Solicitation Questions

Question Number Question

The RFP requests an electronic version of the proposal with both PDF and Word versions of the Technical in L.4.2.2; however, RFP section L.

4.2.3 asks for only a PDF version. Can you please clarify whether a Word version of the Technical proposal is also required?

A Word version of the technical proposal is not required.

2 Can GSA provide a list of the current building tenants?

No

3 Are any grounds keeping services required beyond maintenance of the irrigation system?

No

An original signature is required for the SF33; will GSA accept an electronic signature, or are Offerers to provide a paper copy with an original signature for this form?

Yes, a signature is required for the SF33 and GSA will accept an electronic signature.

5 Will GSA please provide the sign in sheets from the site visit?

A copy of the sign in sheet will be provided with this amendment.

In Part 1, Technical, the Management Plan Narrative is limited to 10 pages. Does this include the Managerial Approach, Quality Control Plan, and the Management Plan Worksheet & Narrative, or only parts of this section? If the 10 page limit encompasses all sections, we would respectfully request additional space to address all items required by GSA.

Per L.5.1.1 only a concise description of the Managerial Approach and Quality Control Plan is required. The Management Plan Worksheet & narrative are not included in the 10 page limitation.

Per C.4.1 Existing Deficiency Inspection; IDL estimate lists shall be submitted to the COR 30 days prior to the start date. In our experience, the initial deficiency list can be quite extensive with multiple buildings and we rarely are given access to the building 30 days prior to the contract start day to vet mechanical operations. Would GSA allow more time, e.g. 60 days after the contract start date, to get bids for repair to bring the system to working order?

Date will remain the same; the contractor may submit an extension request to the COR as the IDL is a deliverable.

6 Who is the current incumbent contractor?

Aleut Facilities Support Services, LLC

7 What is the total value of the previous contract's final option year?

The total contract value for 5 years is $4,166,514.45.

8 Is it possible for you to provide full building information stats to include total sqft of each building / complex?

It is not possible to provide full building information this is restricted to "need to know" and since the company does not have clearance. Total gross sqft are: 275,189.38 sqft @ TX0227AU; 256,698.12 sqft @ TX0250AU; 63,264.65 sqft @ TX0397ZZ.

Under section L.5.2 Experience, the past performance requirement is that we show experience in buildings of similar size and scope at least 500,000 sqft. Does GSA require that size experience per single building, or would past performance in a single contract showing experience with a combined building sqft equal to or greater than that requirement be acceptable?

The last sentence in L.5.2 states "the projects must cumulatively demonstrate" is intended to mean combined square footage.

10 Please provide number and sizes of backflow preventers for each building.

That information is not currently available.

Please provide the following information for each building:Normal Building Operating Hours; Normal Building Working Hours; Building square footage; Number of repairs monthly; Number of service calls monthly; Number of repairs over threshold for the past 2 years; Last testing dates of 5 and 12 year fire extinguisher hydro testing See sqft from #8. Building hours are from 7:00 a.m. to 5:00 p.m. M-F w/ exeption to federal holidays. Will have to get answers to number of repairs from current O&M.

12 Is GSA currently using Maximo CMMS at these facilities?

Yes.

13 Please provide current contract amount.

See response to question 7.

In reference to G.3.4 of the solicitation (Key Contractor Personnel), it states that the Contractor will provide to the Contracting Officer the names, titles, e-mail addresses and phone numbers of key personnel at the time of award, but L4.2, Part 3 (Submittal Package) states that the offeror shall submit a list of key personnel and point of contact information. There seems to be a conflict in statements. This information is usually requested at contract award. Please clarify.

There is no conflict. The requirement in L.4.2.1 for key personnel is for key personnel as it relates to contract award, i.e. someone with signatory authority.

15 Is annual or semiannual emergency generator testing required at all facilities?

Yes, annual.

16 Is annual eddy current testing required?

Yes, annual.

17 Please provide tonnage of the Trane chiller at the Thornberry Federal Building.

800 tons.

18 Will parking be available for the contractor’s personnel at the Thornberry Federal Building and the Austin Federal Courthouse?

There are no assigned parking spaces for contrator personnel.

19 What is the average monthly cost for this contract?

See response to question 7.

20 Has the Government already transitioned to the National CMMS system for this contract?

Yes.

