Gym Floor Specs.pdf

PDF 254 KB Posted

Attached to
Coffin Building Gym Floor Replacement
Solicitation number
PE-56300-RFP-2026-000000024
Issued by
Columbia County, Brooklet City, Georgia

About this file

Summary: Gym Floor Specifications Document

This specification document outlines the technical requirements for the Coffin Building Gym Floor Replacement project in Georgia. The project involves the complete demolition of the existing gym floor to bare concrete and installation of approximately 10,070 square feet of Aacer MFMA certified flooring system. The flooring specification calls for 2¼" × ¾" #2 grade or better MFMA certified maple installed over a custom sleeper system mounted on cushioned pads with a 6-mil vapor barrier beneath. The scope includes installation of new cove base along both end walls and affected wall areas, drum sanding of the entire court surface, and application of game lines with painting and staining to match existing artwork and color schemes.

The specifications establish a detailed technical framework for ensuring proper performance and safety of the replacement floor system. All materials and installation methods must comply with MFMA certification standards, and the custom sleeper system is specifically designed to accommodate the existing six-inch slab depression in the building's concrete foundation. The specifications appear to be prepared to guide potential bidders in submitting accurate proposals and ensuring that all submitted bids meet the minimum quality and performance standards required for this athletic facility renovation project.

View the file

Other files

File Type Posted
DBB_Full_Document_Bid Coffin Gym.docx DOCX document

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

File details come from the government source that posted it. Updated .