H._Final_Solicitation.pdf

PDF 5 MB Posted

Attached to
SB Minor B - Construct crosswalk, ADA curb ramps, and pedestrian flashing beacons
Solicitation number
02A2428
Issued by
Shasta County, San Bernardino City, Shasta CDP, Shasta Lake City, Mount Shasta City, California

About this file

The file is an Invitation for Price Quote (IFPQ) issued by the California Department of Transportation (Caltrans) for a Small Business Minor B construction contract located in Shasta County, Redding, at Lincoln Street. The project involves constructing two ADA-compliant curb ramps, removing existing lane striping, installing crosswalk pavement markings, associated crosswalk signage, and installing pedestrian-activated Rectangular Rapid Flashing Beacon systems. The contract (No. 02A2428) has a quote due date of May 14, 2025, an estimated project cost of $180,000, and a required completion time of 20 working days.

The contract is specifically designated for Certified Small Businesses, with a bid cap of $461,000. Bidders must possess either a Class A or applicable Class C license and be a Certified Small Business at the time of quote. The Department establishes no Disabled Veteran Business Enterprise (DVBE) contract goal but encourages DVBE participation. Bids must be submitted on a unit price basis, and the contract will be awarded to the lowest responsible contractor whose quote complies with all requirements. The project includes 20 project plans and will be supplemented by the 2024 Edition of Standard Specifications and Standard Plans.

View the file

Other files

File Type Posted
D._Bid_Proposal_Sheets_F.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Solicitation No. 02A2428 The following is the Table of Contents for the Small Business Minor B Package documents:

Table of Contents 1 Page

Invitation for Price Quote–Cover Letter 1 Page General Bidders Instructions/Checklist 2 Pages

Proposed Form of Agreement, STD 213 2 Pages

Information Handout 5 Pages

Specifications 43 Pages Link to the 2024 Edition of the Standard Specifications Page 44

The Bid Package contains 20 Project Plans for this project.

CALIFORNIA STATE TRANSPORTATION AGENCY GAVIN NEWSOM, GOVERNOR

California Department of Transportation

ADMINISTRATION

DIVISION OF PROCUREMENT AND CONTRACTS

1727 30th STREET, MS 65

SACRAMENTO, CA 95816-7006

PHONE (916) 227-6000

TTY 711

https://dot.ca.gov/programs/procurement-and-contracts/

Invitation for Price Quote (IFPQ)

Contract No. 02A2428 Quote Due Date: May 14, 2025

Prospective Contractors:

California Department of Transportation (Caltrans/Department) has issued the enclosed Invitation for Price Quote (IFPQ) for services described in the enclosed proposed contract.

Please read the entire contract package and all attachments carefully. If you desire to submit a quote, complete the Price Quote sheet and email it to the Analyst listed in the IFPQ. Your signature affixed to and dated on the quote proposal shall constitute a certification under penalty of perjury, unless exempted, that you have complied with the nondiscrimination program requirements of Government Code Section 12990 and Title 2, California Code of Regulations, Section 11102, and the nondiscrimination program requirements of Title VI of the Civil Rights Act of 1964, 49 Code of Federal Regulations (CFR) Part 21, and 23 CFR Part 200.

Award of this contract will be to the lowest responsible contractor whose quote complies with all requirements as described in this IFPQ.

If your bid is more than $461,000.00, it will be rejected per Public Contract Code Section 10105(b).

Contractor must be a Certified Small Business at the time of the quote date.

Invitation for Price Quote https://dot.ca.gov/programs/procurement-and-contracts/

“Provide a safe and reliable transportation network that services all people and respects the environment.”

CALIFORNIA STATE TRANSPORTATION AGENCY GAVIN NEWSOM, GOVERNOR

California Department of Transportation

ADMINISTRATION

DIVISION OF PROCUREMENT AND CONTRACTS

1727 30th Street, MS 65

SACRAMENTO, CA 95816-7006

PHONE (916) 227-6000

TTY 711

https://dot.ca.gov/programs/procurement-and-contracts/

General Contractors Instructions/Checklist

Solicitation No. 02A2428

A complete bid or bid package will consist of the items identified below.

Complete this checklist to confirm the items in your bid package. Place a check mark or “X” next to each item that you are submitting to Caltrans. All attachments identified below (unless noted otherwise) are required and must be attached in your Bid Package submittal (links to documents are not acceptable), or your bid may be considered non-responsive. Return this checklist with your bid package.

Quotes omitting this information may be regarded as non-responsive and rejected.

Do not submit company advertisements, brochures, informational pamphlets, or any other document unless specifically noted in the IFPQ Requirements and/or as listed below.

Price Quote Proposal for Unit Items (ADM-1509). Complete and sign the Price Quote Proposal for Unit Item Sheet(s).

Subcontractor List (DES-OE-0102.2.C) can be downloaded at https://forms.dot.ca.gov/v2Forms/servlet/FormRenderer?frmid=DESOE0102.2C. List all subcontractors, including DVBEs, as applicable to the requirements of this solicitation.

Contract Requirements (ADM-0378) can be downloaded at https://forms.dot.ca.gov/v2Forms/servlet/FormRenderer?frmid=ADM0378F.

Small Business Status (DES-OE-0102.4) can be downloaded at https://forms.dot.ca.gov/v2Forms/servlet/showForm2?frmid=DOTDESOE0102.4.

California Company Preference (DES-OE-0102.9) can be downloaded at https://forms.dot.ca.gov/v2Forms/servlet/FormRenderer?frmid=DESOE0102.9.

Certified DVBE Summary (ADM-4015) can be downloaded at https://forms.dot.ca.gov/v2Forms/servlet/showForm2?frmid=DOTADM4015.

Contractor Certification Clauses (CCC 04/2017) can be downloaded at https://www.dgs.ca.gov/OLS/Resources/Page-Content/Office-of-Legal-Services-Resources-List- Folder/Standard-Contract-Language.

California Civil Rights Laws Certification (ADM-0076) can be downloaded at https://forms.dot.ca.gov/v2Forms/servlet/FormRenderer?frmid=ADM0076.

Darfur Contracting Act Certification (ADM-0077) can be downloaded at https://forms.dot.ca.gov/v2Forms/servlet/FormRenderer?frmid=ADM0077.

