HST Contract NAS5-26555 Science Operations 15-Month Extension JOFOC - for posting.pdf
PDF 271 KB Posted
- Solicitation number
- GSFCHST2026
About this file
This is a Justification for Other Than Full and Open Competition (JOFOC) for a 15-month contract extension with the Association of Universities for Research in Astronomy (AURA) to operate the Space Telescope Science Institute (STScI) for NASA's Goddard Space Flight Center (GSFC).
The contract extension (NAS5-26555) covers science system engineering, science ground system development, science operations, science research, research award management, and public outreach support for the Hubble Space Telescope (HST), as well as data archive support for missions in the Mikulski Archive for Space Telescopes (MAST). The period of performance extends through November 26, 2027. The procurement is justified under 10 U.S.C. 3204(a)(1) ("only one responsible source") based on AURA/STScI's unique 35-year operational history with HST, proprietary knowledge of the observatory's complex optical systems and instrument intricacies, and the critical need for seamless continuity. The document details how AURA's expert team has continuously refined science operations techniques over 40 years, managing over six million lines of computer code and maintaining approximately 1,600 active science research awards. Additional justification emphasizes synergistic benefits with JWST and Roman Space Telescope operations that reduce risk and costs across all three missions. A synopsis was published on Sam.gov on January 11, 2026, with a 15-day response period; no competing sources expressed interest. The contracting officer must ensure fair and reasonable pricing through proposal evaluation and analysis. The total contract value is redacted from this document.
View the file
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Rev.: 10/2025
NATIONAL AERONAUTICS AND SPACE ADMINISTRATION (NASA)
Goddard Space Flight Center (GSFC)
JUSTIFICATION FOR OTHER THAN FULL AND OPEN COMPETITION (JOFOC)
For Contract NAS5-26555
Hubble Space Telescope (HST) Science Operations
1. This Federal Acquisition Regulation (FAR) 6.104-1(a)(1) – Identification of the agency and the contracting activity, and specific identification of the document as a
“Justification for other than full and open competition.”
This document is a justification for other than full and open competition prepared by
National Aeronautics and Space Administration (NASA) Goddard Space Flight Center
(GSFC).
The procuring agency is NASA, and the contracting activity is GSFC, Greenbelt, MD.
2. FAR 6.104-1(a)(2) –The nature and/or description of the action being approved:
This justification provides the rationale for using other than full and open competition to extend for 15-months Contract NAS5-26555 with the Association of Universities for
Research in Astronomy (AURA) for science system engineering, science ground system development, science operations, science research, research award management, and public outreach support for the Hubble Space Telescope (HST) and data archive support for missions in the Mikulski Archive for Space Telescopes (MAST). AURA, who is operating the Space Telescope Science Institute (STScI) for NASA (AURA/STScI), will be part of a mission team that GSFC leads and includes the European Space Agency
(ESA), other NASA centers as necessary, and other support contractors. The current period of performance of this contract is through June 30, 2026.
3. FAR 6.104-1(a)(3) – A description of the supplies or services required, to meet the
Agency’s needs (including the estimated value):
AURA/STScI will provide the products and services required to execute the science program, maintain and calibrate the onboard instruments, maintain the ground systems, archive and distribute the science data, perform follow-on mission studies, manage the
HST research award program, and conduct astronomical research as well as operate and maintain the MAST. The HST Operations Project manages the overall operations of the
HST and MAST for the Science Mission Directorate. The period of performance for this
15-month extension is through November 26, 2027.
The total value of the products and services associated with this extension modification is estimated to be TEXT DELETED.
4. FAR 6.104-1(a)(4) – An identification of the statutory authority permitting other than full and open competition:
Rev.:10/2025
The statutory authority permitting other than full and open competition is 10 U.S.C.
3204(a)(1), as implemented by Federal Acquisition Regulation 6.103-1, “Only one responsible source and no other supplies or services will satisfy agency requirements.”
5. FAR 6.104(a)(5) – A demonstration that the proposed contractor’s unique qualifications or the nature of the acquisition requires use of the authority cited:
The rationale supporting the use of 10 U.S.C. 3204(a)(1) is as described below.
HST is a unique national asset and one of NASA’s most valuable and productive scientific resources. The STScI, which AURA manages and staffs, is an integral part of the celebrated HST program and contributes greatly to its success through its world-class team of scientists, engineers, managers, and operations personnel and with its efficient and productive science operations infrastructure. Much of HST’s impact as an astronomical tool is directly attributable to AURA’s scientific leadership, technical/operational creativity, and in-depth understanding of the HST’s observatory systems. As the developer of the HST science-operations ground system and its sole operator for over 35 years, the
AURA/STScI alone possesses the requisite knowledge of the observatory’s optical and operational intricacies to safeguard its health and maximize its science productivity.
