFIELD
GREEN BAY
GWINN
HERMANSVILLE
MENOMINEE
IRON MOUNTAIN
VULCAN
CASPIAN
TROUT
WATERSMEET
CREEK
CROSSING
MASS
CITY
BRUCE
ONTONAGON
ROCKLAND BARAGA
ARNHEIM
CRYSTAL
FALLS
ISHPEMING
MICHIGAMME
L'ANSE
AURA
SKANEE
MARQUETTE
NEGAUNEE
MANISTIQUE
ESCANABA
FAYETTE
GARDEN
MUNISING
CURTIS
CITY
GOULD
HARBOR
CALUMET
RIPLEY
HOUGHTON
CHASSELL
HANCOCK
DELAWARE
LAKE
LINDEN
LAURIUM
EAGLE
HARBOR
COPPER
MACKINAC
ISLAND
IGNACE
ST
INDIAN
RIVER
CHEBOYGAN
MACKINAW CITY
PELSTON
ONAWAY
GAYLORD
PETOSKEY
CHARLEVOIX
MANCELONA
KALKASKA
TRAVERSE
CITY
EMPIRE
ELBERTA
ARCADIA
MANISTEE
SCOTTVILLE
BALDWINLUDINGTON
SHELBY
BIG RAPIDS
MOUNT
PLEASANT
CADILLAC
GRAYLING
EAST
TAWAS
ROSCOMMON
LACHINE ALPENA
WOLVERINE
ATLANTA
ROGERS CITY
ALANSON
CROSS
VILLAGE
BOYNE CITY
BELLAIRE
JORDAN
E.
EASTPORT
NORTHPORT
LELAND
BUCKLEY
FIFE
LAKE
FRANKFORT
MESICK
MANTON
BEAR
LAKE
LILLEY
HESPERIA
WHITE
CLOUD
EVART
REMUS
MIDLAND
SAGINAW
BAY
CITY
HARRISVILLE
CURRAN
MIO
OSCODA
TAWAS CITY
WEST
BRANCH
STANDISH
GLADWIN
McBAIN
LAKE CITY
CLARE
CARO
TROUT LAKE
BREVORT
IRON RIVERBRULE
WASHBURN
POPLAR
ASHLAND
PORT WING BAYFIELD
ODARRAH
MELLEN
UPSON
HURLEY
GLIDDEN
PARK FALLS
CLAM LAKE
MERCER
PRESQUE
ISLE
LAND O'LAKES
EAGLE
RIVER
PHELPS
FLORENCE
NIAGRA
CRANDON
SUPERIOR
HAYWARD
MINONG
CABLE
SHELL LAKE
GRANTSBURG
BALSAM
LAKE BARRON
MENOMONIE
DURAND
ALMA
WHITEHALL
BLACK
RIVER
FALLS
SPARTA
LA CROSSE
FRIENDSHIP
MONTELLO
WAUTOMA
GREEN
LAKE
FOND DU LAC
OSHKOSH
APPLETON
DE PERE
GREEN BAY
KEWAUNEE
STURGEON BAY
MARINETTE
OCONTO
SHAWANO
KESHENA
WAUSAU
STEVENS
POINT
WAUPACA
RHINELANDERPHILIPS
MEDFORD
MERRILL
ANTIGO
EAU CLARE
LADYSMITH
THREE
LAKES
MICHIGAN
WISCONSIN
LAKE
MICHIGAN
LAKE
SUPERIOR
HURON
LAKE
100 PORTAGE STREET
HOUGHTON, MI 49931
P (906) 482-4810 F (906) 482-9799
1 2 3 4 5
1 2 3 4 5
D
C
B
A
D
C
B
A
© U.P. Engineers & Architects, Inc.
U.P. ENGINEERS &
ARCHITECTS, INC.
2906 N. STEPHENSON AVE, SUITE 2
IRON MOUNTAIN, MI 49801
P (906) 779-0937 F (906) 779-0947
424 S. PINE ST.
ISHPEMING, MI 49849
P (906) 485-1011 F (906) 485-1013
1701 DUNLAP AVE., SUITE B
MARINETTE, WI 54143
P (715) 732-4188 F (715) 732-4189
707 ASHMUN STREET
SAULT STE. MARIE, MI 49783
P (906) 635-0511 F (906) 635-0612
P R
O
JE
C T
N O w w w .u p e a .c o m
D R
A W
N B
Y
C H
E C
K E
D
A P
P R
O V
E D
D E
S
IG
N E
D B
Y
IS
S
U E
D F
O R
D
A T
E
P
H -0
H o u g h to n -P o rt a g e T w p S c h o o ls
-K it c h e n E q u ip m e n t
R e p la c e m e n t\
D w g s \H
-0
H o u g h to n T w p S c h o o ls
H ig h S ch o o l_
R .r v t
/3
/2
:4 :5
A
M
KITCHEN EQUIPMENT REPLACEMENT
HOUGHTON PORTAGE TOWNSHIP SCHOOLS
G001
COVER SHEET
K
IT
C H
E N
E Q
U
IP
M E
N T
R E
P L
A C
E M
E N
T
H O
U G
H T
O N
P O
R T
A G
E T
O W
N S
H
IP
S C
H O
O L
S
H O
U G
H T
O N
, M I 4
H -0
S P
K C
K C
S P
K
IT
C H
E N
E Q
U
IP
M E
N T
R E
P L
A C
E M
E N
T
H O
U G
H T
O N
P O
R T
A G
E T
O W
N S
H
IP
S C
H O
O L
S
HOUGHTON, MI 49931
SHEET INDEX
NUMBER SHEET NAME
G001 COVER SHEET
A101 AREA OF WORK PLAN - HIGH SCHOOL
A201 KITCHEN FLOOR PLAN - HIGH SCHOOL
M001 MECHANICAL, ELECTRICAL, AND PLUMBING SPECIFICATIONS
M002 MECHANICAL AND PLUMBING ABBREVIATIONS AND SYMBOLS
M101 OVERALL EXISTING MECHANICAL PLAN - HIGH SCHOOL
M401 ENLARGED MECHANICAL/ PLUMBING PLAN - HIGH SCHOOL
M501 MECHANICAL DETAILS & SCHEDULES - HIGH SCHOOL
E001 ELECTRICAL ABBREVIATIONS
E101 AREA OF WORK PLAN - HIGH SCHOOL
ED201 ENLARGED EXISTING ELECTRICAL PLAN - HIGH SCHOOL
E201 PROPOSED ELECTRICAL PLAN - HIGH SCHOOL
E301 PROPOSED PANEL SCHEDULES - HIGH SCHOOL
A601 KITCHEN FLOOR PLAN - ELEMENTARY
PROJECT LOCATION
B
ID
S E
T
/0
/2
A201 A2
A201 A1
1 2 3 4 5
1 2 3 4 5
D
C
B
A
D
C
B
A
© U.P. Engineers & Architects, Inc.
P R
O
JE
C T
N O
D R
A W
N B
Y
C H
E C
K E
D
A P
P R
O V
E D
D E
S
IG
N E
D B
Y w w w .u p e a .c o m
IS
S
U E
D F
O R
D
A T
E
P
H -0
H o u g h to n -P o rt a g e T w p S c h o o ls
-K it c h e n E q u ip m e n t
R e p la c e m e n t\
D w g s \H
-0
H o u g h to n T w p S c h o o ls
H ig h S ch o o l_
R .r v t
/3
/2
:4 :5
A
M
A101
AREA OF WORK
PLAN - HIGH
SCHOOL
K
IT
C H
E N
E Q
U
IP
M E
N T
R E
P L
A C
E M
E N
T
H O
U G
H T
O N
P O
R T
A G
E T
O W
N S
H
IP
S C
H O
O L
S
H O
U G
H T
O N
, M I 4
H -0
S P
K C
K C
S P
K
IT
C H
E N
E Q
U
IP
M E
N T
R E
P L
A C
E M
E N
T
H O
U G
H T
O N
P O
R T
A G
E T
O W
N S
H
IP
S C
H O
O L
S
1" = 30'-0"A1
AREA OF WORK PLAN
NORTH
HIGH SCHOOL
GENERAL NOTES FOR CONTRACTOR:
1. DO NOT ROUGH-IN FROM THE DRAWINGS. REFER TO F.S.E.C. DIMENSIONED ROUGH-IN DRAWINGS FOR ACTUAL REQUIREMENTS.
2. PLUMBING CONTRACTOR (PC) AND ELECTRICAL CONTRACTOR (EC) SHALL MAKE FINAL CONNECTIONS BETWEEN EQUIPMENT AND ROUGH-IN POINT, AND PROVIDE ALL WIRING, SERVICE VALVES, PIPING, ETC AS REQUIRED.
3. TRADES SHALL INSTALL ALL ACCESSORIES (FAUCETS, DRAINS, SWITCHES, VALVES, GAS HOSES, ETC.) FURNISHED BY F.S.E.C.
4. GENERAL TRADES SHALL PROVIDE WALL, FLOOR, OR ROOF PENETRATIONS.
KITCHEN EQUIPMENT SUPPLY PACKAGE BID CLARIFICATIONS (FOR REFERENCE. KITCHEN EQUIPMENT IS BEING PROCURED UNDER SEPARATE CONTRACT BY OWNER):
1. KITCHEN EQUIPMENT SHALL BE SUPPLY ONLY, INCLUDING DELIVERY AND APPLICABLE TAXES; WITH THE EXCEPTION OF THE COOLER AND FREEZER, WHICH SHALL INCLUDE INSTALLATION, REFRIGERATION, CONDENSERS, LINE SETS, STARTUP AND SHELVING INSTALLATION.
2. WALK-IN COOLER AND FREEZER SHALL HAVE STAINLESS SHROUD PANELS FROM THE TOP OF THE UNIT TO THE SUSPENDED CEILING, WHICH IS AT 12’.
3. WALK-IN COOLER AND FREEZER SHALL HAVE INTERIOR RAMPS AND INSULATED FLOORS.
4. POWER TO WALK-INS BY OTHERS, ALONG WITH CONDENSATE PIPING.
5. SUPPLY OF BOTH DISHWASHERS SHALL INCLUDE START-UP, CHEMICALS, COMMISSIONING AND TRAINING FOR STAFF. SETTING BY GENERAL CONTRACTOR.
6. HOT AND COLD FOOD SERVING CARTS SHALL INCLUDE SNEEZE GUARDS AND DROP-DOWN TUBULAR TRAY SLIDES; EXCEPT FOR (1) ITEM #1 COLD SERVING AND (1) ITEM #3 HOT SERVING WILL HAVE 1-SIDED SNEEZE
GUARDS AND DROP-DOWN TUBULAR TRAY SLIDES ON ONE SIDE ONLY. ITEM #2 AND (1) ITEM #3 SHALL HAVE SNEEZE GUARDS ON ONE SIDE ONLY, DROP-DOWN TUBULAR TRAY SLIDES ON BOTH SIDE.
7. HOT AND COLD FOOD SERVING SHALL BE INTERIOR SELF-DRAINING, AND SHALL INCLUDE A SHELF BELOW, CASTERS, AND NO SHROUDING FOR THE BASE. ALL STAINLESS STEEL CONSTRUCTION.
B
ID
S E
T
/0
/2
NOTE: ALL KITCHEN EQUIPMENT SHOWN ON THE KITCHEN EQUIPMENT SCHEDULE IS BEING PROCURED BY THE OWNER.
