NSN 7540-01-152-8070 STANDARD FORM 30. (Rev. 10-83) Previous Edition unusable Prescribed by GSA FAR (48 CFR) 53.243
Page of Pages AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT 1. Contract ID Code
2. AMENDMENT MODIFICATION NO. 3. EFFECTIVE DATE 4. REQUISITION/PURCHASE REQ. NO. 5. PROJECT NO. (if applicable)
6. ISSUED BY CODE 7. ADMINISTERED BY (If other than item 6) CODE
(x) 9A. AMENDMENT OF SOLICITATION NO.
9B. DATED (SEE ITEM 11)
10A. MODIFICATION OF CONTRACT/ORDER NO.
8. NAME AND ADDRESS OF CONTRACTOR (NO., Street, Country, State and ZIP Code)
CODE FACILITY CODE
10B. DATED (SEE ITEM 13)
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
The above numbered solicitation is amended as set forth in item 14. The hour and date specified for receipt of offers is extended, is not extended.
Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods:
(a) By completing items 8 and 15, and returning ______ copies of amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;
or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OR OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment your desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
12. ACCOUNTING AND APPROPRIATION DATA (If required)
13. THIS ITEM ONLY APPLIES TO MODIFICATION OF CONTRACTS/ORDERS. IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
Check One
A. THIS ORDER ID ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT
ORDER NO. IN ITEM 10A.
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority)
E. IMPORTANT: Contractor is not, is required to sign this document and return _______ copies to the issuing office.
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible)
Except as provided herein, all terms and conditions of the document referenced in item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15A. NAME AND TITLE OF SIGNER (Type or print)
16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)
15B. CONTRACTOR/OFFEROR 16B. UNITED STATES OF AMERICA
(Signature of person authorized to sign)
15C. DATE SIGNED
(Signature of Contracting Officer)
16C. DATE SIGNED
Supplementary Page
PAGE 2 OF 7 GS-08P-11-JA-C-0045/0002
Description of Modification/Amendment:
Amendment 0002 is issued to accomplish the following:
Incorporate Attachment 01, Questions and Answers.
SCHEDULE Continued
ITEM NO. SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT
PAGE 3 OF 7 GS-08P-11-JA-C-0045/0002
Accounting and Appropriation Data:
. . . . . . . .RCO00360. . .
Cost Applied: $0.00
0001 The contractor shall provide all materials, labor, equipment and supervision to complete the Building 20, Replace Electrical Distribution System project as described in the attached Specifications, GSA Project Number RCO00360.
The work consists of the following:
1. Replace starter and feeder units in existing motor control centers.
2. Replace multiple existing outdated panelboards.
3. Miscellaneous modifications to and investigation of existing electrical distribution equipment.
Work to be performed at:
Building 20 Denver Federal Center Lakewood, Colorado
DELIVERY DATE: 01/31/2012
SHIP TO:
GSA, DFC SERVICE CENTER DIVISION 8PSDP
BLDG 41 DFC PO BOX 25546
W 6TH AVE & KIPLING STREET
DENVER CO 80225-0546
1.00 LS
0002 Option I: May be exercised no later than 90 calendar days from award.
***SUBJECT TO AVAILABILITY OF FUNDS***
The contractor shall provide all materials, labor, equipment and supervision to complete circuit tracing for up to 25 electrical panels in Building 20, Denver Federal Center, Lakewood, Colorado, as described in the attached Specifications, GSA Project Number
RCO00360.
Work included for each tracing:
-Trace out and verify each branch circuit -Provide new circuit directories -New nameplate - panelboard name and feeder source -Remove any abandoned circuits -Identify any aluminum or cloth wiring
***SUBJECT TO AVAILABILITY OF FUNDS***
DELIVERY DATE: 01/31/2012
SHIP TO:
GSA, DFC SERVICE CENTER DIVISION 8PSDP
BLDG 41 DFC PO BOX 25546
W 6TH AVE & KIPLING STREET
DENVER CO 80225-0546
1.00 LS
PAGE 4 OF 7 GS-08P-11-JA-C-0045/0002
Amendment 0002 – Questions and Responses GSA Solicitation Number GS-08P-11-JA-C-0045
Replace Electrical Distribution System Building 20, Denver Federal Center
Lakewood, Colorado
Question: Will on-site material storage area accommodate a semi truck trailer?
Response: No
Question: Will security clearance, once established, allow for speedy entrance/ exit for personnel?
