SF 1442 Solicitation Body Agreement Representations Certifications Statements of Work Drawings Diagrams Illustrations and Pictures

View the file

Other files

Show all 15

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

PAGE

GENERAL SERVICES ADMINISTRATION

OF

ITEM NO., FORM OR

STOCK NUMBER DESCRIPTION OF ARTICLES OR SERVICES QUAN-

TITY

UNIT

OF

ISSUE

UNIT

PRICE

AMOUNT

Solicitation No. GS-10-P-16-XJ-P-7001

Contractor shall provide all goods/ supplies/materials, equipment, labor, permits, licenses, and clearances necessary to complete the below listed projects.

PROJECT1:

AFB USPO Sound Attenuation

PR#: EQ10PCB-16-5001

Location: James M. Fitzgerald U.S.

Courthouse & Federal Building (AFB)

Description: Installation of sound attenuation and replacement of ceiling tiles in the U.S. Probation/Pretrial Services Office (USPO) per the attached Statement of Work (SOW) (Note: This is not an environmental project.)

Period of Performance: 120 calendar days after issuance of Notice to Proceed

(NTP)

PROJECT 2:

USDC Ground Wire Install

PR#: EQ10PCB-16-5002

Location: James M. Fitzgerald U.S.

Courthouse & Federal Building (AFB)

Description: Install ground wire from U.S.

District Courts (USDC) audiovisual equipment to structural-stell and bond ground wire per the attached Statement of Work (SOW) (Note: This is not an environmental project.)

Period of Performance: 120 calendar days after issuance of Notice to Proceed

(NTP)

PROJECT 3:

AFB FAA Water Fountain Installation

PR#: EQ10PCB-1-16-5000

Location: James M. Fitzgerald U.S.

Courthouse & Federal Building (AFB)

Description: Replace Federal Aviation Administration (FAA) dual water fountain per the attached Statement of Work (SOW) (Note: This is not an environmental project.)

Period of Performance: 60 calendar days after issuance of NTP

LS

LS

LS

3 5

OF

ITEM NO., FORM OR

STOCK NUMBER DESCRIPTION OF ARTICLES OR SERVICES QUAN-

TITY

UNIT

OF

ISSUE

UNIT

PRICE

AMOUNT

Solicitation No. GS-10-P-16-XJ-P-7001

PROJECT 4:

AFB FEMA Security Partition Installation

PR#: EQ10PCB-1-16-5001

Location: James M . Fitzgerald U.S.

Courthouse & Federal Building (AFB)

Description: Construction a wire mesh security partition in the Federal Emergency Management Agency (FEMA) IT server room per the attached Statement of Work (SOW) (Note: This is not an environmental project.)

Period of Performance: 120 calendar days after issuance of Notice to Proceed

(NTP)

PROJECT 5:

AFB G-Mod Loading Area Security Cable Installation

PR#:EQ10PCB-1-16-5004

Location: James M . Fitzgerald U.S.

Courthouse & Federal Building (AFB)

Description: Install security cable to prevent unauthorized vehicle access per the attached Statement of Work (SOW) (Note: This is not an environmental project.)

Period of Performance: 120 calendar days after issuance of Notice to Proceed

(NTP)

PROJECT 6:

AFB Cafeteria Door Replacement

PR#: EQ10PCB-1-16-5005

Location: James M . Fitzgerald U.S.

Courthouse & Federal Building (AFB)

Description: Replace inoperable sliding door with new swing style door per the attached Statement of Work (SOW) (Note:

This is not an environmental project.)

Period of Performance: 120 calendar days after issuance of Notice to Proceed

(NTP)

LS

LS

LS

4 5

OF

ITEM NO., FORM OR

STOCK NUMBER DESCRIPTION OF ARTICLES OR SERVICES QUAN-

TITY

UNIT

OF

ISSUE

UNIT

PRICE

AMOUNT

Solicitation No. GS-10-P-16-XJ-P-7001

LS

LS

LS

PROJECT 7:

AFB FAA ADA Door Operators

PR#: EQ10PCB-1-16-5008

Location: James M . Fitzgerald U.S.

Courthouse & Federal Building (AFB)

Description: Install two ADA door operators with push button access on the Men's & Women's Federal Aviation Administration (FAA) restrooms per the attached Statement of Work (SOW) (Note:

This is not an environmental project.)

Period of Performance: 120 calendar days after issuance of Notice to Proceed

(NTP)

PROJECT 8:

HFB NARA Ceiling Hole Repair

PR#: EQ10PCB-1-16-5006

Location: Historic Federal Building (AFB) Period of Performance: 120 calendar days after issuance of Notice to Proceed

(NTP)

Description: Repair, excluding lead work, of a hole in the women's restroom ceiling (lath & plaster) caused by a leaking pipe per the attached Statement of Work (SOW) (Note: This is not an environmental project.)

Description: Lead specific work for CLIN 0008 per the attached Statement of Work (SOW) (Note: This is not an environmental project.)