21 Which CMMS system is the Government providing to bidders?

Maximo National CMMS

Paragraph L.3.1.2 states “the offer must submit a Worksheet Narrative explaining how their proposed manpower approach will meet the requirement of the solicitation. There is a 2 page limitation on the Worksheet Narrative.” Is this 2-page limitation for the Worksheet Narrative in addition to the 10 pages allocated for the Management Plan Narrative?

The 2-page limitation for the Worksheet Narrative is not included in the 10 page limitation for the Management Plan Narrative

23 Do we also submit SF 33 CONTINUATION PRICING Sheet along with the B.1.1?

No

24 B1.3 rates requested do not ask for regular time or overtime; please clarify

There are no rates requested on Figure B1.

25 Please advise where offerors should indicate regular hours and projected overtime hours in their pricing submission.

This is a Firm Fixed Price contract there is no hourly pricing.

The CBA does not have Bldg. Engineer, Helpers, or laborers, so hourly rates are not available. Do we obtain this data from the WDOL rates to apply to B1.3 IN-HOUSE disciplines?

The CBA job descriptions do not match the goverment's job descriptions. Base staffing on L.2, not CBA. Contractor can title their employees anything they wish but they must still fulfill the L.2 requirements.

The positions indicated in the CBA do not match the positions indicated in Figure L-2; Management Plan Baseline. The Chief Engineer/BAS Technician indicated in Figure L-2 is not listed in the CBA.

See #26

Figure L-2 indicates there is a position entitled “Chief Engineer/BAS Technician,” but there is not a position indicated as such in the Management Plan Worksheet. Please clarify if we should add this position to the Management Plan Worksheet.

The positions listed on the Managment Plan Worksheet are examples.

Our company normally obtains lump sum bids for subcontracted services and does not ask for burdened subcontracted hourly rates. Where are the required hourly salaries from sub-contractors (as offerors are required to list in B 1.3 additional services) obtained?

Hourly subcontract rates are not required to be submitted.

31 If we award a subcontract based upon lump sum pricing, are we still required to submit hourly salaries for subcontractors in B.1.3?

No

32 Does the Government provide parking for contractor employees under this contract?

No

33 If the Government does provide parking, will it include parking for contractors at all three facilities?

No

34 How many Emergency Call Back Service Requests occurred during the last full year of contract operation and (After Hours) ?

See attachment 5 (Work Orders)

35 How many Emergency Service Requests occurred during the last full year of contract operation?

See attachment 5 (Work Orders)

36 How many Urgent Service Requests occurred during the last full year of contract operation?

See attachment 5 (Work Orders)

37 Please confirm this is a WOSB procurement.

Confirmed

During the Site Visit discussions, the Government indicated if bidders deviated from the Government requested staffing, bidders needed to explain such deviations in the Worksheet Narrative. Is Exhibit L-2, Management Plan Baseline, the correct exhibit, which reflects the Government Requested Staffing?

Yes

Paragraph C.2.14, Consumable Parts. indicates the contractor will provide fuel for generators up to $2,500.00 per year, after which the Government would assume the cost of the fuel. Has the fuel costs for this contract exceeded the $2,500.00 limit in the past two years?

No.

40 Reference paragraph C.39.3, Reimbursable Repairs, how many repairs during the last contract year exceeded the $2,500.00 threshold?

See attachment #5 (Work Orders) 41 Please provide the specific method(s) currently used to provide water treatment services In accordance with Paragraph C.35, Water Treatment.

Solid state chemical injection.

42 Are there specify location/size of contractor storage areas in each building for contractor bench stock ?

Yes, there is adequate space for bench stock.

43 What are license renewal dates for certification of incumbent personnel ?

Licensing information is not available for release.

Service Request: What is the responsibility limit (hours, time, and materials) per service request? Is there a current back-log of work orders ? If so, please provide information.

Please refer to C.23.5 of the contract solicitation

Reference C.1.1 Contractor Responsibility for Equipment & Systems - L (pg 8) - What is the age of the roofs for 2 older buildings ? What was date of last roof inspection ? Please provide records of leaks, extent of damage, and repairs completed.

New roof on J.J. Pickle FOB; ~ 10 year on Homer Thornberry

46 Is contractor responsible for pumps-outs and record keeping of grease traps ?

There are no grease traps on site.

47 Is it an annual audit to be performed on CMMS system by validating and updating the equipment inventory database ?

Yes

48 When was last audit conducted on CMMS equipment inventory databased ?

The audit is currently in progress.

