This is a Geotechnical Design Report prepared by the California Department of Transportation (Caltrans) Office of Geotechnical Design South for a project located at the intersection of State Route 39 (Beach Boulevard) and Terry Drive in Huntington Beach, Orange County. The project involves replacing four signal and lighting poles and installing ADA curb ramps, with specific details including cast-in-drilled-hole (CIDH) foundations for each pole. The report is dated October 18, 2024, and covers geotechnical design recommendations for the signal and lighting pole structures, with a focus on subsurface conditions, soil properties, and foundation design considerations.

The project site is located in an area with Quaternary alluvial valley deposits, characterized by slightly to moderately consolidated silt, sand, and gravel. Geotechnical investigations included site reconnaissance, review of boring records, and analysis of groundwater data. Key findings indicate groundwater levels around 14 feet below ground surface, predominantly fine-grained soils, and a low liquefaction potential. The report recommends standard plan foundations with 2.5-foot diameter, 7.5-foot long CIDH piles for each signal and lighting pole location. The investigation also noted the site is within a mapped liquefaction seismic hazard zone, though the specific structure type (signal and lighting poles) typically does not require extensive liquefaction mitigation.

View the file

Other files

File Type Posted
D._Bid_Proposal_SheetsF.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Solicitation No. 12A2276

The following is the Table of Contents for the Small Business Minor B Package documents:

Table of Contents 1 Page

Invitation for Price Quote–Cover Letter 1 Page

General Bidders Instructions/Checklist 2 Pages

Proposed Form of Agreement, STD 213 2 Pages

Information Handout 170 Pages

Specifications 22 Pages

Link to the 2024 Edition of the Standard Specifications Page 23

The Bid Package contains 7 Project Plans for this project.

CALIFORNIA STATE TRANSPORTATION AGENCY GAVIN NEWSOM, GOVERNOR

California Department of Transportation

ADMINISTRATION

DIVISION OF PROCUREMENT AND CONTRACTS

1727 30th STREET, MS 65

SACRAMENTO, CA 95816-7006

PHONE (916) 227-6000

TTY 711

https://dot.ca.gov/programs/procurement-and-contracts/

Invitation for Price Quote (IFPQ)

Contract No. 12A2276 Quote Due Date: April 23, 2025

Prospective Contractors:

California Department of Transportation (Caltrans/Department) has issued the enclosed Invitation for Price Quote (IFPQ) for services described in the enclosed proposed contract.

Please read the entire contract package and all attachments carefully. If you desire to submit a quote, complete the Price Quote sheet and email it to the Analyst listed in the IFPQ. Your signature affixed to and dated on the quote proposal shall constitute a certification under penalty of perjury, unless exempted, that you have complied with the nondiscrimination program requirements of Government Code Section 12990 and Title 2, California Code of Regulations, Section 11102, and the nondiscrimination program requirements of Title VI of the Civil Rights Act of 1964, 49 Code of Federal Regulations (CFR) Part 21, and 23 CFR Part 200.

Award of this contract will be to the lowest responsible contractor whose quote complies with all requirements as described in this IFPQ.

If your bid is more than $461,000.00, it will be rejected per Public Contract Code Section 10105(b).

Contractor must be a Certified Small Business at the time of the quote date.

Invitation for Price Quote https://dot.ca.gov/programs/procurement-and-contracts/

“Provide a safe and reliable transportation network that services all people and respects the environment.”

CALIFORNIA STATE TRANSPORTATION AGENCY GAVIN NEWSOM, GOVERNOR

California Department of Transportation

ADMINISTRATION

DIVISION OF PROCUREMENT AND CONTRACTS

1727 30th Street, MS 65

SACRAMENTO, CA 95816-7006

PHONE (916) 227-6000

TTY 711

General Contractors Instructions/Checklist

Solicitation No. 12A2276

A complete bid or bid package will consist of the items identified below.

Complete this checklist to confirm the items in your bid package. Place a check mark or “X” next to each item that you are submitting to Caltrans. All attachments identified below (unless noted otherwise) are required and must be attached in your Bid Package submittal (links to documents are not acceptable), or your bid may be considered non-responsive. It is the prospective contractor’s responsibility to confirm receipt of their bid before the time the bid is due. Omission of documents or bids lost during transmission will be deemed non-responsive.

Return this checklist with your bid package.

Quotes omitting this information may be regarded as non-responsive and rejected.

Do not submit company advertisements, brochures, informational pamphlets, or any other document unless specifically noted in the IFPQ Requirements and/or as listed below.

Price Quote Proposal for Unit Items (ADM-1509). Complete and sign the Price Quote Proposal for Unit Item Sheet(s).

Subcontractor List (DES-OE-0102.2.C) can be downloaded at https://forms.dot.ca.gov/v2Forms/servlet/FormRenderer?frmid=DESOE0102.2C. List all subcontractors, including DVBEs, as applicable to the requirements of this solicitation.

Contract Requirements (ADM-0378) must be downloaded at https://forms.dot.ca.gov/v2Forms/servlet/FormRenderer?frmid=DOTADM0378

Small Business Status (DOT DES-OE-0102.4) can be downloaded at https://forms.dot.ca.gov/v2Forms/servlet/showForm2?frmid=DOTDESOE0102.4.

California Company Preference (DES-OE-0102.9) can be downloaded at https://forms.dot.ca.gov/v2Forms/servlet/FormRenderer?frmid=DESOE0102.9.

Certified DVBE Summary (DOT ADM-4015) can be downloaded at https://forms.dot.ca.gov/v2Forms/servlet/showForm2?frmid=DOTADM4015.

Contractor Certification Clauses (CCC 04/2017) can be downloaded at https://www.dgs.ca.gov/OLS/Resources/Page-Content/Office-of-Legal-Services-Resources-List- Folder/Standard-Contract-Language.

California Civil Rights Laws Certification (DOT ADM-0076) must be downloaded at https://forms.dot.ca.gov/v2Forms/servlet/FormRenderer?frmid=DOTADM0076.

Darfur Contracting Act Certification (DOT ADM-0077) must be downloaded at https://forms.dot.ca.gov/v2Forms/servlet/FormRenderer?frmid=DOTADM0077.