FOR INFORMATION ONLY, THE FOLLOWING SCOPE OF WORK APPLIES TO THE FOOD SERVICE EQUIPMENT SUPPLIER.
/1
5' - 0"
REMOVE PORTION OF EXISTING WALL FOR PASS THROUGH
SHELF. OPENING TO BE 3'-4" BY 3'-4". SEE DETAILS B1/A201 AND
C2/A201.
KITCHEN
LUNCH ROOM
LUNCH ROOM ALCOVE
PROPOSED
COOLER AND
FREEZER
(2) L3x3x1/4"
1/2"x6" EXPANSION ANCHOR
GROUT CORES SOLID
3' - 9 1/2"
/4
1X TREATED FRAME. NOTCH
AROUND ANGLE AS REQUIRED TO
SIT FLUSH WITH BLOCK. ANCHORS
SHALL BE RECESSED TO ALLOW
STAINLESS WRAP ON FRAME.
2X TREATED FOR
INSIDE FRAME.
COORDINATE OPENING
WITH SHELF.
PROVIDE 3'-4" X 3'-4" CMU OPENING
C3
A201
Sim
C3
A201
Sim
PT 1X (TYP)
L3x3x1/4 (TYP)
STAINLESS STEEL WRAP
SEALANT
3/16" = 1'-0"A2
KITCHEN FLOOR PLAN
1 2 3 4 5
1 2 3 4 5
D
C
B
A
D
C
B
A
© U.P. Engineers & Architects, Inc.
P R
O
JE
C T
N O
D R
A W
N B
Y
C H
E C
K E
D
A P
P R
O V
E D
D E
S
IG
N E
D B
Y w w w .u p e a .c o m
IS
S
U E
D F
O R
D
A T
E
P
H -0
H o u g h to n -P o rt a g e T w p S c h o o ls
-K it c h e n E q u ip m e n t
R e p la c e m e n t\
D w g s \H
-0
H o u g h to n T w p S c h o o ls
H ig h S ch o o l_
R .r v t
/3
/2
:4 :5
A
M
A201
KITCHEN FLOOR
PLAN - HIGH
SCHOOL
K
IT
C H
E N
E Q
U
IP
M E
N T
R E
P L
A C
E M
E N
T
H O
U G
H T
O N
P O
R T
A G
E T
O W
N S
H
IP
S C
H O
O L
S
H O
U G
H T
O N
, M I 4
H -0
S P
K C
K C
T S
K
IT
C H
E N
E Q
U
IP
M E
N T
R E
P L
A C
E M
E N
T
H O
U G
H T
O N
P O
R T
A G
E T
O W
N S
H
IP
S C
H O
O L
S
KITCHEN EQUIPMENT SCHEDULE
NUMBER DESCRIPTION MFR MODEL VOLTS PHASE WATTS AMPS WATER SANITARY REMARKS
1 COLD FOOD SERVING STATION VOLLRATH 37075 120 1 8.1 PROVIDE WITH BREATH GUARD WITH LIGHTS AND TUBULAR TRAY SLIDE.
2 COLD FOOD SERVING STATION VOLLRATH 37065 120 1 8.1 PROVIDE WITH BREATH GUARD WITH LIGHTS AND TUBULAR TRAY SLIDE.
3 HOT FOOD SERVING STATION VOLLRATH 37050 120/208 1 15.7 PROVIDE WITH BREATH GUARD WITH LIGHTS AND TUBULAR TRAY SLIDE.
4 3' WORK TABLE REGENCY 600TSB3036S
5 5' WORK TABLE REGENCY 600TSB3060S
6 DUAL SHELF 3' SLIDE MERCHANDISER HATCO GR2SDS-30D 120/208 1 2440 10.2 NEMA L14-20P
7 DUAL SHELF 5' SLIDE MERCHANDISER HATCO GR2SDS-54D 120/208 1 3780 15.8 NEMA L14-20P
8 OPEN DISPLAY MERCHANDISER TRUE TOAM-48-HC-TSL01 208-230 1 7.6 NEMA 6-15P
9 MILK COOLER EXISTING 120 1
10 30"x72" WORK TABLE REGENCY 600EBT3096
11 DRYING RACK BY OWNER
12 CART EXISTING EXISTING TO REMAIN
13 DISH TABLE EXISTING EXISTING TO REMAIN
14 LOW TEMP CHEMICAL DISHWASHER AMERICAN DISH SERVICE ADC-44 208 3 8.0 KW 60 YES/EXISTING YES/EXISTING CHEMICAL SANITIZING
15 SHELVING EXISTING EXISTING TO REMAIN
16 REFRIGERATOR EXISTING EXISTING TO REMAIN
17 TYPE 1 HOOD EXISTING EXISTING TO REMAIN
18 CONVECTION OVEN EXISTING EXISTING TO REMAIN
19 HAND SINK EXISTING EXISTING TO REMAIN
20 POINT OF SALE EXISTING 120 1 RELOCATED FROM ELEMENTARY SCHOOL
21 PASS THROUGH SHELF EAGLE GROUP PTS-1836
22 NOT USED
23 WALK-IN COOLER/FREEZER COMBO THERMALRITE 16'X12' OVERALL DIMENSIONS. 4" INSULATED FLOOR. 88" WALLS. 4" CEILING
24 WALK-IN COOLER CONDENSING UNIT RUSSELL RFO250L4SDANT 208-230 1 20.4 PROVIDE WITH LOW AMBIENT COOLING DOWN TO -40°F. LOCATED ON ROOF
25 WALK-IN COOLER EVAPORATOR RUSSELL RL6E077DDARE 208-230 1 9.8 PROVIDE WITH DEFROST MODE
26 WALK-IN FREEZER CONDENSING UNIT RUSSELL RFO060M4SDAALNT 208-230 1 15 PROVIDE WITH LOW AMBIENT COOLING DOWN TO -40°F. LOCATED ON ROOF
27 WALK-IN FREEZER EVAPORATOR RUSSELL RL6A052ADARE 115 1 0.8
3/16" = 1'-0"A1
COOLER/ FREEZER FLOOR PLAN
HIGH SCHOOL
GENERAL NOTES:
1. GENERAL CONTRACTOR SHALL RELOCATE ALL OLD EQUIPMENT TO HPTS ONSITE STORAGE AS DIRECTED BY THE
OWNER'S REP EXCEPT AS LISTED BELOW.
2. CONTRACTOR SHALL DISPOSE OF THE DISHWASHERS (BOTH BUILDINGS), STEAMER (ELEMENTARY), AND PASS
THROUGHS (ELEMENTARY).
3. GENERAL CONTRACTOR SHALL RELOCATE THE EXISTING POS STATION FROM THE ELEMENTARY SCHOOL TO THE HIGH
SCHOOL.
4. ALL KITCHEN EQUIPMENT SHOWN ON THE SCHEDULE IS BEING SUPPLIED BY THE OWNER.
B
ID
S E
T
/0
/2
3/4" = 1'-0"B1
CMU OPENING SUPPORT DETAIL
NOTE: REMOVE AND RESTORE EXISTING ACT CEILINGS AS NECESSARY FOR THE INSTALLATION OF THE NEW HVAC AND ELECTRICAL SYSTEMS.
1" = 1'-0"C3
DETAIL THRU FRAME
MECHANICAL/ELECTRICAL SPECIFICATIONS
ELECTRICAL
PART 1 GENERAL
A. WORK INCLUDED: PROVIDE ALL LABOR AND MATERIAL TO INSTALL A COMPLETE
AND FUNCTIONAL ELECTRICAL SYSTEM AS SHOWN ON THE DRAWINGS AND AS
SPECIFIED HEREIN, INCLUDING BUT NOT NECESSARILY LIMITED TO:
1. BRANCH CIRCUIT WIRING, IN CONDUIT, FOR LIGHTING, RECEPTACLES,
JUNCTION BOXES AND MOTORS.
2. HANGERS, ANCHORS, SLEEVES, CHASES, SUPPORTS FOR FIXTURES, AND
OTHER ELECTRICAL MATERIALS AND EQUIPMENT IN ASSOCIATION
THEREWITH.
3. LIGHTING FIXTURES AND LAMPS, WALL SWITCHES, RECEPTACLES AND
SIMILAR ITEMS.
4. MOTORS, STARTERS, AND CONTROLS FOR MOTORS PROVIDED UNDER
THE CONTRACT, BUT FOR WHICH MOTOR STARTER AND CONTROLS ARE
NOT OTHERWISE PROVIDED.
5. WIRING TO AND CONNECTION OF THE LIGHTING FIXTURES, SWITCHES,
RECEPTACLES, AND OTHER ITEMS AS INDICATED ON THE PLANS
6. OTHER ITEMS AND SERVICES REQUIRED TO COMPLETE THE SYSTEMS.
B. RELATED WORK: DOCUMENTS AFFECTING WORK OF THIS SECTION INCLUDE,
BUT ARE NOT NECESSARILY LIMITED TO: GENERAL CONDITIONS, SUPPLEMENTAL
REQUIREMENTS AND DIVISION 1 SPECIFICATIONS.
QUALITY ASSURANCE
A. USE ADEQUATE NUMBERS OF SKILLED WORKMEN WHO ARE THOROUGHLY
TRAINED AND EXPERIENCED IN THE NECESSARY CRAFTS AND WHO ARE
COMPLETELY FAMILIAR WITH THE SPECIFIED REQUIREMENTS AND THE
METHODS NEEDED FOR PROPER PERFORMANCE OF THE WORK OF THIS
SECTION.
B. CODES AND STANDARDS: IN ADDITION TO COMPLYING WITH ALL PERTINENT
CODES AND REGULATIONS, COMPLY WITH:
1. NATIONAL ELECTRIC CODE, LATEST EDITION.
2. LOCAL UTILITY COMPANY REGULATIONS.
3. LOCAL, COUNTY, AND STATE ELECTRICAL CODES.
DEFINITIONS
A. FURNISH: TO SUPPLY, DELIVER, UNLOAD AND INSPECT FOR DAMAGE.
B. INSTALL: TO UNPACK, ASSEMBLE, ERECT, MOUNT, APPLY, PLACE, FINISH, CURE,
PROTECT, CLEAN, ENERGIZE, PROGRAM, ADJUST, TEST AND MAKE COMPLETELY
FUNCTIONAL AND OPERATIONAL.
C. PROVIDE: FURNISH AND INSTALL.
GROUNDING SYSTEM
A. ALL EQUIPMENT INCLUDING CONDUIT SYSTEM, MOTORS, RECEPTACLES AND
OTHER APPARATUS SHALL BE GROUNDED BY CONDUIT AND CONDUCTOR AS
PER ARTICLE 250 OF THE NATIONAL ELECTRIC CODE, AND AS SHOWN ON THE
DRAWINGS.
B. PROJECTS WITH NEW STRUCTURES SHALL HAVE SERVICE ENTRANCE SIZED
GROUND WIRE INSTALLED IN 20 LINEAR FEET OF STRUCTURE FOOTING.
GROUND CABLE SHALL BE WIRE TIED TO EACH ROW OF REINFORCING STEEL.
REMOTE STRUCTURES (WETWELLS, TANKS, ETC.) SHALL HAVE THE GROUND
WIRE INSTALLED BELOW THE BOTTOM SLAB IN A 2-INCH CONCRETE
ENCASEMENT.