5 5

GSA Solicitation No. GS-10-P-16-XJ-P-7001 Simplified Acquisition Construction Contract for Multiple Small Construction Projects in Anchorage, AK

The Solicitation

Notice to Offerors of Total Small Business Set-Aside

The General Services Administration (GSA) is setting aside the contract under the following clause found in the Agreement:

52.219-6, Notice of Total Small Business Set-Aside

Table of Contents

I. General Information A. The Solicitation and Contract B. List of Solicitation Documents C. Authorized Representatives D. Estimated Price Range E. FAR 52.236-27 Site Visit - Construction

F. Receipt of Offers

II. Proposals A. Proposal Contents B. Proposal Format C. Price Proposal D. Technical Proposal E. Other Information to Submit with Proposal

III. General Provisions

A. Availability of Funds B. Requests for Clarification or Interpretation C. Notice to Small Business Firms D. Information Concerning the Disclosure of Solicitation Results E. Affirmative Procurement Program F. Notice Concerning Preparation of Proposals G. Bond/Payment Protection Requirements H. Contractor Performance Information I. Safeguarding Documents Designated as Sensitive But Unclassified J. Additional Security Requirements

IV. FAR/GSAR Solicitation Provisions

Document: C201-SAT-LPTA / OCT 2015 (The Solicitation) Page 1 of 14

A. FAR 52.222-23 Notice of Requirement for Affirmative Action to Ensure Equal

Employment Opportunity for Construction B. FAR 52.225-10 Notice of Buy American Requirement-Construction Materials C. Buy American Exceptions D. FAR 52.252-1 Solicitation Provisions Incorporated by Reference E. GSAR 552.102 Incorporating Provisions and Clauses by Reference

V. Additional Solicitation Provisions and Instructions A. Additional Provisions

VI. Method of Award

A. Evaluation of Offers – Lowest Price Technically Acceptable B. Lowest Price Technically Acceptable Evaluation Process C. Price Reasonableness / Price Realism D. Unbalanced Prices

(The Solicitation) Page 2 of 14

I. General Information

I.A. The Solicitation and Contract

(1) This Solicitation is set-aside for Small Businesses in accordance with FAR 19. This Solicitation sets forth requirements for proposals for a Contract to construct the Project described in the Solicitation Documents. Proposals conforming to the Solicitation requirements will be evaluated in accordance with the Method of Award set forth herein. The Government will award the Contract to the selected Offeror, subject to the conditions set forth herein.

(2) Neither the Solicitation nor any part of an Offeror's proposal shall be part of the Contract except to the extent expressly incorporated therein by the Contracting Officer.

(3) The Offeror's proposal submitted in response to this Solicitation shall constitute a firm offer.

No contract shall be formed unless and until the Contracting Officer has countersigned the SF 1442 submitted by an Offeror, and delivered to the Contractor a copy of the SF 1442 with original signatures together with the Agreement reflecting the Offeror's proposed prices.

I.B List of Solicitation Documents

The Solicitation Documents are comprised of:

(1) The Solicitation

(2) Offeror Representations and Certifications Form

(3) Statement(s) of Work; Specification(s); Drawing(s);

(4) Standard Form (SF) 1442 – Solicitation Offer and Award

(5) The Agreement and Attachments to the Agreement

(6) Construction Wage Rates Requirement Statute (Davis-Bacon) – Wage Determination

I.C . Authorized Representatives

The following individuals are designated as the authorized GSA representatives under this Solicitation:

(1) Contracting Officer

Name: Amy Heusser Address: 222 W 7th Avenue, Anchorage, AK 99513

Telephone: 907-271-3741 Email: amy.heusser@gsa.gov

(2) Alternate Point of Contact

Name: Nicole Noyles (Contract Specialist) Address: 222 W 7th Avenue, Anchorage, AK 99513

Telephone: 907-271-3022 Email: nicole.noyles@gsa.gov

(The Solicitation) Page 3 of 14

I.D. Estimated Price Range

The estimated price range for each individual project is between $0 and $25,000.

I.E. FAR 52.236-27 Site Visit - Construction (FEB 95)

(1) The clauses at FAR 52.236-2, Differing Site Conditions, and FAR 52.236-3, Site Investigations and Conditions Affecting the Work, will be included in any contract awarded as a result of this solicitation. Accordingly, Offerors are urged and expected to inspect the site where the work will be performed.

(2) Site visits will be conducted by appointment only at the times and dates specified by the point of contact shown below. To arrange for a site visit, contact:

Name: Nicole Noyles (Contract Specialist) Email: nicole.noyles@gsa.gov

(3) Site visit will be held at the following dates and times:

Date: 01/07/2016 Thursday Time: Beginning at 9:00 AM AKT

(4) Pre-registration is required for all attendees to the pre-proposal Site Visit. The Site Visit shall be limited to not more than four (4) representatives from each Offeror. Offerors shall submit an email confirming attendance at the specified site visit date and time to the Contract Specialist by 12:00 PM Alaska Time on Wednesday, January 6, 2016. Email shall identify all attendees from their respective team. Participants must have a valid, Government issued picture identification or Driver’s License to gain access to Anchorage Federal Buildings. Contractors are to assemble in the GSA Office of the James M Fitzgerald U.S. Courthouse & Federal Building (222 W 7th Avenue, Anchorage, AK 99513) in Room 151.

I.F. Receipt of Offers

(1) In order to be considered for award, offers conforming to the requirements of the Solicitation must be received at the following office no later than 12:00 pm Alaska standard time on the following date and at the following address:

Date: 01/19/2016 Address: nicole.noyles@gsa.gov (preferred); or

GSA – PBS

Attn: Nicole Noyles 222 W 7th Avenue, Rm 151 Anchorage, AK 99513

(2) Offers sent by commercial package delivery and hand delivery shall be deemed received as of the date and time of delivery to the office designated for receipt of offers.

(The Solicitation) Page 4 of 14 http://www.acquisition.gov/far/current/html/52_233_240.html%23wp1113365 http://www.acquisition.gov/far/current/html/52_233_240.html%23wp1113375 mailto:nicole.noyles@gsa.gov

(3) Offers sent by United States Mail shall be deemed timely if delivered to the address of the office designated for receipt of offers on or before the date established for receipt of offers.

