H.08.03_Specifications for Rudee Final 2021.pdf

PDF 12 MB Posted

Attached to
Norfolk District, Army Corps of Engineers, Rudee Inlet Maintenance Dredging in Virginia Beach, VA
Solicitation number
W9123621B5024
Issued by

About this file

This solicitation is for maintenance dredging services for Rudee Inlet located in Virginia Beach, Virginia. The U.S. Army Corps of Engineers, Norfolk District seeks to dredge approximately 189,000 cubic yards of sandy material from various areas including the entrance channel, sand trap, entrance channel transition area, and outer deposition basin. Dredged material will be placed on nearby beaches. A hydraulic cutterhead dredge will be used to dredge to depths between -14 to -22 feet MLLW depending on the area. The contractor must be able to begin work within 15 days of notice to proceed and complete all work within 180 days. Bids are due by a specified date and the contract will be a firm-fixed price awarded to the responsible bidder providing the best value to the government determined through this sealed bid procurement process. The estimated value of the contract is between $1-5 million.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Rudee Inlet Maintenance Dredging 2021 2021RUDEE

PROJECT TABLE OF CONTENTS

DIVISION 00 - PROCUREMENT AND CONTRACTING REQUIREMENTS

00 01 15 LIST OF DRAWINGS

DIVISION 01 - GENERAL REQUIREMENTS

01 11 00 SUMMARY OF WORK FOR NORFOLK DISTRICT PROJECTS

01 22 00 MEASUREMENT AND PAYMENT

01 30 00 ADMINISTRATIVE REQUIREMENTS

01 32 01.00 10 PROJECT SCHEDULE

01 33 00 SUBMITTAL PROCEDURES

01 35 26 GOVERNMENTAL SAFETY REQUIREMENTS

01 42 00 SOURCES FOR REFERENCE PUBLICATIONS

01 45 00.00 10 QUALITY CONTROL

01 45 00.15 10 RESIDENT MANAGEMENT SYSTEM CONTRACTOR MODE (RMS CM)

01 50 00 TEMPORARY CONSTRUCTION FACILITIES AND CONTROLS

01 57 20.00 10 ENVIRONMENTAL PROTECTION

01 57 30 ENVIRONMENTAL PERMIT WORK REQUIREMENTS

DIVISION 35 - WATERWAY AND MARINE CONSTRUCTION

35 20 23 DREDGING

35 20 23.33 NATIONAL DREDGING QUALITY MANAGEMENT PROGRAM PIPELINE

HYDRAULIC DREDGE

-- End of Project Table of Contents --

PROJECT TABLE OF CONTENTS Page 1

SECTION TABLE OF CONTENTS

DIVISION 00 - PROCUREMENT AND CONTRACTING REQUIREMENTS

SECTION 00 01 15

LIST OF DRAWINGS

03/21

PART 1 GENERAL

1.1 SUMMARY

1.2 CONTRACT DRAWINGS

PART 2 PRODUCTS (Not Used)

PART 3 EXECUTION (Not Used)

-- End of Section Table of Contents --

DOCUMENT 00 01 15 Page 1

SECTION 00 01 15

LIST OF DRAWINGS

03/21

PART 1 GENERAL

1.1 SUMMARY

This section lists the drawings for the project pursuant to contract clause "DFARS 252.236-7001, Contract Drawings, Maps and Specifications."

1.2 CONTRACT DRAWINGS

Contract drawings are as follows:

SHEET NO. TITLE NORFOLK DISTRICT FILE NO.

RUDEE INLET FEDERAL NAVIGATION PROJECT:

1) Title Sheet RDI.2017-08-21.PS(1)

2) Mapping Sheet RDI.2017-08-21.PS(2)

3) Mapping Sheet RDI.2017-08-21.PS(3)

4) Resort Beach Placement Sheet RDI.2017-08-21.PS(4)

5) Resort Beach Placement Sheet RDI.2017-08-21.PS(5)

6) Croatan Beach Placement Sheet RDI.2017-08-21.PS(6)

7) Croatan Beach Placement Sheet RDI.2017-08-21.PS(7)

8) Dredging Area Detail Sheet RDI.2017-08-21.PS(8)

9) Dredging Area Detail Sheet RDI.2017-08-21.PS(9)

9) Dredging Profiles Detail Sheet RDI.2017-08-21.PS(10)

11) Dredging Profiles Detail Sheet RDI.2017-08-21.PS(11)

12) Bid Items and Quantity Estimate Sheet RDI.2017-08-21.PS(12)

13) Beach Profiles and Detail Sheet RDI.2017-08-21.PS(13)

14) Resort Beach Special Placement Sheet RDI.2017-08-21.PS(14)

PART 2 PRODUCTS (Not Used)

PART 3 EXECUTION (Not Used)

-- End of Section --

DOCUMENT 00 01 15 Page 2

DIVISION 01 - GENERAL REQUIREMENTS

SECTION 01 11 00

SUMMARY OF WORK FOR NORFOLK DISTRICT PROJECTS

2/13

PART 1 GENERAL

1.1 DEFINITIONS

1.2 WORK COVERED BY CONTRACT DOCUMENTS

1.2.1 Project Description

1.2.2 Location

1.3 SPECIAL CONTRACTOR REQUIREMENTS

1.3.1 COORDINATION IN WORK AREAS

1.3.1.1 Existing Utility Location

1.3.1.2 Digging Permits

1.4 TIME EXTENSIONS FOR UNUSUALLY SEVERE WEATHER

1.4.1 Schedule

1.4.2 Records

1.4.3 Impacted Days

1.5 SUBCONTRACTS AND WORK COORDINATION

1.6 CONSTRUCTION MANPOWER AND EQUIPMENT REPORT

1.7 PROFIT

1.7.1 Weighted Guidelines

1.7.2 Value

1.7.2.1 Degree of Risk

1.7.2.2 Relative Difficulty of Work

1.7.2.3 Size of Job

1.7.2.4 Periods of Performance

1.7.2.5 Contractor's Investment

1.7.2.6 Assistance by Government

1.7.2.7 Subcontracting

PART 2 PRODUCTS

PART 3 EXECUTION

SECTION 01 11 00 Page 1

SECTION 01 11 00

SUMMARY OF WORK FOR NORFOLK DISTRICT PROJECTS

2/13

PART 1 GENERAL

1.1 DEFINITIONS

CO: Contracting Officer or his authorized representative.

