This document is a detailed presentation on the GSA's Inflation Reduction Act (IRA) programs related to low embodied carbon (LEC) construction materials. It provides an overview of the IRA and its goals, summarizes the $3.375 billion in GSA funding available through 2026-2031 for projects using LEC materials, and describes three specific LEC pilot projects in the GSA's Region 7.
The presentation explains how embodied carbon is measured using Environmental Product Declarations (EPDs), outlines the EPA's approved LEC materials and GSA's GWP limits, and emphasizes the business case for obtaining EPDs. It indicates that GSA will include an evaluation factor favoring the lowest embodied carbon materials in the source selection process, and will require EPDs to be submitted with proposals. A sources sought notice is included for a $10-20 million design-build project at the Eagle Pass Land Port of Entry, which will use IRA funding and require LEC materials with EPDs. Key dates, project details, and submission requirements for interested small businesses and suppliers/manufacturers are provided.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
GSA Public Buildings Service
Greater Southwest Region
Public Buildings Service (PBS)
Region 7 LEC and Pilot Program Information Overview
Inflation Reduction Act (IRA) and Project Information
Industry Day
August 2, 2023
Agenda
Kickoff and Introductions
What is the Inflation Reduction Act?
Region 7 Pilot Projects
What are Low Embodied Carbon Materials?
Resources
Next Steps
Discussion
Introductions
John “JD” Dennis PBS Inflation Reduction Act Program Management Office
Walter Tersch Sustainability Program Manager, Office of Architecture and Engineering
Kendall Waldie / Kathren Santikos / Adena Alarcon Region 7 Design and Construction
Ashley Seffernick / Daria Giannotti Office of Acquisition Management
Carolyn Smith / Marsha Howard
Jason Gerloff / Jessica Garrett Region 7 Acquisition Management Division
Inflation Reduction Act (IRA)
Background
The Inflation Reduction Act (IRA) of 2022 was signed on August 16, 2022 and makes the single largest investment in climate and energy in American history.
Enabling America to tackle the climate crisis ✓
Advancing environmental justice
Securing America’s position as a world leader in domestic clean energy and technology manufacturing
Putting the United States on a pathway to achieving the Administration’s climate goals, including a net-zero operational emissions federal building portfolio by 2045, and net zero emissions procurement by 2050.
IRA Program Goals and Objectives
REDUCING
HARMFUL
EMISSIONS
Avoid millions of metric tons of greenhouse gases through the use of low-embodied carbon construction materials and improved energy-efficient building operations.
CREATING GOOD-
PAYING JOBS
Resulting projects will support an estimated
9,500 annual economy-wide jobs across the length of the projects (approximately
43,000 total job-years).
IMPROVING
EFFICIENCY AND
REDUCING LONG-
TERM COSTS
By making federal buildings more energy efficient, these projects will reduce operating costs and save money for taxpayers over the long run.
CATALYZING
AMERICAN
INNOVATION
By increasing demand for low-carbon materials and emerging/ sustainable technology, these investments will strengthen
America’s domestic industrial base while catalyzing innovation and job growth in homegrown industries that produce next-generation materials, products, and equipment.
Total GSA IRA Funding - $3,375,000,000
Summary of GSA IRA Programs for low-embodied carbon materials in construction and renovation projects.
*Funding available through 9/30/26* for emerging and sustainable technologies.
*Funding available through
9/30/26* for measures to convert GSA facilities into High-
Performance Green Buildings *Funding available through 9/30/31*
$2.15 billion $975 million $250 million
GSA’s appropriations are in IRA sections 60502, 60503, and 60504.
https://www.congress.gov/117/plaws/publ169/PLAW-117publ169.pdf#page=267
Low Embodied Carbon (LEC) Materials
Embodied carbon is the greenhouse gas (GHG) emissions resulting from the mining, harvesting, processing, manufacturing, transporting, and installing construction materials. (Current focus is “cradle to factory gate”.)