II. Proposals

II.A. Proposal Contents

Proposals shall consist of the following documents, completed and executed in accordance with this Solicitation:

1. Price Proposal (submit on SF1442)

2. Technical Proposal (See Section II.D.)

3. Representations and Certifications

II.B. Proposal Format

Offerors are required to submit proposals as described herein. Proposals shall be submitted typed on non-reduced 8 ½ x 11” sheets with 1” margins on top, bottom, left and right.

II.C. Price Proposal

The Price Proposal shall consist of the SF 1442. If the Offeror communicates in its proposal any qualifications, exclusions, or conditions to the proposed prices not provided for in the Contract Documents, the Contracting Officer may reject the proposal and exclude the Offeror from further discussions.

II.D. Technical Proposal The Technical Proposal shall include the information on the offeror’s previous experience and past performance on similar work. The Government intends to evaluate the technical proposals of only the three lowest priced offers.

Factor 1 — Experience:

The offeror shall submit a minimum of three with a maximum of four project examples demonstrating relevant experience. Each project example shall be no more than one page.

Relevant experience is —

1. the offeror’s experience working on general construction work inside of a multi-story, commercial office building;

2. the offeror’s management of subcontracted work; and

3. the offeror’s completion of the work on time in accordance with approved construction schedule.

Narratives for previous experience shall be limited to no more than one page per example on

8.5 x 11 inch paper with 1 inch margins on all sides. Offeror shall submit a current Point of Contact (POC) for each project example. The POC information shall include the name, current phone number and email address for each POC for each project submitted. The Government reserves the right to contact the POC provided by the Offeror to verify the past

(The Solicitation) Page 5 of 14 experience. All projects submitted must be at least 75% complete or must have been completed within the last three (3) years from the date proposals are due. In accordance with FAR 15.306, the Offeror will be given the opportunity to respond to adverse past performance information.

Factor 2 — Past Performance of Offeror:

In accordance with FAR 42.1503(e) and GSAM 515.305, past performance of the proposed offeror will be evaluated using the Federal Awardee Performance and Integrity Information System (FAPIIS), the Past Performance Information Retrieval System (PPIRS). If an Offeror does not have past performance information available from FAPIIS or PPIRS, the information received from the examples submitted from the Offeror will be used. A lack of past performance information in FAPIIS and PPIRS will result in a neutral rating (for FAPIIS or PPIRS information only) during this phase of evaluation. Government databases will be checked and previous customers may be contacted as references.

II.E. Other Information to Submit with Proposal

(1) Representations and Certifications

Offerors submitting a proposal in response to this Solicitation shall complete electronic Annual Representations and Certifications in conjunction with required Entity registration in System for Award Management (SAM), accessed via https://www.sam.gov. Offerors shall also submit with their proposal, the Annual Representations and Certifications (FAR 52.204-8), using the attached Offeror’s Representations and Certifications (C301-SAT).

III. General Provisions

III.A. Availability of Funds

Issuance of this Solicitation does not warrant that funds are presently available for award of a Contract. Award of the contract shall be subject to the availability of appropriated funds, and the Government shall incur no obligation under this Solicitation in advance of such time as funds are made available to the Contracting Officer for the purpose of contract award.

III.B. Requests for Clarification or Interpretation The Government will attempt to answer all requests for clarifications or interpretations of the Solicitation Documents prior to the date set for receipt of offers. Requests for Clarification/Interpretation or questions regarding this solicitation shall be emailed to the Contract Specialist, Nicole Noyles, by 12:00 PM Alaska time on 01/11/2016.

III.C. Notice to Small Business Firms

A program for the purpose of assisting qualified small business concerns in obtaining certain bid, payment, or performance bonds that are otherwise not obtainable is available through the Small Business Administration (SBA) (www.sba.gov). For information concerning SBA's surety bond guarantee assistance, contact your SBA District Office.

III.D. Information Concerning the Disclosure of Solicitation Results

(The Solicitation) Page 6 of 14 https://www.sam.gov/ http://www.sba.gov/

This acquisition is being conducted under the provisions of FAR Part 13 as a negotiated simplified procurement. In accordance with FAR 3.104 and FAR 15.207, after receipt of proposals, no information regarding the identity of those submitting offers, the number of offers received, or the information contained in such offers will be made available until after award except as provided by FAR 15.503.

III.E. Affirmative Procurement Program

GSA has implemented an Affirmative Procurement Program (APP) intended to maximize the use of recovered materials, environmentally preferable, and bio-based products. Offerors should familiarize themselves with the requirements for using and reporting on the use of such materials in performance as set forth in the Agreement. Refer to Clause FAR 52.223-10 encouraging vendors to practice waste reduction.

III.F. Notice Concerning Preparation of Proposals

The Contract contemplated by this Solicitation contains revisions to standard FAR and GSAR construction clauses. Offerors are cautioned to carefully read the entire Solicitation and the Agreement to be included in the Contract contemplated by the Solicitation in order to be fully aware of all requirements and clauses in the contemplated Contract. Verify that all blanks requiring information to be supplied in an Offer have been properly filled out, that all pricing and other numerical data is accurately calculated, and that all copies of the Offer contain the same information.

III.G. Bond/Payment Protection Requirements

In accordance with FAR 28.102, if the awarded contract exceeds $30,000 but does not exceed $150,000, a payment bond or alternative payment protection is required in the amount of the award. Offerors who utilize individual sureties should note the requirement for a certified, audited, financial statement for each person acting as an individual surety under clause FAR 52.228-1 Bid Guarantee and the requirements of clause FAR 52.228-11 Pledges of Assets.