DOT DES-OE-0102.14 In-Use Off-Road Diesel-Fueled Vehicle List can be downloaded at https://forms.dot.ca.gov/v2Forms/servlet/showForm2?frmid=DOTDESOE010214.

The following forms and information will be required at the time of contract award and signature.

Payment Bond (ADM-2009) can be downloaded at https://forms.dot.ca.gov/v2Forms/servlet/FormRenderer?frmid=ADM2009.

Certificate(s) of Insurance

Postconsumer-Content Certification (CalRecycle 74) can be downloaded at https://calrecycle.ca.gov/buyrecycled/stateagency/vendored/form74guide/ https://dot.ca.gov/programs/procurement-and-contracts/ https://forms.dot.ca.gov/v2Forms/servlet/FormRenderer?frmid=DESOE0102.2C https://forms.dot.ca.gov/v2Forms/servlet/FormRenderer?frmid=ADM0378F https://forms.dot.ca.gov/v2Forms/servlet/showForm2?frmid=DOTDESOE0102.4 https://forms.dot.ca.gov/v2Forms/servlet/FormRenderer?frmid=DESOE0102.9 https://forms.dot.ca.gov/v2Forms/servlet/showForm2?frmid=DOTADM4015 http://www.dgs.ca.gov/ols/Resources/StandardContractLanguage.aspx https://www.dgs.ca.gov/OLS/Resources/Page-Content/Office-of-Legal-Services-Resources-List-Folder/Standard-Contract-Language https://www.dgs.ca.gov/OLS/Resources/Page-Content/Office-of-Legal-Services-Resources-List-Folder/Standard-Contract-Language https://forms.dot.ca.gov/v2Forms/servlet/FormRenderer?frmid=ADM0076 https://forms.dot.ca.gov/v2Forms/servlet/FormRenderer?frmid=ADM0077 https://forms.dot.ca.gov/v2Forms/servlet/showForm2?frmid=DOTDESOE010214 https://forms.dot.ca.gov/v2Forms/servlet/FormRenderer?frmid=ADM2009 https://calrecycle.ca.gov/buyrecycled/stateagency/vendored/form74guide/

“Provide a safe and reliable transportation network that services all people and respects the environment.”

Payee Data Record (STD 204) can be downloaded at https://www.documents.dgs.ca.gov/dgs/fmc/pdf/std204.pdf. This form is designed to allow vendors to self-report information needed for accurate and complete reporting of vendor payment income. Completion of this form is required by all vendors providing goods and/or services to the State of California.

Contract Will Not Be Executed Without These Documents.

https://www.documents.dgs.ca.gov/dgs/fmc/pdf/std204.pdf

PROPOSED FORM OF AGREEMENT

DO NOT COMPLETE

Continued on the following sheets, each bearing the Agreement/Contract number.

The provisions on the following pages hereof constitute a part of the Agreement

TBD

02A2428

1. Contractor agrees to indemnify, defend, and save harmless the State, its officers, agents, and employees from any and all claims and losses accruing or resulting to any and all contractors, subcontractors, materialmen, laborers and any other person, firm or corporation furnishing or supplying work services, materials or supplies in connection with the performance of this contract, and from any and all claims and losses accruing or resulting to any person, firm or corporation who may be injured or damaged by Contractor in the performance of this contract.

2. Contractor, and the agents and employees of Contractor, in the performance of the Agreement, shall act in an independent capacity and not as officers or employees or agents of State of California.

3. The State may terminate this agreement and be relieved of the payment of any consideration to Contractor should Contractor fail to perform the covenants herein contained at the time and in the manner herein provided. In the event of such termination the State may proceed with the work in any manner deemed proper by the State. The cost to the State shall be deducted from any sum due Contractor under this agreement, and the balance, if any, shall be paid Contractor upon demand.

4. Without the written consent of the State, this Agreement is not assignable by Contractor either in whole or in part.

5. Time is of the essence in this Agreement.

6. No alteration or variation of the terms of this contract shall be valid unless made in writing and signed by the parties hereto, and no oral understanding or agreement not incorporated herein, shall be binding on any of the parties hereto.

7. The consideration to be paid Contractor, as provided herein, shall be in compensation for all of Contractor’s expenses incurred in the performance hereof, including travel and per diem, unless otherwise expressly so provided.

INFORMATION HANDOUT

For Contract No. 02A2428

At 02-Sha-273-16.2

Identified by Project ID 0224000005

ENCROACHMENT PERMITS

PLAC - City of Redding

Encroachment Permit No. EP-2025-00145, dated 01/10/2025

CITY OF REDDING

ENCROACHMENT PERMIT

Public Works Department | Office: 530-225-4170

EP-2025-00145

01/10/2025

12/31/2026

Location of Encroachment:

2022 PINE ST

REDDING, CA 96001

Contractor: TBD

Phone:

Owner: CALTRANS DISTRICT 2 - CALIFORNIA

DEPARTMENT OF TRANSPORTATION

1031 Butte St, Ms 60 Redding, CA 96001

Phone: 530-949-1591

Site Contact: CALTRANS DISTRICT 2 - CALIFORNIA DEPARTMENT OF TRANSPORTATION Bus: 530-949-1591

In compliance with your request of 01/10/2025 and printed as general or special provisions on any part of this form or attached hereto, permission is hereby granted to:

Caltrans - Replace existing curb ramp at NW corner of Lincoln and Pine Streets, add additional midblock curbramp at east side of Pine Street, stripe crosswalk connecting proposed ramps across pine street and install pedestrian activated Rectangular Rapid Flashing Beacons.

ALL WORK SHALL CONFORM TO CITY CONSTRUCTION STANDARDS.

TRAFFIC CONTROL SHALL CONFORM TO CURRENT CALIFORNIA MUTCD STANDARDS AND REMAIN IN PLACE DURING THE

ENTIRE TIME OF WORK

CONTRACTOR TO PERMANENTLY FILL AND CAP OPEN TRENCHES WITHIN 5 DAYS OF FIRST OPENING TRENCH. OPEN TRENCH CAN BE APPROVED TO REMAIN OPEN BEYOND THE 5 DAY LIMIT WITH PRIOR APPROVAL FROM PUBLIC WORKS

INSPECTOR

ANY DAMAGES TO EXISTING ASPHALT, CONCRETE, DRAINAGE STRUCTURES, UTILITIES, OR LANDSCAPE SHALL BE

REPLACED IN KIND OR BETTER.