1.2 WORK COVERED BY CONTRACT DOCUMENTS

1.2.1 Project Description

The Rudee Inlet Maintenance Dredging Project will consist dredging up to approximately 189,000 cubic yards of sandy maintenance material from the Rudee Entrance Channel, Sand Trap, Entrance Channel Transition Area, North Jetty Area, South Jetty Area, and Outer Deposition Basin located in Virginia Beach, Virginia.

Approximately 75,000 cubic yards of sandy material will be dredged from the Entrance Channel and Sand Trap with placement on Resort Beach to the north of the Inlet. Approximately 15,000 cubic yards of sandy material will be dredged from the Entrance Channel Transition Area and North and South Jetty Protection Areas with placement on Resort Beach to the north of the Inlet.

Approximately 99,000 cubic yards of sandy dredged material will be dredged from the Outer Deposition Basin. 50,000 cubic yards of that will be placed South of the Inlet at Croatan Beach and the remaining 49,000 cubic yards will be placed to the north on Resort Beach. A Hydraulic Cutter-head Dredge will be used to accomplish this work. Maximum pay depth (required + allowable), will be to -14 feet Mean Lower Low Water (MLLW) in the Entrance Channel, -20 feet MLLW in the Sand Trap, -16 feet MLLW in the Entrance Channel Transition Area, -14 feet MLLW for the North and South Jetty Protection Areas, and -22 feet MLLW for the Outer Deposition Basin.

Dredging will take place in the Atlantic Ocean and it is expected that dredging conditions will be in an ocean environment. The contractor is expected to work in the vicinity of large groups of bystanders and tourists during placement operations and work at a project with high recreational traffic through the Entrance Channel. The contractor will not be allowed to use Lake Wesley as a staging and safe harbor area for plant and equipment but may use the Croatan Point Dock facilities or the Safety Area of the Federal Project. The contractor is expected to have the ability to pump sandy dredged material up to 1.25 miles.

1.2.2 Location

The work shall be located in portions in Virginia Beach, Virginia. The exact location is shown on the plans.

SECTION 01 11 00 Page 2

1.3 SPECIAL CONTRACTOR REQUIREMENTS

1.3.1 COORDINATION IN WORK AREAS

1.3.1.1 Existing Utility Location

Existing utilities must be located before doing any digging work on Facility. The Contractor shall be responsible to contact Miss Utility, obtain all necessary existing utility locations, which may be necessary to accomplish his work, and mark any utility lines in the immediate vicinity of his work. It shall be the responsibility of the Contractor to contact Miss Utilities at 1-800-552-7001 for locating commercial utilities 48 hours prior to digging operations.

1.3.1.2 Digging Permits

Contractor is responsible for obtaining all digging and/or site permits, including associated locating and marking services, in accordance with local and The Commonwealth of Virginia's requirements, at no additional cost to the Government.

The Contractor shall be responsible to obtain all necessary digging permits and pay costs associated with the permit,which may be necessary to accomplish his work.

1.4 TIME EXTENSIONS FOR UNUSUALLY SEVERE WEATHER

This provision specifies the procedure for the determination of time extensions for unusually severe weather in accordance with the Contract Clause entitled "Default: (Fixed Price Construction)". In order for the Contracting Officer to award a time extension under this clause, the following conditions must be satisfied:

a. To be applicable, the weather delay must occur at or in the immediate vicinity of the project site. The weather experienced at the project site during the contract period must be found to be unusually severe, that is, more severe than the adverse weather anticipated for the project location during any given month.

Storm severity determination shall be made by the Contracting Office or their representative.

b. The unusually severe weather must actually cause a delay to the completion of the project. The delay must be beyond the control and without the fault or negligence of the Contractor.

c. All awards or extensions for time shall be at the sole discretion of the Contracting Officer or their representative.

1.4.1 Schedule

The following schedule of monthly anticipated adverse weather delays is based on National Oceanic and Atmospheric Administration (NOAA) or similar data for the project location and will constitute the base line for monthly weather time evaluations. The Contractor's progress schedule must reflect these anticipated adverse weather delays in all weather dependent activities.

SECTION 01 11 00 Page 3

MONTHLY ANTICIPATED ADVERSE WEATHER DELAY WORK DAYS

BASED ON (5) DAY WORK WEEK

JAN FEB MAR APR MAY JUN JUL AUG SEP OCT NOV DEC

10 9 8 6 7 7 9 6 5 5 6 9

1.4.2 Records

Upon acknowledgement of the Notice to Proceed and continuing throughout the contract, the Contractor will record on the daily CQC report, the occurrence of adverse weather and resultant impact to normally scheduled work. Actual adverse weather delay days must prevent work on critical activities for 50 percent or more of the Contractor's scheduled work day.

1.4.3 Impacted Days

The number of actual adverse weather days shall include days impacted by actual adverse weather (even if adverse weather occurred in previous month), be calculated chronologically from the first to the last day in each month, and be recorded as full days. If the number of actual adverse weather delay days exceeds the number of days anticipated in the schedule of monthly anticipated adverse weather delays, above, the contracting officer will convert any qualifying delays to calendar days, giving full consideration for equivalent fair weather work days, and issue a modification in accordance with the Contract Clauses entitled "Default (Fixed Price Construction)".