III.H. Contractor Performance Information

(1) Evaluating Contractor Performance: The General Services Administration is using the Contractor Performance Assessment Reporting System (CPARS) module as the secure, confidential, information management tool to facilitate the performance evaluation process.

CPARS enables a comprehensive evaluation by capturing comments from both GSA and the contractor. The website for CPARS is http://www.cpars.gov

Completed CPARS evaluations are sent to the Past Performance Information Retrieval System (PPIRS) which may then be used by Federal acquisition community for use in making source selection decisions. PPIRS assists acquisition officials by serving as the single source for contractor past performance data.

(2) CPARS Registration: Each award requiring an evaluation must be registered in CPARS. The contractor will receive several automated emails. Within thirty days of award, the contractor will receive an e-mail that contains user account information, as well as the applicable contract and order number(s) assigned. Contractors will be granted one user account to access all evaluations.

Document: C201-SAT-LPTA / OCT 2015 (The Solicitation) Page 7 of 14 http://www.cpars.gov/

(3) Contractor CPARS Training: Contractors may sign up for CPARS training. A schedule of classes will be posted to the CPARS training site (http://www.cpars.gov/allapps/cpcbtdlf.htm) and updated as needed.

(4) Contractor Representative (CR) Role: All evaluations will be sent the Contractor Representative (CR) named on your award. The CR will be able to access CPARS to review and comment on the evaluation. If your CR is not already in the CPARS system, the contracting officer will request the name and email address of the person that will be responsible for the CR role on your award.

Once an evaluation is ready to be released the CR will receive an email alerting them the evaluation is ready for their review and comment. The email will indicate the time frame the CR has to respond to the evaluation; however, the CR may return the evaluation earlier than this date.

GSA shall provide for review at a level above the contracting officer (i.e., contracting director) to consider any disagreement between GSA and the contractor regarding GSA’s evaluation of the contractor. Based on the review, the individual at a level above the contracting officer will issue the ultimate conclusion on the performance evaluation.

Copies of the evaluations, contractor responses, and review comments, if any, will be retained as part of the contract file.

III.I. Safeguarding Documents Designated as Sensitive But Unclassified

Certain information contained in the Solicitation Documents may have been designated as Sensitive but Unclassified (SBU) building information. With respect to such information, Offerors shall agree to the terms for receipt of such information, as set forth in the provision “Administrative Matters” in Section III of the Agreement, as a condition of receipt of such information.

III.J. Additional Security Requirements

(1) FAR 52.204-9, Personal Identity Verification of Contractor Personnel, January 2011

(2) GSAR Clause 552.204-9, Personal Identity Verification Requirements, October 2012

IV. FAR/GSAR Solicitation Provisions

IV.A. FAR 52.222-23 Notice of Requirement for Affirmative Action to Ensure Equal Employment Opportunity for Construction (FEB 1999)

(Applicable to solicitations resulting in construction contracts in excess of $10,000.)

(a) The offeror's attention is called to the Equal Opportunity clause and the Affirmative Action Compliance Requirements for Construction clause of this solicitation.

(b) The goals for minority and female participation, expressed in percentage terms for the Contractor's aggregate workforce in each trade on all construction work in the covered area, are as follows:

Document: C201-SAT-LPTA / OCT 2015 (The Solicitation) Page 8 of 14 http://www.cpars.gov/allapps/cpcbtdlf.htm

Goals for Minority Participation for Each Trade

Goals for Female Participation for Each Trade

8.7%

6.9%

These goals are applicable to all the Contractor's construction work performed in the covered area. If the Contractor performs construction work in a geographical area located outside of the covered area, the Contractor shall apply the goals established for the geographical area where the work is actually performed. Goals are published periodically in the Federal Register in notice form, and these notices may be obtained from any Office of Federal Contract Compliance Programs office.

(c) The Contractor's compliance with Executive Order 11246, as amended, and the regulations in 41 CFR 60-4 shall be based on (1) its implementation of the Equal Opportunity clause, (2) specific affirmative action obligations required by the clause entitled "Affirmative Action Compliance Requirements for Construction,'' and (3) its efforts to meet the goals. The hours of minority and female employment and training must be substantially uniform throughout the length of the contract, and in each trade. The Contractor shall make a good faith effort to employ minorities and women evenly on each of its projects. The transfer of minority or female employees or trainees from Contractor to Contractor, or from project to project, for the sole purpose of meeting the Contractor's goals shall be a violation of the contract, Executive Order 11246, as amended, and the regulations in 41 CFR 60-4. Compliance with the goals will be measured against the total work hours performed.

(d) The Contractor shall provide written notification to the Deputy Assistant Secretary for Federal Contract Compliance, U.S. Department of Labor, within 10 working days following award of any construction subcontract in excess of $10,000 at any tier for construction work under the contract resulting from this solicitation. The notification shall list the--

(1) Name, address, and telephone number of the subcontractor;

(2) Employer's identification number of the subcontractor;

(3) Estimated dollar amount of the subcontract;

(4) Estimated starting and completion dates of the subcontract; and

(5) Geographical area in which the subcontract is to be performed.

(e) As used in this Notice, and in any contract resulting from this solicitation, the "covered area" is: Anchorage, AK

IV.B. FAR 52.225-10 Notice of Buy American Requirement—Construction Materials.

(MAY 2014)

(a) Definitions. “Commercially available off-the-shelf (COTS) item,” “construction material,” “domestic construction material,” and “foreign construction material,” as used in this provision, are defined in the clause of this solicitation entitled “Buy American—Construction Materials” (Federal Acquisition Regulation (FAR) clause 52.225-9).