• Must use materials that have substantially lower levels of embodied GHGs, compared to estimated industry averages of similar materials or products
Region 7 LEC Pilot Projects
Ysleta Land Port of Entry (LPOE), Ysleta, TX Paving will use LEC concrete, asphalt and steel
Construction Services (Design Bid Build Project)
Estimated Cost of Construction: $5M to $10M
Target RFP issuance to bidders: October 2023
Planned award date: March 2024
The LPOE processes privately owned vehicles, commercial traffic and pedestrians.
The port operates 24 hours a day, seven days per week.
Intent is for the select repair and replacement of approximately 725,000 square feet (SF) of concrete pavement. The repairs consist mostly of joint sealing, patching, and the select replacement of 8” – 10” thick reinforced concrete.
Kika de la Garza LPOE, Pharr, TX Paving will use LEC concrete, asphalt and steel
Design and Construction Services (Design Build Project)
Estimated Cost of Construction: $5M to $10M
Target RFP issuance to bidders: January 2024
Planned award date: April 2024
Region 7 LEC Pilot Projects
The LPOE serves both passenger and commercial vehicles.
Intent of the project is to have selective repair and replacement of approximately 300,000 SF of concrete pavement. The repairs consist mostly of select repairs of 8” to 13” thick reinforced concrete. Areas that are currently asphalt are to be converted to concrete.
World Trade Bridge LPOE, Laredo, TX Paving will use LEC concrete, asphalt and steel
Design and Construction Services (Design Build Project)
Estimated Cost of Construction: $10M to $20M
Target RFP issuance to bidders: January 2024
Planned award date: May 2024
This commercial vehicle-only port of entry processes about 8,200 vehicles each day.
Intent of the project is to repair and/or replace approximately 887,000 SF of deteriorating or damaged rigid concrete pavement. The repairs consist mostly of joint sealing, patching, and the select replacement of 8” – 10” thick reinforced concrete.
Areas include commercial traffic roadways, commercial dock areas and a non intrusive inspection access roadway.
Region 7 LEC Pilot Projects
Region 7 LEC Pilot Projects ( ) and construction materials with environmental product declarations
Ysleta, TX
Laredo, TX
Pharr, TX
The U.S. Environmental Protection
Agency (EPA) issued an Interim
Determination in December 2022 to guide GSA and the Federal Highway
Administration on selecting IRA-qualifying materials and products.
For each material, GSA established GWP limits and announced them in May for:
- the best-performing 20% of materials in terms of embodied carbon,
- the best performing 40% of materials in terms of embodied carbon (Top
40% Limits), and
- better than industry average (Better
Than Average Limit).
More Details on Low Embodied Carbon Materials
Approved LEC Materials
Asphalt | Concrete | Glass | Steel https://www.epa.gov/inflation-reduction-act/inflation-reduction-act-programs-fight-climate-change-reducing-embodied#federal https://www.epa.gov/inflation-reduction-act/inflation-reduction-act-programs-fight-climate-change-reducing-embodied#federal https://www.gsa.gov/about-us/newsroom/news-releases/gsa-pilots-buy-clean-inflation-reduction-act-requirements-for-low-embodied-carbon-construction-materials-05162023
How is embodied carbon measured?
o An Environmental Product Declaration (EPD) is an independently-verified summary, created by a manufacturer, of how a product impacts the environment during its life cycle.
o EPDs enable purchasers to better understand a product’s environmental impacts so they can make more informed product selections.
o In an EPD, the GHG emissions associated with a product is called global warming potential (GWP) and is measured as carbon dioxide equivalent (CO2e).
How is Embodied Carbon Reported?
The Business Case for EPDs o GSA's P100 Facilities Standards require concrete and asphalt EPDs for
ALL GSA projects that use at least 10 cubic yards of a mix type.