Two significant factors support the Government awarding AURA this contract extension on a sole-source basis: 1) the unique nature of AURA’s corporate knowledge and experience with the ever-evolving science operations function on the HST program; and
2) synergies present between the HST, James Webb Space Telescope (JWST), and Roman
Space Telescope (RST) missions established through AURA’s purposeful implementation of the contract requirements for each mission in a manner that reduces risk, increases productivity, and minimize costs for all three programs. These items are elaborated below.
AURA’s Unique Knowledge and Experience
HST is a highly complex and internationally acclaimed observatory that provides capabilities to the astronomical community that are unlike any others. The telescope was placed into orbit by the space shuttle in April 1990. A serious optical flaw in the manufacture of the primary mirror was discovered during the orbital verification stage.
Rectification of this flaw directly affected the goal of the first planned astronaut-servicing mission to HST, as well as the optical design of the second and third generation instruments installed during the four subsequent servicing missions. Evolving detector technologies have enabled the telescope to make observations impossible (indeed, not even conceived) at launch. AURA has expertly and continuously refined the science operations techniques of the mission during the past 40 years to incorporate these changes and has worked with the astronomical community to develop, peer-review, communicate, and coordinate these changes with the telescope’s many users.
Such modifications have included innumerable technical ones, many of which are complicated because of their interaction with one another. Examples include: 1) developing and implementing a more accurate and greatly enlarged guide star catalog with improved HST astrometry made possible by the inclusion of new and better guide star position and magnitude estimates provided by the European Gaia mission; 2) reprocessing archived datasets from HST’s legacy instruments in light of improved instrument calibration techniques; 3) time-ordering scheduled observations to avoid the effect of signal persistence in a detector from contaminating subsequent observations with the same instrument; 4) identifying and using new lifetime positions in the instrument detectors that suffer from gain-loss through use; 5) dramatically improving the astrometry of the telescope by developing a novel method to image stars while the telescope is in motion; 6) developing and maintaining novel software applications to counter the aging effects of radiation on the charge transfer efficiency of the instruments; 7) improving the operational methodology and accuracy to measure the focus of the telescope and the relative position of the Fine Guidance Sensors and instruments; 8) implementing software and processes to enable efficient scheduling of observations based on operating with only one gyroscope;
and 9) expanding the HST data archive into the MAST to include high-level science products, other ultraviolet/optical mission datasets, integration with science platforms to enable cloud-side analysis in the era of increasingly large and complex datasets, and
“Virtual Observatory” interface elements with search tools that promote scientific research across all of NASA’s archives.
Each of these items is representative of many others like them and each item directly contributes to the current scientific productivity of the observatory. Such technical items can only be executed by an operations team that is supported by active scientists who thoroughly understand not only the technical state of the satellite and its current instruments, but also the telescope’s legacy instruments; their design modes, evolving calibration needs, and performance histories.
It is improbable that any other contractor could learn and provide seamless continuity during this extension period to these large, technically based, science operations issues. A new company team would have to be ready and competent to immediately operate and maintain the complex science operations infrastructure that, among other things, creates command loads which execute onboard HST. These command sequences control the spacecraft’s movements, internal functions and communications with Earth, as well as the observatory’s instruments.
The computer systems that are employed daily to accomplish these science-operations tasks collectively comprise over six million lines of computer code in multiple programming languages. Software bugs or operational errors can easily cause an instrument to suspend its operation or cause the spacecraft to enter a safe-hold mode.
Each orbit of telescope time lost in such occurrences represents a significant loss to the mission and to the astronomical community. There are approximately six times as many requests by investigators to use an orbit of the telescope’s time as there are orbits to award.
In concert with the GSFC-based Flight Operations Team and Spacecraft System
Engineering group, AURA has also made extensive, complex modifications to the planning, scheduling, and command-load-generation systems to support mission-critical life-extension activities. These include operating the telescope in One -Gyro-Control
Modes; modifying the target acquisition and reacquisition sequences to mitigate the effects of aging Fine Guidance Sensors; operating the Fine Guidance Sensors to minimize wear to their mechanical components; organizing the downlink of science data to reduce the number of HST transmitter duty cycles; and developing concepts to enable the implementation of a reduced-reaction-wheel science mode in a timely fashion should the need arise.