(b) Requests for determinations of inapplicability. An offeror requesting a determination regarding the inapplicability of the Buy American statute should submit the request to the Contracting Officer in time to allow a determination before submission of offers. The offeror shall Document: C201-SAT-LPTA / OCT 2015 (The Solicitation) Page 9 of 14 https://www.acquisition.gov/far/current/html/52_223_226.html%23wp1169273 include the information and applicable supporting data required by paragraphs (c) and (d) of the clause at FAR 52.225-9 in the request. If an offeror has not requested a determination regarding the inapplicability of the Buy American statute before submitting its offer, or has not received a response to a previous request, the offeror shall include the information and supporting data in the offer.

(c) Evaluation of offers.

(1) The Government will evaluate an offer requesting exception to the requirements of the Buy American statute, based on claimed unreasonable cost of domestic construction material, by adding to the offered price the appropriate percentage of the cost of such foreign construction material, as specified in paragraph (b)(3)(i) of the clause at FAR 52.225-9.

(2) If evaluation results in a tie between an offeror that requested the substitution of foreign construction material based on unreasonable cost and an offeror that did not request an exception, the Contracting Officer will award to the offeror that did not request an exception based on unreasonable cost.

(d) Alternate offers.

(1) When an offer includes foreign construction material not listed by the Government in this solicitation in paragraph (b)(2) of the clause at FAR 52.225-9, the offeror also may submit an alternate offer based on use of equivalent domestic construction material.

(2) If an alternate offer is submitted, the offeror shall submit a separate Standard Form 1442 for the alternate offer, and a separate price comparison table prepared in accordance with paragraphs (c) and (d) of the clause at FAR 52.225-9 for the offer that is based on the use of any foreign construction material for which the Government has not yet determined an exception applies.

(3) If the Government determines that a particular exception requested in accordance with paragraph (c) of the clause at FAR 52.225-9 does not apply, the Government will evaluate only those offers based on use of the equivalent domestic construction material, and the offeror shall be required to furnish such domestic construction material. An offer based on use of the foreign construction material for which an exception was requested—

(i) Will be rejected as nonresponsive if this acquisition is conducted by sealed bidding; or

(ii) May be accepted if revised during negotiations.

IV.C. Buy American Exceptions

For Buy American exceptions, if any, see the applicable Buy American clause in Section IV of the Agreement.

IV.D. FAR 52.252-1 Solicitation Provisions Incorporated by Reference (FEB 98)

This solicitation incorporates one or more solicitation provisions by reference, with the same force and effect as if they were given in full text. Upon request, the Contracting Officer will make their full text available. The offeror is cautioned that the listed provisions may include blocks that must be completed by the offeror and submitted with its quotation or offer. In lieu of submitting the full text of those provisions, the offeror may identify the provision by paragraph identifier and provide the appropriate information with its quotation or offer. Also, the full text of a solicitation provision may be accessed electronically at this address:

http://www.acquisition.gov/comp/far/index.html Document: C201-SAT-LPTA / OCT 2015 (The Solicitation) Page 10 of 14 https://www.acquisition.gov/far/current/html/52_223_226.html%23wp1169273 https://www.acquisition.gov/far/current/html/52_223_226.html%23wp1169273 https://www.acquisition.gov/far/current/html/52_223_226.html%23wp1169273 https://www.acquisition.gov/far/current/html/FormsStandard62.html%23wp1177057 https://www.acquisition.gov/far/current/html/FormsStandard62.html%23wp1177057 https://www.acquisition.gov/far/current/html/52_223_226.html%23wp1169273 https://www.acquisition.gov/far/current/html/52_223_226.html%23wp1169273 http://www.acquisition.gov/comp/far/index.html

NUMBER TITLE DATE

52.236-28

52.204-6

Preparation of Proposals - Construction

Data Universal Numbering System Number

OCT 1997

JUL 2013

IV.E. GSAR Clause 552.102 Incorporating Provisions and Clauses

This solicitation incorporates one or more solicitation provisions by reference, with the same force and effect as if they were given in full text. Upon request, the Contracting Officer will make their full text available.

NUMBER

552.236-75

TITLE

Use of Premises

DATE

APR 1984

V. Additional Solicitation Provisions and Instructions

V.A. Instructions to Offerors – Competitive Simplified Acquisition

(1) Definitions. As used in this Section -

“Discussions” are negotiations that occur after establishment of the competitive range that may, at the Contracting Officer’s discretion, result in the offeror being allowed to revise its proposal.

“In writing,” “writing,” or “written” means any worded or numbered expression that can be read, reproduced, and later communicated, and includes electronically transmitted and stored information.

“Proposal revision” is a change to a proposal made after the solicitation closing date, at the request of or as allowed by a Contracting Officer as the result of negotiations.

“Time,” if stated as a number of days, is calculated using calendar days, unless otherwise specified, and will include Saturdays, Sundays, and legal holidays. However, if the last day falls on a Saturday, Sunday, or legal holiday, then the period shall include the next working day.

(2) Amendments to solicitations. If this solicitation is amended, all terms and conditions that are not amended remain unchanged. Offerors shall acknowledge receipt of any amendment to this solicitation by the date and time specified in the amendment(s).

(3) Submission, modification, revision, and withdrawal of proposals.

(a) Unless other methods (e.g., electronic commerce or facsimile) are permitted in the solicitation, proposals and modifications to proposals shall be submitted in paper media in sealed envelopes or packages (i) addressed to the office specified in the solicitation, and (ii) showing the time and date specified for receipt, the solicitation number, and the name and address of the offeror.