PART 2 PRODUCTS
A. PROVIDE ONLY MATERIALS THAT ARE NEW, OF THE TYPE AN QUALITY SPECIFIED.
WHERE UNDERWRITER'S LABORATORIES, INC. HAVE ESTABLISHED STANDARDS
FOR SUCH MATERIALS, PROVIDE ONLY MATERIALS BEARING THE U.L. LABEL.
DISTRIBUTION SYSTEM
A. IDENTIFICATION
1. IDENTIFY ALL PANEL BOARDS, CABINETS, SAFETY SWITCHES AND OTHER
APPARATUS USED FOR OPERATION AND CONTROL OF CIRCUITS,
APPLIANCES AND EQUIPMENT.
B. WIRING DEVICES
1. PROVIDE DUPLEX RECEPTACLES OF 2-POLE, 3-WIRE, GROUNDING TYPE,
AND 20 AMP, 120 VAC AND GROUNDED TO THE CONDUIT SYSTEM OR BY
INSULATED GROUND CONDUCTOR. COLOR TO MATCH EXISTING.
STAINLESS STEEL COVERS.
2. PROVIDE GROUND FAULT CIRCUIT INTERRUPTER RECEPTACLES AS
INDICATED ON THE DRAWINGS. GFCI RECEPTACLES SHALL BE 20A, 120
VAC. COLOR TO MATCH EXISTING. STAINLESS STEEL COVERS.
3. SPECIAL RECEPTACLES SHALL BE LISTED ON THE DRAWINGS AND AS
REQUIRED BY CODE.
4. LIGHT SWITCHES SHALL BE COMMERCIAL GRADE 20A, 120 VAC. COLOR
TO MATCH EXISTING. STAINLESS STEEL COVERS.
5. COORDINATE RECEPTACLE MOUNTING HEIGHTS WITH EQUIPMENT.
C. WIRING RACEWAYS AND FITTINGS
1. CONCEALED WIRING SHALL BE METALLIC SHEATHED CABLE, #12 COPPER
MIN., AND SHALL BE INSTALLED AS PER THE NATIONAL ELECTRIC CODE.
ALL EXPOSED WIRING EXCEPT THAT WHICH IS RUNNING THROUGH
FRAMING MEMBERS SHALL BE IN EMT CONDUIT AND SECURELY
FASTENED TO THE SURFACE. UNDERGROUND CIRCUITS SHALL BE THWN
INSULATED STRANDED COPPER WIRE INSTALLED IN PVC CONDUIT.
2. ALL OUTLETS, JUNCTION BOXES AND SWITCH BOXES SHALL BE STAMPED
METALLIC WITH SCREWED ON COVERS OF SIZE AND SHAPE TO
ACCOMMODATE WIRES WITHOUT CROWDING AND TO SUIT THE
LOCATION. ALL DEVICE BOXES SHALL BE MINIMUM 4" SQUARE OR
OCTAGONAL BY 1-1/2" DEEP. ALL TELEPHONE OUTLETS SHALL BE 4-11/16"
SQUARE BY 2-1/8" DEEP. ALL BOXES SHALL BE PROVIDED WITH SUITABLE
BOX EXTENSIONS AND/OR PLASTIC RINGS AS REQUIRED. THROUGH THE
WALL BOXES OR BACK MOUNTED DEVICES ARE NOT PERMITTED.
3. EXPOSED WIRING SHALL BE EMT.
PART 3 EXECUTION
PREPARATION
A. COORDINATION
1. COORDINATE AS NECESSARY WITH OTHER TRADES TO ASSURE
PROPER AND ADEQUATE PROVISION IN THE WORK OF THOSE
TRADES FOR INTERFACE WITH WORK OF THIS SECTION
2. COORDINATE THE INSTALLATION OF ELECTRICAL ITEMS WITH
THE SCHEDULE FOR WORK OF OTHER TRADES TO PREVENT
UNNECESSARY DELAYS IN THE TOTAL WORK.
3. WHERE LIGHTING FIXTURES AND OTHER ELECTRICAL ITEMS ARE
SHOWN IN CONFLICT WITH LOCATIONS OF STRUCTURAL
MEMBERS AND MECHANICAL OR OTHER EQUIPMENT, PROVIDE
REQUIRED SUPPORTS AND WIRING TO CLEAR THE
ENCROACHMENT.
4. ARCHITECTURAL DRAWINGS SHOWING ELECTRICAL DEVICES
AND DIMENSIONS FOR ELECTRICAL DEVICES TAKE PRECEDENCE
OVER THE ELECTRICAL DRAWINGS.
B. DATA INDICATED ON THE DRAWINGS AND IN THESE SPECIFICATIONS
ARE AS EXACT AS COULD BE SECURED, BUT THEIR ABSOLUTE
ACCURACY IS NOT WARRANTED. THE EXACT LOCATIONS, DISTANCES,
LEVELS AND OTHER CONDITIONS WILL BE GOVERNED BY ACTUAL
CONSTRUCTION AND THE DRAWINGS AND SPECIFICATION SHOULD BE
USED ONLY FOR GUIDANCE IN SUCH REGARD. USE THE DRAWINGS AND
THESE SPECIFICATIONS FOR GUIDANCE AND SECURE THE ARCHITECT'S
APPROVAL FOR CHANGES IN LOCATION.
C. WHERE OUTLETS ARE NOT SPECIFICALLY LOCATED ON THE DRAWINGS,
LOCATE AS DETERMINED IN THE FIELD BY THE ARCHITECT. WHERE
OUTLETS ARE INSTALLED WITHOUT SUCH SPECIFIC DIRECTION,
RELOCATE AS DIRECTED BY THE ARCHITECT AT NO ADDITIONAL COST
TO THE OWNER. ADJACENT OUTLETS ON OPPOSITE SIDES OF A WALL
SHALL BE SEPARATED BY A STUD.
D. VERIFY ALL MEASUREMENTS AT THE BUILDING. NO EXTRA
COMPENSATION WILL BE ALLOWED BECAUSE OF DIFFERENCES
BETWEEN WORK SHOWN ON THE DRAWINGS AND ACTUAL
MEASUREMENTS AT THE SITE OF CONSTRUCTION.
A. INSTALLATION OF RACEWAYS
B. KEEP ALL CABLE/CONDUIT AT LEAST 6" AWAY FROM THE COVERING ON
HOT WATER PIPES.
1. KEEP ENDS OF CONDUIT CLOSED AND CLEAN OF FOREIGN
DEBRIS WITH APPROVED CONDUIT SEALS DURING
CONSTRUCTION. USE CONDUIT UNIONS WHERE JOINTS ARE
REQUIRED. DO NOT USE RUNNING THREADS.
C. PROVIDE NECESSARY SLEEVES AND CHASES WHERE CONDUITS PASS
THROUGH FLOORS AND WALLS. PROVIDE OTHER NECESSARY
OPENINGS AND SPACES, ARRANGING FOR PROPER TIME TO PREVENT
UNNECESSARY CUTTING IN CONNECTION WITH THE WORK. PERFORM
CUTTING AND PATCHING IN ACCORDANCE WITH THE PROVISIONS FOR
THE ORIGINAL WORK. GROUT/CAULK AROUND ALL PENETRATIONS.
D. PROVIDE NECESSARY SLEEVES AND CHASES WHERE CONDUITS PASS
THROUGH FLOORS AND WALLS. PROVIDE OTHER NECESSARY
OPENINGS AND SPACES, ARRANGING FOR PROPER TIME TO PREVENT
UNNECESSARY CUTTING IN CONNECTION WITH THE WORK. PERFORM
CUTTING AND PATCHING IN ACCORDANCE WITH THE PROVISIONS FOR
THE ORIGINAL WORK. GROUT/CAULK AROUND ALL PENETRATIONS.
E. WHERE CONDUIT IS EXPOSED, RUN PARALLEL TO OR AT RIGHT ANGLES
TO LINES OF THE BUILDING.
F. MAKE BENDS WITH STANDARD CONDUIT ELBOWS OR CONDUIT BENT TO
NOT LESS THAN THE SAME RADIUS.
G. MAKE BEND FREE FROM DENTS AND FLATTENING.
H. SECURELY AND RIGIDLY SUPPORT CABLE, CONDUITS AND BOXES
THROUGHOUT THE WORK.
TEST REQUIREMENTS
A. ALL SYSTEMS SHALL TEST FREE FROM SHORT CIRCUITS AND GROUNDS,
SHALL BE FREE FROM MECHANICAL AND ELECTRICAL DEFECTS, AND
SHALL SHOW AN INSULATION RESISTANCE BETWEEN PHASE
CONDUCTORS AND GROUND OF NOT LESS THAN THAT REQUIRED BY
THE NATIONAL ELECTRIC CODE.
B. TEST ALL CIRCUITS FOR PROPER NEUTRAL CONNECTIONS.
C. IF VOLTAGE AND REGULATION ARE NOT WITHIN ACCEPTABLE LIMITS,
ARRANGE WITH THE SERVICE UTILITY FOR PROPER VOLTAGE.
D. WHEN MATERIAL AND/OR WORKMANSHIP IS FOUND NOT TO COMPLY
WITH THE SPECIFIED REQUIREMENTS, WITHIN THREE DAYS AFTER
RECEIPT OF NOTICE OF SUCH NON-COMPLIANCE REMOVE THE NON-
COMPLYING ITEMS FROM THE JOB SITE AND REPLACE THEM WITH
ITEMS COMPLYING WITH THE SPECIFIED REQUIREMENTS, ALL AT NO
ADDITIONAL COST TO THE OWNER.
PROJECT COMPLETION
A. UPON COMPLETION OF THE WORK OF THIS SECTION, THOROUGHLY
CLEAN ALL EXPOSED PORTIONS OF THE ELECTRICAL INSTALLATION,
REMOVING ALL TRACES OF SOIL, LABELS, GREASE, OIL AND OTHER
FOREIGN MATERIAL AND USING ONLY THE TYPE OF CLEANER.
RECOMMENDED BY THE MANUFACTURER OF THE ITEM BEING CLEANED.
B. PROVIDE NEW PANELBOARD DIRECTORIES FOR NEW PANELS AND
EXISTING PANELS THAT HAVE BEEN MODIFIED. THE PANEL DIRECTORY
SHALL BE TYPED AND PLACED IN THE PANEL.
C. PROCURE PERMITS AND LICENSES AND PAY FEES, FINES AND TAXES AS
REQUIRED BY AUTHORITIES. UPON COMPLETION OF THE WORK AND
CLEAN UP, PRIOR TO FINAL PAYMENT, SECURE CERTIFICATES OF
INSPECTION FROM INSPECTORS HAVING JURISDICTION AND SUBMIT TO
THE OWNER.
MECHANICAL/ PLUMBING
PART 1 GENERAL
A. CONDITIONS OF THE CONTRACT: THE CONDITIONS OF THE CONTRACT AND
THE GENERAL REQUIREMENTS ARE HEREBY MADE A PART OF THE DIVISION.