NOTIFY TRAVIS MCNEILL (338-4918) AT LEAST 24 HOURS PRIOR TO STARTING WORK AND 24 HOURS PRIOR TO ANY REQUIRED INSPECTION. ALL WORK MUST BE INSPECTED BEFORE ANY CONDUIT OR PIPELINE IS COVERED AND BEFORE ANY CONCRETE IS PLACED. WORK SHALL NOT OCCUR ON SATURDAYS, SUNDAYS OR HOLIDAYS WITHOUT PRIOR

APPROVAL FROM THE ENGINEERING DIVISION.

Notify Underground Service Alert (www.usanorth.org 1-800-227-2600) at least 48 hours in advance of construction activities that can affect any underground utilities. Note that private utilities or other utilities not within the sphere of a USA inspection will not be marked. You will be liable for any damages to such private facilities caused during construction and, by taking out this permit, you agree to indemnify the City of Redding against any claims resulting from such damage. The City encourages you to take all reasonable steps to identify such facilities prior to commencement of work authorized by this permit.

Notice: You are required to give 48 hours notice to any property owner whose property you will cross or block during the course of construction. Failure to make proper notification will result in citation.

Permittee hereby understands and agrees that failure to complete all work described herein, on or before expiration date shown above, will give the City authority to exercise the options of (1) completing the work with City forces, or (2) engaging the lowest bidder of not less than three contractors to complete the work. In either case, the permittee will defray all costs.

777 Cypress Avenue Redding, CA 96001(530) 225-4170

PERMIT NO.

ISSUE DATE

EXPIRATION DATE

Approved: Director of Public Works

BY:

This permit is to be strictly construed. No work other than that specifically mentioned above is authorized hereby.

P RO V I S I O N S O N P A G E 2

TRAFFIC DIAGRAMS ATTACHED

ATTACH STANDARDS

777 Cypress Avenue Redding, CA 96001(530) 225-4170

Permit No: EP-2025-00145CITY OF

REDDING ENCROACHMENT PERMIT PROVISIONS

I. GENERAL PROVISIONS - ALL WORK

1. This permit shall, in all respects, be subject to and governed by the provisions of Chapter 5.5, Division 2, of the Streets and Highways Code of the State of California, except where expressly superceded by more stringent City Ordinances of provisions

All work performed under this Permit to be in accordance with approved plans, specifications and/or drawings attached hereto, and in strict conformance with current City Encroachment Ordinance.

2.

Permittee shall, at its expense, relocate subject encroachment when necessary because of street or highway improvements in accordance with Section 1463 of the Streets and Highways Code of the State of California.

3.

Permittee agrees to perform the work authorized under this permit as outlined by the Transportation and Engineering Department and remove all excess material from the site upon completion.

4.

Permittee agrees to notify the City of completion of all work authorized under this permit, and shall obtain final approval and acceptance of work from the Transportation and Engineering Department.

5.

Permittee agrees to place all necessary barricades, and/or other devices to properly protect pedestrian and vehicular traffic at all times. Traffic to be permitted to pass at all times unless otherwise specified.

6.

Permittee shall hold the City of Redding and its officers and employees harmless and shall indemnify them against any loss or liability resulting from any work performed under this permit.

7.

II. STANDARD CONSTRUCTION REQUIREMENTS - standards below apply to this permit, and can be found online at www.ci.redding.ca.us/transeng/engineering/pwstdsearch.cfm

777 Cypress Avenue Redding, CA 96001(530) 225-4170

EP-2025-00145Permit No:CITY OF

REDDING ENCROACHMENT PERMIT PROVISIONS

Travis McNeillPW Inspector: 338-4918

Contractor: TBD

Owner: 530-949-1591CALTRANS DISTRICT 2 -

CALIFORNIA DEPARTMENT

OF TRANSPORTATION

Site Contact: CALTRANS DISTRICT 2 - CALIFORNIA DEPARTMENT OF TRANSPORTATION530-949-1591

INSPECTION RECORD

Engineering Final Date: By:

777 Cypress Avenue Redding, CA 96001(530) 225-4170

Small Business Minor B Solicitation

Quotes open: Wednesday, May 14, 2025 Dated: May 1, 2025

Revised 10/31/2024

STATE OF CALIFORNIA

DEPARTMENT OF TRANSPORTATION

Notice to Bidders And

Special Provisions For Construction On State Highway In Shasta County in Redding at Lincoln Street.

In District 2 On Route 273 Under

Standard Specifications dated 2024

Project plans approved February 12, 2025 Standard Plans dated 2024

Identified by Contract No. 02A2428

02-Sha-273-16.2 Project ID 0224000005

SPECIAL NOTICES

• See sections 1-1.06, 1-1.07B, 2-1.17, 2-1.33, 5-1.13D, and 5-1.13F for “Small Business Enterprise

Participation Goal Requirement” and “Small Business and Non-Small Business Subcontractor Preferences.”

• See section 6-1.08 for the requirements for environmental product declarations for hot mix asphalt and concrete materials and products.

California Civil Rights Laws Any person that submits a bid or proposal to, or otherwise proposes to enter into or renew a contract with a State agency with respect to any contract in the amount of one hundred thousand dollars ($100,000) or more shall certify, under penalty of perjury, at the time the bid or proposal is submitted or the contract is renewed, that they satisfy all of the conditions set forth in California Public Contract Code Section 2010 and they shall execute the Certification attached.

