Chiller Removal & Installation at the U. S. Post Office & Courthouse in Alexandria, LA
Solicitation number
GS-07-P-16-HT-C-7015
Issued by

About this file

Amendment 03

View the file

Other files

File Type Posted
Amendment_04.pdf PDF
Amendment_02.pdf PDF
Amendment_01.pdf PDF
Pre-Proposal_Attendee_Registration_Form.pdf PDF
Attachment_A_-_Experience_on_Similar_Projects.pdf PDF
PBS_Past_Performance_Questionnaire.docx DOCX document
GS-07-P-16-HT-C-7015.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods:

(a) By completing items 8 and 15, and returning or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment your desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT 1. CONTRACT ID CODE

2. AMENDMENT/MODIFICATION NO. 3. EFFECTIVE DATE 4. REQUISITION/PURCHASE REQ. NO. 5. PROJECT NO. (If applicable)

7. ADMINISTERED BY (If other than Item 6) CODE

STANDARD FORM 30 (REV. 10-83)

Prescribed by GSA FAR (48 CFR) 53.243

FACILITY CODE

9A. AMENDMENT OF SOLICITATION

NO.

9B. DATED (SEE ITEM 11)

10A. MODIFICATION OF CONTRACT/ORDER NO.

10B. DATED (SEE ITEM 13)

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers is extended, is not extended.

12. ACCOUNTING AND APPROPRIATION DATA (If required) copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;

13. THIS ITEM ONLY APPLIES TO MODIFICATION OF CONTRACTS/ORDERS.

IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

CHECK ONE A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT ORDER NO.

IN ITEM 10A.

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).

C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER (Specify type of modification and authority)

Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

15C. DATE SIGNED

15A. NAME AND TITLE OF SIGNER (Type or print)

16C. DATE SIGNED

16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)

14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

PAGE OF PAGES

6. ISSUED BY CODE

8. NAME AND ADDRESS OF CONTRACTOR (No., street, county, State and ZIP Code) (X)

CODE

15B. CONTRACTOR/OFFEROR

(Signature of person authorized to sign)

16B. UNITED STATES OF AMERICA

(Signature of Contracting Officer)

NSN 7540-01-152-8070

Previous edition unusable

7PQD

Amendment 03 is issued to provide a revised Scope of Work dated 8/24/16, a revised Document C101-SB (The Agreement) and the transformer scope.

7PQD

Energy & Acquisition Support Branch

819 TAYLOR ST

FORT WORTH, TX 76102-6124 United States

Energy & Acquisition Support Branch

819 TAYLOR ST

FORT WORTH, TX 76102-6124 United States

GS-07-P-16-HT-C-7015

1 47

08/24/2016

08/10/2016

Replacement of Two (2) 80 Ton air cooled chillers

LA0002

Alexandria PO/CTHS 515 Murray St Alexandria, LA

Date: 24 August 2016 Prepared by: Dana Ulanoff

SCOPE OF WORK

The contractor shall provide all materials, supplies, labor, equipment and supervision, necessary to complete the demolition and replacement of two (2)80 ton air cooled chillers and chilled water pumps. Upon completion of the project, this chiller shall be connected to the common building chilled water loop and BAS.

New Chiller Requirements Minimum 87 tons of cooling Evaporator EWT/LWT (F) 53.95/44.01 Evaporator GPM- 208.8 @ 95 degrees Ambient temperature IPLV .592 Evaporator Pressure Drop (Not to exceed) 6.25 psi (4 pass heat exchanger) Magnetic Bearing oil less compressor Chiller submittals shall be submitted with the proposal.

A. Demolition

1. Remove refrigerant from the existing air cooled chillers.

2. Disconnect all electrical, controls, piping and associated equipment to chiller. Remove all unused conduit/wiring back to panel boards and provide knock-out plugs at all unused openings.

3. Remove and dispose of properly two 80 ton air cooled chillers.

4. Remove and dispose of properly the chilled water pumps

5. One chiller shall be replaced and the new chiller shall be operational for 48 hours before the demolition of the second chiller is replaced.