B. WORK INCLUDED UNDER THIS DIVISION OF THE SPECIFICATIONS CONSISTS OF
FURNISHING LABOR, EQUIPMENT AND MATERIALS, TOOLS, AND SKILLS
NECESSARY FOR AND REASONABLY INCIDENTAL TO THE COMPLETE
INSTALLATION OF THE MECHANICAL SYSTEMS, AS HEREIN DESCRIBED AND
INDICATED ON THE DRAWINGS, INCLUDING SUCH MINOR DETAILS NOT
SPECIFICALLY MENTIONED OR SHOWN AS MAY NECESSARY TO COMPLETE
THE SYSTEM, READY FOR SUCCESSFUL OPERATION, AND SUBJECT TO THE
TERMS AND CONDITIONS OF THE CONTRACT. ALL WORK UNDER THIS DIVISION
SHALL BE DONE IN ACCORDANCE WITH THE BEST MODERN PRACTICE, USING
FIRST GRADE EQUIPMENT AND MATERIAL NEW AND PREVIOUSLY UNUSED.
DUCTWORK, PIPING AND EQUIPMENT SHALL BE ARRANGED TO AVOID
INTERFERENCE WITH EACH OTHER AND LIGHT OUTLETS AND FIXTURES.
C. THE MAJOR ITEMS OF WORK TO BE INCLUDE, BUT ARE NOT LIMITED TO, THE
FOLLOWING:
1. DISCONNECT AND RECONNECT EQUIPMENT TO EXISTING PLUMBING.
CONTRACTOR SHALL PROVIDE NEW BACKFLOW PREVENTERS, FLOW
CONTROL VALVES, ETC. AS REQUIRED.
2. PROVIDE A NEW MAKE UP AIR SYSTEM AND ASSOCIATED CONDENSING
UNIT AND DUCTWORK.
3. MODIFY/DEMO MECHANICAL EQUIPMENT AND DUCT AS SHOWN ON THE
DRAWINGS.
THE CONTRACTOR SHALL
A. FURNISH AND INSTALL EVERYTHING REQUIRED OR REASONABLY IMPLIED BY
THESE SPECIFICATIONS AND DRAWINGS, THE INTENT BEING THAT THERE BE
TURNED OVER TO THE OWNER SYSTEMS COMPLETE IN EVERY DETAIL AND
READY FOR OPERATION. BIDDERS ARE REQUESTED TO REPORT TO THE
ENGINEER ANY OMISSIONS OR DEVIATIONS FROM STANDARD PRACTICE
WHICH WILL AFFECT THIS PROPOSAL. OBTAIN ANY CLARIFICATION PRIOR TO
BID OR ABIDE BY ENGINEER'S DECISION AND INTERPRETATION OF PLANS AND
SPECIFICATIONS. IF AN ITEM IS EITHER MENTIONED OR SHOWN, IT IS
CONSIDERED SUFFICIENT FOR INCLUSION OF SAID ITEM IN CONTRACT.
B. PROVIDE ON-SITE TRAINING FOR OWNER AND/OR OWNER REPRESENTATIVES
FOR ALL MECHANICAL SYSTEMS AND CONTROLS.
C. PROVIDE OPERATIONS AND MAINTENANCE MANUALS FOR ALL PRODUCTS.
COORDINATION WITH OTHER TRADES
A. CARE SHALL BE EXERCISED BY CONTRACTOR IN RUNNING ALL PIPES, DUCTS,
CONDUITS, ETC. TO AVOID INTERFERENCES WITH OTHER WORK AND
MATERIALS INSTALLED BY OTHER CONTRACTORS WORKING ON THE SITE.
REVIEW ALL CONDITIONS SET FORTH ON THE PLANS AND SPECIFICATIONS
AND COORDINATE SAME WITH THE OTHER CONTRACTORS.
B. PIPING PASSING THROUGH CORRIDORS, TUNNELS, CHASES, ETC. SHALL BE
CONSIDERED FOR PROPER DRAINAGE. CONSULT WITH CONTRACTORS AND
AVOID CONFLICTS WITH LOCATION OF PIPING. ORDER OF PRIORITY FOR ALL
PIPING, DUCTWORK AND ELECTRICAL CONDUIT TO BE INSTALLED SHALL BE AS
FOLLOWS WITH THE HIGHEST PRIORITY LISTED FIRST:
1. PLUMBING DRAIN LINES
2. FIRE PROTECTION PIPING
3. DUCTWORK
4. DOMESTIC HOT AND COLD WATER
5. HYDRONIC PIPING
6. ELECTRICAL CONDUIT
7. GAS PIPING (NATURAL AND/OR LP)
WORKMANSHIP
A. ALL WORK SHALL BE DONE IN A SKILLFUL, NEAT AND WORKMANLIKE MANNER,
IN ACCORDANCE WITH THE BEST MODERN PRACTICE FOR EACH CLASS OF
WORK AND TO BE THE APPROVAL OF THE ARCHITECT/ENGINEER AND OWNER.
SCOPE OF WORK
A. THE OMISSION OF EXPRESS REFERENCE TO ANY PARTS NECESSARY FOR, OR
REASONABLY INCIDENTAL TO A COMPLETE MECHANICAL INSTALLATION, SHALL
NOT BE CONSTRUED FROM RELEASING THE CONTRACTOR FROM FURNISHING
SUCH PARTS.
DRAWINGS AND PLANS
A. DESIGN DRAWINGS SHOW GENERAL ARRANGEMENT AND EXTENT OF WORK.
THE DRAWINGS ARE DIAGRAMMATIC AND MAY NOT NECESSARILY BE DRAWN
TO SCALE FOR PURPOSE OF CLARITY AND LEGIBILITY. IT IS INTENDED THAT
ALL MECHANICAL ITEMS BE LOCATED SYMMETRICALLY WITH ARCHITECTURAL
ELEMENTS WHERE FEASIBLE AND BE INSTALLED TO AVOID OBSTRUCTIONS
AND PRESERVE HEADROOM. CONTRACTOR TO REVIEW PLANS OF OTHER
TRADES WITH HIS OWN WORK TO AVOID CONFLICTS AND INTERFERENCE'S.
CONTRACTOR MUST MAKE USE OF ALL SOURCES OF INFORMATION INCLUDING
DRAWINGS OF EQUIPMENT FURNISHED BY OTHERS. FAILURE TO REVIEW
WORKING SPACES OR CHECK DIMENSIONS IN QUESTION SHALL NOT WARRANT
CONFLICTS. DRAWINGS AND SPECIFICATIONS ARE INTENDED TO BE
COMPLIMENTARY.
PERMITS, FEES AND INSPECTIONS
A. WHERE GOVERNING REGULATIONS AND IMPOSED CODES AND STANDARDS
REQUIRE CHARGES, NOTICES, PERMITS, LICENSES, INSPECTIONS, TESTS, AND
SIMILAR ITEMS OR ACTIONS IN ORDER TO LAWFULLY PROCEED WITH THE
REQUIRED MECHANICAL WORK, OBTAIN THOSE ITEMS, PAY ALL FEES, AND
TAKE THOSE ACTIONS IN ACCORDANCE WITH THE REGULATIONS OF THE
GOVERNING AUTHORITY.
B. THE MECHANICAL WORK SHALL BE IN CONFORMANCE WITH THE FOLLOWING:
1. STATE OF MICHIGAN BUILDING CODE
2. STATE OF MICHIGAN PLUMBING CODE
3. STATE OF MICHIGAN MECHANICAL CODE
4. SANITARY, GAS AND WATER UTILITY AUTHORITY STANDARDS
5. ALL LOCAL CODES AND REGULATIONS
6. NATIONAL FIRE PROTECTION ASSOCIATION (NFPA 101) LIFE
SAFETY.
CERTIFICATES OF APPROVAL
A. UPON COMPLETION OF THE BUILDING, PROVIDE OWNER WITH CERTIFICATE OF
APPROVAL FROM THE PLUMBING AND MECHANICAL DIVISIONS, BUREAU OF
CONSTRUCTION CODES, DEPARTMENT OF LABOR, STATE OF MICHIGAN AND
LOCAL OFFICE.
TESTING
A. ALL SYSTEMS INSTALLED UNDER THIS CONTRACT SHALL BE SUBJECTED TO
THE FOLLOWING TESTS:
1. BUILDING DRAINAGE-SANITARY, ALL LINES WITHIN THE
BUILDING WALLS, WATER TEST-NO LESS THAN 10 FEET HEAD
OF WATER FOR ONE (1) HOUR OR AS REQUIRED BY CODE
2. WATER-DOMESTIC-HOT AND WATER PIPING IN TUNNELS,
WALLS, TRENCHES, BELOW SLAB AND/OR IN THE GROUND
SHALL BE TESTED AT 100 P.S.I. AIR BEFORE ANY SLABS ARE
POURED, SOAP TEST APPLIED TO ALL CONNECTIONS OR AN AIR
AND WATER WET TEST AT 100 P.S.I., AND HOLDING TIGHT
WITHOUT LOSS OF PRESSURE FOR A MINIMUM OF A FOUR (4)
HOUR PERIOD AND SHALL BE WITNESSED BY A
REPRESENTATIVE OF THE ARCHITECT/ENGINEER.
3. GAS PIPING-AIR TEST TO 100 P.S.I. AND TO REMAIN TIGHT WITH
LOSS FOR PRESSURE FOR A MINIMUM OF A FOUR (4) HOUR
PERIOD. TEST ALL JOINTS WHILE UNDER PRESSURE.
PART 2 PRODUCTS
PIPING INSULATION
A. MATERIALS: FLAME SPREAD/SMOKE DEVELOPED RATING OF 25/50 OR
LESS IN ACCORDANCE WITH ASTM E84 (NFPA 255).
B. APPLICATOR: COMPANY SPECIALIZING IN PERFORMING THE WORK OF
THIS SECTION WITH MINIMUM OF THREE (3) YEARS EXPERIENCE.
C. MANUFACTURERS:
1. OWENS-CORNING FIBERGLASS CORPORATION.
2. CERTAINTEED CORPORATION.
3. JOHNS-MANVILLE CORPORATION.
4. KNAUF.
5. OR APPROVED EQUAL.
D. TYPE: SEE PIPING SYSTEM INSULATION SCHEDULE
PIPING
A. WATER PIPING BURIED WITHIN 5 FEET OF BUILDING
1. COPPER TUBING: ASTM B88, TYPE K, HARD DRAWN OR
ANNEALED.
2. FITTINGS: ASME B16.18, CAST BRONZE OR ASTM B16.22
WROUGHT COPPER AND BRONZE
3. JOINTS: ASTM B32, SOLDER, GRADE 95TA.
4. COPPER TUBING: ASTM B88, TYPE K
5. FITTINGS: ASME B16.26, CAST BRONZE.
6. JOINTS: FLARED
B. WATER PIPING, ABOVE GRADE
1. COPPER TUBING: ASTM B88, TYPE L HARD DRAWN.
2. FITTINGS: ASME B16.18, CAST BRONZE OR ASTM B16.22
WROUGHT COPPER AND BRONZE
3. JOINTS: ASTM B32, SOLDER, GRADE 95TA.
C. NATURAL GAS PIPING, BURIED WITHIN 5 FEET OF BUILDING
1. STEEL PIPE: ASTM A53 OR A120, SCHEDULE 40 BLACK.
2. FITTINGS: ASTM A234, FORGED STEEL WELDING TYPE, WITH
AWWA C105 POLYETHYLENE JACKET OR DOUBLE LAYER, HALF-
LAPPED 10 MIL POLYETHYLENE TAPE.
3. JOINTS: ANSI B31.2 WELDED.
D. NATURAL GAS PIPING, ABOVE GRADE
1. STEEL PIPE: ASTM A53 OR A120, SCHEDULE 40 BLACK.
2. FITTINGS: ASTM B16.3, MALLEABLE IRON, OR ASTM A234, FORGED
STEEL WELDING TYPE.