Assumption of Risk and Indemnification Regarding Exposure to Environmental Health Hazards

In addition to, and not a limitation of, Contractor’s indemnification obligations contained elsewhere in this Agreement, Contractor hereby assumes all risks of the consequences of exposure of Contractor’s employees, agents, Subcontractors, Subcontractors’ employees, and any other person, firm, or corporation furnishing or supplying work services, materials, or supplies in connection with the performance of this Agreement, to any and all environmental health hazards, local and otherwise, in connection with the performance of this Agreement. Such hazards include, but are not limited to, bodily injury and/or death resulting in whole or in part from exposure to infectious agents and/or pathogens of any type, kind, or origin. Contractor also agrees to take all appropriate safety precautions to prevent any such exposure to Contractor’s employees, agents, Subcontractors, Subcontractors’ employees, and any other person, firm, or corporation furnishing or supplying work services, materials, or supplies in connection with the performance of this Agreement. Contractor also agrees to indemnify and hold harmless Caltrans, the State of California, and each and all of their officers, agents, and employees, from any and all claims and/or losses accruing or resulting from such exposure. Except as provided by law, Contractor also agrees that the provisions of this paragraph shall apply regardless of the existence or degree of negligence or fault on the part of Caltrans, the State of California, and/or any of their officers, agents, and/or employees.

Mandatory Organic Waste Recycling

It is understood and agreed that pursuant to Public Resources Code Sections 42649.8 et seq., if Contractor generates two (2) cubic yards or more of organic waste or commercial solid waste per week, Contractor shall arrange for organic waste recycling services or commercial waste recycling services that separate/source organic waste recycling. Contractor shall provide proof of compliance, i.e. organic waste recycling services or commercial waste recycling services that separate/source organic waste recycling, upon request from Caltrans Contract Manager.

ADA Compliance

All entities that provide electronic or information technology or related services that will be posted online by Caltrans must be in compliance with Government Code Sections 7405 and 11135 and the Web Content Accessibility Guidelines (WCAG) 2.0 or subsequent version, published by the Web Accessibility Initiative of the World Wide Web Consortium at a minimum Level AA success. All entities will respond to and resolve any complaints/deficiencies regarding accessibility brought to their attention.

Satisfying a Self-Insured Retention (SIR) All insurance required by this Agreement must allow, but not require, the State to pay any SIR and/or act as Contractor’s agent in satisfying any SIR. The choice to pay any SIR and/or act as Contractor’s agent in satisfying any SIR is at the State’s discretion. If the State chooses to pay any SIR and/or act as Contractor’s agent in satisfying any SIR, Contractor shall reimburse the State for the same.

Available Coverages/Limits In the event the insurance coverages obtained by Contractor is broader in scope than, and/or the limits are higher than, those required under the Agreement, all such broader coverage and/or higher limits available to the Contractor shall also be available and applicable to the State.

Electronic Signatures Each party agrees that the electronic signatures, whether digital or encrypted, of the parties included in this Agreement are intended to authenticate this writing and to have the same force and effect as manual signatures for this Agreement. Documents that are referenced by this Agreement may still require manual signatures.

Executive Order N-6-22 – Russia Sanctions

On March 4, 2022, Governor Gavin Newsom issued Executive Order N-6-22 (the EO) regarding Economic Sanctions against Russia and Russian entities and individuals. “Economic Sanctions” refers to sanctions imposed by the U.S. government in response to Russia’s actions in Ukraine, as well as any sanctions imposed under state law . By submitting a bid or proposal, Contractor represents that it is not a target of Economic Sanctions. Should the State determine Contractor is a target of Economic Sanctions or is conducting prohibited transactions with sanctioned individuals or entities, that shall be grounds for rejection of Contractor’s bid/proposal any time prior to contract execution, or, if determined after contract execution, shall be grounds for termination by the State.

Executive Order N-12-23 – Generative Artificial Intelligence (GenAI) Technology Use and Reporting

A. The State of California seeks to realize the potential benefits of GenAI, through the development and deployment of GenAI tools, while balancing the risks of these new technologies.

https://www.gov.ca.gov/wp-content/uploads/2022/03/3.4.22-Russia-Ukraine-Executive-Order.pdf

B. Bidder / Offeror must notify the State in writing if it:

1) intends to provide GenAI as a deliverable to the State; or

2) intends to utilize GenAI, including GenAI from third parties, to complete all or a portion of any deliverable that materially impacts:

a) functionality of a State system,

b) risk to the State, or

c) Contract performance.

Note: For avoidance of doubt, the term “materially impacts” shall have the meaning set forth in State Administrative Manual (SAM) § 4986.2 Definitions for GenAI.

C. Failure to report GenAI to the State may result in disqualification. The State reserves the right to seek any and all relief to which it may be entitled to as a result of such non-disclosure.

D. Upon notification by a Bidder / Offeror of GenAI as required, the State reserves the right to incorporate GenAI Special Provisions into the final contract or reject bids/offers that present an unacceptable level of risk to the State.

E. Government Code 11549.64 defines “Generative Artificial Intelligence (GenAI)” as an artificial intelligence system that can generate derived synthetic content, including text, images, video, and audio that emulates the structure and characteristics of the system’s training data.

Standard Title VI/Nondiscrimination Assurances (DOT Order No. 1050.2A)

California Department of Transportation, in accordance with the provisions of Title VI of the Civil Rights Act of 1964 (78 Stat. 252, 42 USC Sections 2000d to 2000d-4) and the Regulations, hereby notifies all bidders that it will affirmatively ensure that any contract entered into pursuant to this advertisement, disadvantaged business enterprises will be afforded full opportunity to submit bids in response to this invitation and will not be discriminated against on the grounds of race, color, or national origin in consideration for an award.

Bid Bonds

Bid bonds are only required for agreements over $461,000.00. Contractors are no longer required to purchase and submit a Bid Bond when bidding on Minor B Projects. Section 2-1.34 of the 2024 Standard Specifications is not applicable to Minor B Projects.

Waste Disposal

Prior to the commencement of waste disposal, Contractor must adhere to the provisions highlighted in Senate Bill 1383 (Lara) of 2016 Title 14, CCR, General Provisions section 18981.2, Public Resources Code sections 42652 et. Seq.

s114402 Text Box v

Table of Contents Notice to Bidders.…………………………………………………………………………………………………1

Special Provisions………………………………………………..……………………………………………….3

Division I General Provisions………………………………………………………………………………….…3

1 General

2 Bidding

3 Contract Award and Execution

4 Scope of Work

5 Control of Work

6 Control of Materials

7 Legal Relations and Responsibility to The Public

8 Prosecution and Progress

9 Payment

Division II General Construction

12 Temporary Traffic Control

15 Existing Facilities

Division V Surfacings and Pavements

39 Asphalt Concrete

Division VIII Miscellaneous Construction

73 Concrete Curbs and Sidewalks

78 Incidental Construction

Division IX Traffic Control Devices

82 Signs and Markers

84 Markings

Division X Electrical Work

87 Electrical Systems

Division XI Materials

90 Concrete Link to the 2024 Edition of the Standard Specifications…………..………..………………………………..44 vi

STANDARD PLANS LIST

The standard plan sheets applicable to this Contract include those listed below. When applicable, revised standard plans (RSPs) listed below are included in the project plans.