Response: Yes
Question: Will maintenance personnel be available nightly and on weekends for access to locked rooms?
Response: Means of access will be provided for after hours work, if needed.
Question: On Page E501, detail shows a “Keyed note” #4. –There is no description for keyed note #4. Please Clarify.
Response: Delete keyed note 4 from detail no. 3
Question: If circuit tracing and panel identification option is selected by GSA, will it be incorporated into this contract. Will adjustments be made for project completion dates based on additional work required to be completed?
Response: The Option may be included at time of contract award or by modification to the contract after award. If the Option is included in the award, the completion date will remain unchanged. If the Option is incorporated into the contract by modification, the completion date will be negotiated at the time.
Question: There appears to be a contradiction between Page 41, Paragraph 1.B.2 and Page 42 “Electrical, Water and Gas” as it relates to the contractors responsibility and what the On GSA will provide when relates to electricity, water and gas.
Response: GSA will pay for the cost of utilities used for this project.
Question: On Page 43, it states that telephone service is not available on-site for the Contractor’s use. Will the use of cell phones be allowed?
Response: Yes, but not while driving.
PAGE 5 OF 7 GS-08P-11-JA-C-0045/0002
Question: Drawing E501 - In switchboard ES-1, what is the amperage of the feeder to HUM- FDA that is to be removed?
Response: The switchboard referenced on sheet E501, detail no. 3, is switchboard “HIM”. Revise the detail title on detail no. 3 to state “HIM” instead of “ES-1”. “ES-1” is shown on detail no. 1 on this sheet.
Delete the demolition work associated with feeder HUM-FDA. This feeder was previously removed. Revise keyed note 2 to read: “RELABEL BREAKER AS SPARE”.
Question: Drawing E501 - What is the approximate length of the feeder to HUM-FDA that is to be removed, or at what grid lines on the drawings is HUM-FDA located?
Response: Not applicable. HUM-FDA has been removed and does exist anymore.
Question: Drawing E501 - When removing the abandoned feeder, are we to remove the conduit and wire or wire only?
Response: Not applicable. HUM-FDA has been removed and does exist anymore.
Question: Drawing E502 - In MCC-20-1 there are four contactors to be replaced. How many poles does each of the contactors have?
Response: Assume the contactors are 3–pole for bidding purposes.
Question: Drawing E502 - In MCC -20-1, what are the amperages of the two circuit breakers with question marks shown on them, or for bidding purposes what amperage fused switch do you want them replaced with?
Response: Assume the two unknown circuit breakers are 100A, 3-pole. Replace them with 100A, 3-pole fused switch units. Fuse size to be verified per notes on this drawing.
Question: Drawing E602 - In switchboard HIM, what is the amperage of the feeder to HUM-FDA that is to be removed?
Response: Not applicable. HUM-FDA has been removed and does exist anymore.
Question: Drawing E602 - What is the approximate length of the feeder to HUM-FDA that is to be removed, or at what grid lines on the drawings is HUM-FDA located?
Response: Not applicable. HUM-FDA has been removed and does exist anymore.
Question: Drawing E602 - When removing the abandoned feeder, are we to remove the conduit and wire or wire only?
Response: Not applicable. HUM-FDA has been removed and does exist anymore.
Question: Drawing E610 - For all of the panel boards that are to be replaced, are there panel schedules available that show how many branch breakers that are required including the amperage/number of poles for each branch circuit breaker?
Response: There are no panelboard schedules. See the notes on “DFC BUILDING SCHEDULE OF WORK”. Contractor to field verify existing panelboards and breaker arrangements. For bidding purposes, assume any main breakers ratings match the bus ratings of the panelboards. Assume the branch breakers are any combination of 1-, 2-, or
PAGE 6 OF 7 GS-08P-11-JA-C-0045/0002
3-pole and any possible amperage rating available for the type of panelboard (i.e. assume worst case). Assume panelboards may have up to 42 branch poles per section.
Question: Drawing E610 - Are the existing flush mounted panels that are being replaced of a standard size so that the back boxes can be re-used and we would only have to replace the interiors and covers?
Response: See the notes on “DFC BUILDING 20 SCHEDULE OF WORK”. Some are scheduled for complete replacement including back-boxes, and some are scheduled for a new panelboard to be installed adjacent to existing. For bidding purposes, reuse of back-boxes is not permitted as this may not result in maintaining the UL ratings for the new panelboards.