6. Remove lightning protection from the existing Carrier Brand Chillers to be re-installed on the new chillers.

B. Alterations

1. Provide and install two (2) each 87 ton nominal Capacity single compressor air cooled chiller.

Installation shall be/have but not limited to:

i. Equal to or better than magnetic bearing Frictionless Centrifugal Chillers part # AD028.1BG06.F4AEBA.A004AA.E10 (See exhibits A&B).

• Oil-free centrifugal Danfoss Turbocor compressor(s)

• Compressor suction and discharge isolation valves

• Chiller(s) to be shipped Standard - Unit shipped fully assembled

• Chillers are ETL listed and certified to CSA C22.2 No.236

• Conforming to ANSI/UL 1995

• Power connection style: Single Point Power Connection

• Individual Breaker(s) or fused disconnect(s) per compressor(s)

• Nema 3R Control enclosures – outdoor use

• Mechanical HP/LP switch.

• ASME certified horizontal shell-and-tube heat exchangers.

• Supporting baffles inside Standard EVAP tubesheets

• High efficiency enhanced tubes

• Evaporator Insulation: Standard Thermal Insulation 1.5” (38mm)

• Evaporator water boxes rated to 145psig fitted with Grooved Pipe

Connection

• High performance copper tube with aluminum fin condenser

• Fin surface treatment: Anticorrosive paint coating – 1000 hour salt spray test in accordance with ASTM B117

• Sheet metal and electrical panel coating rated to 1000 hour salt spray test in accordance with ASTM B117

• Chilled water : IFM – Thermal Dispersion Switch

• Electronic expansion valve(s)

• Dual pressure relief valves on evaporator mounted on changeover valve.

• Factory Startup: Certified Startup Agent

• Smardt Gen 4 chiller controller with 12” touch panel and internet capability (internet service provided by owner)

• Connectivity: BACNET MSTP / IP

• BPHE Economizer for each compressor

• Hail Guards

• 5 years chillers , compressors parts and labor and refrigerants

ii. One chiller shall be replaced and be fully operational for two days b e f o r e the replacement of the second chiller begins. The delivery and removal of the chiller(s) shall occur on the weekend to reduce impact to the building’s occupants during crane operation. And chilled water outage required for this project shall be accomplished after hours or on the weekend.

Any c o s t associated with using the O & M’s staff to support after h o u r support shall be included to your pricing proposal.

iii. Replace existing chilled water pumps including associated valves, strainers, check valves, liquid filled gauges and expansion joints. New pumps shall be vertical inline type 209 gpm 90 feet o f h e a d . Expansion joints shall include restraint devices. Install new variable frequency drive for each chilled water pump. Install new variable frequency drive for each chilled water pump. The VFD for the chilled water pump shall control a 10degf temperature differential across the evaporator but no lower than the minimum flow required by the chiller manufacture. New temperature differential controller shall be integrated into the control scheme of the VFD to control the speed of the pumps. All these drives shall be integrated into the BAS showing drive speed in HZ and actual pressure psi / temperature degf differential. Alexandria’s existing BAS is a Niagara overlay to a Siemens system.

The existing chillers are integrated into the Siemens MBC BacNet controller “Alex1”

Create or modify the Chiller Plant graphics.

Create an alarm point within the BAS and link to the remote notification email configuration page.

iv. Provide and install all necessary piping and insulation to match existing profiles. Provide and install all necessary piping hangers and/or support for new piping. Include new valve tags IAW current Valve Tag Schedule in the control room. Paint all piping to match existing color scheme. Paint color selection to be provided by

GSA.

v. Provide and install all necessary water thermowell connections and include new thermometers and liquid filled pressure gauges (6 thermometers/10 liquid filled gauges) with associated hardware to provide shut off and removal during gauge removal. Provide new manual isolation valves (4 each) and properly sized expansion devices with restraint devices. (4 each) Remove the existing manual valves and replace with new valves.