(b) The first page of the proposal must show—

(i) The solicitation number;

(The Solicitation) Page 11 of 14

(ii) The name, address, and telephone and facsimile numbers of the offeror (and electronic address if available);

(iii) A statement specifying the extent of agreement with all terms, conditions, and provisions included in the solicitation and agreement to furnish any or all items upon which prices are offered at the price set opposite each item;

(iv) Names, titles, and telephone and facsimile numbers (and electronic addresses if available) of persons authorized to negotiate on the offeror’s behalf with the Government in connection with this solicitation; and

(v) Name, title, and signature of person authorized to sign the proposal. Proposals signed by an agent shall be accompanied by evidence of that agent’s authority, unless that evidence has been previously furnished to the issuing office.

(c) Submission, revision, and withdrawal of proposals.

(i) Offerors are responsible for submitting proposals, and any revisions, so as to reach the Government office designated in the solicitation by the time specified in the solicitation.

If no time is specified in the solicitation, the time for receipt is 4:30 p.m., local time, for the designated Government office on the date that proposal or revision is due.

(ii) Any proposal, or revision received at the Government office designated in the solicitation after the exact time specified for receipt of offers is “late” and will not be considered unless it is received before award is made, the Contracting Officer determines that accepting the late offer would not unduly delay the acquisition; and—

(1) If it was transmitted through an electronic commerce method authorized by the solicitation, it was received at the initial point of entry to the Government infrastructure not later than 5:00 p.m. one working day prior to the date specified for receipt of proposals; or

(2) There is acceptable evidence to establish that it was received at the Government installation designated for receipt of offers and was under the Government’s control prior to the time set for receipt of offers; or

(3) It is the only proposal received.

(iii) Acceptable evidence to establish the time of receipt at the Government installation includes the time/date stamp of that installation on the proposal wrapper, other documentary evidence of receipt maintained by the installation, or oral testimony or statements of Government personnel.

(iv) If an emergency or unanticipated event interrupts normal Government processes so that proposals cannot be received at the office designated for receipt of proposals by the exact time specified in the solicitation, and urgent Government requirements preclude amendment of the solicitation, the time specified for receipt of proposals will be deemed to be extended to the same time of day specified in the solicitation on the first work day on which normal Government processes resume.

(v) Proposals may be withdrawn by written notice received at any time before award. If the solicitation authorizes facsimile proposals, proposals may be withdrawn via facsimile received at any time before award, subject to the conditions specified in the provision at 52.215-5, Facsimile Proposals. Proposals may be withdrawn in person by an offeror or an

(The Solicitation) Page 12 of 14 authorized representative, if the identity of the person requesting withdrawal is established and the person signs a receipt for the proposal before award.

(d) Offerors may submit revised proposals only if requested or allowed by the Contracting Officer.

(e) Proposals may be withdrawn at any time before award. Withdrawals are effective upon receipt of notice by the Contracting Officer.

(4) Offer expiration date. Proposals in response to this solicitation will be valid for the number of days specified on the solicitation cover sheet.

(5) Restriction on disclosure and use of data. Offerors that include in their proposals data that they do not want disclosed to the public for any purpose, or used by the Government except for evaluation purposes, shall—

(a) Mark the title page with the following legend:

This proposal includes data that shall not be disclosed outside the Government and shall not be duplicated, used, or disclosed—in whole or in part—for any purpose other than to evaluate this proposal. If, however, a contract is awarded to this offeror as a result of—or in connection with—the submission of this data, the Government shall have the right to duplicate, use, or disclose the data to the extent provided in the resulting contract. This restriction does not limit the Government's right to use information contained in this data if it is obtained from another source without restriction. The data subject to this restriction are contained in sheets [insert numbers or other identification of sheets]; and

(b) Mark each sheet of data it wishes to restrict with the following legend:

Use or disclosure of data contained on this sheet is subject to the restriction on the title page of this proposal.

V.B. Additional Provisions

VI. Method of Award

VI.A. Evaluation of Offers – Lowest Price Technically Acceptable

(1) The Government intends to award separate contracts for each project resulting from this solicitation to the responsible offeror(s) whose proposal(s) represents the best value from the selection of the technically acceptable proposal with the lowest evaluated price. Award will be made on the basis of the lowest evaluated price of proposals meeting the acceptability standards for non-cost factors. Proposals will be evaluated on a pass/fail basis.

(2) The Government may reject any or all proposals if such action is in the Government’s interest.

(3) The Government may waive informalities and minor irregularities in proposals received.

(4) The Government will first evaluate price to determine the lowest through highest priced offers. The Government intends to evaluate the technical proposals of only the three lowest priced offers. The remaining technical proposals, if any, shall not be evaluated as to technical acceptability unless one of the three lowest price offers proves to be technically unacceptable. If one of the three lowest priced proposals proves to be technically unacceptable, then the fourth-lowest priced proposal (and so on) will be evaluated for technical acceptability. Any costs

(The Solicitation) Page 13 of 14 incurred by offerors in preparing or submitting offers are the offerors' sole responsibility; the United States will not reimburse any offeror for any proposal preparation costs.

(5) The Government intends to evaluate proposals and award on initial proposals. Therefore, the offeror’s initial proposal shall contain the offeror’s best price.

(7) Unsuccessful offerors will be notified in accordance with FAR 13.106-3(c).