3. JOINTS: NFPA 54, THREADED OR WELDED TO ANSI/NFPA Z223.1
E. FLANGES, UNIONS AND COUPLINGS
1. PIPE SIZE 2 INCHES AND UNDER:
a. FERROUS PIPE: 150 PSIG MALLEABLE IRON THREADED
UNIONS.
b. COPPER TUBE AND PIPE: 150 PSIG BRONZE UNIONS WITH
SOLDERED JOINTS.
2. PIPE SIZE OVER 2 INCHES:
a. FERROUS PIPE: 150 PSIG FORGED STEEL SLIP-ON FLANGES;
1/16 INCH THICK PREFORMED NEOPRENE GASKETS.
b. COPPER TUBE AND PIPE: 150 PSIG SLIP-ON BRONZE FLANGES;
1/16 INCH THICK PREFORMED NEOPRENE GASKETS
3. DIELECTRIC CONNECTIONS: UNION WITH GALVANIZED OR
PLATED STEEL THREADED END, COPPER SOLDER END, WATER
IMPERVIOUS ISOLATION BARRIER.
F. BALL VALVES
1. MANUFACTURERS:
A. CRANE COMPANY
B. APOLLO
C. NIBCO, INC.
D. OR APPROVED EQUAL
2. UP TO AND INCLUDING 2 INCHES: BRONZE TWO PIECE BODY,
CHROME PLATED STEEL BALL, TEFLON SEATS AND STUFFING
BOX RING, LEVEL HANDLE THREADED ENDS.
G. PLUG VALVES
1. MANUFACTURERS:
A. CRANE COMPANY
B. APOLLO
C. NIBCO, INC.
D. OR APPROVED EQUAL
2. UP TO AND INCLUDING 2 INCHES: BRONZE BODY, BRONZE
TAPERED PLUG, NON-LUBRICATED, TEFLON PACKING, THREADED
ENDS.
3. OVER 2 INCHES: CAST IRON BODY AND PLUG, NON-LUBRICATED,
TEFLON PACKING, FLANGED ENDS.
DUCTWORK INSULATION
A. MATERIALS: FLAME SPREAD/SMOKE DEVELOPED RATING OF 25/50 OR
LESS IN ACCORDANCE WITH ASTM E84 (NFPA 255).
B. APPLICATOR: COMPANY SPECIALIZING IN PERFORMING THE WORK OF
THIS SECTION WITH MINIMUM OF THREE (3) YEARS EXPERIENCE.
C. MANUFACTURERS:
1. OWENS-CORNING FIBERGLASS CORPORATION.
2. CERTAINTEED CORPORATION.
3. JOHNS-MANVILLE CORPORATION.
4. KNAUF.
5. OR APPROVED EQUAL.
D. TYPE: SEE DUCT INSULATION SCHEDULE
DUCTWORK
A. GALVANIZED STEEL DUCTS: ASTM A525 AND ASTM A527 GALVANIZED
STEEL SHEET, LOCK-FORMING QUALITY, HAVING G90 ZINC COATING IN
CONFORMANCE WITH ASTM A90.
B. INSULATED FLEXIBLE DUCTS
1. TWO PLY VINYL FILM SUPPORTED BY HELICALLY WOUND SPRING
STEEL WIRE; FIBERGLASS INSULATION, POLYETHYLENE VAPOR
BARRIER FILM.
2. PRESSURE RATING: 10 INCHES WG POSITIVE, 1.0 INCHES WG
NEGATIVE.
3. MAXIMUM VELOCITY: 4000 FPM
4. TEMPERATURE RANGE: -10 DEG F TO 160 DEG F
C. HANGER ROD: ASTM A36; STEEL, GALVANIZED; THREADED BOTH ENDS,
THREADED ONE END OR CONTINUOUSLY THREADED.
1.
2.
3.
4.
C.
D. DUCTWORK FABRICATION
1. FABRICATE AND SUPPORT IN ACCORDANCE WITH SMACNA HVAC
DUCT CONSTRUCTION STANDARDS-METAL AND FLEXIBLE, AND AS
INDICATED. PROVIDE DUCT MATERIAL, GAGES, REINFORCING, AND
SEALING FOR OPERATING PRESSURES INDICATED.
2. CONSTRUCT T'S, BENDS, AND ELBOWS WITH RADIUS OF NOT LESS
THAN 1-1/2 TIMES WIDTH OF DUCT ON CENTERLINE. WHERE NOT
POSSIBLE AND WHERE RECTANGULAR ELBOWS ARE USED,
PROVIDE AIR FOIL TURNING VANES. WHERE ACOUSTICAL LINING IS
INDICATED, PROVIDE TURNING VANES OF PERFORATED METAL
WITH GLASS FIBER INSULATION.
3. INCREASE DUCT SIZES GRADUALLY, NOT EXCEEDING 15 DEG
DIVERGENCE WHEREVER POSSIBLE; MAXIMUM 30 DEG
DIVERGENCE UPSTREAM OF EQUIPMENT AND 45 DEG
CONVERGENCE DOWNSTREAM.
4. FABRICATE CONTINUOUSLY WELDED ROUND AND OVAL DUCT
FITTINGS TWO GAGES HEAVIER THAN DUCT GAGES INDICATED IN
SMACNA STANDARD. JOINTS SHALL BE MINIMUM 4 INCH CEMENTED
SLIP JOINT, BRAZED OR ELECTRIC WELDED. PRIME COAT WELDED
JOINTS.
5. PROVIDE STANDARD 45 DEGREE LATERAL WYE TAKEOFFS UNLESS
OTHERWISE INDICATED WHERE 90 DEG CONICAL TEE
CONNECTIONS MAY BE USED.
PART 3 EXECUTION
A. PIPING INSTALLATION:
1. PROVIDE NON-CONDUCTING DIELECTRIC CONNECTIONS
WHEREVER JOINING DISSIMILAR METALS.
2. ROUTE PIPING IN ORDERLY MANNER AND MAINTAIN
GRADIENT.
3. PROVIDE CLEARANCE FOR INSTALLATION OF INSULATION
AND ACCESS TO VALVES AND FITTINGS.
4. PROVIDE ACCESS WHERE VALVES AND FITTINGS ARE NOT
EXPOSED.
5. ESTABLISH ELEVATIONS OF BURIED PIPING OUTSIDE THE
BUILDING TO ENSURE NOT LESS THAN 5 FT. OF COVER.
6. INSTALL VALVES WITH STEM UPRIGHT OR HORIZONTAL, NOT
INVERTED.
7. PIPE VENTS FROM GAS PRESSURE REDUCING VALVES TO
OUTDOORS AND TERMINATE IN WEATHER PROOF HOOD.
B. DUCTWORK INSTALLATION:
1. INSTALL AND SEAL DUCTS IN ACCORDANCE WITH SMACNA
HVAC DUCT CONSTRUCTION STANDARDS-METAL AND
FLEXIBLE.
2. DUCTS SIZES ARE INSIDE CLEAR DIMENSIONS. FOR LINED
DUCTS, MAINTAIN SIZES INSIDE LINING.
C. SERVICE CONNECTIONS
1. PROVIDE NEW SANITARY SEWER SERVICES. BEFORE
COMMENCING WORK, CHECK INVERT ELEVATIONS
REQUIRED FOR SEWER CONNECTIONS. CONFIRM INVERTS
AND ENSURE THAT THESE CAN BE PROPERLY CONNECTED
WITH SLOPE FOR DRAINAGE AND COVER TO AVOID
FREEZING.
2. PROVIDE NEW WATER SERVICE COMPLETE WITH WATER
METER WITH BY-PASS VALVES.
3. PROVIDE 18 GA GALVANIZED SHEET METAL SLEEVE
AROUND SERVICE MAIN TO 6 INCHES ABOVE FLOOR AND 6
FEET MINIMUM BELOW GRADE. SIZE FOR MINIMUM OF
2INCHES OF LOOSE BATT INSULATION STUFFING.
4. PROVIDE NEW GAS SERVICE COMPLETE WITH GAS METER
AND REGULATORS. GAS SERVICE DISTRIBUTION PIPING TO
HAVE INITIAL MINIMUM PRESSURE OF 14 IN WG.
1 2 3 4 5
1 2 3 4 5
D
C
B
A
D
C
B
A
© U.P. Engineers & Architects, Inc.
P R
O
JE
C T
N O
D R
A W
N B
Y
C H
E C
K E
D
A P
P R
O V
E D
D E
S
IG
N E
D B
Y w w w .u p e a .c o m
IS
S
U E
D F
O R
D
A T
E
P
H -0
H o u g h to n -P o rt a g e T w p S c h o o ls
-K it ch e n E q u ip m e n t R e p la c e m e n t\
D w g s \M e c h a n ic a l\ H
-0
H o u g h to n T w p S c h o o ls
H ig h S c h o o l_
M e c h a n ic a l_
R .r v t
/3
/2
:4 :3
A
M
M001
MECHANICAL,
ELECTRICAL, AND
PLUMBING
SPECIFICATIONS
K
IT
C H
E N
E Q
U
IP
M E
N T
R E
P L
A C
E M
E N
T
H O
U G
H T
O N
P O
R T
A G
E T
O W
N S
H
IP
S C
H O
O L
S
H O
U G
H T
O N
, M I 4
H -0
S P
K C
K C
S P
K
IT
C H
E N
E Q
U
IP
M E
N T
R E
P L
A C
E M
E N
T
H O
U G
H T
O N
P O
R T
A G
E T
O W
N S
H
IP
S C
H O
O L
S
B
ID
S E
T
/0
/2
STM
STM
PLUMBING PIPING MECHANICAL PIPING
DUCTWORK
CDS
CDR
CHWS
CHWR
CDS
CDR
CHWR
CHWS
AIR
ST
G
G
AIR
HWR
HWR
HWS
HWS
FP
FP
C
C
ST
V
V
SAN
HWC
SAN
EA24x14
EA24x14
EA24x14
HW
CW
HWC
OA24x14
OA24x14
OA24x14
RA24x14
SA24x14
SA24x14
S D
SA24x14
RA24x14
RA24x14
CW
HW
STM
CDR
CDS
CHWR
CHWS
HWR
HWS
G
AIR
FP
C
ST
CW
V
SAN
HWC
HW
HYDRONIC HOT WATER SUPPLY - NEW
HYDRONIC HOT WATER SUPPLY - EXISTING
HYDRONIC HOT WATER SUPPLY - DEMO
HYDRONIC HOT WATER RETURN - NEW
HYDRONIC HOT WATER RETURN - EXISTING
HYDRONIC HOT WATER RETURN - DEMO
COMPRESSED AIR - NEW
COMPRESSED AIR - EXISTING
COMPRESSED AIR - DEMO
GAS - NEW
GAS - EXISTING
GAS - DEMO
DOMESTIC COLD WATER - EXISTING
DOMESTIC COLD WATER - DEMO
DOMESTIC COLD WATER - NEW
DOMESTIC HOT WATER - EXISTING
DOMESTIC HOT WATER - DEMO
DOMESTIC HOT WATER - NEW
DOMESTIC HOT WATER RECIRC - EXISTING
DOMESTIC HOT WATER RECIRC DEMO
DOMESTIC HOT WATER RECIRC - NEW
SANITARY - EXISTING
SANITARY - DEMO
SANITARY - NEW
VENT - EXISTING
VENT - DEMO
VENT - NEW
STORM - EXISTING
STORM - DEMO
STORM - NEW
CONDENSATE - EXISTING
CONDENSATE - DEMO
CONDENSATE - NEW
FIRE PROTECTION - EXISTING
FIRE PROTECTION - DEMO
FIRE PROTECTION - NEW
ABBREVIATIONS
PIPING "T"
PIPING 90
STRAINER
SYMBOL LEGEND
CAP
NOTES
INLINE PUMP
BALANCE VALVE
PRESSURE RELIEF VALVE
3-WAY CONTROL VALVE
2-WAY CONTROL VALVE
GLOBE VALVE
GATE VALVE
CHECK VALVE
CIRCUIT SETTER
BUTTERFLY VALVE
BALL VALVE
EXHAUST AIR DUCT DOWN
EXHAUST AIR DUCT UP
RETURN AIR DUCT DOWN
RETURN AIR DUCT UP
SUPPLY AIR DUCT DOWN
SUPPLY AIR DUCT UP
AIR FLOW
HUMIDISTAT - 60" A.F.F.
