This is a Request for Qualifications and Proposals issued by the Fullerton School District for construction and preliminary/preconstruction services related to the Gymnasium Replacement Project at Robert C. Fisler School, located at 1350 Starbuck Street, Fullerton, California 92833. The District seeks qualified contractors to perform construction services under a lease-leaseback delivery method as authorized by California Education Code Section 17406. Contractors must prequalify through the District's Prequalification Questionnaire on or before November 17, 2026, and hold a current, valid Class B Contractor's License in good standing with the California Contractor's State License Board. A mandatory job walk is scheduled for November 16, 2026, at 9:00 a.m., with two required stops: the first at Park JR High (1501 W. Rosecrans Avenue, Fullerton, CA 92833) at the gymnasium, followed by Robert C. Fisler School. Attendance at both job walk locations is mandatory, and failure to attend will result in bid disqualification. Proposals must be submitted by 11:00 a.m. on December 6, 2026, through the Planwell/E-ARC website at https://customer.e-arc.com/arcEOC/PWELL_Main.asp?mem=29 or by contacting Mike McAdam at Mike_McAdam@myfsd.org. The RFQ/P was published in the Orange County Register on November 6, 2026, and November 13, 2026.
The successful contractor will be required to furnish a 100% Performance Bond and a 100% Payment Bond. All workers on the project must be paid not less than the general prevailing wage rate as determined by the California Department of Industrial Relations for the applicable work type and locality, consistent with California Labor Code Sections 1770 et seq. Contractors and subcontractors must comply with registration and qualification requirements under California Labor Code Sections 1725.5 and 1771.1, as well as all provisions of the Project Labor Agreement implemented by the District. Contractors are responsible for acknowledging receipt of any addenda issued by the District prior to submitting their response.
View the file
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
REQUEST FOR QUALIFICATIONS AND PROPOSALS FOR CONSTRUCTION SERVICES
FSD 2026-2027-BOND-01
Gymnasium Replacement Project at Robert C. Fisler School 1350 Starbuck St. Fullerton, CA 92833
The Fullerton School District issues a Request for Qualifications and Proposals to invite contractors to perform construction and preliminary/preconstruction services for the above District project (“Project”) pursuant to the lease-leaseback delivery method. (Ed. Code, § 17406.) Any contractor that may seek to contract with the District to perform construction services on this Project must respond to this RFQ/P.
Contractors that intend to submit a response to the RFQ/P must: (1) prequalify with the District by submitting the District’s Prequalification Questionnaire located at the following link: https://www.qualitybidders.com/, on or before, November 17, 2026; and (2) hold a Class B Contractors License that is current, valid, and in good standing with the California Contractor's State License Board.
The RFQ/P can be found on the Planwell/E-ARC website at https://customer.e-arc.com/arcEOC/PWELL_Main.asp?mem=29 or by contacting Mike McAdam at Mike_McAdam@myfsd.org for support.
Responses must be received by 11:00am. on December 6, 2026 pursuant to the process in the RFQ/P.
The successful contractor shall be required to furnish a 100% Performance Bond and a 100% Payment Bond if awarded a contract for the Project. The successful contractor(s) and its subcontractors shall pay all workers on the Project not less than the general prevailing rate of per diem wages and the general prevailing rate for holiday and overtime work as determined by the Director of the Department of Industrial Relations (DIR), State of California, for the type of work performed and the locality in which the work is to be performed within the boundaries of the District, pursuant to sections 1770 et seq. of the California Labor Code. Prevailing wage rates are available from the District or on the Internet at:
<http://www.dir.ca.gov>. Contractors shall comply with the registration and qualification requirements pursuant to sections 1725.5 and 1771.1 of the California Labor Code. The successful contractor and its subcontractors must also comply with all provisions in the Project Labor Agreement that the District is implementing on this Project.
If the District issues addenda to this RFQ/P, contractors are solely responsible for and must acknowledge receipt of addenda in the contractor’s response.
Mandatory Job Walk: November 16,2026 @ 9:00am Site Visit at 1st stop at Park JR High 1501 W. Rosecrans Ave, Fullerton CA 92833 at the GYM, Then will drive to Robert C. Fisler School, 1350 Starbuck St., Fullerton, CA 92833. MUST attend all two above job walks in order to submit a bid or will be disqualified. Job walk could take several hours.
FULLERTON SCHOOL DISTRICT
By: Orange County Register Publication Dates: (1) November 6, 2026 (2) November 13, 2026 mailto:Mike_McAdam@myfsd.org