ABBREVIATIONS, LINES, SYMBOLS, AND LEGEND

A3A Abbreviations (Sheet 1 of 3) A3B Abbreviations (Sheet 2 of 3) A3C Abbreviations (Sheet 3 of 3) A10A Legend - Lines and Symbols (Sheet 1 of 5) A10B Legend - Lines and Symbols (Sheet 2 of 5) A10C Legend - Lines and Symbols (Sheet 3 of 5) A10D Legend - Lines and Symbols (Sheet 4 of 5) A10E Legend - Lines and Symbols (Sheet 5 of 5) A24F Pavement Markings - Crosswalks

CURBS, DRIVEWAYS, DIKES, CURB RAMPS AND ACCESSIBLE PARKING

A87A Curbs and Driveways A88A Curb Ramp Details A88B Curb Ramp and Island Passageway Details

TEMPORARY CRASH CUSHIONS, RAILING AND TRAFFIC SCREEN

T1A Temporary Crash Cushion, Sand Filled (Unidirectional) T1A1 Temporary Crash Cushion, Sand Filled (Unidirectional) T1B Temporary Crash Cushion, Sand Filled (Bidirectional) T2 Temporary Crash Cushion, Sand Filled (Shoulder Installations) T3A Temporary Railing (Type K) T3B Temporary Railing (Type K) T3C Temporary Barrier System (Cross Bolt) T3D Temporary Barrier System (Cross Bolt) T3E Temporary Barrier System (Cross Bolt) RSP T3F Temporary Barrier System (Cal F-23) RSP T3F2 Temporary Barrier System (Cal F-23) RSP T3G Temporary Barrier System (Staking or Anchoring) RSP T3G2 Temporary Barrier System (Staking or Anchoring)

TEMPORARY TRAFFIC CONTROL SYSTEMS

T9 Traffic Control System Tables for Lane and Ramp Closures T11 Traffic Control System for Lane Closure on Multilane Conventional Highways

TEMPORARY PEDESTRIAN ACCESS ROUTES

T30 Temporary Pedestrian Access Routes - Typical Sidewalk Closure and

Pedestrian Detour T31 Temporary Pedestrian Access Routes - Typical Sidewalk Diversion Within

Roadbed T32 Temporary Pedestrian Access Routes - Typical Sidewalk/Crosswalk Closure and Pedestrian Detour T33 Temporary Pedestrian Access Routes - Ramp T34 Temporary Pedestrian Access Routes - Curb Ramp Options

ROADSIDE SIGNS

RS1 Roadside Signs - Typical Installation Details No. 1 RS2 Roadside Signs - Wood Post - Typical Installation Details No. 2

Notice to Bidders Quotes open: May 14, 2025 Dated: May 1, 2025 General work description: In general, the project consists of the construction of two ADA compliant curb ramps, removal of existing lane striping, installation of crosswalk pavement markings, associated crosswalk signage and pedestrian activated Rectangular Rapid Flashing Beacon system.

The Department of Transportation (Department) will receive quotes for Construction On State Highway In Shasta County in Redding at Lincoln Street.

District-County-Route-Post Mile: 02-Sha-273-16.2 Prime Contractor must have either a Class A license or an applicable Class C license.

Prime Contractor must be a certified Small Business under Section 2-1.05.

Department establishes no DVBE Contract goal but encourages bidders to obtain DVBE participation.

Bids must be on a unit price basis.

Complete the work within 20 working days.

The estimated cost of the project is $180,000.00 The Department will receive quotes until 2:15 p.m. on the quotes open date at:

Analyst’s Email: arlena.tedder@dot.ca.gov *Put SB Contract # in the Subject Line of the Email

Quotes received after this time will not be accepted.

No pre-bid meeting is scheduled for this project.

Quote Packages, including Invitation for Quote, Notice to Bidders, Special Provisions, and Project Plans are available in electronic format only. These documents may be viewed and obtained at:

Cal eProcure website: https://caleprocure.ca.gov/pages/index.aspx Standard Specifications dated 2024 Standard Plans dated 2024

Present bidders’ inquiries to the District at:

CALTRANS North Region Construction Office Fax number (530) 822-4324 Email: inquiry.nr.bid@dot.ca.gov

Questions about alleged patent ambiguity of the plans, specifications, or estimate must be asked before bid opening. After bid opening, the Department does not consider these questions as bid protests.

Department will open bids under Section 2-1.43.

There will be no public opening of quotes. Quotes results will not be listed on the Internet.

Request quote results at:

Analyst’s Name: Arlena Tedder Email: arlena.tedder@dot.ca.gov Phone: (279)234-2434

District office addresses are provided in the Standard Specifications.

mailto:johnas.bell@dot.ca.gov https://caleprocure.ca.gov/pages/index.aspx mailto:inquiry.nr.bid@dot.ca.gov mailto:arlena.tedder@dot.ca.gov

Prevailing wages may be required on this Contract under Section 7-1.02K(2). The Director of the California Department of Industrial Relations (DIR) determines the general prevailing wage rates. Obtain the wage rates at the DIR website, http://www.dir.ca.gov, or from the Department's Labor Compliance Office of the district in which the work is located at https://dot.ca.gov/programs/construction/labor-compliance.

Department has made available Notices of Suspension and Proposed Debarment from the Federal Highway Administration. For a copy of the notices, go to http://ppmoe.dot.ca.gov/des/oe/contractor-info.html. Additional information is provided in the Excluded Parties List System at https://www.dol.gov/ofccp/regs/compliance/preaward/debarlst.htm.

