GSCS New Bus Shop _ 00 1113 _ Invitation to B.pdf

PDF 138 KB Posted

Attached to
GSCS New Bus Shop
Solicitation number
PE-55096-NONST-2025-000000005
Issued by
Taliaferro County, Georgia

About this file

This is an Invitation to Bid document from the Griffin-Spalding County Board of Education for the GSCS New Bus Shop project located on Flynt Street in Griffin, Georgia. Sealed bids from qualified General Contractors will be received until 3:00 P.M. on January 23, 2025, at the Learning Center. Contractors must have been in business for at least 10 years and completed a minimum of three similar renovation projects, preferably with education/school construction experience. A mandatory pre-bid conference is scheduled for January 9, 2025, at 10:00 A.M. at the Learning Center, and only bids from contractors who attend will be accepted. Electronic bidding documents can be obtained from MSSA-PBK Architects for a non-refundable deposit of $250.00.

The contract will be awarded on a lump sum basis and bids must include a 5% Bid Bond. Both Performance and Payment Bonds of 100% of the Contract Price will be required. Bids cannot be withdrawn for 35 days after opening. The documents can be examined at Construct Connect, Dodge Data & Analytics, National Association of Minority Contractors, and MSSA-PBK offices. The owner reserves the right to reject any or all bids and waive technicalities. No specific funding source or set-aside requirements are mentioned in the document.

View the file

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

GSCS NEW BUS SHOP 12-18-24

Griffin-Spalding County School System

MSSA-PBK PN 202302

INVITATION TO BID 001113-1

DOCUMENT 001113 - INVITATION TO BID 1

Sealed bids from qualified General Contractors will be received by the Griffin-Spalding County Board of 3

Education in the Learning Center, 216 South Sixth Street, Griffin, Georgia 30224 until 3:00 P.M., 4

Prevailing Time, January 23, 2025, for GSCSNew Bus Shop, Flynt Street, Griffin, Spalding 5

County, Georgia 30223. At the time and place noted above, the proposals for the Project will be 6 publicly opened and read. 7

Qualified General Contractors interested in bidding on the project shall have been in business for a 9 minimum of ten (10) years, successfully completed a minimum of three (3) similar renovation and 10 preferably performed other types of education/school related construction projects. A list of all similar 11 renovation and modification projects along with all other projects completed or currently under 12 construction under the firm name during the last five (5) years shall be provided at the Pre-Bid 13

Conference to justify qualifications. Such list shall contain as a minimum the architect, owner, project 14 name, building type, project type, building size, total project costs, change order costs, notice- to-proceed 15 date and substantial completion date. 16

All General Contractors Bidding this Project are required to attend the Pre-Bid Conference 18 scheduled for the Project. Pre-Bid Conference to be held January 9, 2025, at 10:00 A. M. at the 19

Learning Center, 216 South Sixth Street, Griffin, Georgia 30223. A roster containing the names of 20 all those Qualified General Contractors attending the conference will be compiled and verification 21 of a Bidders’ attendance at the conference will be required before acceptance of his/her Bid. Bids 22 from General Contractors not attending the Pre-Bid Conference will not be accepted. 23

Electronic bidding documents may be obtained at the office of the Architects, MSSA-PBK, 525 25

East Taylor Street, Post Office Box 880, Griffin, Georgia 30224. Registration for documents, 26 together with non-refundable deposit of $250.00 should be filed promptly with the Architects. 27

A share file link for accessing PDF’s of bid documents will be emailed as soon as possible. Only 28 bids received from Contractors registered with the Architect will be accepted. 29

Bidding Documents may be examined at the following location(s): 31

1.) Construct Connect c/o CMD Attn: DPC 34

800-364-2059 35

2.) Dodge Data & Analytics 37

413-507-3179 38

3.) National Association of Minority Contractors 40

470-355-1230 41

4.) MSSA-PBK 43

770-227-5473 44

Only a proposal submitted by a Bidder on record with the Architect as having received plans and 47 specifications from the Architect will be opened. 48

GSCS NEW BUS SHOP 12-18-24

Griffin-Spalding County School System

MSSA-PBK PN 202302

INVITATION TO BID 001113-2

Contract, if awarded, will be on a lump sum basis. No bid may be withdrawn for a period of 35 days after 1 time has been called on date of opening. Bids must be accompanied by a Bid Bond in an amount not less 2 than 5% of the Base Bid. Both a Performance and a Payment Bond will be required in an amount equal to 3

100% of the Contract Price. The Owner reserves the right to reject any or all bids and to waive 4 technicalities. 5

For: Griffin-Spalding County Board of Education 7

By: Superintendent Keith L. Simmons 9

File details come from the government source that posted it. Updated .