1.5 SUBCONTRACTS AND WORK COORDINATION

Contract Clauses "SUBCONTRACTS", "PERMITS AND RESPONSIBILITIES", and "MATERIAL AND WORKMANSHIP" are supplemented as follows:

a. Divisions or sections of specifications are not intended to control the Contractor in dividing the work among subcontractor, or to limit work performed by any trade.

b. Contractor shall be responsible for coordination of the work of the trades, subcontractors, and materials.

c. The Government or its representative will not undertake to settle any difference between the Contractor and Contractor's subcontractors, or between subcontractors.

d. The Government reserves the right to refuse to permit employment on the work or require dismissal from the work of any subcontractor who, by reason of previous unsatisfactory work on Corps of Engineers projects, or for any other reason is considered by the Contracting Officer to be incompetent or otherwise objectionable.

SECTION 01 11 00 Page 4

1.6 CONSTRUCTION MANPOWER AND EQUIPMENT REPORT

The Contractor shall submit executed CENAO Form 987, Construction Manpower and Equipment Report daily. The report shall include manpower and equipment for the general and subcontractors. Forms are available from the Contracting Officer.

1.7 PROFIT

1.7.1 Weighted Guidelines

Weighted guidelines method of determining profit shall be used on any equitable adjustment change order or modification issued under this contract. The profit factors shall be as follows:

Factor Rate Weight Value

Degree of Risk 20 Relative difficulty of work 15 Size of Job 15 Period of performance 15 Contractor's investment 05 Assistance by Government 05 Subcontracting 25

1.7.2 Value

Based on the circumstances of each procurement action, each of the above factors shall be weighted from .03 to .12 as indicated below. The value shall be obtained by multiplying the rate by the weight. The value column when totaled indicates the fair and reasonable profit percentage under the circumstances of the particular procurement.

1.7.2.1 Degree of Risk

Where the work involves no risk or the degree of risk is very small, the weighting should be .03; as the degree of risk increases, the weighting should be increased up to a maximum of .12. Lump sum items will have, generally, a higher weighted value than the unit price items for which quantities are provided. Other things to consider: the portion of the work to be done by subcontractors, nature of work, where work is to be performed, reasonableness of negotiated costs, amount of labor included in costs, and whether the negotiation is before or after performance of work.

1.7.2.2 Relative Difficulty of Work

If the work is most difficult and complex, the weighting should be .12 and should be proportionately reduced to .03 on the simplest of jobs. This factor is tied in to some extent with the degree of risk. Some things to consider: the nature of the work, by whom it is to be done, where, and what is the time schedule.

1.7.2.3 Size of Job

All work not in excess of $100,000 shall be weighted at .12. Work

SECTION 01 11 00 Page 5 estimated between $100,000 and $5,000,000 shall be proportionately weighted from .12 to .05.

1.7.2.4 Periods of Performance

Jobs in excess of 24 months are to be weighted at .12. Jobs of lesser duration are to be proportionately weighted to a minimum of .03 for jobs not to exceed 30 days. No weight where additional time not required.

1.7.2.5 Contractor's Investment

To be weighted from .03 to .12 on the basis of below average, average, and above average. Things to consider: amount of subcontracting, mobilization payment item, Government furnished property, equipment and facilities, and expediting assistance.

1.7.2.6 Assistance by Government

To be weighted from .12 to .03 on the basis of average to above average.

Things to consider: use of Government owned property, equipment and facilities, and expediting assistance.

1.7.2.7 Subcontracting

To be weighted inversely proportional to the amount of subcontracting.

Where 80 percent or more of the work is to be subcontracted, the weighting is to be .03 and such weighting proportionately increased to .12 where all the work is performed by the Contractor's own forces.

PART 2 PRODUCTS

Not Used.

PART 3 EXECUTION

Not used.

SECTION 01 11 00 Page 6

DIVISION 01 - GENERAL REQUIREMENTS

SECTION 01 22 00

MEASUREMENT AND PAYMENT

03/21

PART 1 GENERAL

1.1 REFERENCES

1.2 SUBMITTALS

1.3 LUMP SUM PAYMENT ITEMS

1.3.1 Payment Item No. 0001 Mobilization and Demobilization

1.3.1.1 Mobilization

1.3.1.2 Demobilization

1.3.2 Payment Item No. 0006 Cost of performing work without the availability of Lake Wesley

1.4 UNIT PRICE PAYMENT ITEMS

1.4.1 [Enter Appropriate Subpart Title Here]

WARNING: Text in tags exceeds the maximum length of 300 characters

1.4.2 Payment Item No. 0003 Maintenance dredging the Entrance Channel Transition Area (from -14' to -15'+1' Mean Lower Low Water), North Jetty Protection Area, and South Jetty Protection Area with placement at the Resort Beach Placement Area

1.4.3 Payment Item No. 0004 Dredging the Outer Deposition Basin to -21+1' Mean Lower Low Water with placement at the Resort Beach Placement Area

1.4.4 Payment Item No. 0005 Dredging the Outer Deposition Basin to -21'+1' Mean Lower Low Water with placement at the Croatan Beach Placement Area, maximum of 50,000 cubic yards

1.4.5 Payment Item No. 0007 Contracting Officer Directed Standby Time

1.5 MISPLACED MATERIAL

1.6 EXCESSIVE DREDGING

1.7 MONTHLY PARTIAL PAYMENTS

PART 2 PRODUCTS (Not Applicable)

PART 3 EXECUTION (Not Applicable)

SECTION 01 22 00 Page 1

SECTION 01 22 00

MEASUREMENT AND PAYMENT

03/21

PART 1 GENERAL

1.1 REFERENCES

The publications listed below form a part of this specification to the extent referenced. The publications are referred to within the text by the basic designation only.

U.S. ARMY CORPS OF ENGINEERS (USACE)

EM 1110-2-1003 (2015) Hydrographic Surveying Manual

1.2 SUBMITTALS

Not Used.

1.3 LUMP SUM PAYMENT ITEMS

Payment items for the work of this contract for which contract lump sum payments will be made are listed in the BIDDING SCHEDULE and described below. All costs for items of work, which are not specifically mentioned to be included in a particular lump sum or unit price payment item, shall be included in the listed lump sum item most closely associated with the work involved. The lump sum price and payment made for each item listed shall constitute full compensation for furnishing all plant, labor, materials, and equipment, and performing any associated Contractor quality control, environmental protection, meeting safety requirements, tests and reports, and for performing all work required for which separate payment is not otherwise provided.