DOT DES-OE-0102.14 In-Use Off-Road Diesel-Fueled Vehicle List can be downloaded at https://forms.dot.ca.gov/v2Forms/servlet/showForm2?frmid=DOTDESOE010214.

https://forms.dot.ca.gov/v2Forms/servlet/FormRenderer?frmid=DESOE0102.2C https://forms.dot.ca.gov/v2Forms/servlet/FormRenderer?frmid=DOTADM0378 https://forms.dot.ca.gov/v2Forms/servlet/showForm2?frmid=DOTDESOE0102.4 https://forms.dot.ca.gov/v2Forms/servlet/FormRenderer?frmid=DESOE0102.9 https://forms.dot.ca.gov/v2Forms/servlet/showForm2?frmid=DOTADM4015 http://www.dgs.ca.gov/ols/Resources/StandardContractLanguage.aspx https://www.dgs.ca.gov/OLS/Resources/Page-Content/Office-of-Legal-Services-Resources-List-Folder/Standard-Contract-Language https://www.dgs.ca.gov/OLS/Resources/Page-Content/Office-of-Legal-Services-Resources-List-Folder/Standard-Contract-Language https://forms.dot.ca.gov/v2Forms/servlet/FormRenderer?frmid=DOTADM0076 https://forms.dot.ca.gov/v2Forms/servlet/FormRenderer?frmid=DOTADM0077 https://forms.dot.ca.gov/v2Forms/servlet/showForm2?frmid=DOTDESOE010214

“Provide a safe and reliable transportation network that services all people and respects the environment.”

The following forms and information will be required at the time of contract award and signature.

Payment Bond (ADM-2009) must be downloaded at https://forms.dot.ca.gov/v2Forms/servlet/FormRenderer?frmid=DOTADM2009

Certificate(s) of Insurance

Postconsumer-Content Certification (CalRecycle 74) can be downloaded at https://www.google.com/url?client=internal-element-cse&cx=017557373779849962485:erv3s56gka0&q=https://www2.calrecycle.ca.gov/Docs/Web/1114 80&sa=U&ved=2ahUKEwiK0-qnvd6IAxWPKkQIHcH3HiIQFnoECAcQAQ&usg=AOvVaw37dYPswR47anIRTKPDAvXb.

Payee Data Record (STD 204) can be downloaded at https://www.documents.dgs.ca.gov/dgs/fmc/pdf/std204.pdf. This form is designed to allow vendors to self-report information needed for accurate and complete reporting of vendor payment income.

Completion of this form is required by all vendors providing goods and/or services to the State of California.

Contract Will Not Be Executed Without These Documents.

https://forms.dot.ca.gov/v2Forms/servlet/FormRenderer?frmid=DOTADM2009 https://www.google.com/url?client=internal-element-cse&cx=017557373779849962485:erv3s56gka0&q=https://www2.calrecycle.ca.gov/Docs/Web/111480&sa=U&ved=2ahUKEwiK0-qnvd6IAxWPKkQIHcH3HiIQFnoECAcQAQ&usg=AOvVaw37dYPswR47anIRTKPDAvXb https://www.google.com/url?client=internal-element-cse&cx=017557373779849962485:erv3s56gka0&q=https://www2.calrecycle.ca.gov/Docs/Web/111480&sa=U&ved=2ahUKEwiK0-qnvd6IAxWPKkQIHcH3HiIQFnoECAcQAQ&usg=AOvVaw37dYPswR47anIRTKPDAvXb https://www.google.com/url?client=internal-element-cse&cx=017557373779849962485:erv3s56gka0&q=https://www2.calrecycle.ca.gov/Docs/Web/111480&sa=U&ved=2ahUKEwiK0-qnvd6IAxWPKkQIHcH3HiIQFnoECAcQAQ&usg=AOvVaw37dYPswR47anIRTKPDAvXb https://www.google.com/url?client=internal-element-cse&cx=017557373779849962485:erv3s56gka0&q=https://www2.calrecycle.ca.gov/Docs/Web/111480&sa=U&ved=2ahUKEwiK0-qnvd6IAxWPKkQIHcH3HiIQFnoECAcQAQ&usg=AOvVaw37dYPswR47anIRTKPDAvXb https://www.documents.dgs.ca.gov/dgs/fmc/pdf/std204.pdf

PROPOSED FORM OF AGREEMENT

DO NOT COMPLETE

Continued on the following sheets, each bearing the Agreement/Contract number.

The provisions on the following pages hereof constitute a part of the Agreement

TBD

12A2276

1. Contractor agrees to indemnify, defend, and save harmless the State, its officers, agents, and employees from any and all claims and losses accruing or resulting to any and all contractors, subcontractors, materialmen, laborers and any other person, firm or corporation furnishing or supplying work services, materials or supplies in connection with the performance of this contract, and from any and all claims and losses accruing or resulting to any person, firm or corporation who may be injured or damaged by Contractor in the performance of this contract.

2. Contractor, and the agents and employees of Contractor, in the performance of the Agreement, shall act in an independent capacity and not as officers or employees or agents of State of California.

3. The State may terminate this agreement and be relieved of the payment of any consideration to Contractor should Contractor fail to perform the covenants herein contained at the time and in the manner herein provided. In the event of such termination the State may proceed with the work in any manner deemed proper by the State. The cost to the State shall be deducted from any sum due Contractor under this agreement, and the balance, if any, shall be paid Contractor upon demand.

4. Without the written consent of the State, this Agreement is not assignable by Contractor either in whole or in part.

5. Time is of the essence in this Agreement.

6. No alteration or variation of the terms of this contract shall be valid unless made in writing and signed by the parties hereto, and no oral understanding or agreement not incorporated herein, shall be binding on any of the parties hereto.

7. The consideration to be paid Contractor, as provided herein, shall be in compensation for all of Contractor’s expenses incurred in the performance hereof, including travel and per diem, unless otherwise expressly so provided.

State of California California State Transportation Agency

DEPARTMENT OF TRANSPORTATION

M e m o r a n d u m To: SAIED MEHRANFARD Date: October 18, 2024

Design Branch H District 12

File: 12-ORA-39-PM4.9

EA: 12-0V320

Attn: Biyao Lu EFIS: 1224000118 Signal and Lighting Poles

From: GEOTECHNICAL SERVICES Office of Geotechnical Design South

Branch C

Subject: GEOTECHNICAL DESIGN REPORT FOR SIGNAL AND LIGHTING POLES ON STATE ROUTE

39 (BEACH BOULEVARD) AT TERRY DRIVE

INTRODUCTION

Pursuant to the request dated August 20, 2024, the Office of Geotechnical Design South (OGDS), Branch C, has prepared this Geotechnical Design Report (GDR) for the project along State Route 39 (SR-39; also known as Beach Boulevard) at the Terry Drive Intersection (PM 4.9) in the city of Huntington Beach. The purpose of this GDR is to summarize the investigations performed and to provide foundation recommendations for the replacement of electrical signal and lighting poles. The recommendations provided in this report are based on the Layout sheet dated July 17, 2024, review of boring information from GeoTracker, review of Caltrans boring records, and a site reconnaissance performed on September 17, 2024.

Project Description

This project proposes to replace four signal and lighting poles and install ADA curb ramps at the intersection of SR-39 and Terry Drive in the city of Huntington Beach in Orange County. The Vicinity Map and Site Map are shown in Appendix 1. Details for the signal and lighting poles and the associated cast-in-drilled-hole (CIDH) foundations are presented in Table 1.