THERMOSTAT - 60" A.F.F.
DUCT SMOKE DETECTOR
MOTORIZED DAMPER
FIRE / SMOKE DAMPER
(RATING DETERMINED BY WALL TYPE)
VOLUME CONTROL DAMPER
SQUARE TO ROUND TRANSITION
RETURN OR EXHAUST REGISTER
SUPPLY REGISTER
RELIEF AIR HOOD - ROOF
FRESH AIR INTAKE HOOD - ROOF
EXHAUST FAN - ROOF
RETURN OR EXHAUST AIR GRILLE
LINEAR DIFFUSER
SUPPLY AIR DIFFUSER PIPE BREAK
PIPE DOWN
PIPE UP
CLEAN OUT
GAS METER
UNION
HOSE BIBB
ELECTRIC BELL
SIAMESE CONNECTION
BARE FIN TUBE ELEMENT
FIN TUBE ELEMENT WITH COVER
EXTERNALLY INSULATED DUCTWORK
INTERNALLY LINED DUCTWORK
SUPPLY AIR DUCT - EXISTING
SUPPLY AIR DUCT - DEMO
SUPPLY AIR DUCT - NEW
RETURN AIR DUCT - EXISTING
RETURN AIR DUCT - DEMO
RETURN AIR DUCT - NEW
OUTSIDE AIR DUCT - EXISTING
OUTSIDE AIR DUCT - DEMO
OUTSIDE AIR DUCT - NEW
EXHAUST AIR DUCT - EXISTING
EXHAUST AIR DUCT - DEMO
EXHAUST AIR DUCT - NEW
CONDENSOR WATER SUPPLY
CONDENSOR WATER RETURN
CHILLED WATER SUPPLY
CHILLED WATER RETURN
CONDENSOR WATER SUPPLY - DEMO
CONDENSOR WATER SUPPLY - EXIST
CONDENSOR WATER RETURN - DEMO
CONDENSOR WATER RETURN - EXIST
CHILLED WATER SUPPLY - DEMO
CHILLED WATER SUPPLY - EXIST
CHILLED WATER RETURN - DEMO
CHILLED WATER RETURN - EXIST
METER
STEAM - NEW
STEAM - EXISTING
STEAM - DEMO
CONNECTION TO EXISTING
ACCU AIR COOLED CONDENSING UNIT
AFF ABOVE FINISHED FLOOR
AHU AIR HANDLING UNIT
AI ANALOG INPUT
AO ANALOG OUTPUT
APD AIR PRESSURE DROP
AS AIR SEPERATOR
B BOILER
BB BASEBOARD
BC BOOSTER COIL
BDD BACKDRAFT DAMPER
BFG BELOW FINISHED GRADE
BFP BACKFLOW PREVENTER
BHP BRAKE HORSE POWER
BOD BOTTOM OF DUCT
BOP BOTTOM OF PIPE
BT BATH TUB
BTU BRITISH THERMAL UNITS
BTUH BRITISH THERMAL UNITS PER HOUR
C CONVECTOR
CA COMPRESSED AIR
CB CATCH BASIN
CC COOLING COIL
CCF 100 CUBIC FEET
CD CEILING DIFFUSER
CF CUBIC FEET
CFH CUBIC FEET PER HOUR
CFM CUBIC FEET PER MINUTE
CFP CLEAN OUT FERRULE AND PLUG
CH CHILLER
CI CAST IRON
CHWR CHILLED WATER RETURN
CHWS CHILLED WATER SUPPLY
CO CLEAN OUT
CO CARBON MONOXIDE
COND CONDENSATE
CO2 CARBON DIOXIDE
CT COOLING TOWER
CU CONDENSING UNIT
CU FT CUBIC FOOT
CUH CABINET UNIT HEATER
CW COLD WATER
CWR CONDENSER WATER RETURN
CWS CONDENSER WATER SUPPLY
D DIFFUSER
DB DRY BULB
DEG F DEGREE FAHRENHEIT
DF DRINKING FOUNTAIN
DI DIGITAL INPUT
DIA DIAMETER
DN DOWN
DO DIGITAL OUTPUT
DWV DRAIN, WASTE AND VENT
EA EACH
EAT ENTERING AIR TEMPERATURE
EC ELECTRICAL CONTRACTOR
EF EXHAUST FAN
EG EXHAUST AIR GRILLE
ELEV ELEVATION
ER EXHAUST AIR REGISTER
EUH ELECTRIC UNIT HEATER
EWC ELECTRIC WATER COOLER
EWH ELECTRIC WATER HEATER
EWT ENTERING WATER TEMPERATURE
EX EXISTING
EXH EXHAUST
F FURNACE
FAI FRESH AIR INTAKE
FBO FURNISHED BY OTHERS
FC FAN COIL
FD FLOOR DRAIN
FD FIRE DAMPER
FIN FIN TUBE RADIATION
FLG FLANGE
FP FIRE PROTECTION
FPM FEET PER MINUTE
FT FOOT OR FEET
F&T FLOAT AND THERMOSTATIC TRAP
G GAS (NATURAL)
GAL GALLON
GC GENERAL CONTRACTOR
GPH GALLONS PER HOUR
GPM GALLONS PER MINUTE
GT GREASE TRAP
H HYDROGEN
HB HOSE BIBB
HC HEATING COIL
HCO HORIZONTAL CLEANOUT
HP HORSE POWER
HTR HEATER
HVAC HEATING, VENTILATING & AIR COND
HW HOT WATER
HWC HOT WATER RECIRCULATING
HWR HOT WATER RETURN
HWS HOT WATER SUPPLY
HX HEAT EXCHANGER
IE INVERT ELEVATION
IF INLINE FAN
IN INCH OR INCHES
IP IRON PIPE
INV INVERT
IWH INSTANTANEOUS WATER HEATER
JAN JANITOR
JC JANITOR'S CLOSET
JS JANITOR'S SINK
LAT LEAVING AIR TEMPERATURE
LAV LAVATORY
LBS POUNDS
LHWR LOW TEMPERATURE HOT WATER
RETURN
LHWS LOW TEMPERATURE HOT WATER
SUPPLY
LIQ LIQUID (REFRIGERATION)
LV LOUVER
LP PROPANE GAS (LIQUID)
LWT LEAVING WATER TEMPERATURE
M METER
MAU MAKE-UP AIR HANDLING UNIT
MAX MAXIMUM
MB MOP BASIN
MBH BRITISH THERMAL UNITS (1000)
MBTUH BRITISH THERMAL UNITS (1000)
MC MECHANICAL CONTRACTOR
MCA MINIMUM CIRCUIT AMPACITY
MD MOTORIZED DAMPER
MECH MECHANICAL
MIN MINIMUM
MOCP MAXIMUM OVER CURRENT
PROTECTION
OA OUTDOOR AIR
OAI OUTDOOR AIR INTAKE
OC ON CENTER
OD OVERFLOW DRAIN
ODP OPEN DRIP PROOF
OXY OXYGEN
P PUMP
PC PLUMBING CONTRACTOR
PD PNEUMATIC OPERATED DAMPER
PIV POST INDICATING VALVE
PRV PRESSURE REDUCING VALVE
PT PRESSURE TEMPERATURE PLUG
PTAC PACKAGED TERMINAL AIR COND. UNIT
PVAC PROCESS VACUUM
S SINK
SA SUPPLY AIR
SAD SUPPLY AIR DIFFUSER
SAF SUPPLY AIR FAN
SAN SANITARY SEWER
SD SMOKE DETECTOR
SG SUPPLY AIR GRILLE
SH SHOWER HEAD
SHC STEAM HEATING COIL
SR SUPPLY REGISTER
SS STAINLESS STEEL
ST STORM
STM STEAM
SUCT SUCTION (REFRIGERATION)
TCC TEMPERATURE CONTROL CONTRACTOR
TCD TEMPERATURE CONTROL DAMPER
TCP TEMPERATURE CONTROL PANEL
TD TRANSFER DUCT
TG TRANSFER AIR GRILLE
TT THERMOSTATIC TRAP
TYP TYPICAL
UG UNDERGROUND
UH UNIT HEATER
UV UNIT VENTILATOR
V VENT
VAC VACUUM
VAV VARIABLE AIR VOLUME BOX
VD VOLUME DAMPER
VFD VARIABLE FREQUENCY DRIVE
VS VENT STACK (SANITARY)
VTR VENT THRU ROOF (SANITARY)
VUV VERTICAL UNIT VENTILATOR
W WASTE
WB WET BULB
WC WATER CLOSET
W/O WITHOUT
WH WATER HEATER
WSHP WATER SOURCE HEAT PUMP
NOTE:
NOT ALL ABBREVIATIONS AND/OR SYMBOLS ARE
USED IN THIS SET OF DOCUMENTS.
N2O NITROUS OXIDE
NC NORMALLY CLOSED
NIC NOT INCLUDED OR NOT IN CONTRACT
NIT NITROGEN
NO NORMALLY OPEN
KW KILOWATT
R REGISTER
RA RETURN AIR
RD ROOF DRAIN
RET RETURN
RF RETURN FAN
RG RETURN AIR GRILLE
RPZ REDUCED PRESSURE ZONE BACKFLOW PREVENTER
RR RETURN REGISTER
RTU ROOF TOP UNIT
MECHANICAL/PLUMBING AND FIRE PROTECTION GENERAL NOTES
1. THESE DRAWINGS ARE DIAGRAMMATIC IN CHARACTER AND DO NOT NECESSARILY INDICATE
EVERY OFFSET, VALVE, FITTING, ETC. REQUIRED. CONTRACTOR IS RESPONSIBLE FOR FIELD ROUTING
ALL DUCTWORK AND PIPING AT NO ADDITIONAL COST.
2. THE CONTRACTOR SHALL PROVIDE ALL EQUIPMENT, MATERIALS AND OPERATIONS AND
PERFORM ALL LABOR REQUIRED FOR INSTALLATIONS AS INDICATED THE DRAWINGS, IN THE
SPECIFICATIONS AND AS REQUIRED BY LOCAL, STATE AND FEDERAL CODES, AND AS MAY BE
REASONABLY IMPLIED TO ACCOMPLISH COMPLETE MECHANICAL, PLUMBING AND FIRE PROTECTION
SYSTEMS.
3. ALL ELECTRICAL DISCONNECTS REQUIRED PER NEC CODE SHALL BE FURNISHED AND
INSTALLED BY THE ELECTRICAL CONTRACTOR UNLESS NOTED OTHERWISE.