49 Subcontractors- Please provide a list of subcontractors utilizied on the current contract. (Generators, Electrical, BAS, Fire System, Tanks, etc) Offerors are required to submit their own subcontractors.

Paragraph C.34.1 Maintenance - IR Scans, Breaker Testing, ARC Flash (pg 30) - Please provide records of annual IR scans performed with repair documentation of issues identified during scans. Please provide records of last break testing and switch gear inspectiongs. ARC Flash coordination study - Are all panels labeled with appropriate safety signage/stickers?

That information will be provided to the successful offeror.

Reference C.39.2 Non-reimbursable Repairs (pg 37) - It states contractor is responsible of non-reimbursable repairs under $2,500.00 in cost (parts & materials). What is the historical data (#of incidents) involving this type of services ?

See attachment #5 (Work Orders).

Reference C.39.8 Ordering Repairs from Outside Source - How many incidents have transpired in which this has occurred, a reimbursable repair was identified and $2,500.00 or less was deducted from monthly invoice?

See attachment #5 (Work Orders).

53 Reference C.41.3 Local Air Quality Management Operating Permits, (pg 40) - Are these operating permits current ? What is the expiration date ?

Test are performed annually and current.

Reference C.41.6 Polychlorinated Biphenyl (PCB) Control, (pg 40) - Is there a current recycle program for hazardous disposal ? If so, please provide record-keeping and reporting requirements.

There is a regional PCB control program and the records will be provided to successful offeror.

Reference C.44 Fire Protection and Life Safety Equipment & System - Is there records of last (5) year riser inspection ? If so, please provide records. Is there records of last (4) year fire/smoke damper inspections ? If so, please provide records.

Yes, the records will be provided to successful offeror.

56 Reference Attachment 1 - Collective Bargaining Agreement (CBA), (pg 10) What is the number of "special events" per contract year ?

Unknown, the government does not have that information.

Reference Attachment 2 - Service Contract Act Wage Determiniation (WD) - How long have these employees worked in their respective positions ? (This information is critical to determine pricing for applicable vacation benefits.) Under WD, it mention Executive Order 13706, in which a contractor must provide employees with 1 hour of paid sick leave, upt to 56 hours each year. If WD is to be utilizied, will the Executive Order Apply ?

Per FAR Part 22, the seniority of current employees will be provided to the successful offeror. Yes, EO 13706 applies.

Reference BL01- Equipment Inventory Dated May 2017 - There are many assets listed with incompleted information ... Was the list updated in May 2017 ? Will the incubment contractor be responsible for updating the list or will the new contractor be required to inspect/update to ensure accuracy of each assets ? Regarding (2) older buildings, What is the age of major equipment ( chillers, boilers, generators, pumps, etc)?

See response to question 48

Reference Technical Exhibits - J, It appears there may be several exhibits missing from those provided (J-3, J-5, J-6, J-10 thru 13 and J-16).

Please clarify if these were inadvertently omitted.

The exhibits have been deleted from the specifications and were intentionally ommitted.

Reference T.E J-15 - Shave Engery Program - Please advise if this program is currently in effect at any of the buildings under the current contract.

This program is part of this solicitation.

During the site visit of Austin Courthouse, equipment such as the Super Straddle and scissor lift was observied onsite. Are these items government- provided equipment ?

Super straddle is own by the government at the Pickle building and the other super straddle is own by the US Courts at the Austin Courthouse.

62 Building Drawings: Are drawings "hard copy" or CADD or both ? If updates are required, will updates need to be in a CADD form ?

Both, but not O&M's responsibility to update drawings; blue print library is available onsite.

Preventative Maintenance (PM) and Inspections: Please provide the following information on PM inspections of major equipment (fire/life safety, boiler, chillers, etc.)

The PM schedule is current.

Section C, Page 7, Introduction I, Item H. Item States "Provide Salvage, reuse and recycling services for waste generated from building operations, maintenance and repair and discarded equipment." Please clarify this requirement is for waste generated only by the O&M contractor and does not include waste or recycling for building tenants or other GSA hired contractors?

Yes, this requirement does not include waste generated by the tenants or other contractors

65 Please provide a listing of work request completed annually to include all unscheduled maintenance actions accomplished?