Unless otherwise noted, all elevations in this report are referenced to the North American Vertical Datum of 1988 (NAVD88). To convert as-built information from NGVD29 to NAVD88, add 2.2 feet to the NGVD29 elevation.

Information Handout Information Handout; Contract No. 12A2276; Page 1 of 170

SAIED MEHRANFARD Geotechnical Design Report October 18, 2024 Signal and Lighting Poles Page 2 EA: 12-0V320 / EFIS: 1224000118

Table 1 – Signal and Lighting Poles

Structure

ID1

Signal and

Lighting Pole Type

Standard Plan

Sheet Number

Approx.

Station and Offset (ft)2

Approx.

Northing/

Easting (US survey ft)3

Top of Pile Elevation

(ft)4

Surface Condition

CIDH

Diameter

(ft)

CIDH

Length

(ft)

SLP 01 15TS ES-7A

257+22 54 Rt.

2209751.581/ 6032752.450

26.3 Level 2.5 7.5

SLP 02 15TS ES-7A

257+38 87 Lt.

2209822.529/ 6032775.531

27.2 Level 2.5 7.5

SLP 03 15TS ES-7A

258+01 72 Rt.

2209731.369/ 6032895.053

27.0 Level 2.5 7.5

SLP 04 15TS ES-7A

258+09 66 Lt.

2209811.833/ 6032914.947

25.8 Level 2.5 7.5

1 SLP = signal and lighting pole.

2 Stationing and offsets estimated per “A” line, SR-39 according to Layout sheet dated July 17, 2024.

3 Estimated from locations shown on Layout sheet dated July 17, 2024.

4 Estimated using 2018 USGS elevation data.

GEOTECHNICAL INVESTIGATION

Subsurface Exploration

The geotechnical investigation included a site reconnaissance conducted on September 17, 2024, as well as review of Caltrans and GeoTracker boring records, geologic maps, and historical groundwater data. Due to utility, right of way, and site constraints, no geotechnical drilling and sampling could be completed near the signal and lighting pole locations.

Geotracker boring records and Caltrans boring records from a nearby past project along SR-39 were taken into consideration in our analyses. The boring records referenced for the analyses are included in Appendix 2 and are summarized in Table 2.

Table 2 – Pertinent Boring Records

Project Borehole

ID(s) Date

Completed Station

Line Approx.

Station1

Approx.

Offset1

(ft)

Ground Surface

Elevation (ft)

Total Depth (ft bgs)

Geotracker - ARCO #1887 (Global ID T0605900790)

BC-3

MW-10R

MW-21

10/15/1996 4/24/2002 11/9/2009

“A” Line, SR-39

256+96 256+92 257+35

124 Lt.

63 Rt.

71 Rt.

26.42 26.42 26.42

25.5

Geotracker - SHELL OIL (Global ID T0605980648)

MW-10

MW-11

MW-15

MW-16

MW-20

8/17/2005 8/17/2005 2/22/2008 5/19/2009 7/19/2010

“A” Line, SR-39

258+15 258+16 257+87 258+40 258+47

146 Rt.

121 Rt.

138 Rt.

166 Rt.

101 Rt.

25.6 25.8 23.4 26.5 25.8

Information Handout; Contract No. 12A2276; Page 2 of 170

Page 3 EA: 12-0V320 / EFIS: 1224000118

Project Borehole

ID(s) Date

Completed Station

Line Approx.

Station1

Approx.

Offset1

(ft)

Ground Surface

Elevation (ft)

Total Depth (ft bgs)

GDR for Proposed Signal Upgrades on SR-39

(EA 12-0P010)

R-17-001 7/11/2017 N/A3 N/A3 N/A3 26.3 51.5

1 Stationing/offsets estimated by overlaying boring locations over “A” line, SR-39 in Layout sheet dated 07/17/2024.

2 Estimated using 2018 USGS elevation data.

3 Boring record for 12-0P010 GDR was located approximately 0.25 miles away from project site and was used to validate subsurface conditions.

Laboratory Testing

No subsurface soil samples were obtained from the field exploration due to utility, site, and right of way constraints. Therefore, no testing was performed to determine the corrosivity of the project locations.

GEOTECHNICAL CONDITIONS

Geology

The two referenced geologic maps indicate that the signal and lighting poles will be constructed in an area mapped as Quaternary alluvial valley deposits (specifically young axial-channel deposits, Qya). The unit is generally described as having slightly to moderately consolidated silt, sand, and gravel deposits with varying amounts of cobbles and boulders in areas closer to mountainous terrain. The geologic map of the project area is presented in Appendix 1.

Surface Conditions

All pole structures are located at the intersection of SR-39 and Terry Drive in an urban developed area of Huntington Beach approximately 3.5 miles northeast of the Pacific Ocean coastline. SR-39 within the project limits is generally at native grade.

All structure locations are located on relatively flat terrain dominated by the SR-39 roadway and other paved areas such as sidewalks and parking lots. Roadway stormwater in the vicinity of the project site appears to be drained mainly by sheet flow to the roadway curbs and to an underground drainage system.

Subsurface Conditions

Subsurface conditions anticipated during construction of the structures are presented in Table 3 below. This information is based on the referenced GeoTracker and Caltrans boring records.

Information Handout; Contract No. 12A2276; Page 3 of 170

Page 4 EA: 12-0V320 / EFIS: 1224000118

Table 3 – Subsurface Conditions

Nearby Structure(s)1 Approximate Elevations

(ft) Subsurface Conditions Referenced Boring Record(s)

SLP 01

SLP 02

SLP 03

SLP 04

27-10 Approximately stiff silts and clays in varying amounts, and with varying amounts of sand.

Geotracker - ARCO #1887 (Global ID T0605900790)

Geotracker - SHELL OIL (Global ID T0605980648)

GDR for Proposed Signal

Upgrades on SR-39

(EA 12-0P010)2

10-0 Stiff clays with varying amounts of accompanying silt and sand, silts, silty sands, and sandy silts

1 SLP = signal and lighting pole.

2 Boring record for 12-0P010 GDR was located approximately 0.25 miles away from project site and was used to validate subsurface conditions.

Groundwater

Caltrans and GeoTracker records were reviewed for relevant groundwater data near the project site to determine an appropriate design groundwater elevation.

Wells for the former ARCO #1887 GeoTracker site located approximately 200 feet southeast of the project site indicated a high groundwater elevation of 13.76 feet in September 2023. Similarly, wells for the former SHELL OIL GeoTracker site located approximately 100 feet northeast of the project site indicated a high groundwater elevation of 13.91 feet in November 2013.

Considering the available boring records and public groundwater data, a groundwater elevation of 14 feet can be used for design for the signal and lighting poles. Based on this information, the groundwater level is several feet below the CIDH pile tips. However, it should be noted that groundwater levels may fluctuate several feet based on storm events and other factors. Due to this uncertainty, there is a possibility that CIDH piles may encounter groundwater at the bottom of the drilled hole. A summary of the groundwater data used for this GDR is presented in Table 4.