1.3.1 Payment Item No. 0001 Mobilization and Demobilization

All costs connected with the mobilization and demobilization of all of the Contractor's dredging plant and equipment as defined below will be paid for at the contract lump sum price for this item. Sixty percent of the lump sum price will be paid to the Contractor upon completion of his mobilization at the work site. The remaining forty percent will be paid to the Contractor upon completion of demobilization. In the event the Contracting Officer considers that the amount in this item, sixty percent which represents mobilization and forty percent which represents demobilization, does not bear a reasonable relation to the cost of the work in this contract, the Contracting Officer may require the Contractor to produce cost data to justify this portion of the bid. Failure to justify such price to the satisfaction of the Contracting Officer will result in payment of actual mobilization costs, as determined by the Contracting Officer, at the completion of mobilization, and actual demobilization costs, as determined by the Contracting Officer, at the completion of demobilization. The determination of the Contracting Officer is not subject to appeal.

SECTION 01 22 00 Page 2

1.3.1.1 Mobilization

Mobilization shall include all costs for operations accomplished prior to commencement of actual dredging operations. This shall include as a minimum the following:

a. Transfer of dredge and attendant plant, barges and scows, and other like equipment and machinery.

b. All initial installation of dredge-pipe

c. All costs for any other associated work that is necessary in advance of the actual dredging operations.

d. Preparation of beach for access, and equipment handling to accomplish placement on the beachfront placement areas.

1.3.1.2 Demobilization

Demobilization shall include general preparation for transfer of plant to its home base.

1.3.2 Payment Item No. 0006 Cost of performing work without the availability of Lake Wesley

Payment for the additional costs of performing the scheduled work without the availability of Lake Wesley, boundary defined on the Contract drawings, as a staging and safe harbor area for the Contractor's plant and equipment shall be made as a "Lump Sum" (LS) price.

1.4 UNIT PRICE PAYMENT ITEMS

Payment items for the work of this contract on which the contract unit price payments will be made are listed in the BIDDING SCHEDULE and described below. The unit price and payment made for each item listed shall constitute full compensation for furnishing all plant, labor, materials, and equipment, and performing any associated Contractor quality control, environmental protection, meeting safety requirements, tests and reports, and for performing all work required for each of the unit price items.

1.4.1 [Enter Appropriate Subpart Title Here]1.4.1 Payment Item No. 0002 Maintenance dredging the Entrance Channel, the Entrance Channel Overlay Transition Area (to -14' Mean Lower Low Water), the Entrance Channel Overlay Outer Deposition Basin (to -14' Mean Lower Low Water), the Entrance Channel Adjacent Sand Trap, and the Sand Trap with placement at the Resort Beach Placement Area

Payment to be made for all costs associated with dredging shall include the cost of removal, transportation and disposal of dredged material at the RESORT BEACH PLACEMENT AREA, exclusive of the mobilization and demobilization as defined above. The total amount of material removed and to be paid for under this payment item will be measured by the cubic yard in place by computing the volume between the bottom surface shown by soundings of the last surveys made before dredging, and the bottom surface shown by the soundings of surveys made as soon as practicable after the work has been completed. The volume for measurement and payment shall include the material within the limits of overdepth and side slopes described in paragraph "Required Dredging Prism, Overdepth, and Side

SECTION 01 22 00 Page 3

Slopes" of SECTION 35 20 23, less any deductions that may be required for misplaced material described in subparagraph "Misplaced Material", below.

The drawings are believed to accurately represent conditions at the time of the surveys indicated. New soundings will be taken immediately before dredging as specified in paragraph "Before Dredging Surveys" of SECTION 35 20 23. The Contractor's unit price for dredging, based on the above method of computation of the quantity for payment, shall include his evaluation of shoaling, other natural changes in the waterway, or changes caused by the Contractor's operations that might occur during the period between the surveys before dredging and the surveys for acceptance of the work.

Computations for payment purposes will be made by the Government for the scheduled dredging using, as defined in the USACE Hydrographic Survey Manual EM 1110-2-1003, the Average End Area (AEA) method, Triangulated Irregular Network (TIN) method, or a combination of these methods at the discretion of the Government, utilizing electronic data processing software and machines for the calculations. Determination of quantities removed and the deductions made to determine quantities in place to be paid for in the areas specified, after having once been made, will not be reopened except on evidence of collusion, fraud, or obvious error.

1.4.2 Payment Item No. 0003 Maintenance dredging the Entrance Channel Transition Area (from -14' to -15'+1' Mean Lower Low Water), North Jetty Protection Area, and South Jetty Protection Area with placement at the Resort Beach Placement Area

Payment to be made for all costs associated with dredging shall include the cost of removal, transportation and disposal of dredged material in the RESORT BEACH PLACEMENT AREA, exclusive of the mobilization and demobilization as defined above. The total amount of material removed and to be paid for under this payment item will be measured by the cubic yard in place by computing the volume between the bottom surface shown by soundings of the last surveys made before dredging, and the bottom surface shown by the soundings of surveys made as soon as practicable after the work has been completed. The volume for measurement and payment shall include the material within the limits of overdepth and side slopes described in paragraph "Required Dredging Prism, Overdepth, and Side Slopes" of SECTION 35 20 23, less any deductions that may be required for misplaced material described in subparagraph "Misplaced Material", below.

The drawings are believed to accurately represent conditions at the time of the surveys indicated. New soundings will be taken immediately before dredging as specified in paragraph "Before Dredging Surveys" of SECTION 35 20 23. The Contractor's unit price for dredging, based on the above method of computation of the quantity for payment, shall include his evaluation of shoaling, other natural changes in the waterway, or changes caused by the Contractor's operations that might occur during the period between the surveys before dredging and the surveys for acceptance of the work.