See attachment #5 (Work Orders)

66 Please provide how many Miscellaneous Work request have been accomplished on average per year?

See attachment #5 (Work Orders)

67 Section C, Page 20, C.8.4. Please define what types of activities are considered "requests not under the scope of this contract"?

This refers to service request for any work not specifically listed in this solicitation.

Page 23, C.13, Major Systems and Critical Systems Breakdown. Requires the contactor to notify the COR for elevator breakdowns yet that level of elevator repair is not required under the scope of this contract. Please clarify?

The contractor is required to notify the COR that repairs are required.

Page 24, C.14, Requires the contractor to keep a reference library to include building design documents and as-builts; however, does not state that GSA will provide any of these documents. Please Clarify?

The document will be provided but the contractor is responsible for maintaining the library, i.e. update with the most current references.

Page 27, C.23.3, States the contractor is to respond to emergency call backs for elevators with trapped passengers yet that level of repair is not required under the scope of this contract. Please clarify?

The contractor may be required to respond to the emergency situation to assist the elevator maintenance contractor.

Page 19, C.8.2. Requires that cell phones provided to our employees have to be compatible with the BAS Alarm reporting notification and GSA e-mails. Please clarify what type of phones or network services are compatible?

BAS is compatible with all major providers and any phone that is text-capable.

72 Is the government or the contractor responsible for the cost of training on new systems or updates to licenses?

Contractor is responsible for cost of maintaining required license.

73 Is the contractor staffing declaration for key employees or all staff?

All staff.

74 Has the government begun the process of Energy Star ratings or Smart Buildings?

Yes

75 Will the successful offeror's PM have the opportunity to participate in the building operations management meetings?

Yes

For Architectural and Structural systems $200.00/ 3 hour threshold, is the contractor allowed to seek approval of the COR if the work will exceed the threshold?

Yes

77 What is the age and condition of the roofing on all 3 buildings? Are there any warranties on the roof-top of the (3) buildings ? Please clarify J.J. Pickle is brand new; Homer Thornberry is ~10+ years; Austin Courthouse is 5 years old.

78 Will the government provide training on the Tridium Niagr Systems currently being used by GSA?

No

Will the government entertain monthly partnering meetings via conference call with our PM and corporate operations management of the successful offeror?

Yes

For the equipment that is excluded from the scope, does the government already have existing contracts to accomplish this work and will the government be open to vendor suggestions?

The offeror is only responsible for equipment listed in this solicitation. The government is always open to suggestions.

What CMMS system is the government currently using? Is the CMMS up to date with all of the equipment and PM's and repairs for each piece of equipment covered under this contract? Can the Government confirm the CMMS system will generate all deliverables required under the contract?

See 12; yes; no

82 Are "consumable parts" considered under the $2,500 threshold?

Yes, bench stock items are not considered for project stock.

Section C.2.25. Will the incumbent be responsible for the repairs on the deficiency list prior to contract start? If not will the incoming contractor be responsible and is that included in the $2500.00 threshold?

The incoming contractor is not responsible for the initial deficiency list.

84 Is the government building management team open to suggestions for sustainable existing building from prior experience to help meet the goal?

The government is always open to suggestions for improved performance.

85 Section C.2.32. Can you please elaborate on "indefinite quantity"?

The indefinite quantity refers to unknown quantity of additional services that may be required. See clauses 52.216-8 and 52.216-9 for limitations.

86 Regarding the threshold for this contract is there a ceiling amount that the government has established to be fair to the contractor?

See clauses 52.216-8 and 52.216-9 for limitations.

Section C.2.30. Fire protection systems are excluded from this contract does that include the monthly inspections and hydro-static testing and is refilling of the fire extinguishers also excluded?

Fire Protection systems are not excluded from the contract

88 Section C.2.37. Please elaborate on the term "non-reimbursable repair"?

See section C.39.2 for further information

89 Is any of the equipment on the equipment list currently under manufacturer warranty period? If so, could you provide a list of that equipment?

Yes, a list will not be provided as warrantys are held by the US Government

90 Section C.2.45. Is "Predictive Maintenance part of the $2500.00 threshold?

No

91 Please elaborate on "scheduled and unscheduled? Is Unscheduled considered a repair that would fall within the $2500.00 threshold?

Preventative maintenance does not fall under reimburseable repairs.

92 Will the government utilize the CPARS system to obtain additional past performance during the evaluation period?

Yes.