VI.B. Lowest Price Technically Acceptable Evaluation Process

(1) The Government will first evaluate price to determine the lowest through highest priced offers. The Government intends to evaluate the technical proposals of only the three lowest priced offers. The remaining technical proposals shall not be evaluated as to technical acceptability unless one of the three lowest price offers proves to be technically unacceptable. If one of the three lowest priced proposals proves to be technically unacceptable, then the fourth-lowest priced proposal will be evaluated for technical acceptability. This process will continue until the Government deems three proposals technically acceptable. Award will then be made to the lowest-priced, technically acceptable offeror. Any costs incurred by offerors in preparing or submitting offers are the offerors' sole responsibility; the United States will not reimburse any offeror for any proposal preparation costs.

(2) Award will be made on the basis of the lowest evaluated price of proposals meeting the acceptability standards for non-cost factors.

(3) The following non-cost factors will be evaluated for acceptability:

(a) Experience

(b) Past Performance

VI.C. Price Reasonableness

The proposed prices will be evaluated for reasonableness. Price reasonableness determines whether an Offeror’s price is too high. Analysis of price proposals will be performed using one or more of the techniques defined in FAR 15.404 in order to determine price reasonableness. Price reasonableness may be established through adequate price competition, but may also be determined through price analysis techniques as described in FAR 15.404-1. Notwithstanding anything to the contrary in this solicitation and for the avoidance of doubt, the Government will not perform a price realism analysis of the Offeror’s proposal.

(The Solicitation) Page 14 of 14

GSA Contract No. [TBD at time of award] Simplified Acquisition Construction Contract for Multiple Small Construction Projects in Anchorage, AK

The Agreement

Table of Contents

I. Project Information A. Project Summary B. The Contract C. Period of Performance D. Work Conditions/Site Requirements E. Authorized Representative F. Contract Liquidated Damages Rate G. Buy American Exceptions H. Statement of Work, Specifications, Drawings, Exhibits, and Other Attachments

II. Prices A. Basis of Pricing B. Contract Price Form

III. Terms and Conditions

A. Commencement, Prosecution, and Completion of Work B. Contractor Responsibilities C. Contractor Management and Personnel D. Material and Workmanship E. Project Schedule F. Extensions of Time G. Interpretation of Specifications and Drawings H. Submittals I. Government’s Right to Stop Work for Non-Compliance J. Other Contracts K. Substantial Completion and Contract Completion L. Use and Possession Prior to Substantial Completion M. Equitable Adjustments N. Finality of Contract Modifications O. Liquidated Damages P. Insurance Requirements Q. Administrative Matters R. Bonds S. Safeguarding Sensitive Data and Information Technology Resources T. Options and Allowances U. Additional Terms and Conditions

IV. Contract Clauses

A. Clauses Incorporated in Full Text B. Clauses Incorporated by Reference

Document: C101-SAT / OCT 15 (The Agreement)

I. Project Information

I.A. Project Summary

Multiple Small Construction Projects in the James M. Fitzgerald U.S. Courthouse & Federal Building and the Historic Federal Building in Anchorage, AK. Each project will be awarded separately. Projects are as follows:

• AFB FAA Water Fountain Installation (PR# EQ10PCB-1-16-5000)

• AFB FEMA Security Partition Installation (PR# EQ10PCB-1-16-5001)

• AFB G-Mod Loading Area Security Cable Install (PR# EQ10PCB-1-16-5004)

• AFB Cafeteria Door Replacement (PR# EQ10PCB-1-16-5005)

• HFB NARA Ceiling Hole Repair (PR# EQ10PCB-1-16-5006)

• AFB FAA ADA Door Operators (PR# EQ10PCB-1-16-5008)

• AFB USPO Sound Attenuation (PR# EQ10PCB-16-5001)

• AFB USDC Ground Wire Installation (PR# EQ10PCB-16-5002)

I.B. The Contract

(1) The Contract consists of the SF 1442, the Agreement, the Statement of Work, Specifications, Drawings, Exhibits, Amendments, Modifications, and other Attachments identified herein (collectively, the Contract Documents). The Contract contains the entire agreement of the Parties, and no prior written or oral agreement, express or implied, shall be admissible to contradict or modify any part of the Contract.

(2) The Contractor shall provide and pay for all labor, materials, equipment, tools, transportation, and other facilities and services necessary for the proper execution of the work described in and reasonably inferable from the Contract Documents (the Work), whether temporary or permanent. In consideration for, and upon condition of, the Contractor's completion of the Work, GSA shall pay the Contractor the price or prices established in Section II, subject to the terms and conditions set forth in this Contract.

I.C. Period of Performance

Overall Period of Performance is 120 calendar days from NTP for the following projects:

• AFB FEMA Security Partition Installation (PR# EQ10PCB-1-16-5001)

• AFB G-Mod Loading Area Security Cable Install (PR# EQ10PCB-1-16-5004)

• AFB Cafeteria Door Replacement (PR# EQ10PCB-1-16-5005)

• HFB NARA Ceiling Hole Repair (PR# EQ10PCB-1-16-5006)

• AFB FAA ADA Door Operators (PR# EQ10PCB-1-16-5008)

• AFB USPO Sound Attenuation (PR# EQ10PCB-16-5001)

Document: C101-SAT / OCT 15

• AFB USDC Ground Wire Installation (PR# EQ10PCB-16-5002)

Overall Period of Performance is 60 calendar days from NTP for the following projects:

• AFB FAA Water Fountain Installation (PR# EQ10PCB-1-16-5000)

(1) Commencement. The Contractor shall commence performance of the Work within 10 days after the Contractor receives the Notice to Proceed (NTP).

(2) Substantial Completion. The Contractor shall achieve Substantial Completion of the Work, as that term is defined in this Agreement, no later than 100 calendar days from issuance of Notice to Proceed (NTP).