Standard Specifications and Standard Plans may be viewed at Department’s Division of Design website at https://dot.ca.gov/programs/design/ccs-standard-plans-and-standard-specifications.

http://www.dir.ca.gov/OPRL/PWD/Index.htm https://dot.ca.gov/programs/construction/labor-compliance http://ppmoe.dot.ca.gov/des/oe/contractor-info.html https://na01.safelinks.protection.outlook.com/?url=https%3A%2F%2Fwww.dol.gov%2Fofccp%2Fregs%2Fcompliance%2Fpreaward%2Fdebarlst.htm&data=02%7C01%7Ckimberly.fox%40dot.ca.gov%7C415eb37b3bff4ddfd9f208d687c22911%7C621b0a64174043cc8d884540d3487556%7C0%7C0%7C636845665317930395&sdata=nirsW6JifMsUooJNNbezMCat3XgJXa1NFOD20aC5rHc%3D&reserved=0 https://dot.ca.gov/programs/design/ccs-standard-plans-and-standard-specifications

Special Provisions

Division I General Provisions 1 General

Add to section 1-1.01:

Bid Items and Applicable Sections Item code

Item description Applicable section

015225 RESET BIKE RACK 78

016052 RECTANGULAR RAPID FLASHING BEACON SYSTEM (EA) 87

Add to the table in the 1st paragraph of section 1-1.06:

SBE Small Business Enterprise

Replace the definition of Bid Item List in Section 1-1.07B with:

Bid Item List: List of bid items and the associated quantities on the Price Quote Proposal for Unit Items.

Replace the definition of Director in Section 1-1.07B with:

Director: Department’s District Director.

Add the following to Section 1-1.07B:

Quote: Bid for an agreement with bidders limited to only Small Businesses under Section 2-1.05.

Add to section 1-1.09:

This project is in a freeze-thaw area.

Add the following to the table in Section 1-1.11:

Reference or agency or department unit

Website Address Telephone Number

Office of Civil Rights https://dot.ca.gov/programs/ civil-rights

1823 14th Street Sacramento, CA 95811 (916) 324-0449

2 Bidding

Replace Section 2-1.05 with:

2-1.05 Bidder Eligibility Bidder must be certified as a small business at the time and date of bid opening and on the date of contract award or have submitted a complete application to the Department of General Services (DGS), Office of Small Business and DVBE Services. The complete application and any required substantiating documentation must be received by DGS by 5:00 p.m. on the bid opening date.

Replace Section 2-1.06A with:

2-1.06A General Standard Specifications and Standard Plans may be viewed at Bidders’ Exchange website.

The Bid Package may be viewed and obtained at the Cal eProcure website.

The Bid Package includes the Invitation for Bid, Notice to Bidders, Special Provisions, Project Plans, Revised Standard Plans, and a web link to the Standard Specifications and Standard Plans.

Replace the 3rd paragraph of Section 2-1.06B with:

If an Information Handout or cross sections are available, you may view and obtain them at the Cal eProcure website.

Add between the 1st and 2nd paragraphs of section 2-1.06B:

The Department makes the following supplemental project information available:

Supplemental Project Information Means Description

Included in the Information Handout 1. PLAC - City of Redding Encroachment Permit No. EP-2025-00145, dated 01/10/2025.

Add the following to Section 2-1.10 Submit the form with your bid.

https://dot.ca.gov/programs/civil-rights https://dot.ca.gov/programs/civil-rights

Replace section 2-1.11 with:

2-1.11 IN-USE OFF-ROAD DIESEL-FUELED VEHICLE LIST

Section 2-1.11 applies to non-informal-bid contracts.

Complete and submit the In-Use Off-Road Diesel-Fueled Vehicle List form under section 2-1.33.

On the In-Use Off-Road Diesel-Fueled Vehicle List form, list each fleet used by you or your subcontractor to perform work and is subject to 13 CCR § 2449 et seq. Submit a copy of a valid Certificate of Reported Compliance (13 CCR § 2449, subdivision (n)) for each fleet listed on the form within 10 days of bid opening. Failure to list a fleet used by you or your subcontractor to perform work on the In-Use Off-Road Diesel-Fueled Vehicle List form may result in a nonresponsive bid. Failure to submit the Certificate of Reported Compliance for a fleet listed on the In-Use Off-Road Diesel-Fueled Vehicle List form may result in a nonresponsive bid

Replace Section 2-1.15 with:

2-1.15 Disabled Veteran Business Enterprises (DVBE) 2-1.15A General Take necessary and reasonable steps to ensure that DVBEs have opportunity to participate in the Agreement.

Comply with Military and Veterans Code Sections 999 et seq.

Department encourages bidders to obtain DVBE participation to ensure Department achieves its State-mandated overall DVBE goal.

If you obtain DVBE participation:

1. Complete and submit the Certified DVBE Summary form with your bid. List all DVBE participation on this form.

2. List each first tier DVBE subcontractor in the Subcontractor List form, regardless of percentage of the total bid.

If a DVBE joint venture is used, submit the joint venture agreement with the Certified DVBE Summary form.

List each first tier DVBE, subcontractor on the Subcontractor List (DES-OE-0102C) regardless of percentage of the total bid.

DVBEs must be certified by the bid opening date and remain certified through contract award.

Delete Section 2-1.18.

Delete Section 2-1.27.

Replace Section 2-1.33 with:

2-1.33 Bid Document Completion and Submittal Complete forms in the Bid Package. Submit the forms with your bid.

Failure to submit the forms and information as specified may result in a nonresponsive bid.

If an agent other than the authorized corporate officer or a partnership member signs the bid, file a Power of Attorney with the Department either before opening bids or with the bid. Otherwise, the bid may be nonresponsive.

Delete Section 2-1.34

Delete the second paragraph of Section 2-1.40.

Replace Section 2-1.43 with:

2-1.43 Bid Opening The Department opens the bids after the time shown in the Notice to Bidders.

Replace the first paragraph of Section 2-1.47 with:

2-1.47 Bid Relief The Department may grant bid relief under Public Contract Code Sections 5100 et seq. Submit any request for bid relief to DPAC. The Relief of Bid Request form is available at the Department's website.