Computations for payment purposes will be made by the Government for the scheduled dredging using, as defined in the USACE Hydrographic Survey Manual EM 1110-2-1003, the Average End Area (AEA) method, Triangulated Irregular Network (TIN) method, or a combination of these methods at the discretion of the Government, utilizing electronic data processing software and machines for the calculations. Determination of quantities removed and the deductions made to determine quantities in place to be paid for in the areas specified, after having once been made, will not be reopened except on evidence of collusion, fraud, or obvious error.

SECTION 01 22 00 Page 4

1.4.3 Payment Item No. 0004 Dredging the Outer Deposition Basin to -21+1' Mean Lower Low Water with placement at the Resort Beach Placement Area

Payment to be made for all costs associated with dredging shall include the cost of removal, transportation and disposal of dredged material at the RESORT BEACH PLACEMENT AREA, exclusive of the mobilization and demobilization as defined above. The total amount of material removed and to be paid for under this payment item will be measured by the cubic yard in place by computing the volume between the bottom surface shown by soundings of the last surveys made before dredging, and the bottom surface shown by the soundings of surveys made as soon as practicable after the work has been completed. The volume for measurement and payment shall include the material within the limits of overdepth and side slopes described in paragraph "Required Dredging Prism, Overdepth, and Side Slopes" of SECTION 35 20 23, less any deductions that may be required for misplaced material described in subparagraph "Misplaced Material", below.

The drawings are believed to accurately represent conditions at the time of the surveys indicated. New soundings will be taken immediately before dredging as specified in paragraph "Before Dredging Surveys" of SECTION 35 20 23. The Contractor's unit price for dredging, based on the above method of computation of the quantity for payment, shall include his evaluation of shoaling, other natural changes in the waterway, or changes caused by the Contractor's operations that might occur during the period between the surveys before dredging and the surveys for acceptance of the work.

Computations for payment purposes will be made by the Government for the scheduled dredging using, as defined in the USACE Hydrographic Survey Manual EM 1110-2-1003, the Average End Area (AEA) method, Triangulated Irregular Network (TIN) method, or a combination of these methods at the discretion of the Government, utilizing electronic data processing software and machines for the calculations. Determination of quantities removed and the deductions made to determine quantities in place to be paid for in the areas specified, after having once been made, will not be reopened except on evidence of collusion, fraud, or obvious error.

1.4.4 Payment Item No. 0005 Dredging the Outer Deposition Basin to -21'+1' Mean Lower Low Water with placement at the Croatan Beach Placement Area, maximum of 50,000 cubic yards

Payment to be made for all costs associated with dredging shall include the cost of removal, transportation and disposal of dredged material at the CROATAN BEACH PLACEMENT AREA , exclusive of the mobilization and demobilization as defined above. The total amount of material removed and to be paid for under this payment item will be measured by the cubic yard in place by computing the volume between the bottom surface shown by soundings of the last surveys made before dredging, and the bottom surface shown by the soundings of surveys made as soon as practicable after the work has been completed. The volume for measurement and payment shall include the material within the limits of overdepth and side slopes described in paragraph "Required Dredging Prism, Overdepth, and Side Slopes" of SECTION 35 20 23, less any deductions that may be required for misplaced material described in subparagraph "Misplaced Material", below.

The drawings are believed to accurately represent conditions at the time of the surveys indicated. New soundings will be taken immediately before dredging as specified in paragraph "Before Dredging Surveys" of SECTION 35 20 23. The Contractor's unit price for dredging, based on the above method of computation of the quantity for payment, shall include his evaluation of shoaling, other natural changes in the waterway, or changes caused by the Contractor's operations that might occur during the period between the

SECTION 01 22 00 Page 5 surveys before dredging and the surveys for acceptance of the work.

Computations for payment purposes will be made by the Government for the scheduled dredging using, as defined in the USACE Hydrographic Survey Manual EM 1110-2-1003, the Average End Area (AEA) method, Triangulated Irregular Network (TIN) method, or a combination of these methods at the discretion of the Government, utilizing electronic data processing software and machines for the calculations. Determination of quantities removed and the deductions made to determine quantities in place to be paid for in the areas specified, after having once been made, will not be reopened except on evidence of collusion, fraud, or obvious error.

1.4.5 Payment Item No. 0007 Contracting Officer Directed Standby Time

The contract price per day for Contracting Officer directed standby time shall include the Contractor's costs for holding his plant, equipment, and crew onsite until further direction is given by the Contracting Officer.

Time will be measured and paid for by the day (24 hours) and calculated to the nearest hour (1/24 day) for payment.

If the Contracting Officer directs that plant be placed in a standby status, the Contractor shall cease dredging operations, placement operations, and preparation for dredging operations, and shall secure the dredge plant in a mooring location acceptable to the Contracting Officer as well as remove equipment from the placement areas and staging areas. The Contracting Officer will give the Contractor 72 hour notice before plant is to be placed on standby status. When in standby status, plant will not be moved from the designated location unless approved by the Contracting Officer. Upon written notice of removal of the plant from standby status by the Contracting Officer, the Contractor shall be prepared to resume operations within 72 hours. Payment for moving from a dredging area to a standby location, and from a standby location to the designated dredging area, will be paid for under Payment Item No. 0001.

1.5 MISPLACED MATERIAL

Any material that is deposited elsewhere than in places designated or approved by the Contracting Officer will not be paid for, and the Contractor may be required to remove such misplaced material and deposit it where directed by the Contracting Officer at the Contractor's expense.

1.6 EXCESSIVE DREDGING

Material taken from outside the specific areas to be dredged or beyond the limits as extended in paragraph "Required Dredging Prism, Overdepth, and Side Slopes" will be considered as excessive overdepth dredging, or excessive side slope dredging, for which payment will not be made. Nothing in these specifications shall be construed to prevent payment for the removal of shoals performed in accordance with the applicable provisions of Paragraphs SHOALING and FINAL EXAMINATION AND ACCEPTANCE of Section 35 20 23.