• Sections 4.8.5 "Low Embodied Carbon Concrete" and 4.8.6
“Environmentally Preferable Asphalt”.
• These requirements are also in GSA's contract templates.
https://www.gsa.gov/system/files/P100%202022%20Addendum%20Final_.pdf#page=159 https://www.gsa.gov/system/files/P100%202022%20Addendum%20Final_.pdf#page=160
● EPDs are at the heart of all state and Federal Buy
Clean Initiatives, and are the key to receiving any low-carbon material appropriations.
○ For example, the Inflation Reduction Act of 2022
(IRA) allocates $2.15 billion to GSA and $2 billion to the U.S. DOT’s Federal Highway
Administration (FHWA) alone, exclusively for low-carbon concrete, steel, glass, and asphalt with
EPDs.
● GSA considers offerors’ embodied carbon reduction plans during its source selection process to choose a winning bidder.
● Other public agencies also consider whether materials have EPDs and low carbon.
○ TxDOT participates in FHWA’s Climate
Challenge
○ The New York Low Embodied Carbon Concrete
Act and New Jersey’s low embodied carbon concrete requirements offer bid discounts and tax credits to compliant offerors.
https://www.sustainability.gov/buyclean/ https://www.sustainability.gov/buyclean/ https://www.sustainability.gov/buyclean/ http://gsa.gov/ira http://gsa.gov/ira https://www.fhwa.dot.gov/inflation-reduction-act/ https://www.fhwa.dot.gov/inflation-reduction-act/ https://www.fhwa.dot.gov/inflation-reduction-act/ https://highways.dot.gov/newsroom/fhwa-steps-efforts-tackle-greenhouse-gas-emissions-highway-construction-71-million-climate https://highways.dot.gov/newsroom/fhwa-steps-efforts-tackle-greenhouse-gas-emissions-highway-construction-71-million-climate
● Market demand for EPDs continues to increase. For example, projects pursuing
LEED certification often target “Environmental Product Declarations” points.
○ EPDs are also key for calculating a building’s whole-building "embodied carbon" footprint associated with material selections
○ GSA’s new construction and major modernizations target a 20% whole-building embodied carbon reduction. (P100 section 1.9.2.9 “Decarbonization”)
● The business decision to develop an EPD may yield a competitive advantage.
○ It distinguishes your company's offerings, shows market leadership, can get your products listed in popular EPD databases, and can help increase efficiency.
● All IRA low-carbon funding received by GSA ($2.15B) and FHWA ($2B) requires an EPD. There is no waiver process for IRA-funded materials.
● Direct EPD and embodied carbon questions to embodiedcarbon@gsa.gov.
https://www.usgbc.org/credits/new-construction-core-and-shell-schools-new-construction-retail-new-construction-data-15?return=/credits/New%20Construction/v4.1 https://www.gsa.gov/system/files/P100%202022%20Addendum%20Final_.pdf#page=39 https://www.oneclicklca.com/article-the-business-case-for-investing-in-epds/
How to get an Environmental Product Declaration* o Climate Earth is one popular tool for generating concrete EPDs. With Climate Earth, it costs about
$7,000 and takes about four months to generate initial EPDs.
• Theta EPD for Concrete and Cement is another new platform for efficiently construction material EPDs.
o Asphalt: Emerald Eco-Label EPD Tool o EPDs get easier, quicker, and less expensive after the first one.
• Automated links to your existing data help.
o This general “How to get an EPD” overview gives more detail, including on EPD Program Operators.