4. CONTRACTOR SHALL PROVIDE PRODUCTS AS SPECIFIED ON THE DRAWINGS AND
SPECIFICATIONS, HOWEVER, WHERE THE WORDS "EQUAL TO" ARE USED, ADDITIONAL PRODUCTS
MAY BE SUBMITTED AS PROPOSED SUBSTITUTIONS, BUT REQUIRE APPROVAL FROM
ARCHITECT/ENGINEER.
5. DESIGN DRAWINGS SHOW GENERAL ARRANGEMENT AND EXTENT OF WORK. THE DRAWINGS
ARE DIAGRAMMATIC AND MAY NOT NECESSARILY BE DRAWN TO SCALE FOR PURPOSE OF CLARITY AND LEGIBILITY. IT IS INTENDED THAT ALL ITEMS BE LOCATED SYMMETRICALLY WITH ARCHITECTURAL
ELEMENTS WHERE FEASIBLE AND BE INSTALLED TO AVOID OBSTRUCTIONS AND PRESERVE
HEADROOM. CONTRACTOR SHALL REVIEW PLANS OF OTHER TRADES WITH HIS OWN WORK TO AVOID CONFLICTS AND INTERFERENCES. CONTRACTOR MUST MAKE USE OF ALL SOURCES OF INFORMATION
INCLUDING DRAWINGS OF EQUIPMENT FURNISHED BY OTHERS. FAILURE TO REVIEW WORKING
SPACES OR CHECK DIMENSIONS IN QUESTION SHALL NOT WARRANT CONFLICTS.
6. DRAWINGS AND SPECIFICATIONS ARE INTENDED TO BE COMPLIMENTARY. WHERE DRAWINGS
AND SPECIFICATIONS CONFLICT EACH OTHER, IT IS THE CONTRACTORS RESPONSIBILITY TO GET CLARIFICATION FROM THE ARCHITECT/ENGINEER PRIOR TO BIDDING. FAILURE TO GET CLARIFICATION SHALL NOT RESULT IN ADDITIONAL COST AND THE MORE STRINGENT SHALL BE USED AS INTENDED
BASIS FOR BIDDING.
7. PLANS AND SPECIFICATIONS ARE INTENDED TO CONFORM TO GOVERNING CODES AND
STANDARDS. IF NON-CONFORMITIES ARE DISCOVERED WHILE BIDDING, OR PERFORMING THE WORK IMPLIED, BRING THE SAME TO THE ATTENTION OF THE ARCHITECT/ENGINEER FOR CLARIFICATION IN WRITING PRIOR TO SUBMITTING BID OR PROCEEDING WITH WORK. NON-CONFORMITIES OF CODE COMPLIANCE WORK INSTALLED AND CORRECTIONS REQUIRED WITHOUT CONSULTION AND WRITTEN RESPONSE OF SAME BY THE ENGINEER WILL BE THE CONTRACTORS FINANCIAL RESPONSIBILITY.
8. MOTORS SHALL BE PROVIDED BY MECHANICAL CONTRACTOR AS REQUIRED BY THE
EQUIPMENT FURNISHED BY THE MECHANICAL CONTRACTOR. MOTORS TO BE SUITABLE FOR LOAD, DUTY, VOLTAGE, FREQUENCY, HAZARD, SERVICE AND LOCATION INTENDED. SINGLE PHASE MOTORS MUST HAVE INTEGRAL THERMAL OVERLOAD PROTECTION IN ADDITION TO THAT PROVIDED IN MOTOR
CONTROLLERS. MOTORS TO CONFORM IN DESIGN AND PERFORMANCE TO THE MOTOR STANDARDS
OF NEMA. MOTORS RATED FOR CONTINUOUS DUTY UNDER FULL LOAD WITH A MAXIMUM
TEMPERATURE RISE OF 105 DEG F FOR OPEN, 125 DEG F FOR DRIP PROOF AND 130 DEG F FOR
EXPLOSION PROOF AND TOTALLY ENCLOSED TYPES. SUPPLY MOTORS WITH BELT DRIVES WITH
ADJUSTABLE BASES, REMOVABLE BELT GUARDS AND VARIABLE PITCH DRIVE PULLEY SELECTED SO THAT MIDPOINT OF VARIABLE RANGE OF PULLEY WILL DRIVE EQUIPMENT AT RATED SPEED. MOTORS
1 HP AND LARGER SHALL BE THREE PHASE (UNLESS OTHERWISE LISTED).
9. MOTOR CONTROLLERS SHALL BE PROVIDED BY THE MECHANICAL CONTRACTOR FOR
MOTORS FURNISHED BY THE MECHANICAL CONTRACTOR. MOTOR CONTROLLERS SHALL BE OF SIZES AND TYPES AS NEEDED TO MEET THE OPERATIONAL CONDITIONS AS REQUIRED BY THE SEQUENCE OF OPERATION. ELECTRICAL CONTRACTOR TO FURNISH AND INSTALL THE POWER CIRCUIT, LOCAL
DISCONNECT AND CONNECTION TO MOTOR TERMINALS. MECHANICAL CONTRACTOR TO MOUNT
MOTOR CONTROLLERS AND CONTROL COMPONENTS AND WIRE AND MAKE ALL FINAL CONTROL
CONNECTIONS BETWEEN DEVICES.
10. THE DRAWINGS INDICATE KNOWN UTILITY AND DRAINAGE LINES IN ACCORDANCE WITH THE
INFORMATION FURNISHED TO THE ENGINEER. RESPONSIBILITY FOR LOCATING, UNCOVERING,
DISPOSING OR MAINTAINING ALL EXISTING UTILITY LINES TO REST SOLELY WITH THE CONTRACTOR.
VERIFY LOCATIONS AND DEPTHS OF SERVICE CONNECTION POINTS BEFORE PROCEEDING WITH
CONSTRUCTION.
11. CONTRACTOR SHALL CHECK EXISTING PREMISES BEFORE SUBMISSION OF BIDS TO CHECK
ALL CONDITIONS WHICH MAY EFFECT THE PERFORMANCE OF THE WORK INVOLVED. NO
ALLOWANCES OR EXTRA PAYMENT WILL BE MADE DUE TO CONTRACTOR'S FAILURE TO EXAMINE SITE
AND FULLY DISCERN WORKING CONDITIONS.
12. MECHANICAL CONTRACTOR SHALL RECEIVE, PROPERLY HOUSE, HANDLE, HOIST, AND
DELIVER TO PROPER LOCATION EQUIPMENT AND OTHER MATERIALS REQUIRED FOR THIS CONTRACT.
13. THE CONTRACTOR SHALL OBTAIN PERMITS, ARRANGE FOR INSPECTIONS, AND PAY FEES AND EXPENSES IN CONNECTION THEREWITH, AS A PART OF THE WORK REQUIRING SUCH PERMITS. EVERY
EFFORT IS MADE TO DESCRIBE THE WORK REQUIREMENTS IN CONFORMITY WITH APPLICABLE
CODES.
14. THE CONTRACTOR SHALL REVIEW ANY ALTERNATES OF OTHER TRADES, AND PRICE THEIR BID
TO ACCOUNT FOR ITEMS AFFECTING HIS WORK.
15. PIPING PASSING THROUGH CORRIDORS, TUNNELS, CHASES, ETC. SHALL BE CONSIDERED FOR
PROPER DRAINAGE. CONSULT WITH THE OTHER CONTRACTORS AND AVOID CONFLICT WITH
LOCATION OF PIPING. ORDER OF PRIORITY FOR ALL PIPING AND CONDUITS TO BE INSTALLED SHALL
BE AS FOLLOWS WITH THE HIGHEST PRIORITY LISTED FIRST.
A. PLUMBING DRAIN LINES
B. CONDENSATE LINES
C. DUCTWORK
D. FIRE PROTECTION
E. HOT AND COLD WATER PIPING
F. ELECTRICAL CONDUIT
16. WORK ASSIGNMENTS INFERRED BY THE DRAWINGS AND NOTES INCLUDED IN THESE PROJECT
DOCUMENTS ARE INFORMATIONAL ONLY AND ARE NOT INTENDED TO RELIEVE THE BIDDING
CONTRACTOR OF HIS OBLIGATION TO THE OWNER TO PROVIDE A COMPLETE AND COORDINATED
PROJECT. COMPREHENSIVE SUBCONTRACTOR COORDINATION AND FINAL WORK ASSIGNMENTS TO
SUBCONTRACTORS ARE THE SOLE RESPONSIBILITY OF THE BIDDING CONTRACTOR.
17. ALL DUCTS SERVING SUPPLY, RETURN AND EXHAUST TERMINALS SHALL BE PROVIDED WITH
BALANCE DAMPERS. FOR CLARITY, ALL DAMPERS MAY NOT BE SHOWN ON PLANS.
18. PROVIDE DIELECTRIC UNIONS/CONNECTIONS AT ALL JUNCTIONS OF DISSIMILAR METALS.
M
M
H
T
M
OD
OD
OD
OVERFLOW STORM - EXISTING
OVERFLOW STORM - DEMO
OVERFLOW STORM - NEW
1 2 3 4 5
1 2 3 4 5
D
C
B
A
D
C
B
A
© U.P. Engineers & Architects, Inc.
P R
O
JE
C T
N O
D R
A W
N B
Y
C H
E C
K E
D
A P
P R
O V
E D
D E
S
IG
N E
D B
Y w w w .u p e a .c o m
IS
S
U E
D F
O R
D
A T
E
P
H -0
H o u g h to n -P o rt a g e T w p S c h o o ls
-K it ch e n E q u ip m e n t R e p la c e m e n t\
D w g s \M e c h a n ic a l\ H
-0
H o u g h to n T w p S c h o o ls
H ig h S c h o o l_
M e c h a n ic a l_
R .r v t
/3
/2
:4 :3
A
M
M002
MECHANICAL AND
PLUMBING
ABBREVIATIONS
AND SYMBOLS
K
IT
C H
E N
E Q
U
IP
M E
N T
R E
P L
A C
E M
E N
T
H O
U G
H T
O N
P O
R T
A G
E T
O W
N S
H
IP
S C
H O
O L
S
H O
U G
H T
O N
, M I 4
H -0
S P
K C
K C
S P
K
IT
C H
E N
E Q
U
IP
M E
N T
R E
P L
A C
E M
E N
T
H O
U G
H T
O N
P O
R T
A G
E T
O W
N S
H
IP
S C
H O
O L
S
B
ID
S E
T
/0
/2
M401 A1
1 2 3 4 5
1 2 3 4 5
D
C
B
A
D
C
B
A
© U.P. Engineers & Architects, Inc.