The modifications and improvements that AURA has made in the science operations area are not limited to technical items. AURA has also addressed process changes in the areas of science policy and community engagement that have increased the scientific productivity of the telescope. Examples in this area include: 1) modifying the size and structure of the Time Allocation Committee to ensure that telescope time is awarded fairly and prudently in light of the changes within astronomy and cosmology over the last quarter century. Most significantly, these changes include being the first NASA mission to develop and enforce a dual-anonymous proposing system that has resulted in gender parity for the first time among those receiving HST observing time; 2) establishing processes and inter-mission agreements to facilitate multi-wavelength observations by investigators using multiple space-based observatories. The goal is to allow investigators to submit a single proposal which, if approved, results in the allocation of telescope time on multiple observatories; 3) modifying the proposal-selection process to mitigate against the troubling problem of underrepresentation by mid-size observing programs; and 4) ensuring the best archive of HST science data for perpetuity through leadership in soliciting recommendations from the astronomical community and implementing special operating campaigns such as Treasury programs, multi-cycle programs, the UV-initiatives, long exposure, deep-field imaging observations, and 5) developing a novel approach that allows activation of “disruptive” targets of opportunities without dramatically impacting the ongoing observation plan.
Again, these items are representative of many more like them. Each cited example demands that a contractor have a thorough understanding of the telescope’s changing capabilities, its observational history, the volume and quality of currently archived datasets, the major astronomical issues of the day, and the ever-changing role of HST within the astronomical community. Only AURA currently possesses this detailed and expert knowledge of HST.
Synergy between the HST, JWST, and RST Missions that Reduces Risk and Cost
AURA currently holds contracts with NASA’s JWST and RST programs to operate the
JWST spacecraft and conduct science operations, and conduct science operations for the
RST mission. AURA has leveraged its human and equipment resources to perform these three contracts. Through this synergy, the projects benefit from one another by reducing risk and cost.
NASA should not jeopardize the period of joint operations of HST, JWST, and RST for this short 15-month period. Assuming another vendor could be brought up to speed to conduct HST operations, it would not only be financially costly, but also highly likely to negatively impact the technical, schedule, and cost performance of both JWST and RST.
Allowing AURA to continue its expert work on HST operations for the extension period is the only conceivable way to reduce the risk that untimely, learning-induced errors could impact HST.
The issues raised in the previous paragraph (and in paragraph five of this section of the
JOFOC) highlight an associated cost concern. There is no historic precedent for gauging incumbent capture or technical “lessons learned” in transitioning to a new contractor on the HST contract. Complicating the incumbent-capture issue is the fact that matrixed scientific staff members supporting HST are supporting JWST and RST at the same time, and may likely choose to remain with AURA in support of those missions. The HST project would need to consider the following:
1. There is significant technical risk associated with the requirement for a new contractor to create immediate, error-free command loads to the HST spacecraft.
2. A new contractor would need to seamlessly begin administrating approximately 1,600 active science research awards or cause significant issues at academic institutions across the nation regarding graduate student research and advanced degrees as well as tenure-related publication (career) issues for the principle investigators.
3. The operational HST mission cadence is 12 months long. The solicitation of telescope proposals (which involves updating special software tools like exposure-time calculators for the proposing investigators), the peer-review of these proposals and awarding of telescope time, the generation of a long-term observing schedule, and the budgetary review and award of submitted research award budgets all happen once per year. A typical cycle begins with the call for proposals in January, the receipt of science proposals in April, the awarding of telescope time in July, and commencement of observations in early November.
To ensure that an incoming contractor can competently “hit the ground running” technically it would require that they pick up a significant fraction of the incumbent workforce or retain that workforce until adequate technical training can occur. As discussed, a new vendor may not be successful at incumbent capture. As a result, a 90-day phase-in period or longer may be required for day-to-day operations. Competence in the longer-cadenced items which comprise the bulk of the STScI’s efforts, might require a longer phase-in or “reach back” capability to secure consultation and training help from experienced personnel.
Award to any other source would result in substantial duplication of cost to the
Government that is not expected to be recovered through competition and the limited length of this extension period. TEXT DELETED. Given the risks and potential consequences described earlier in this section of the JOFOC, coupled with the fact that the contractor’s HST activities would begin after the submission of science proposals and essentially the same time as the convening of the Telescope Allocation Committee meeting, would mean that a minimum 90-day phase-in would be required to ensure smooth transition of ongoing operations and the start of the new cycle of observations. If a new contractor were able to achieve 75 percent incumbent capture, which may be difficult, a 90-day phase in would require duplication of effort TEXT DELETED not including the retention or reach-back costs associated with longer-cadenced areas of work which could conceivably equal this amount over the course of a year.