3 Contract Award and Execution Add the following to Section 3-1.02A:

For a unit price-based bid, submit the bid with a unit price and the item total (the product of the unit price and the quantity) for each item and a total price (the sum of the item totals) in the spaces provided on the Bid Item List. Prices submitted on the Bid Item List are the basis of comparison of bids except:

1. If a discrepancy between the unit price and the item total exists, the unit price prevails except:

1.1. If the unit price is illegible, omitted, or the same as the item total, item total prevails, and the unit price is the quotient of the item total and the quantity.

1.2. If a decimal error is apparent in the product of the unit price and the quantity, the Department will use either the unit price or item total based on the closest by percentage to the unit price or item total in the Department's Final Estimate.

2. If the unit price and the item total are illegible or are omitted, the bid may be determined nonresponsive.

3. Bids on lump sum items are item totals. If a unit price for a lump sum item is entered and it differs from the item total, the item total prevails.

4. Entries are to be expressed in dollars or decimal fractions of a dollar. Symbols such as commas and dollar signs are ignored and have no significance in establishing unit price or item total.

5. Unit prices and item totals are interpreted by the number of digits and decimal placement. Do not round item totals or the total bid.

Replace Section 3-1.04 with:

3-1.04 Contract Award If the Department awards the contract, the award is made to the lowest responsible bidder within 30 days after bid opening.

Replace Section 3-1.09 with:

3-1.09 Contract Bonds Section 3-1.05 does not apply.

If the total bid exceeds $25,000, the successful bidder must furnish a payment bond to secure the claim payments of laborers, workers, mechanics, or materialmen providing goods, labor, or services under the Contract. This bond must be equal to at least 100 percent (100%) of the total bid (Pub. Cont. Code Section 7103).

A performance bond is not required.

Replace Section 3-1.11 with:

3-1.11 Payee Data Record Complete and sign the Payee Data Record form included in the contract documents.

Replace Section 3-1.18 with:

3-1.18 Contract Execution The successful bidder must sign the Standard Agreement form to execute the contract.

The bidder's security may be forfeited for failure to execute the contract within the time required.

Add to Section 3:

3-1.20 Budget Disclaimer If sufficient program funds are not allocated to complete this contract as awarded, the contract may be amended to reflect any reduction in funds or be terminated.

4 Scope of Work

Delete Section 4-1.07C.

Delete Section 4-1.07D.

5 Control of Work

5-1.13D(2) Commercially Useful Function SBEs must perform a commercially useful function under 2 CA Code Regs § 1896.15 when performing tasks listed on the Certified Small Business Listing for the Non-Small Business Preference form and as a Department authorized substitute SBE. The SBE’s value of work will only count toward the non-small business preference if the SBE performs a commercially useful function under 2 CA Code Regs § 1896.15.

Provide written notification to the Engineer at least 15 days in advance of each SBE’s initial performance of work on the Contract. Include the SBE’s name, contract work to be performed, and the location, date, and time of where the SBE’s work will take place.

Monitor each SBE’s performance of a commercially useful function throughout their duration of work on the Contract. Maintain supporting documentation of commercially useful function related records.

Provide copies of the following to the Department within 5 business days of a specific SBE request:

1. Subcontract or agreement with the SBE

2. Purchase orders

3. Bills of lading

4. Invoices

5. Proof of payment

You and your SBEs must submit any commercially useful function related records and documents within 5 business days of Department request such as:

1. Proof of ownership or lease and rental agreements for equipment

2. Tax records

3. Employee rosters

4. Certified payroll records

5. Inventory rosters

Notify the Engineer immediately if you believe an SBE may not be performing a commercially useful function.

Failure to submit requested records and documents, or failure of an SBE to perform a commercially useful function, will be a violation of these specifications. Such violations will result in referral to the Department of General Services, and you may be subject to sanctions under Govt Code § 14842 et seq.

5-1.13D(3) Substitutions Substitution of an SBE may be requested for the reasons listed in Pub Cont Code § 4107. The Department will consider your SBE substitution request under 2 CA Code Regs § 1896.10. The substitute must be another SBE.

The requirement that an SBE be certified by the bid opening date does not apply to SBE substitutions after contract award.

Include in your substitution request:

1. Copy of the written notice issued to the SBE with proof of delivery

2. Copy of the SBE response to the notice

3. Your explanation of the reason for the substitution request

4. Names and certification numbers of the listed SBE and the proposed substitute SBE

5. Description of the work to be performed including dollar amount or percentage of overall contract the proposed substitute SBE will perform

6. If an SBE substitution cannot occur, written justification and the steps that were taken to try to acquire a new SBE and how that non-small business preference portion of the Contract will be fulfilled

Upon receipt of the substitution request, the listed SBE will be notified by the Department of the substitution request. The listed SBE will have 5 business days to respond. Where the listed SBE objects to the substitution, the Department will schedule a hearing.

If the Department authorizes your SBE substitution request, it will do so in writing.

Work performed by a firm other than the listed SBE or authorized substitute will be a violation of these specifications. Such violations will result in notification of the Department of General Services, and you may be subject to sanctions under Govt Code § 14842 et seq.

Replace section 5-1.13E with:

5-1.13E Prompt Payment Section 5-1.13E applies to all contracts.

Pay your subcontractors within 7 days of receipt of each progress payment under Pub Cont Code §§ 10262 and 10262.5. Pay duly authorized motor carriers of property in dump trucks for transportation charges under Bus & Prof Code § 7108.6. Pay other entities, such as material suppliers, within 30 days of receipt of each progress payment.

Each month, after the 15th and prior to 20th, submit the following payment information through the Department’s prompt payment monitoring system at https://caltrans.dbesystem.com:

1. Subcontractor’s or entity’s business name

2. Description of work performed

2.1. Bid item numbers or change order numbers

2.2. Written narrative of work performed

3. Value of work performed

4. Amount paid to subcontractor or entity

5. Withhold amount, if applicable

6. Explanation of withhold reasoning, if applicable

Your subcontractors and other entities may validate payments received using the prompt payment monitoring system.