1.7 MONTHLY PARTIAL PAYMENTS

Monthly partial payments will be based on estimated quantities determined by the Contracting Officer.

SECTION 01 22 00 Page 6

PART 2 PRODUCTS (Not Applicable)

PART 3 EXECUTION (Not Applicable)

SECTION 01 22 00 Page 7

DIVISION 01 - GENERAL REQUIREMENTS

SECTION 01 30 00

ADMINISTRATIVE REQUIREMENTS

08/08

PART 1 GENERAL

1.1 SUBMITTALS

1.2 PROGRESS AND COMPLETION PICTURES

1.3 PRECONSTRUCTION CONFERENCE

1.3.1 Scheduling

1.3.2 Purpose

1.3.3 Discussion Items

1.4 OTHER MEETINGS DURING THE CONTRACT

1.5 MINUTES OF MEETINGS

PART 2 PRODUCTS (Not Used)

PART 3 EXECUTION (Not Used)

SECTION 01 30 00 Page 1

SECTION 01 30 00

ADMINISTRATIVE REQUIREMENTS

08/08

PART 1 GENERAL

1.1 SUBMITTALS

Government approval is required for submittals with a "G" designation;

submittals not having a "G" designation are for information only. When used, a designation following the "G" designation identifies the office that will review the submittal for the Government. The following shall be submitted in accordance with Section 01 33 00 SUBMITTAL PROCEDURES:

SD-01 Preconstruction Submittals

View location map; G

Progress and completion pictures

1.2 PROGRESS AND COMPLETION PICTURES

Photographically document site conditions during dredging and beach placement operations. Provide during the first month and within one month of the completion of work, digital photographs, 1600x1200x24 bit true color 1200 dpi minimum resolution in JPEG file format showing the work. Take a minimum of 20 digital photographs of the dredge and at the dredged material placement site, (about 10-each). Show clean water leaving the dredged material placement site spillways and show the inflow at the outfall pipe and material building up at the outfall. Submit two sets of digital photographs each set on a separate CD-R, in the first and last month of the project. Include on the second CD all photos taken. Include photographs demonstrating environmental procedures. Photographs for the two months shall be in a separate monthly directory and each file shall be named to indicate its subject, location and direction in which the camera is looking. All file names shall include a date designator. Cross reference submittals in the appropriate daily report. Photographs shall be provided for unrestricted use by the Government.

1.3 PRECONSTRUCTION CONFERENCE

1.3.1 Scheduling

After award of the construction contract and prior to the start of any construction work, the Contracting Officer's Representative (COR) will schedule and conduct an initial preconstruction conference. Subsequent preconstruction conferences will be required and scheduled by the COR prior to the start of any construction work. The Contractor's Project Manager, Superintendent and Quality Control System Manager shall attend these meetings. The Contractor is encouraged to have an officer of his company (Project Manager could be this person) and representation from each of his sub-contractors and major construction work divisions at the conferences.

The conferences will be held at a location and time as specified by the COR.

SECTION 01 30 00 Page 2

1.3.2 Purpose

The purpose of this preconstruction conferences is to enable the COR to outline the procedures that will be followed by the Government in its administration of this construction contract and to discuss the performance that will be expected from the Contractor. This conference will allow the Contractor an opportunity to ask questions about the Government's supervision and inspection of contract work, about security requirements, regulations, and other similar matters. The COR may invite other Government personnel involved in the work to attend this conference.

1.3.3 Discussion Items

The following is a sample list of items for discussion during the preconstruction conference; however, the Contracting Officer's Representative may modify this list or include additional items for discussion as conditions and the work require.

a. Authority of the Contracting Officer/Contracting Officer's Representative.

b. Contractor's Progress Schedule.

c. Correspondence Procedures.

d. Contractor Labor Standards Provisions.

e. Contract Modifications and Administrative Procedures.

f. Contractor's Administrative, Laydown and Storage Areas.

g. Procedures for Processing Submittals.

h. Payment Estimate Data and Procedures.

i. Contractor Utilities.

j. Security Requirements and Other Regulations, if applicable.

k. Government Furnished Equipment, if applicable.

l. Disposition of Salvage Property, if applicable.

m. Contractor Insurance Requirements.

n. Environmental Protection Plan.

o. Contractor Performance Evaluation.

p. Emergency and Safety Procedures.

q. Plant and Suitability to Perform the Work.

r. Turnover of Placement Areas After Dredging.

s. Contractor Required Notification Procedures.

t. Contractor's Submittal Register.

SECTION 01 30 00 Page 3

u. Contractor's Survey and Information Reporting Procedures.

v. Tidal zoning values developed by NOS and, if necessary, bench mark descriptions for the project

w. Contractor's Quality Control Plan and Activity Hazard Analysis, with special emphasis to coordinate the proposed work procedures of the Contractor at the Beach Placement Area and the associated procedures the Contractor intends to employ to protect the public and comply to noise and safety requirements.

1.4 OTHER MEETINGS DURING THE CONTRACT

Other meetings may be held after the Preconstruction Conference, for the purpose to discuss concerns and deficiencies that may include the following:

a. Contractor's Site Safety and Health Plan.

b. Quality Control Plan.

c. Environmental Protection Plan.

d. Progress Schedule updates.

1.5 MINUTES OF MEETINGS

The Government will prepare minutes of all meetings.