93 Can the sequence of operations become a part of the BOP which is a living document?

Yes.

94 Section C.2.55. Can the "on-site supervisor" be responsible for all 3 buildings?

Yes, only one project manager is required for the project.

Section C.5.1-F. Regarding deficiencies when a third party contractor is hired by the government, is the contractor responsible for the threshold of the repair?

No 96 Section C.11. Will our PM be involved in the weekly progress meetings?

Yes 97 Section C.12. How often are the performance review meetings conducted?

Frequency will be determined based on performance and at CO discretion.

Section C.34.1. Infrared testing is usually performed by an electrical contractor due to local and state codes. We understand that the desire is to have this testing done yearly. Can we use an outside electrical contractor as long as the goals are met?

Yes, a licensed and qualified person should perform this work.

Section C.39.3.1. Unsolicited Proposals if the contractor is not utilized to complete the repair, is the contractor still responsible for the $2500.00 threshold?

No

100 Section C.39.4. Is the miscellaneous work billable to the government?

The first 20 hours and $50 of consumable parts is not billable to the government.

Section C.44.8 & 9. Based on previous statements in the PWS all fire and safety equipment and components are the responsibility of another separate vendor. However in C.44.8 & 9 it states that we are responsible for the extinguishing systems. Could you please provide a list of the work to be performed by the outside vendor?

Fire Protection Systems are to be inspected and tested in compliance with NFPA

102 During the transition period will our entire key personnel be involved in the transition and are their services billable?

Yes personnel are involved during the 60 day transition period; no, service is not billable

103 Will GSA be providing the contractor with current warranty information for any equipment still under warranty?

See response to question 89

104 Will GSA be providing equipment manuals for any existing equipment?

Yes

105 Is MAXIMO currently in use for this contract? How many and what type of MAXIMO licenses are needed by GSA staff?

See question #12 & #21; contractor licensing is not required.

106 How many contractor employees/technicians currently support this contract for the incumbent?

The number of employees is irrelevant as this is a revised scope of work.

107 How often do filters/air filters need to be changed.

As needed, based on inspection condition.

108 Please confirm the type of electrical testing to be performed on this contract. 1 year inferred testing? 3 year electrical testing?

Confirming annual testing of IR testing.

109 Are barcode labels currently affixed to each piece of equipment for tracking and incorporation into the CMMS?

No

110 Is the contractor responsible for the costs of software, firmware updates, and licensing for the BAS systems? or Labor only?

See C.34.4.1.1 GSA-hosted Systems Requirements, f.

111 Section C.30 Key Control: Will production of keys be performed on site?

Refer to the Management Plan Baseline

112 Section C.30 Key Control: Will production of keys be performed on site?

It will be up to the successful contractor to produce the keys. The Federal Courthouse is high security keys and are only available through Dorma.

During the site visit, COR mentioned the "an unacceptable level of maintenance" per GSA standards. We observed numerous examples of equipment that appeared to have not had preventive maintenance performed recently... (1) Please confirm that the outgoing contractor will make these repairs as referenced in C.4.1 (2) Will these items include equipment that has not been subject to preventive maintenance within the final year of the contract? (3) We observed rust, water leaks, missing insulation and exposed metal surfaces on equipment that clearly has not been maintained in the sense we would normally expect. Please articulate what our responsibility for this will be. We see it as a significant effort to bring up to standards.

The incumbent will be held responsible for outstanding deficiencies and concerns can be elevated during the transition period.

Will the government make the current preventive maintenance schedule available? In order to perform monthly, quarterly, annual, etc. PM's, we will need to establish the time frames based on when the service is due again. Please describe any differences between an existing deficiency and a contract closeout deficiency or if they are one and the same.

The PM schedule will be provided to the successful offeror. See response to question 113 for status of existing deficiencies.

Figure L-1 lists Custodians and Groundskeepers as contract positions, while Figure L-2 does not. Please clarify which positions contractors are required to address and staff in proposal.

The Management Plan worksheet of L1 is showing the "example" of how to fill-out the below portion of the form. This solicitation is strictly Operation & Maintenance services. There are two portion of this worksheet to fill-out, which consist "Non-Union" employees and "Union" employees.

Figure L-2 lists Chief Engineer/BAS Technician as a staff position while Figure L-1 does not. Please clarify if contractors are required to provide staffing for Chief Engineer/BAS Technician.