Table 4 – Groundwater Data

Nearby Structure

Project/Reference Borehole or Well ID

Date Measured

Ground Surface

Elevation (ft)

Depth to Groundwater

(ft)

Groundwater Elevation

(ft)

SLP 01

SLP 02

SLP 03

SLP 04

Geotracker - ARCO #1887 (Global ID T0605900790)

MW-6 9/8/2023 23.71 9.95 13.76

Geotracker - SHELL OIL (Global ID T0605980648)

MW-20 11/13/2013 25.80 11.89 13.91

Information Handout; Contract No. 12A2276; Page 4 of 170

Page 5 EA: 12-0V320 / EFIS: 1224000118

SEISMIC HAZARDS

Fault Rupture

The project site is not located within an Alquist-Priolo Earthquake Fault Zone (EFZ) as established by the California Geologic Survey, nor is it located within 1,000 feet from any documented Holocene or younger aged faults. Therefore, per MTD 20-10, this project site is not considered susceptible to surface fault rupture hazard.

Liquefaction

The project site is located within a mapped California Geological Survey liquefaction seismic hazard zone and is generally considered susceptible to liquefaction during a seismic event. However, due to the presence of predominantly fine-grained soils at the project site, liquefaction potential for the CIDH foundations is considered low. During a seismic event, liquefaction will likely not occur along the length of the CIDH foundations, and therefore will not significantly affect the CIDH foundation capacity.

Liquefaction analysis is typically not warranted for signal and lighting poles since they are considered minor structures. If liquefaction resistant recommendations and liquefaction mitigations are required, a request for liquefaction analysis should be submitted to OGDS.

The liquefaction map of the project area is included in Appendix 1.

ANALYSIS AND DESIGN

Soil/ Rock Engineering Properties

Based on the geotechnical investigation, the strength parameters of the subsurface soils at the pole locations meet the required strength parameters for the CIDH pile foundation design. The geotechnical parameters utilized for this report are as follows:

Cohesionless Soil: Unit Weight, γ= 120 pcf, Friction angle, φ= 30° Cohesive Soil: Shear Strength, Su = 1500 psf

RECOMMENDATIONS

Standard plan foundations, including the CIDH foundation information presented in Table 1, are recommended for the construction of the signal and lighting poles.

Additionally, considering the lack of corrosion data at the project site and the soil types at the project site, it is recommended that the site be considered corrosive for the design of the CIDH foundations.

Based on historical groundwater information, the groundwater level is several feet below the CIDH pile tips. However, it should be noted that groundwater levels may fluctuate several feet based on numerous factors. Due to this uncertainty, construction at this site should be prepared for the possibility of groundwater in the drilled hole.

Information Handout; Contract No. 12A2276; Page 5 of 170

Page 6 EA: 12-0V320 / EFIS: 1224000118

REFERENCES

The following documents and data were used for the preparation of this report:

1. OCM Partners, 2023, 2018 USGS Lidar: Southern CA Wildfires, United States Geological

Survey, https://www.fisheries.noaa.gov/inport/item/58709.

2. Morton, D.M. and Miller, F.K., 2006, Geologic map of the San Bernardino and Santa Ana 30’ x 60’ quadrangles, California, United States Geological Survey, Open-File Report OF-2006- 1217, 1:100,000.

3. Bedrosian, T.L., Roffers, P., Hayhurst, C.A., Lancaster, J.T., and Short, W.R., 2012, Geologic Compilation of Quaternary Surficial Deposits in Southern California, California Geological Survey, Special Report 217, 1:100,000.

4. California Geological Survey, Earthquake Zones of Required Investigation Web Map, https://maps.conservation.ca.gov/cgs/EQZApp/app/.

Information Handout; Contract No. 12A2276; Page 6 of 170

Page 7 EA: 12-0V320 / EFIS: 1224000118

Questions relating this report should be directed to Kevin Melgar at 909-595-7048 or Chris Corder at 916-817-7261.

KEVIN MELGAR, P.E. CHRISTOPHER CORDER, P.G.

Transportation Engineer – Civil Engineering Geologist Office of Geotechnical Design South Office of Geotechnical Design South

Appendices:

1. Figures

2. Boring Records c: Biyao Lu, Project Engineer, District 12 Khondokar Karim, Project Liaison Engineer, Division of Engineering Services Behdad Baseghi, Materials Branch Chief, District 12

Information Handout; Contract No. 12A2276; Page 7 of 170

Appendix 1:

Figures

Information Handout; Contract No. 12A2276; Page 8 of 170

ORANGE COUNTY

0 8 164 Miles

PROJECT

LOCATION

Appendix 1 Vicinity Map

EA: 12-0V320

EFIS: 1224000118

Signal and Lighting Poles Huntington Beach, CA

BASEMAP SOURCE: Esri World Topographic Map

§̈¦5

Pacific Ocean

¬«74

§̈¦15

§̈¦215

¬«91

§̈¦405

¬«57

Information Handout; Contract No. 12A2276; Page 9 of 170

SLP 03

SLP 01

SLP 04

SLP 02

"/ SIGNAL AND LIGHTING POLE

0 90 18045 Feet

Terry Drive

Appendix 1 Site Map

EA: 12-0V320

EFIS: 1224000118

Signal and Lighting Poles Huntington Beach, CA

IMAGERY SOURCE: Caltrans Hexagon Aerial Imagery

St ate

R ou te

(B ea ch B ou lev ar d)

Information Handout; Contract No. 12A2276; Page 10 of 170

Qyf

Qyf

Qyf

Qya

Qya

Qya

Qvof

Qya

Qsu

Qya

Qyf Qyf

Qsu QyfQyf

Qyf

Qsu

Qyf

Qya Qya

Qol

Qw QyfQsu

Qof Qya

Qyl

Qyf

Qyf

Qyf

Qb af af

Qyl

Qol

Qyl Ql

Qyl Qol

Qyl

Ql

Qyl

Qol

Qyl

Qol

CONTACT, LOCATION ACCURATE

OR APPROXIMATE

REFERENCE CONTACT, LOCATION

ACCURATE OR APPROXIMATE

WATER BOUNDARY

WATER BODY

af: ARTIFICIAL FILL Qsu: UNDIFFERENTIATED

SURFICIAL DEPOSITS

Qb: BEACH DEPOSITS Qw: ALLUVIAL WASH DEPOSITS

Ql, Qyl, or Qol: LACUSTRINE, PLAYA, AND ESTUARINE DEPOSITS

Qyf, Qof, OR Qvof: ALLUVIAL FAN

DEPOSITS

Qya: ALLUVIAL VALLEY DEPOSITS

0 4,000 8,0002,000 Feet

Appendix 1 Geologic Map

EA: 12-0V320

EFIS: 1224000118

Signal and Lighting Poles Huntington Beach, CA

§̈¦405

PROJECT

LOCATION

Pacific Ocean

GEOLOGIC MAP SOURCE: Geologic Compilation of Quaternary Surficial Deposits in Southern California, California Geological Survey Special Report 217, 2012.