PART 2 PRODUCTS (Not Used)

PART 3 EXECUTION (Not Used)

SECTION 01 30 00 Page 4

DIVISION 01 - GENERAL REQUIREMENTS

SECTION 01 32 01.00 10

PROJECT SCHEDULE

08/08

PART 1 GENERAL

1.1 REFERENCES

1.2 SUBMITTALS

1.3 QUALITY ASSURANCE

PART 2 PRODUCTS

PART 3 EXECUTION

3.1 GENERAL REQUIREMENTS

3.1.1 Approved Project Schedule

3.1.2 Schedule Status Reports

3.1.3 Default Terms

3.2 BASIS FOR PAYMENT AND COST LOADING

3.3 PROJECT SCHEDULE DETAILED REQUIREMENTS

3.3.1 PROGRESS SCHEDULE FORMAT

3.3.2 Level of Detail Required

3.3.2.1 Activity Durations

3.3.2.2 Procurement Activities

3.3.2.3 Critical Activities

3.3.2.4 Government Activities

3.3.2.5 Definable Features of Work Coding (FOW1, FOW2, FOW3)

3.3.3 Scheduled Project Completion and Activity Calendars

3.3.3.1 Project Start Date

3.3.3.2 Schedule Constraints and Open Ended Logic

3.3.3.3 Early Project Completion

3.3.4 Milestones

3.4 PROJECT SCHEDULE SUBMISSIONS

3.4.1 Project Schedule Submission

3.4.2 Periodic Schedule Updates

3.4.3 Standard Activity Coding Dictionary

3.5 OWNERSHIP OF FLOAT

SECTION 01 32 01.00 10 Page 1

SECTION 01 32 01.00 10

PROJECT SCHEDULE

08/08

PART 1 GENERAL

1.1 REFERENCES

The publications listed below form a part of this specification to the extent referenced. The publications are referred to within the text by the basic designation only.

U.S. ARMY CORPS OF ENGINEERS (USACE)

ER 1-1-11 (1995) Administration -- Progress, Schedules, and Network Analysis Systems

1.2 SUBMITTALS

Government approval is required for submittals with a "G" designation;

submittals not having a "G" designation are for information only. When used, a designation following the "G" designation identifies the office that will review the submittal for the Government. Submit the following in accordance with Section 01 33 00 SUBMITTAL PROCEDURES:

SD-01 Preconstruction Submittals

Project Schedule; G

1.3 QUALITY ASSURANCE

The Contractor CQC representative shall be responsible for the preparation and certification as complete all required project Progress Schedule submittals and reports.

PART 2 PRODUCTS

Not Used

PART 3 EXECUTION

3.1 GENERAL REQUIREMENTS

Prepare for approval a Project Schedule, as specified herein, pursuant to the Contract Clause, SCHEDULE FOR CONSTRUCTION CONTRACTS. Show in the schedule the sequence in which the Contractor proposes to perform the work and dates on which the Contractor contemplates starting and completing all schedule activities. The scheduling of the entire project, including the design (if any) and construction sequences, is required. The scheduling of construction is the responsibility of the Contractor. Contractor management personnel shall actively participate in its development.

Subcontractors and suppliers working on the project shall also contribute in developing and maintaining an accurate Project Schedule. Provide a schedule that is a forward planning as well as a project monitoring tool.

SECTION 01 32 01.00 10 Page 2

3.1.1 Approved Project Schedule

Use the approved Project Schedule to measure the progress of the work and to aid in evaluating time extensions. Make the schedule cost loaded and activity coded. The schedule will provide the basis for all progress payments. If the Contractor fails to submit any schedule within the time prescribed, the Contracting Officer may withhold approval of progress payments until the Contractor submits the required schedule.

3.1.2 Schedule Status Reports

Provide a Schedule Status Report on at least a monthly basis. If, in the opinion of the Contracting Officer, the Contractor falls behind the approved schedule, take steps necessary to improve its progress including those that may be required by the Contracting Officer, without additional cost to the Government. In this circumstance, the Contracting Officer may require the Contractor to increase the number of shifts, overtime operations, days of work, and/or the amount of construction/dredging plant, and to submit for approval any supplementary schedule or schedules as the Contracting Officer deems necessary to demonstrate how the approved rate of progress will be regained.

3.1.3 Default Terms

Failure of the Contractor to comply with the requirements of the Contracting Officer shall be grounds for a determination, by the Contracting Officer, that the Contractor is not prosecuting the work with sufficient diligence to ensure completion within the time specified in the contract. Upon making this determination, the Contracting Officer may terminate the Contractor's right to proceed with the work, or any separable part of it, in accordance with the default terms of the contract.

3.2 BASIS FOR PAYMENT AND COST LOADING

Use the schedule as the basis for determining contract earnings during each update period and therefore the amount of each progress payment. Lack of an approved schedule update, or qualified scheduling personnel, may result in the inability of the Contracting Officer to evaluate contract earned value for the purposes of payment. Failure of the Contractor to provide all required information will result in the disapproval of subsequent schedule updates. In the event schedule revisions are directed by the Contracting Officer and those revisions have not been included in subsequent revisions or updates, the Contracting Officer may hold retainage up to the maximum allowed by contract, each payment period, until such revisions to the Project Schedule have been made. Activity cost loading shall be reasonable, as determined by the Contracting Officer.

3.3 PROJECT SCHEDULE DETAILED REQUIREMENTS

The Contractor shall submit his Progress Schedule to the Contracting Officer for approval at the Pre-Construction Conference specified in SECTION ADMINISTRATIVE REQUIREMENTS. The Progress Schedule shall be submitted and certified as complete by the Contractor's Quality Control Representative in the form of a chart graphically indicating the sequence proposed to accomplish each work feature or operation. The chart shall be prepared to show the starting and completion dates of all work features on a linear horizontal time scale beginning with date of Notice to Proceed, arrival date of Contractor's plant to the job site, all activities scheduled prior to dredging, dredging start and completion dates, calendar

SECTION 01 32 01.00 10 Page 3 days to completion of all work, and contract completion date.

The Contractor shall indicate on the chart the important work activities that are critical to the timely overall completion of the project. Key dates for important features or portions of work features are milestone dates and shall be so indicated on the chart.

3.3.1 PROGRESS SCHEDULE FORMAT

Use the Critical Path Method (CPM) of network calculation to generate the Project Schedule and prepare the Project Schedule using the Precedence Diagram Method (PDM) OR prepare the Progress Schedule in the form of a Gantt Chart.