P R
O
JE
C T
N O
D R
A W
N B
Y
C H
E C
K E
D
A P
P R
O V
E D
D E
S
IG
N E
D B
Y w w w .u p e a .c o m
IS
S
U E
D F
O R
D
A T
E
P
H -0
H o u g h to n -P o rt a g e T w p S c h o o ls
-K it ch e n E q u ip m e n t R e p la c e m e n t\
D w g s \M e c h a n ic a l\ H
-0
H o u g h to n T w p S c h o o ls
H ig h S c h o o l_
M e c h a n ic a l_
R .r v t
/3
/2
:4 :3
A
M
M101
OVERALL EXISTING
MECHANICAL PLAN
- HIGH SCHOOL
K
IT
C H
E N
E Q
U
IP
M E
N T
R E
P L
A C
E M
E N
T
H O
U G
H T
O N
P O
R T
A G
E T
O W
N S
H
IP
S C
H O
O L
S
H O
U G
H T
O N
, M I 4
H -0
S P
K C
K C
S P
K
IT
C H
E N
E Q
U
IP
M E
N T
R E
P L
A C
E M
E N
T
H O
U G
H T
O N
P O
R T
A G
E T
O W
N S
H
IP
S C
H O
O L
S
1" = 30'-0"A2
AREA OF WORK PLAN
NORTH
HIGH SCHOOL
B
ID
S E
T
/0
/2
(TYP)
EX. 2" GAS
1½" G UP
MUA-1
ACCU-1
PD-1
300 CFM
PD-1
300 CFM
PD-1
300 CFM
PD-1
300 CFM
PD-1
300 CFM
RG-1
1500 CFM
SA
RA
16"x16"
"x
10"Ø (TYP FOR PD-1)
21"x20"
12"ø
"ø
VD-1
450 CFM
VD-1
450 CFM
"x
"x
50"x18"
48"x16" 40"x16"
S A
R A
MECHANICAL ROOM ABOVE.
ROUTE EVAPORATOR CONDENSATE PIPING
TO FLOOR DRAIN LOCATED IN MECHANICAL ROOM.
1 REMOVE EXISTING DISHWASHER ROOFTOP EXHAUST FAN AND ASSOCIATED CURB, DUCTWORK, ELECTRICAL, SUPPORTS, AND APPURTENANCES.
TEMPORARILY COVER EXISTING ROOF PENETRATION WATER TIGHT. ROOF PENETRATION TO BE MODIFIED FOR MAKE UP AIR UNIT RETURN DUCT.
KEYNOTES
2 REMOVE EXISTING DIFFUSER AND ASSOCIATED DUCT AND SUPPORTS.
3 REMOVE EXISTING DUCT AND ASSOCIATED SUPPORTS AND DAMPERS. CAP UNUSED OPENINGS.
5 ROOFTOP MOUNTED MAKE UP AIR UNIT: RE-USE/MODIFY EXISTING ROOF PENETRATION FOR RETURN DUCT. PROVIDE NEW PENETRATION FOR SUPPLY DUCT AND GAS PIPING. ALL ROOF PENETRATIONS SHALL BE SEALED WATER TIGHT, BE COMPATIBLE WITH THE EXISTING ROOFING, AND INSTALLED PER MANUFACTURER'S REQUIREMENTS. PROVIDE L3x3x1/4" SUPPORT AROUND NEW SUPPLY DUCT PENETRATION. PERPENDICULAR
SUPPORTS TO THE ROOF TRUSSES SHALL SPAN FROM TRUSS TO TRUSS.
6 ROOFTOP MOUNTED REMOTE CONDENSING UNIT: MOUNT ON (2) 6X6 TREATING BLOCKING THAT SPAN AT LEAST (2) TRUSSES. PROVIDE ROOFING 6" BIGGER ON ALL SIDES UNDER 6X6'S. PROVIDE REQUIRED CLEARANCES OF ALL NEARBY UNITS.
4 DISCONNECT EXISTING PLUMBING FROM DISHWASHER. SALVAGE PLUMBING FOR RE-USE.
7 CONNECT NEW DISHWASHER TO EXISTING PLUMBING. PROVIDE WITH NEW ATMOSPHERIC VACUUM BREAKER ON WATER SUPPLY. PROVIDE AIR
GAP FROM SANITARY TO FLOOR SINK.
8 PROVIDE CONDENSATE PUMP FOR EVAPORATOR UNITS. PROVIDE CONDENSATE PIPING FROM THE PUMP TO THE FLOOR DRAIN LOCATED IN THE
MECHANICAL ROOM. COORDINATE EXACT LOCATION WITH EQUIPMENT AND LAYOUT.
9 PROVIDE STAINLESS STEEL WRAP FOR NEW PASSTHROUGH OPENING. WRAP BOTH SIDES AND TOP TO COVER ANGLE IRON SUPPORTS.
OPENING IS APPROXIMATELY 3'-4" x 3'-4". SEE ARCHITECTURAL DRAWINGS.
ROOF NOTE
ALL WORK REQUIRING MODIFICATIONS TO THE EXISTING ROOF SYSTEM SHALL BE UNDER THE SUPERVISION OF THE ROOFING MANUFACTURER'S QUALIFIED INSTALLER. NEW PENETRATIONS AND MODIFICATIONS TO EXISTING PENETRATIONS SHALL BE SEALED WATERTIGHT. WORK PERFORMED
SHALL NOT VOID OR IMPACT THE EXISTING ROOF WARRANTY IN ANY MANNER.
SEQUENCE OF OPERATIONS
EXISTING KITCHEN EXHAUST HOOD:
THE EXISTING EXHAUST HOOD/FAN SHALL RUN CONTINUOUSLY DURING OCCUPIED HOURS. OCCUPIED HOURS ARE DETERMINED BY AN EXISTING WALL SWITCH LOCATED IN THE KITCHEN.
MAKE UP AIR UNIT:
OCCUPIED HOURS: THE MAKE UP AIR FAN SHALL START ACCORDING TO THE FACTORY SEQUENCE. OUTSIDE AIR DAMPER SHALL OPEN 100% AND THE RETURN AIR DAMPER SHALL CLOSE.
UNOCCUPIED HOURS: THE MAKE UP AIR FAN SHALL START ACCORDING TO THE FACTORY SEQUENCE WHEN A CALL FOR SPACE CONDITIONING OCCURS. THE OUTSIDE AIR DAMPER WILL CLOSE AND THE RETURN AIR DAMPER WILL OPEN TO 100%. UPON SPACE TEMPERATURE SET POINT BEING MET, THE MAKE UP AIR UNIT SHALL SHUT DOWN ACCORDING TO THE FACTORY
SEQUENCE.
HEATING CONTROL:
UPON A CALL FOR SPACE HEATING, THE MICROPROCESSOR CONTROLLER WILL MODULATE THE INDIRECT GAS FURNACE TO MAINTAIN THE SPACE TEMPERATURE SET POINT.
COOLING CONTROL:
UPON A CALL FOR COOLING, THE AIR COOLED CONDENSING UNIT SHALL ACTIVATE ITS FIRST STAGE OF COOLING. IF SPACE TEMPERATURE CAN NOT BE SATISFIED, THE SECOND STAGE
SHALL ACTIVATE.
1 2 3 4 5
1 2 3 4 5
D
C
B
A
D
C
B
A
© U.P. Engineers & Architects, Inc.
P R
O
JE
C T
N O
D R
A W
N B
Y
C H
E C
K E
D
A P
P R
O V
E D
D E
S
IG
N E
D B
Y w w w .u p e a .c o m
IS
S
U E
D F
O R
D
A T
E
P
H -0
H o u g h to n -P o rt a g e T w p S c h o o ls
-K it ch e n E q u ip m e n t R e p la c e m e n t\
D w g s \M e c h a n ic a l\ H
-0
H o u g h to n T w p S c h o o ls
H ig h S c h o o l_
M e c h a n ic a l_
R .r v t
/3
/2
:4 :3
A
M
M401
ENLARGED
MECHANICAL/
PLUMBING PLAN -
HIGH SCHOOL
K
IT
C H
E N
E Q
U
IP
M E
N T
R E
P L
A C
E M
E N
T
H O
U G
H T
O N
P O
R T
A G
E T
O W
N S
H
IP
S C
H O
O L
S
H O
U G
H T
O N
, M I 4
H -0
S P
K C
K C
S P
K
IT
C H
E N
E Q
U
IP
M E
N T
R E
P L
A C
E M
E N
T
H O
U G
H T
O N
P O
R T
A G
E T
O W
N S
H
IP
S C
H O
O L
S
1/8" = 1'-0"A1
ENLARGED EXISTING MECHANICAL/ PLUMBING PLAN
1/8" = 1'-0"A3
ENLARGED PROPOSED MECHANICAL/ PLUMBING PLAN
HIGH SCHOOL
B
ID
S E
T
/0
/2
INSULATION
DUCT
OUTSIDE END BEARING
DAMPER BLADE
1/8" CLEARANCE ALL AROUND
1/2" ROUND ROD PIN
INSULATION STANDOFF
HANDLE WITH
LOCKING QUADRANT
INSIDE END BEARING
INSULATION STIFFEN BLADE AS REQUIRED
DAMPER BLADE
HANDLE WITH LOCKING QUADRANT
DUCT
SECTION
SIDE ELEVATION
NOTES:
1. DELETE INSULATION STAND-OFF FOR DUCTWORK WITHOUT EXTERIOR INSULATION.
2. DETAIL SIMILAR FOR ROUND AND MULTI-BLADE DAMPERS.
FINISHED ROOF
24" FACTORY INSULATED ROOF CURB
FLASH INTO ROOF PER
MANUFACTURER
RECOMMENDATIONS
DISCONNECT
SUPPLY AIR TO KITCHEN
MAKE-UP-AIR UNIT (SEE
SCHEDULE)
OUTDOOR AIR INTAKE.
MAINTAIN MINIMUM 10'-0"
CLEARANCE TO ALL
EXHAUST OR VENT
TERMINATIONS.
GAS VALVE
GAS PIPING
POWER SUPPLY
APPROVED PENETRATION
CEILING
TREATED BLOCKING TO MATCH
INSULATION THICKNESS
DUAL WALL TURNING VANES
"D
"R
"R" = 1/2 x "D"
T H
R O
A T
1 2 3 4 5
1 2 3 4 5
D
C
B
A
D
C
B
A
© U.P. Engineers & Architects, Inc.
P R
O
JE
C T
N O
D R
A W
N B
Y
C H
E C
K E
D
A P
P R
O V
E D
D E
S
IG
N E
D B
Y w w w .u p e a .c o m
IS
S
U E
D F
O R
D
A T
E
P
H -0
H o u g h to n -P o rt a g e T w p S c h o o ls
-K it ch e n E q u ip m e n t R e p la c e m e n t\
D w g s \M e c h a n ic a l\ H
-0
H o u g h to n T w p S c h o o ls
H ig h S c h o o l_
M e c h a n ic a l_
R .r v t
/3
/2
:4 :4
A
M
M501
MECHANICAL
DETAILS &
SCHEDULES - HIGH
SCHOOL
K
IT
C H
E N
E Q
U
IP
M E
N T
R E
P L
A C
E M
E N
T
H O
U G
H T
O N
P O
R T
A G
E T
O W
N S
H
IP
S C
H O
O L
S
H O
U G
H T
O N
, M I 4
H -0
S P
K C
K C
S P
K
IT
C H
E N
E Q
U
IP
M E
N T
R E
P L
A C
E M
E N
T
H O
U G
H T
O N
P O
R T
A G
E T
O W
N S
H
IP
S C
H O
O L
S
AIR-COOLED CONDENSING UNIT SCHEDULE
ID MANUFACTURER MODEL NUMBER
GROSS
CAPACITY
(MBH)
NOMINAL
CAPACITY
(TONS)
EER REFRIG. TYPE WEIGHT (LBS)
COMPRESSOR ELECTRICAL
NOTES
TYPE STAGE VOLTS PHASE MCA MOCP
ACCU-1 CARRIER 38AUD 115.7 10 11.2 R410a 516 SCROLL…