Huntington Beach

Sa nta

An a R ive r

Information Handout; Contract No. 12A2276; Page 11 of 170

LIQUEFACTION ZONES

0 4,000 8,0002,000 Feet

Huntington Beach

Appendix 1 Liquefaction Map

EA: 12-0V320

EFIS: 1224000118

Signal and Lighting Poles Huntington Beach, CA

§̈¦405

PROJECT

LOCATION

Pacific Ocean

GEOLOGIC MAP SOURCE: Geologic Compilation of Quaternary Surficial Deposits in Southern California, California Geological Survey Special Report 217, 2012.

Sa nta

An a R ive r

Information Handout; Contract No. 12A2276; Page 12 of 170

Appendix 2:

Boring Records

Information Handout; Contract No. 12A2276; Page 13 of 170

Information Handout; Contract No. 12A2276; Page 14 of 170

Information Handout; Contract No. 12A2276; Page 15 of 170

Information Handout; Contract No. 12A2276; Page 16 of 170

Information Handout; Contract No. 12A2276; Page 17 of 170

Information Handout; Contract No. 12A2276; Page 18 of 170

Information Handout; Contract No. 12A2276; Page 19 of 170

Information Handout; Contract No. 12A2276; Page 20 of 170

Information Handout; Contract No. 12A2276; Page 21 of 170

3/4/4

5/5/8

4/5/6

5/5/8

6/7/10

9/10/12 well box encased in concrete bentonite grout seal from 2-5 feet bentonite chips from 5-8 feet blank 2 inch dia.

SCH 40 PVC from 0.5-10 feet

#2/12 sand filter pack from 8-31 feet screened (0.02 inch slots) 2 inch dia.

SCH 40 PVC from 10-30 feet

MW-20d5

MW-20d10

MW-20d15

MW-20d20

MW-20d25

MW-20d30 ml sp

ASPHALT, 6 inches.

SILT - very dark gray [5Y 4/1], medium stiff, moist;

becomes stiff at 10 feet;

trace sand at 15 feet;

becomes greenish gray [10Y 5/1] at 20 feet;

becomes yellowish brown [10YR 5/4] at 25 feet, very moist to saturated.

SAND - fine-grained, dark yellowish brown [10YR 4/4], medium dense, saturated.

Bottom at 31 feet.

DRILLING METHOD: Hollow-Stem Auger

DEPTH TO FIRST SATURATION: 25 feet

SURFACE ELEVATION: 26.3 feet msl (estimate)

TOP OF WELL CASING ELEVATION: 25.80 feet msl

BORING DIAMETER: 8 inches

LOGGED BY: M. Escobedo CHECKED BY: D. Henry

DRILLING COMPANY: Gregg Drilling and Testing, Inc. STATIC GW ELEVATION: N/A

TOTAL DEPTH: 31 feet

DATE: N/A

This log is a representation of subsurface conditions at the time and place of drilling. With the passage of time or at any other location, there may be consequential changes in conditions.

S am pl es Sample

I.D.

B lo w C ou nt s (p er in ch es

P

ID

/L E

L (p pm

G ra ph ic

Lo g

S oi l C la ss

Geologic Description

D E

P

TH

(fe et

Ti m e

Well Diagram

D E

P

TH

(fe et

1) PID Used:

LOCATION: 16732 Beach Blvd., Huntington Beach, CA

PROJECT NO.: 09.658

DATE BEGAN: 7/19/10

Remarks/Notes: Page

Log of Boring/Well MW-20

WAYNE PERRY, INC.

8281 Commonwealth Avenue Buena Park, California 90621

(714) 826-0352 www.wpinc.com

FINISHED: 7/19/10

PROJECT: Former Shell Service Station

Information Handout; Contract No. 12A2276; Page 22 of 170

S-1

S-2

S-3

S4

R-1

0.0-13' Corrosion

PA

PI

UW, M

SILTY SAND (SM); medium dense; light brown; moist;

fine SAND.

Loose, Thin SANDY SILT (ML), Interbeds, Soft, Brown, Moist, Fine sand. PP=0.45 tsf.

Wet.

SILT (ML); stiff; grayish brown; trace fine SAND ;

PP=1.5 tsf.

Fat CLAY (CH); stiff; gray; trace fine SAND ; PP=1.0 tsf.

DRILLING CONTRACTOR

Fugro

HAMMER EFFICIENCY, ERi

90.2%

SAMPLER TYPE(S) AND SIZE(S) (ID)

Shelby (2.87"), SPT (1.4")

TOTAL DEPTH OF BORING

51.5 ft

BOREHOLE DIAMETER

4 in

AFTER DRILLING (DATE)DURING DRILLING

14.7 ft

SURFACE ELEVATION

~26.3 ft

DRILLING METHOD

Rotary Wash

DRILL RIG

CME 75

SPT HAMMER TYPE

Auto

BOREHOLE BACKFILL AND COMPLETION

Borehole Grouted per permit #17-06-24

GROUNDWATER

READINGS

BEGIN DATE

7-10-17

COMPLETION DATE

7-11-17

LOGGED BY

Jason Hogendorn BOREHOLE LOCATION (Lat/Long or North/East and Datum)

33° 43' 23.736" / -117° 59' 20.58"

HOLE ID

R-17-001 BOREHOLE LOCATION (Offset, Station, Line)

(continued)

SHEET

R Q

D

S am pl e

N um be r

M oi st ur e C on te nt

Remarks

B lo w s pe r in

E

LE

V A

T

IO

N ft)

24.32

22.32

20.32

18.32

16.32

14.32

12.32

10.32

8.32

6.32

4.32

2.32

D E

P T

H ft)

D ry

U ni t W ei gh t

(p cf

S am pl e

Lo ca tio n

DESCRIPTION

R ec ov er y

D ril lin g

M et ho d

C as in g

D ep th

PREPARED BY

David Williams

PROJECT OR BRIDGE NAME

Traffic Signal Update

BRIDGE NUMBER

Department of Transportation

Division of Engineering Services

Geotechnical Services

Office of Geotechnical Design - South

REPORT TITLE

BORING RECORD

DIST.

B lo w s pe r fo ot

S he ar S tr en gt h

(t sf

COUNTY

ORA

ROUTE

POSTMILE

5.1/8.1

DATE

7-19-17

M at er ia l G ra p hi cs

PROJECT ID

1215000022

HOLE ID

R-17-001

B

R

S T

A N

D A

R D

R T

E

9.