Additional non-recoverable costs would also likely be incurred in instrument calibration and pipeline data processing development and operations, and definitely in the loss of synergy with the JWST and RST missions and their integration with MAST. These are individually described below.
Instrument and Ground System Work:
The algorithms and techniques for mitigating detector degradation are not static. Unless the key scientific personnel responsible for the development and implementation of new calibration techniques are retained and able to continue their ongoing programs, their prior efforts would likely be lost. Minimally, it can be expected that there would be delays in the development cycle of these calibration upgrades and their associated ground system changes. This would affect the scientific productivity of the mission and possibly necessitate the recalibration of large instrument datasets which takes time and effort.
There are too many unknown variables to develop a precise estimate for the financial impact associated with this area, TEXT DELETED
6. FAR 6.104-1(a)(6) – A description of the efforts made to ensure that offers are solicited from as many potential sources as practicable, including whether a notice was or will be publicized as required by part 5 and, if not, which exception under part 5 applies:
A notice to the Government Point of Entry (GPE) website (Sam.gov) was published on
January 11, 2026, in accordance with FAR part 5. This posting will inform potential sources of NASA’s intent to award this sole-source modification to AURA/STScI. The results of this synopsis will be summarized in Section 10 below.
7. FAR 6.104(a)(7) – A determination by the contracting officer that the anticipated cost to the Government will be fair and reasonable:
The contracting officer’s signature on this document indicates that the contracting officer has determined that the anticipated cost to the government will be fair and reasonable.
AURA/STScI must be required to submit a proposal that the Government will evaluate and negotiate. Prior to execution of the contractual modification, a proposal analysis will be performed. The proposal analysis will ensure that the final agreed-to price for the contract modification is fair and reasonable. Specifically, AURA’s proposed costs, direct labor rates, direct labor hours, skill mix, other direct costs, indirect costs, and fee(s) will be evaluated to determine fair and reasonableness. This evaluation may also include support from auditing agencies or contracts, as needed. Because this action is an extension of the current contract, the Government will rely upon existing contract data along with auditing agencies.
8. FAR 6.104(a)(8) – Description of the market research conducted, and the results, or a statement of the reason market research was not conducted:
The market research conducted was based on in-depth market knowledge of the relevant science-data-processing contractor marketplace by senior members of the project’s scientific and technical staff. Based on their knowledge and research it was determined that while there are other organizations recognized for significant contributions to astronomy and astrophysical research, none have detailed knowledge of the complex and dated HST spacecraft, its operational constraints, current life-extension initiatives, or its complex and changing instrument suite, a subset of which was described in the first portion of Section 5 of this document (Rationale Supporting the Use of the Authority).
Working knowledge of the unique and complex intricacies of each operating instrument and their many supported individually-calibrated modes could not reasonably be attained, much less implemented proficiently, without a significant phase-in period, and hence, a considerable period of cost duplication. This would result in productivity loss to the HST program, and possibly damage to the instruments. As such, there are no other identified organizations that can provide the government with the significant synergistic benefits to/with the JWST and RST programs as detailed in the latter portion of Section 5.
There are various organizations who might, in time, learn to conduct the science operations functions of the HST mission, but none of them could be expected to accomplish these tasks without a significant and costly phase-in period. No other organization is currently synergistically linked to the JWST and RST missions like AURA to reap the mutual benefits to each mission described in Section 5 of this document.
9. FAR 6.104-1(a)(9) – Any other facts supporting the use of other than full and open competition:
None
10. FAR 6.104(a)(10) – A listing of the sources, if any, that expressed an interest in writing in the acquisition:
A notice of NASA’s intent to award this sole-source action was synopsized on the GPE website (Sam.gov) per FAR Part 5. (See Section 6 above). The synopsis notified interested sources that this requirement will be issued on a sole-source basis and provide them an opportunity to submit their interest and capabilities to the contracting officer within 15 days of the synopsis publication. No responses were received.
11. FAR 6.104-1(a)(11) – A statement of actions, if any, the agency may take to remove or overcome any barriers to competition before any subsequent acquisition for the supplies or services required:
HST is expected to operate as long as its science productivity is sufficiently cost effective.
Future contracts will depend on the continued viability of the observatory, but at a minimum, the final data calibration and closeout period is anticipated to occur beyond this contract’s period of performance
The Agency will continue to examine the market in the future for alternative solutions or new sources before executing any subsequent acquisitions for the same requirements.