Question: Drawing E610 - The schedule of work shows switchboard HIM with note E that states replace selected feeder breakers and note F that states see sheet E501 for complete scope.
E501 doesn’t show switchboard HIM. How many feeder breakers are to be replaced and what is the amperage and number of poles of each feeder breaker?
Response: As per above responses to Drawing E501 questions, switchboard HIM is shown in detail no. 3 on sheet E501.
Question: Drawing E610 - Note I in the electrical equipment schedule of work calls for a new flush panel board adjacent to the existing panel board. Please verify that the new panel board is intended to be installed right next to the existing panel board, if not please provide a distance that you anticipate between the new and existing panel boards.
Response: Yes, it is the intention for note “I” that the new panelboards are to be installed as close as possible to the existing panelboards.
Question: Drawing E610 - The Electrical Equipment Schedule of Work shows transformer TR- 100 with a 75KVA rating, Drawing E11B and Drawing E601 show it with a 45 KVA rating. Which is the correct rating?
Response: The correct rating is 45KVA. Revise the TR-100 line on “DFC BUILDING 20 SCHEDULE OF WORK” from “75KVA” to “45KVA”.
Question(s): Drawing E610 - The Electrical Equipment Schedule of Work shows switchboard H12 with work note D that reads Trace unknown feeder units, verify ratings of feeder units, update nameplates and remove any abandoned feeders/motor circuits:
How many unknown feeder units are to be traced?
Response: There appears to be six feeders on H12 which need to be verified.
Three of the feeders are not labeled on the switchboard.
T How many abandoned feeders/motor circuits are to be removed?
Response: Unknown. Contractor to field verify as per the note.
What amperage are the abandoned feeders/motor circuits that are to be removed?
Response: Unknown. Contractor to field verify as per the note.
U What are the approximate lengths of the abandoned feeders/motor circuits that are to be removed?
Corrections to the drawings for E610 and AIC:
Sheet E610, DFC BUILDING 20 – ELECTRICAL EQUIPMENT SCHEDULE OF WORK:
Revise the AIC ratings for the 277/480V panelboards scheduled for replacement as follows:
PAGE 7 OF 7 GS-08P-11-JA-C-0045/0002
Panelboard Corrected AIC Rating
EMERGENCY 35K
LP1-1 18K
LP2-1 18K
LP2-3 35K
LP2-4 35K
LP2-5 35K
PP1-3 18K
P1-19 35K
LP1-2 18K
LP2-2 18K
LP2-6 18K
LP2-7 18K
Sheet E610 – Add additional panelboard RPP1-6 to be replaced. It has 125A, mainbreaker size is unknown, 42 ckts, AIC rating is 10K and it is flush mounted.
Sheet E610 – Add comment D under Circuit Tracing – Receptacles traced shall be marked with Panel Designation and circuit number.
| AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT: |
| IDCode: |
| pdfpage1: 1 |
| Pages: 7 |
| DocNo: 0002 |
| EffDate: JUL 18, 2011 |
| ReqNo: 8PSDP-11-0117 |
| ProjNo: |
| IssuedByCode: 8PSD |
| IssuedBy: GSA DENVER FEDERAL SERVICE CENTER 8PSD |
BLDG 41 DFC PO BOX 25546
W 6TH AVE & KIPLING STREET
DENVER CO 80225-0546
| AdminByCode: |
| AdminBy: See Block 6 |
| ContractorCode: |
| FacCode: |
| SolChg: Yes |
| AwdChg: Off |
| SolNo: GS-08P-11-JA-C-0045 |
| SolDate: JUN 16, 2011 |
| AwdNo: |
| AwdDate: |
| NoCopies: 1 |
| Amended: Yes |
| OffrExt: Off |
| OffrNoEx: No |
| ApprData: See Schedule |
| ChgeOrd: Off |
| ChgeOrder: |
| Modify: Off |
| B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).: |
| SuppAgre: Off |
| SuppAuth: |
| ModOthr: Off |
| OthrSpec: |
| NoReq: Off |
| Require: Off |
| Copies: |
| Descript: See Supplementary Page. |
| SignName: |
| SignTitl: |
| ContDate: |
| ContrOfficerInfo: |
| CODate: |
| Contractor Info: |
| ContractorPOC: |
| Contractor: |
| ModAmount: |
| Header: |
| 15B. CONTRACTOR/OFFEROR: |
| Footer1: |
| signature: |