G

P J

C A

LT

R

A N

S L

IB

R

A R

Y

F E

B

7)

.G

LB

/2

3/

Information Handout; Contract No. 12A2276; Page 23 of 170

S-5

S-6

S-7

S-8

S-9 s-10

PI

Fat CLAY (CH) (continued).

PP=1.0 tsf.

PP=1.0 tsf.

Thin SANDY SILT (ML) Interbeds medium stiff PP=0.5 tsf.

SILTY SAND (SM); dense; gray; fine - medium SAND.

SILT (ML); stiff; gray; trace fine SAND ; PP=1.5 tsf.

Bottom of borehole at 51.5 ft bgs

Borehole terminated at the planned depth.

This Boring Record was developed in accordance with the Caltrans Soil & Rock Logging, Classification, and Presentation Manual (2010) except as noted on the Soil or Rock Legend or below.

SHEET

R Q

D

S am pl e

N um be r

M oi st ur e C on te nt

Remarks

B lo w s pe r in

E

LE

V A

T

IO

N ft)

0.32

-1.68

-3.68

-5.68

-7.68

-9.68

-11.68

-13.68

-15.68

-17.68

-19.68

-21.68

-23.68

-25.68

-27.68

D E

P T

H ft)

D ry

U ni t W ei gh t

(p cf

S am pl e

Lo ca tio n

DESCRIPTION

R ec ov er y

D ril lin g

M et ho d

C as in g

D ep th

PREPARED BY

David Williams

PROJECT OR BRIDGE NAME

Traffic Signal Update

BRIDGE NUMBER

Department of Transportation

Division of Engineering Services

Geotechnical Services

Office of Geotechnical Design - South

REPORT TITLE

BORING RECORD

DIST.

B lo w s pe r fo ot

S he ar S tr en gt h

(t sf

COUNTY

ORA

ROUTE

POSTMILE

5.1/8.1

DATE

7-19-17

M at er ia l G ra p hi cs

PROJECT ID

1215000022

HOLE ID

R-17-001

B

R

S T

A N

D A

R D

R T

E

9.

G

P J

C A

LT

R

A N

S L

IB

R

A R

Y

F E

B

7)

.G

LB

/2

3/

Information Handout; Contract No. 12A2276; Page 24 of 170

Aerially Deposited Lead Site Investigation Report

S ta n te c C o n s u lt in g S e rv ic e s I n c

Prepared for:

California Department of Transportation District 12 1750 East 4th Street, Suite 100 Santa Ana, California 92705

Prepared by:

Stantec Consulting Services inc.

735 E. Carnegie Drive, Suite 280

San Bernardino, California 92408

January 10, 2025

Project/File:

185832518

SR-39/Upgrade Safety Lighting

Intersection of Beach Boulevard and Terry Drive

Huntington Beach, Orange County, California

EA: 12-0V320

Project ID No.: 1224000118

Task Order 18

Contract 12A2113

Information Handout; Contract No. 12A2276; Page 25 of 170

Site Investigation Report

For individuals with sensory disabilities, this document is available in alternate formats upon request. For any questions regarding this TO, please call or write to Arman Behtash, Environmental Engineering, 1750

East 4th Street, Suite 100, Santa Ana, CA, 92705, Phone Number (657) 328-0143.

Information Handout; Contract No. 12A2276; Page 26 of 170

The conclusions in the Report titled Aerially Deposited Lead Site Investigation Report are Stantec’s professional opinion, as of the time of the Report, and concerning the scope described in the Report. The opinions in the document are based on conditions and information existing at the time the scope of work was conducted and do not take into account any subsequent changes. The Report relates solely to the specific project for which Stantec was retained and the stated purpose for which the Report was prepared.

The Report is not to be used or relied on for any variation or extension of the project, or for any other project or purpose, and any unauthorized use or reliance is at the recipient’s own risk.

Stantec has assumed all information received from California Department of Transportation (the “Client”) and third parties in the preparation of the Report to be correct. While Stantec has exercised a customary level of judgment or due diligence in the use of such information, Stantec assumes no responsibility for the consequences of any error or omission contained therein.

This Report is intended solely for use by the Client in accordance with Stantec’s contract with the Client.

While the Report may be provided by the Client to applicable authorities having jurisdiction and to other third parties in connection with the project, Stantec disclaims any legal duty based upon warranty, reliance or any other theory to any third party, and will not be liable to such third party for any damages or losses of any kind that may result.

Prepared by

Signature

Anne Perez

Reviewed by

Dion Monge

Approved by

Kevin Miskin

Information Handout; Contract No. 12A2276; Page 27 of 170

Table of Contents i

Executive Summary ................................................................................................................................... iii

1 INTRODUCTION ........................................................................................................................ 1.1

1.1 PURPOSE .................................................................................................................................. 1.1

1.2 BACKGROUND .......................................................................................................................... 1.1

1.3 REGULATORY CONSIDERATIONS ......................................................................................... 1.1

1.3.1 Soil Sampling .............................................................................................................................. 1.1

2 PROJECT SETTING .................................................................................................................. 2.1

2.1 PROJECT AREA DESCRIPTION .............................................................................................. 2.1

2.2 REGIONAL GEOLOGY AND HYDROGEOLOGY ..................................................................... 2.1

2.3 SURROUNDING AREA.............................................................................................................. 2.1

3 SCOPE OF WORK ..................................................................................................................... 3.1

3.1 PROPOSED SCOPE OF WORK ............................................................................................... 3.1

3.2 DEVIATIONS FROM THE PROPOSED SCOPE OF WORK .................................................... 3.2

4 SOIL INVESTIGATION METHODOLOGY ................................................................................ 4.1

4.1 PRE-FIELD ACTIVITIES ............................................................................................................ 4.1

4.2 FIELD INVESTIGATIONS .......................................................................................................... 4.2

4.2.1 Traffic Control ............................................................................................................................. 4.2

4.2.2 Soil Borings and Sampling ......................................................................................................... 4.2

4.2.3 Sample Collection and Preservation .......................................................................................... 4.2

4.2.4 Boring Locations ......................................................................................................................... 4.3

4.2.5 Decontamination ......................................................................................................................... 4.3

4.2.6 Borehole Abandonment .............................................................................................................. 4.3

4.2.7 Investigation Derived Waste ....................................................................................................... 4.3

4.2.8 Field Quality Assurance/Quality Control ..................................................................................... 4.3

5 LABORATORY ANALYSIS ....................................................................................................... 5.1

6 INVESTIGATIVE RESULTS ...................................................................................................... 6.1

6.1 FIELD FINDINGS ....................................................................................................................... 6.1

6.2 ANALYTICAL RESULTS ............................................................................................................ 6.1

6.2.1 ADL ............................................................................................................................................. 6.1

6.3 DATA VALIDATION .................................................................................................................... 6.2