If a subcontractor’s or other entity’s work is in dispute, provide a written withhold notification to the subcontractor or entity and the Engineer no later than 7 days after receipt of the corresponding progress payment that includes the following:

1. Value of the disputed work

2. Amount of the withhold being taken

3. Bid item numbers or change order numbers associated with the disputed work

4. Explanation of the deficiencies of the disputed work and how the corresponding value was calculated

5. Corrective actions to be taken for release of withheld amount

The Department may request additional documentation from you to evaluate whether you applied the withhold in good faith. Submit requested documents within 10 days of receipt of request.

The Department may withhold the same amount of your withhold from a future progress pay estimate if the Department determines any of the following has occurred:

1. Withhold was not applied in good faith

2. Requested additional withhold documentation records were not provided

3. Payment information was not submitted through the prompt payment monitoring system

4. Required withhold notification was not provided

The Department may also apply a 2 percent penalty on the withhold amount for every month payment is not made.

5-1.13F(2) Commercially Useful Function SBEs must perform a commercially useful function under 2 CA Code Regs § 1896.15 when performing tasks listed on the Small Business Enterprise – Commitment form and as a Department authorized substitute SBE. The SBE’s value of work will only count toward the SBE participation goal requirement if the SBE performs a commercially useful function under 2 CA Code Regs § 1896.15.

Provide written notification to the Engineer at least 15 days in advance of each SBE’s initial performance of work on the Contract. Include the SBE’s name, contract work to be performed, and the location, date, and time of where the SBE’s work will take place.

Monitor each SBE’s performance of a commercially useful function throughout their duration of work on the Contract. Maintain supporting documentation of commercially useful function related records.

Provide copies of the following to the Department within 5 business days of a specific SBE request:

1. Subcontract or agreement with the SBE

2. Purchase orders

3. Bills of lading

4. Invoices

5. Proof of payment

You and your SBEs must submit any commercially useful function related records and documents within 5 business days of Department request such as:

1. Proof of ownership or lease and rental agreements for equipment

2. Tax records

3. Employee rosters

4. Certified payroll records

5. Inventory rosters

Notify the Engineer immediately if you believe an SBE may not be performing a commercially useful function.

Failure to submit requested records and documents, or failure of an SBE to perform a commercially useful function, will be a violation of these specifications. Such violations will result in referral to the Department of General Services, and you may be subject to sanctions under Govt Code § 14842 et seq.

5-1.13F(3) Substitutions Substitution of an SBE may be requested for the reasons listed in Pub Cont Code § 4107. The Department will consider your SBE substitution request under 2 CA Code Regs § 1896.10. The substitute must be another SBE.

The requirement that an SBE be certified by the bid opening date does not apply to SBE substitutions after contract award.

Include in your substitution request:

1. Copy of the written notice issued to the SBE with proof of delivery

2. Copy of the SBE response to the notice

3. Your explanation of the reason for the substitution request

4. Names and certification numbers of the listed SBE and the proposed substitute SBE

5. Description of the work to be performed including dollar amount or percentage of overall contract the proposed substitute SBE will perform

6. If an SBE substitution cannot occur, written justification and the steps that were taken to try to acquire a new SBE and how that SBE participation goal requirement portion of the Contract will be fulfilled

Upon receipt of the substitution request, the listed SBE will be notified by the Department of the substitution request. The listed SBE will have 5 business days to respond. Where the listed SBE objects to the substitution, the Department will schedule a hearing.

If the Department authorizes your SBE substitution request, it will do so in writing.

Work performed by a firm other than the listed SBE or authorized substitute will be a violation of these specifications. Such violations will result in notification of the Department of General Services, and you may be subject to sanctions under Govt Code § 14842 et seq.

Add to the end of section 5-1.20A:

During the progress of the work under this Contract, work under the following contracts may be in progress at or near the job site of this Contract:

Coincident or Adjacent Contracts Contract no. County–Route–Post

Mile Location Type of work

02-0J390 SHA-273-16.50 to 16.80

California Street, Downtown Redding

California Street Bikeway

02-1K280 SHA-273-17.390 SR 299 and Quartz Hill Rd

Census and EMS Upgrade

Coordinate lane closures and traffic handling with the Engineer and with contractors of coincident or adjacent projects. Potential conflicts may not be limited to the contracts listed above.

Replace section 5-1.36C(2) with:

5-1.36C(2) Nonhighway Facility Protection The utilities shown in the following table may interfere with the work and must be exposed or protected in place. Make arrangements with the utility owner (1) to conduct or witness all exposures or (2) to request temporary deactivation of the utility.

Utilities to Be Exposed and/or Protected in Place During Construction Utility Location

PG&E gas Northwest corner of Pine St. and Lincoln St.

REU OH Electrical West side of Pine St.

Add between the 2nd and 3rd paragraphs of section 5-1.36C(3):

Installation of the utilities shown in the following table requires coordination with your activities. Make the necessary arrangements with the utility company through the Engineer and submit a schedule:

1. Verified by a representative of the utility company

2. Allowing at least the time shown for the utility owner to complete its work

Utility Relocation and Contractor-Arranged Time for the Relocation Utility Utility address Location Working days

PG&E Gas valve cover

PG&E

2730 Gateway Oaks Sacramento, CA 95833 916-936-7806 Attention: Jocker Alejandro

Northwest corner of Pine St. and Lincoln St

Add to Section 5-1.38:

The Engineer will only consider a request for relief of maintenance and protection responsibility if the Engineer has suspended the work under Section 8-1.06.

Replace Section 5-1.42 with:

5-1.42 Requests For Information (RFI) Submit an RFI upon recognition of any event or question of fact arising under the Contract.

The Engineer responds to the RFI within three (3) days. Proceed with the work unless otherwise ordered. You may protest the Engineer's response by:

1. Submitting a potential claim record, using the Supplemental Potential Claim Record form, within three (3) days after receiving the Engineer's response

2. Complying with Section 5-1.43

Replace Section 5-1.43 with:

5-1.43 Potential Claims and Dispute Resolution 5-1.43A General Minimize and mitigate impacts of potentially claimed work or event.

For each potential claim, assign an identification number determined by chronological sequencing and the first date of the potential claim.

Use the identification number for each potential claim on the Supplemental Potential Claim Record form.

Failure to comply with this procedure is a waiver of the…

This is the start of the file's text. The full file is on GovTribe.