3.3.2 Level of Detail Required

Develop the Project Schedule to an appropriate level of detail. Failure to develop the Project Schedule to an appropriate level of detail, as determined by the Contracting Officer, will result in its disapproval. The Contracting Officer will consider, but is not limited to, the following characteristics and requirements to determine appropriate level of detail:

3.3.2.1 Activity Durations

Reasonable activity durations are those that allow the progress of ongoing activities to be accurately determined between update periods.

3.3.2.2 Procurement Activities

The schedule must include activities associated with the submittal, approval, procurement, fabrication and delivery of long lead materials, equipment, fabricated assemblies and supplies as applicable. Long lead procurement activities are those with an anticipated procurement sequence of over 90 calendar days. A typical procurement sequence includes the string of activities: submit, approve, procure, fabricate, and deliver.

3.3.2.3 Critical Activities

The following activities shall be listed as separate line activities on the Contractor's Project Schedule and may be submitted on a separate sheet.

This list represents a partial lists and is not considered complete:

a. Submission and approval of Accident Prevention Plan.

b. Submission and approval of all environmental submittals.

c. Submission and approval of dredge plan and auxiliary equipment.

d. Submission and approval of pre-placement beach survey.

e. Submission and approval of Quality Control Plan.

f. Coast Guard Notification of Mariner's and VADEQ & VMRC notification.

g. Submittal of current marine plant certification and recent plant inspection.

3.3.2.4 Government Activities

Show Government and other agency activities that could impact progress.

These activities include, but are not limited to:

a. Government surveys for payment

b. Required Contractor submittals for Government approval

c. Inspections required by the contract.

SECTION 01 32 01.00 10 Page 4

3.3.2.5 Definable Features of Work Coding (FOW1, FOW2, FOW3)

Assign a Definable Feature of Work Code to appropriate activities based on the definable feature of work to which the activity belongs. Definable Feature of Work is defined in Specification Section 01 45 00.00 10 QUALITY CONTROL. An activity shall not have more than one Definable Feature of Work Code. Not all activities are required to be Definable Feature of Work Coded.

3.3.3 Scheduled Project Completion and Activity Calendars

The schedule interval shall extend from NTP date to the required contract completion date. The contract completion activity (End Project) shall finish based on the required contract duration in the accepted contract proposal, as adjusted for any approved contract time extensions. The first scheduled work period shall be the day after NTP is received by the Contractor.

3.3.3.1 Project Start Date

The schedule shall start no earlier than the date on which the NTP was acknowledged. Include as the first activity in the project schedule an activity called "Start Project"( or NTP). The "Start Project" activity shall have an "ES" constraint date equal to the date that the NTP was acknowledged, and a zero day duration.

3.3.3.2 Schedule Constraints and Open Ended Logic

Constrain completion of the last activity in the schedule by the contract completion date. Schedule calculations shall result in a negative float when the calculated early finish date of the last activity is later than the contract completion date. Include as the last activity in the project schedule an activity called "End Project". The "End Project" activity shall have an "LF" constraint date equal to the contract completion date for the project, and with a zero day duration or by using the "project must finish by" date in the scheduling software. The schedule shall have no constrained dates other than those specified in the contract. The use of artificial float constraints such as "zero fee float" or "zero total float" are typically prohibited. There shall only be 2 open ended activities:

Start Project (or NTP) with no predecessor logic and End Project with no successor logic.

3.3.3.3 Early Project Completion

In the event the project schedule calculates an early completion date of the last activity prior to the contract completion date, identify those activities that it intends to accelerate and/or those activities that are scheduled in parallel to support the Contractor's "early" completion. The last activity shall have a late finish constraint equal to the contract completion date and the schedule will calculate positive float. The Government will not approve an early completion schedule with zero float on the longest path. The Government is under no obligation to accelerate activities for which it is responsible to support a proposed early contract completion.

3.3.4 Milestones

The schedule must include milestone activities for each significant project

SECTION 01 32 01.00 10 Page 5 event including but not limited to: milestone activities for confined disposal facility preparation complete; installation of pipeline complete;

dredging complete.

3.4 PROJECT SCHEDULE SUBMISSIONS

Provide the submissions as described below.

3.4.1 Project Schedule Submission

Submit the initial Project Schedule, defining the Contractor's planned operations for approval within 15 calendar days after the NTP is acknowledged. The approved Project Schedule will be used for payment purposes . Cost load the Project Schedule to balance the contract award Contract line item numbers (CLINS) shown on the Price Schedule. The initial Project Schedule must include all of the required Plan and Program preparations, submissions and approvals identified in the contract (for example, Quality Control Plan, Safety Plan, and Environmental Protection Plan)

3.4.2 Periodic Schedule Updates

Submit periodic schedule updates monthly with requests for progress payment. These submissions will assist the Contracting Officer in assessing the Contractor's progress. Update the percent complete for each activity started, based on the realistic assessment of work completed. If the Contractor fails or refuses to furnish the information and project schedule data, which in the judgment of the Contracting Officer or authorized representative is necessary for verifying the Contractor's progress, the Contractor shall be deemed not to have provided an estimate upon which progress payment may be made.

3.4.3 Standard Activity Coding Dictionary

If a CPM/PDM system is used for the Project Schedule, the activity coding structure defined in the Standard Data Exchange Format (SDEF) in ER 1-1-11, Appendix A is acceptable; A template SDEF compatible schedule backup file (sdef.prx) is available on the QCS website: http://rms.usace.army.mil/.

3.5 OWNERSHIP OF FLOAT

Float available in the schedule, at any time, shall not be considered for the exclusive use of either the Government or the Contractor.

SECTION 01 32 01.00 10 Page 6

DIVISION 01 - GENERAL REQUIREMENTS

SECTION 01 33 00

SUBMITTAL PROCEDURES

05/11

PART 1 GENERAL

1.1 SUMMARY

1.2 DEFINITIONS

1.2.1 Submittal Descriptions (SD)

1.2.2 Approving Authority

1.2.3 Work

1.3 SUBMITTALS

1.4 SUBMITTAL CLASSIFICATION

1.4.1…

This is the start of the file's text. The full file is on GovTribe.