6.3.1 Field QA/QC ............................................................................................................................... 6.2

6.3.2 Laboratory QA/QC ...................................................................................................................... 6.2

7 STATISTICAL DATA EVALUATION - SOIL ............................................................................. 7.1

7.1 CORRELATION BETWEEN TOTAL LEAD AND CAL WET-CITRIC SOLUBLE LEAD ............ 7.1

7.2 LINEAR REGRESSION ANALYSIS ........................................................................................... 7.1

7.3 STATISTICAL DATA EVALUATION .......................................................................................... 7.1

Information Handout; Contract No. 12A2276; Page 28 of 170 ii

8 CONCLUSIONS ......................................................................................................................... 8.1

9 RECOMMENDATIONS .............................................................................................................. 9.1

10 REFERENCES ......................................................................................................................... 10.1

11 CLOSURE ................................................................................................................................ 11.1

Tables

Table 1 – Summary of Soil Analytical Results – Lead and pH Table 2 – Lead Statistics

Figures

Figure 1 – Project Area Location Map

Figure 2 – SB-1, SB-2, SB-3 and SB-4 ADL Boring Locations Map

List of Appendices

Appendix A USA Ticket Numbers/Field Docs/Photolog Appendix B GPS Coordinates Appendix C Laboratory Data Appendix D Data Validation Appendix E Statistics

Information Handout; Contract No. 12A2276; Page 29 of 170

Executive Summary iii

At the request of Caltrans District 12, an ADL SI was conducted at the intersection of Beach Boulevard

(State Route 39 (SR-39)) and Terry Drive, in the city of Huntington Beach, in Orange County, California

(hereafter, the Project Area; Figure 1). The work was conducted pursuant to the provisions in Agreement

12A2113 and with the Task Order No. 18 request.

The purpose of the SI was to assess lead concentrations within the anticipated Project Area construction zone and to make recommendations for re-use and disposal of excess soil based on the provisions of the

California Department of Toxic Substances Control (DTSC), Soil Management Agreement for Aerially

Deposited Lead-Contaminated Soils (ADL Agreement) [DTSC, 2016]. Results from the investigation will be used to assess re-use requirements within the Project Area, estimate soil removal and disposal costs for any excess soil, to provide information to support worker and public safety protocols, and to identify a need for training/monitoring requirements, if applicable.

The proposed scope of work consisted of advancing and sampling four soil borings at the target sample depths of surface to 0.5, 1.0-1.5, 2.0-2.5, and 3.5 to 4.0 feet below ground surface (bgs). A total of 16 samples were collected as part of this task order.

The soil samples were analyzed for total lead, five soil samples for soluble lead by California waste extraction test using citric acid as the extractant (Cal WET-citric), one soil sample for soluble lead using dionized water (DI) as the extractant (Cal WET-DI), five soil samples for soluble lead by the Toxicity

Characteristic Leaching Procedure (TCLP) extraction method, and two soil samples for the power of hydrogen (pH).

As directed in Section CC.1 of Contract 12A2113, Stantec conducted a Tier 1A/1B laboratory data validation. The data validation was performed in conformance with United States Environmental Protection

Agency (USEPA) Region IX Data Validation Guidance, as required by the Caltrans Agreement 12A2113.

The data were validated pursuant to this Caltrans requirement and found to be suitable for the purposes of this investigation.

The investigation results are summarized below.

ADL

ADL were quantified in 16 soil samples collected from four borings. The following is a summary of detections.

• Total Lead: Total lead concentrations ranged from 2.6 to 170 milligrams per kilogram (mg/kg). Two of the samples reported total lead above 50 mg/kg. One of the samples reported total lead at or above the ADL threshold of 80 mg/kg. None of the samples reported concentrations above the

California Total Threshold Limit Concentration (TTLC) of 1,000 mg/kg for lead.

Information Handout; Contract No. 12A2276; Page 30 of 170 iv

• Soluble Lead by Cal WET-Citric Extraction Method: Five soil samples were further analyzed for soluble lead following the Cal WET-Citric extraction method. Soluble lead concentrations ranged from 0.26 mg/L to 11 milligrams per liter (mg/L). One of the samples reported soluble lead at or above the California Soluble Threshold Limit Concentration (STLC) of 5 mg/L.

• Soluble Lead by Cal WET-DI Extraction Method: One soil sample was further analyzed for soluble lead following the Cal WET-DI extraction method. The soluble lead concentration reported was

0.88 mg/L. The sample did not report soluble lead at or above the Agreement Threshold of 1.5 mg/L.

• Soluble Lead by TCLP Extraction Method: Five soil samples were analyzed for soluble lead using the TCLP. Soluble lead concentrations ranged from less than the laboratory method detection limit of 0.0018 mg/L (<0.0018 mg/L) to 0.012 mg/L. None of the samples reported soluble lead at or above federal hazardous waste level for toxicity of 5 mg/L.

• Power of Hydrogen: Two (2) soil samples were analyzed for pH. The pH was reported as 8.2 for both samples - well within the range of nonhazardous waste and above the ADL soil re-use threshold of 5 set forth in the ADL Agreement.

The correlation between total lead and Cal WET-Citric soluble lead was calculated in accordance with the methodology presented in Contract 12A2113. The entire data set showed good correlation with a variance

(R2) of 0.9868 and a correlation coefficient (R) of 0.99. Caltrans generally considers a correlation coefficient of 0.8 or greater as demonstrating good correlation.

Conclusions

In consideration of the data presented in this report and in accordance with the conditions of the ADL

Agreement (2016a), the following conclusions have been developed.

• ADL is present in near surface soils at certain locations within the proposed construction zone.

• While none of the soil samples exhibits a characteristic of RCRA hazardous waste, one of the soil samples, collected primarily in the upper 1.0 foot, exhibits characteristics of a California Non-RCRA hazardous waste based on soluble lead concentrations.

• Management of the waste in accordance with the conditions of the ADL Agreement will allow for cost effective re-use and off-site disposal options.

Recommendations

Based on the findings, results, and conclusions of the investigation, soil in the investigation area may be impacted by ADL. Recommendations for re-use and disposal of excess soil are summarized below.

1. Consistent with Caltrans protocols, project work should be conducted under a lead compliance plan prepared by the contractor.