The description on L2 (Management Plan Baseline), show the current employees working under CBA union agreement with the current incubment. As before, we previously explain the top portion in shadow in "grey" is providing example on how to fill-out the below portion of the worksheet.

Figure L-1 lists a Maintenance Mechanic and Figure L-2 lists General Maintenance Mechanic; please clarify if this is the same position. If not, please indicate which of these two positions contractors are required to staff.

The lists of position showing in the "grey" section, is providing examples of classification of employees. This is sample on "How to" fill-out the below portion of the worksheet.

Section L.5.1.1 Management Plan Narrative: These items alone will surely exceed the 10-page limitation and does not include contractors’ approach to Phase In, Phase Out, Building Management Plan, etc. which per the SOW, contractors “must demonstrate that all the services required by this solicitation will be satisfactorily performed.” In order to satisfactorily address all services required by the SOW, we respectfully request the page limit for the Management Plan Narrative be increased to at least 20 pages. Are the Managerial Approach and Quality Control Plan included in the 10 page narrative?

The set 10 pages for Management Plan Narrative remains set at 10 pages. The Quality Control plan is part of the set 10 pages narrative.

Section L.4.2.1, Part 3 – Miscellaneous Documents: Should contractors assume SOW is requiring proposals to include full resumes for key personnel? If so, what is the page limit for this section of the proposal? In addition, should contractors submit same information for major subcontractors? Please indicate which positions are considered “key personnel.” If key personnel resumes are not allowed/required, please provide clarification on the format for submittal of key personnel information.

The Miscellaneous Documents are: Signed Standard form (SF) 33, List of Key Personnel and point of contact information, Proof of registration of System for Award Management (SAM), stated under L.4.2.1, part 3.

120 Section L.4.2.2 Format: May contractors use an 11x17 page size for tables, charts, graphs and figures?

Under L.4.2.2, paragraph (4), states: Tables, charts, graphs and figures may be used wherever practical to depict systems and layout implemenation schedules, and plans if necessary. However, 11x17 may not be used.

Please clarify or confirm the following: Section C.1.1.E system, equipment and fixtures repairs are limited to $200/3 hours and identifies the contractor's labor exposure, and the Section C.39.5 $2500 material threshold identifies contractor materials exposure.

The 3 hour/$200 refers to Archecturual detail outside the scope and the $2,500 refers to any repair.

122 Can the government provide a listing of applicable doors covered by the inspection requirement?

No

Service items in the Statement of Work call for a licensed electrician to perform the services, repairs and testing, but an electrician is not listed in any staffing documents, plans or the CBA. Please clarify the requirement and how or if it relates to staffing requirements.

We do not require a license electrician to be on staff. However, any electrician must meet the requirement in Section H.15.

In reference to G.3.4 of the solicitation (Key Contractor Personnel), it states that the Contractor will provide to the Contracting Officer the names, titles, e-mail addresses and phone numbers of key personnel at the time of award, but L4.2, Part 3 (Submittal Package) states that the offeror shall submit a list of key personnel and point of contact information. There seems to be a conflict in statements. This information is usually requested at contract award. Please clarify.

The key personnel specified for L.4.2, Part 3 refer to corporate personnel.

125 Is annual or semiannual emergency generator testing required at all facilities?

Generator testing is monthly, and annual service PM

126 Is annual eddy current testing required?

Eddy current is required every 3 years

Section L, Paragraph L.5.3.1, Past Performance Questionnaires. If a CPARS was completed for a submitted project, are we to also include the actual CPARS with the proposal?

If the projects being submitted have been evaluated in CPARS, the offeror will complete the CONTRACT IDENTIFICATION section on L3 form and indicate the contract was evaluated in CPARS and submit with their proposal, no further action is required.

Section L, Paragraph L.4.2.1, Part 3 Miscellaneous Documents, requires List on Offeror key personnel and point of contact information. Is this corporate Key Personnel, on-site key personnel, or both?

Corporate personnel

129 Is a Load Bank required for generator testing?

No

What front end is on the Building Management Systems? We were told there were at least two different systems. What brands are they? Also, are they kept updated from the vendor on a regular basis?

Reference C.22.1

131 Is the maintenance of solar panels included in SOW, or are they on a separate contract?

No, the maintenance is not required and no they are not on a separate contract.