About this file

This is a Project Addendum #02 issued by Commtech Design on behalf of Gull Lake Community Schools in Richland, Michigan, for an Audio/Video Upgrade project (#1297-01). The addendum modifies the original contract documents and specifications by establishing a new bid due date of August 7, 2019 at 2:00 PM. The project scope includes the installation of standard throw projectors with associated infrastructure at multiple locations, requiring USB connectivity from teacher stations to projectors, network cable runs from each projector to the network closet, and the provision of new projectors and projector mounts at each designated location.

The addendum addresses clarifications requested by bidders regarding technical specifications and installation requirements. Specifically, it confirms that USB cabling must be run from teacher stations to projectors despite the projectors not being interactive, that network connectivity must be established for all projectors, and that new equipment (projectors and mounts) must be supplied rather than utilizing existing infrastructure. No pricing information, set-asides, incumbent contractors, or funding sources are specified in this addendum.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Gull Lake HS_MS Add 02 1

PROJECT ADDENDUM #02

To All Bidders Date: July 26, 2019

From: Bret Emerson Company Commtech Design

Project Name:

Audio / Video Upgrade #1297-01

Client: Gull Lake Community Schools 10100 E. D Ave Richland, MI 49083

The Following Changes, revisions, modifications, etc. shall be incorporated into the contract documents, specifications and plans

Attachments;

1. None

Specifications;

1. Change the Bid Due Date to August 7, 2019 @ 2:00pm

Questions;

1. The drawing with standard throw projectors all show USB connectivity from teachers station to project. These projector models aren’t interactive. Do we still need to run USB cabing from teacher station to project location?

Answer. Yes

2. Just to clarify, each projector needs to have network cable ran back to the network closet, correct?

Answer. Correct

3. The drawings with standard throw projectors all show call outs for the projector and projector mounts. But the elevation front view drawings show each to be existing? Can you please clarify which is correct?

Answer. Provide new projector and Projector mount at each location.

Sincerely, Bret Emerson