2. Alternatives for reuse within the project area and off-site disposition are provided below.

Information Handout; Contract No. 12A2276; Page 31 of 170 v

Layers 1-4 - 0.0 to 4.0 ft 50.9 3.2 <1.5* <5 >5 Unregulated Unregulated

TOTAL

LEAD UCL95

(1)

SOLUBLE LEAD

(2) pH

ADL

AGREEMENT

(4)

RE-USE

ADL

AGREEMENT(4)

WASTE

CLASSIFICATION

Cal WET-Citric

UCL95

(3) CALWET-DI TCLP

SOIL POPULATION

ALL AREAS - ALL DATA - ALL DEPTHS COMBINED

Layers 1-4 - 0.0 to 4.0 ft 29.1 1.8 <1.5* <5 >5 Unregulated Unregulated

SB-1-0.5 : 0.0-1.0 feet bgs 170 11 0.88 0.0066 8.2 R1 Z2

REMOVAL OF HOT SPOT

HOT SPOT - SB-1-0.5: 0.0-1.0 feet bgs

ADL

AGREEMENT

(4)

RE-USE

ADL

AGREEMENT

(4)

WASTE

CLASSIFICATION

Cal WET-Citric

UCL95 (3) CALWET-DI TCLP

SOIL POPULATION

TOTAL

LEAD UCL95

(1)

SOLUBLE LEAD (2)

pH

ALL TOTAL LEAD DATA COMBINED AS ONE WASTE STREAM - MINUS SB-1-0.5

a. Alternative 1: If soils will be treated as one waste stream, soil disturbed or generated within the project area to the total depth of 4 feet bgs may be managed as unregulated material.

b. Alternative 2: The upper one foot on the northwest corner of the intersection (see boring

SB-1) may be managed as Type R1 material for on-site re-use or Type Z2 for off-site disposal. The remaining soil on the northwest corner (deeper than one foot) and all soil on the northeast, southwest, and southeast corners for surface to deeper depths may be managed as unregulated material.

3. The recommendations for re-use and disposal are based on lead and pH and the provisions of the

ADL Agreement (DTSC 2016). Additional testing and requirements may be imposed by other agencies for disposition or re-use outside the highway system right-of-way (ROW).

Information Handout; Contract No. 12A2276; Page 32 of 170

1 INTRODUCTION

1.1

At the request of Caltrans District 12, an ADL SI was conducted at the intersection of Beach Boulevard

(State Route 39 (SR-39)) and Terry Drive, in the city of Huntington Beach, in Orange County, California

(hereafter, the Project Area; Figure 1). The work was conducted pursuant to the provisions in Agreement

12A2113 and with the Task Order No. 18 request.

1.1 PURPOSE

The purpose of the SI was to assess lead concentrations within the anticipated Project Area construction zone and to make recommendations for re-use and disposal of excess soil based on the provisions of the

California Department of Toxic Substances Control (DTSC), Soil Management Agreement for Aerially

Deposited Lead-Contaminated Soils (ADL Agreement) [DTSC, 2016]. Results from the investigation will be used to assess re-use requirements within the Project Area, estimate soil removal and disposal costs for any excess soil, to provide information to support worker and public safety protocols, and to identify a need for training/monitoring requirements, if applicable.

1.2 BACKGROUND

According to the Task Order request, Caltrans District 12 proposes to improve lighting for pedestrians and bicycles by replacing poles at all crosswalk approaches and departures and replacing ADA curb ramps at the corners of the intersection of Beach Boulevard and Terry Drive.

The remainder of this report describes the scope of work, methodology, findings, results, conclusions, and recommendations associated with this SI.

1.3 REGULATORY CONSIDERATIONS

1.3.1 Soil Sampling

The ADL Agreement outlines the management of ADL-impacted soil generated by Caltrans as it pertains to stockpiling, re-use, disposal, tracking, transportation, and final placement of soil. The ADL Agreement defines “clean” soil and ADL-contaminated soil and provides thresholds and guidelines for re-use and disposal. Soil is classified based on laboratory analysis for total lead, soluble lead, and pH. Allowed management of excess soil includes unrestricted use (clean soil, i.e., unregulated soil under the ADL

Agreement), restricted re-use within the highway system right-of-way, documented commercial re-use, and disposal to a Class I, II, or III landfill.

Information Handout; Contract No. 12A2276; Page 33 of 170

1.2

ADL Agreement Allowed

Management

Total Lead (TL)

(mg/kg)

Soluble

Lead

Cal WET-

Citric

(mg/L)

Soluble

Lead

Cal WET

DI

(mg/L)

Soluble

Lead

TCLP

(mg/L) pH

Non-Regulated

Material – Non-ADL

Soil

Unrestricted Use

Appropriate for use without restrictions at any property

<80 and <5 -- <5 >2 and

<12.5--

Type Com Material

Non Hazardous

Appropriate for commercial use only either on SHS or other commercial property or Class III

Disposal

80<TL<320 and <5 -- <5 >5 and

<12.5

Type R1 Material

California Non-RCRA

Hazardous Waste

For Re-use On-Site, cover with one foot of clean soil

320<TL<1600 or >5 <1.5 <5 >5 and

<12.5

Type R2 Material

California Non-RCRA

Hazardous Waste

For Re-use On-Site, cover with pavement structure

1600<TL<3200 or >5 <150 <5 >5 and

<12.5

Type Z0 Material Class II Disposal 320<TL<1000 and <5 -- <5 >2 and

<12.5

Type Z2 Material

Non-RCRA

(California)

Hazardous Waste

Class I Disposal >1000 or >5 -- <5 >2 and

<12.5

Type Z3 Material

RCRA Hazardous

Waste

Class I Disposal -- -- -- >5 <2 or

>12.5

DI = Deionized water

Cal WET = California Waste Extraction Test

TCLP = Toxicity Characteristic Leaching Procedure

By managing the soil pursuant to the ADL Agreement, Caltrans will be reducing impact of hazards, preserving landfill capacity, and reducing air quality impacts inherent in transporting waste, while protecting human health and the environment.

The results of this SI will also assist the contractor in developing an appropriate health and safety plan and training program for the field staff as required per Title 8 of the California Code of Regulations (CCR).

Information Handout; Contract No. 12A2276; Page 34 of 170

2 PROJECT SETTING

2.1

2 PROJECT SETTING

This section describes the Project Area setting including a description of the physiographic setting, general geology and hydrogeology, and a general description of the area around the Project Area.

2.1 PROJECT AREA DESCRIPTION

The Project Area is located at an approximate elevation of 70 feet above mean sea level, approximately

3.5 miles northeast of Seal Beach (the Pacific Ocean), and approximately 13 miles west of the Santa Ana

Mountains, at the intersection of Beach Boulevard (SR-39) with Terry Drive, in the city of Huntington Beach, in Orange County, California (Figure 1).

2.2 REGIONAL GEOLOGY AND HYDROGEOLOGY

The Project Area is located within the Peninsular Ranges Geomorphic Province of California. According to the California Geological Society’s (CGS), California Geomorphic Provinces-Note 36 (CGS, 2002), this

Province is characterized by northwest trending valleys. The valleys of the province are subparallel to faults branching from the San Andreas Fault.

According to published geology maps, the primary surficial geologic units in the vicinity of the Project Area borings consists primarily of Quaternary young alluvium deposits (CDMG, 1981).

This is the start of the file's text. The full file is on GovTribe.