(3) Contract Completion. The Contractor shall achieve Contract Completion, as the term is defined in this Agreement, within 10 calendar days of Substantial Completion.

I.D. Work Conditions/Site Requirements See Statement of Work for each project.

I.E. Authorized Representative

(1) This Contract is between the United States of America, acting by and through the Administrator of General Services (GSA), and the Contractor (the Parties). References in this Contract to "the Owner" or "the Government" shall be understood to refer to GSA. The following individual is designated as the only authorized GSA representative under this Contract, unless other warranted contracting officers are designated in writing:

Contracting Officer Name: Amy Heusser Address: 222 W 7th Avenue, Rm 151, Anchorage, AK 99513 Telephone: 907-27103741 Email: amy.heusser@gsa.gov

(2) Authorities and Limitations

(a) All rights, responsibilities and authorities of GSA under this Contract are vested in the Contracting Officer. The Contracting Officer may delegate these rights, responsibilities, and authorities to other GSA representatives. Such delegations shall be effective and binding only if communicated in writing to the Contractor, and subject to any limitations specified therein.

(b) The Contractor shall perform the Contract in accordance with any order (including but not limited to instruction, direction, interpretation, or determination) issued by the Contracting Officer or other representative to whom the Contracting Officer has delegated authority. The Contractor assumes all the risk and consequences of performing work in accordance with an order issued by a person lacking authority to issue such order.

Document: C101-SAT / OCT 15

I.F. Contract Liquidated Damages Rate In accordance with “Liquidated Damages” clause in Section III (Terms and Conditions), liquidated damages shall be calculated at the rate of $0 per calendar day.

I.G. Buy American Exceptions For the applicable Buy American clause and any exceptions, see Section IV of this Agreement.

I.H. Statement of Work, Specifications, Drawings, Exhibits, and Other Attachments The following documents are incorporated by reference into this Contract.

(1) Statement of Work: See corresponding project Statement of Work

(2) Specifications: See corresponding project Statement of Work for specifications

(3) Drawings: See corresponding project Statement of Work for list of project specific drawings

(5) Wage Determination posted to DOL website at time of award

II. Prices

II.A Basis of Pricing

(1) Contract Prices. All Contract prices set forth in this Section include all costs necessary to complete the work for which the price is established (e.g., Base Contract, Unit Price, Options) in accordance with the Contract Documents, including, but not limited to, the cost of work performed by subcontractors and consultants, indirect costs, fees, expenses, taxes, and profit.

(2) Knowledge of Conditions Affecting Price. FAR 52.236-3, Site Investigations and Conditions Affecting the Work, is incorporated by reference in this Contract. The Contractor shall be presumed to have established all prices with knowledge of general and local conditions that may affect the cost of Contract performance at the site where the Work is to be performed, to the extent that such information is reasonably obtainable.

(3) Unit Prices and Allowances. If any portion of the Work is to be performed on a unit price basis, the Unit Price shall include all costs of coordinating and incorporating the unit-priced portion of the Work into the Base Contract Work. The Contractor shall only be obligated to perform unit-priced work to the extent that an Allowance has been established. The Contractor shall be obligated to perform such work in excess of a unit quantity for which an Allowance is established only if directed by the Contracting Officer in writing. The Contractor shall be bound to the unit price or prices set forth herein in all equitable adjustments for changes including unit priced work, and no markups shall be applied to such unit prices.

(4) Options. If any portion of the Work is to be performed upon the timely exercise of an Option, the Option Price shall include all costs of coordinating and incorporating the Option-priced portion of the Work into the Base Contract Work. An adjustment to the Contract price for such additional work shall be computed solely on the basis of the Option price or prices set forth herein. Unless otherwise specified, all options may be exercised within 90 days of Contract award.

Document: C101-SAT / OCT 15

(5) Bid Rates. If this Contract includes Bid Rates to be used in determination of equitable adjustments (e.g., overhead, profit, daily rates for time-related costs), such rates shall be deemed to include all costs recoverable as components of an equitable adjustment consistent with the requirements, definitions, and exclusions applicable to equitable adjustments set forth in this Contract, and consistent with the Contractor's cost accounting practices. Unless otherwise specified, the bid rates shall be deemed to include only the Contractor's costs, and not the costs of any subcontractors.

Document: C101-SAT / OCT 15

II.B. Contract Price Form

SF1442

III. Terms and Conditions

III.A. Commencement, Prosecution, and Completion of Work The Contractor shall not commence the Work until the Contracting Officer has issued NTP. The Contractor shall diligently prosecute the Work so as to achieve Substantial Completion of the Work, as defined in Section III (Terms and Conditions), “Substantial Completion and Contract Completion” clause, within the time specified in Section I (Project Information), “Period of Performance” clause. If the Contract specifies different completion dates for different phases or portions of the Work, the Contractor shall diligently prosecute the Work so as to achieve Substantial Completion of such phases or portions of the Work within the times specified.

III.B. Contractor Responsibilities

(1) Unless otherwise expressly stated in the Contract, the Contractor shall be responsible for all means and methods employed in the performance of the Contract.

(2) The Contractor shall be responsible for providing professional design services in connection with performance of the Work or portions of the Work only if this responsibility is expressly stated and the Contract Documents provide the performance and design criteria that such services will be required to satisfy. In the performance of such work, the Contractor shall be responsible for retaining licensed design professionals, who shall sign and seal all drawings, calculations, specifications and other submittals that the licensed professional prepares.

This is the start of the file's text. The full file is on GovTribe.

File details come from the government source that posted it. Updated .