*GSA does not endorse these or any other third-party resources.
https://climateearth.com/ https://thetaepd.com/signup/concrete https://asphaltepd.org/ https://www.buildingtransparency.org/resources/how-get-epd/
Embodied Carbon Resources
• gsa.gov/ira
• GSA’s Pilot IRA LEC
Requirements
• GSA LEC Pilot Fact
Sheet
• GSA IRA LEC FAQs
• Federal Buy Clean
Initiative
• GSA Sustainable
Facilities Tool:
Embodied Carbon Page http://gsa.gov/ira https://www.gsa.gov/cdnstatic/Interim%20IRA%20LEC%20Material%20Requirements%20-%20used%20in%20Pilot%20May%202023%2005162023.pdf https://www.gsa.gov/cdnstatic/Interim%20IRA%20LEC%20Material%20Requirements%20-%20used%20in%20Pilot%20May%202023%2005162023.pdf https://www.gsa.gov/system/files/Fact%20Sheet%20-%20LEC%20pilot%20May%202023%20PDF.pdf https://www.gsa.gov/system/files/Fact%20Sheet%20-%20LEC%20pilot%20May%202023%20PDF.pdf https://www.gsa.gov/system/files/FAQs-on-GSAs-IRA-LEC-Material-Requirements.pdf https://www.sustainability.gov/buyclean/ https://www.sustainability.gov/buyclean/ https://sftool.gov/learn/about/658/embodied-carbon https://sftool.gov/learn/about/658/embodied-carbon https://sftool.gov/learn/about/658/embodied-carbon
The Source Selection Process and
Embodied Carbon
● A source selection evaluation factor will be included that favors the provision of IRA-Eligible Materials with the lowest possible GWP
● Offerors will propose materials that meet Top 20% Limits, Top 40% Limits, or Better Than Average Limits and will be scored accordingly
○ Materials meeting the Top 20% limit are scored higher
● EPDs to support the proposed materials will be required as reflected in the solicitation for each project.
How to find GSA opportunities
Helpful links:
o GSA Forecast of Contract Opportunities: Acquisition Gateway o Open Market opportunities over $25,000: sam.gov (search contract opportunities) o Prepare for Getting on the GSA Schedule: MAS Roadmap https://hallways.cap.gsa.gov/app/#/dv/federal-business-forecast https://sam.gov/content/home https://www.gsa.gov/buy-through-us/purchasing-programs/gsa-multiple-award-schedule/mas-roadmap
Next Steps
August 21: Issuance of Sources Sought
NOTICE – OPEN TO ALL CONCERNS .
September 8: Due Date for Letter of Interest
Anticipated Submission Requirements:
Experience of Similar Projects
Past Performance of Similar Projects
EPD Requirements
Design Portion: Civil Engineer with TxDOT experience
(commercial concrete pavements)
Note: All dates are anticipated dates and are subject to change.
Please continue to review SAM.gov http://sam.gov
Thank You!
QUESTIONS?
Embodied carbon policy contact: embodiedcarbon@gsa.gov
Contact about these specific projects: jason.gerloff@gsa.gov
General GSA IRA program questions: IRAexternalinquiries@gsa.gov mailto:embodiedcarbon@gsa.gov mailto:jason.gerloff@gsa.gov mailto:IRAexternalinquiries@gsa.gov
| Slide 1 |
| Slide 2 |
| Slide 3: Introductions |
| Slide 4: Inflation Reduction Act (IRA) Background |
| Slide 5 |
| Slide 6: Summary of GSA IRA Programs |
| Slide 7: Low Embodied Carbon (LEC) Materials |
| Slide 8 |
| Slide 9 |
| Slide 10 |
| Slide 11: Region 7 LEC Pilot Projects ( ) and construction materials with environmental product declarations |
| Slide 12: More Details on Low Embodied Carbon Materials |
| Slide 13: How is Embodied Carbon Reported? |
| Slide 14: The Business Case for EPDs |
| Slide 15: The Business Case for EPDs |
| Slide 16: The Business Case for EPDs |
| Slide 17: How to get an Environmental Product Declaration* |
| Slide 18: Embodied Carbon Resources |
| Slide 19: The Source Selection Process and Embodied Carbon |
| Slide 20: How to find GSA opportunities |
| Slide 21: Next Steps |
| Slide 22 |
File details come from the government source that posted it. Updated .