vi. Provide and install all necessary and properly sized electrical conduit and electrical wiring for new chiller. Contractor will be responsible to verify existing electrical power and/or circuit breakers will handle new chiller’s electrical voltage and amperage. Provide and install properly sized transformers, electrical panel(s) and circuit breakers for new chillers as needed. Provide new panel schedules reflecting work accomplished. Refer to exhibit transformer general scope for minimum specification for the new step up transformer(s) required for each chiller. Note- The new chillers are 460 volt 3 phase and the old Carrier Brand chillers are 208/230 volt 3 phase. Install new fused disconnect for each new chiller and mount next to each chiller within 10 feet of chillers.

vii. Install new two way valves with DDC actuators.

These two way valves/actuators shall be fast reaction (25 seconds or less). One per each chiller. (Total 2 each) They will be integrated into the BAS and BAS graphics page. The position of these valves shall be reflected in the BAS graphics page via feedback signal from the actuator.

viii. Proposal documents shall include new chiller spec sheet for intended chiller manufacture that shall include intended chiller performance data.

1. The new chiller’s control system shall communicate with existing building automated system. Replacement Chillers shall be wired to and communicate by BACnet or directly to the Building's Niagara JACE Controller. The Chillers shall not be linked through a propriety building system controller.

Contractor will be responsible to verify the existing BAS and provide all necessary wiring, controls, Bacnet cards to integrate chiller’s controls to BAS. The BAS Integration contractor shall include any mapping and linking changes of the MagLev chiller on the graphics page of the building’s BAS including new piping, chiller layout and cooling tower.

Contractor is responsible for licensing fee and drivers to connect/communicate with BACnet to the existing JACE.

Chiller display/ chiller history/trending shall be connected to the BAS for viewing and controlling. Provide the tonnage wi th the chiller graphic (ex: ACME 87 Ton). Include links to the chiller history logs on the central plant page so that access to the trends is easily opened for analysis. The Contractor shall program the existing and any new feedback points using BACNET protocol intergraded into the existing BAS. The new chiller’s control system shall communicate with existing building automated system. Contractor will be responsible to verify the existing BAS and provide all necessary wiring, controls, and/or Bacnet cards to integrate chiller’s controls to BAS. Automated valves shall provide reporting feedback on current status, history screens, and valve icons shall be visible on the BAS central plant page. All analog histories of new Chiller points shall be recorded in 15 minute intervals and stored in the building JACE controller for 14 days. All discrete point histories shall be recorded both as 15 minute interval, 14 day FIFO history logs but also as COV histories storing 100 intervals within the JACE. All

ix. Replace all insulation on the chilled water piping located on the roof and install aluminum jacketing cover. Approximately 230’ feet total.

Replace/install insulation on the chilled water piping on new chilled water pumps and a minimum of 10 feet of insulation on the horizontal chilled water pipe before and after (inlet and outlet of the pumps) each new pump.

new Chiller point histories shall be exported daily from the JACE to the hosting GSA BAS Server and to the GSA AMS Application for long term archival storage. Provide the necessary equipment controllers and or expansion boards to incorporate sequence of operation along with new equipment into the BAS.

Notes:

Security Requirements: Contractor personnel performing work on the BAS under this contract must possess HSPD-12 Clearance and GAC Cards in order to access GSA secured networks and sites.

Integration Technician: Integration technician performing installation shall be certified on the Niagara AX JACE for both installation and maintenance of the system and shall have a minimum of 3 years’ experience performing the required tasks. The Contractor shall provide with their offer the integration technician’s resume and certification documentation.

B. Specifications and Requirements

1. Valves connections, accessories and operators

i. Provide threaded ends for valves 2.5 inches and smaller

ii. Provide flanged or grooved ends for valves 3 inch and larger

iii. For butterfly valves (isolation valves) provide lever handle, infinitely adjustable with lock nut and memory stop. Provide hot dipped galvanized extension stems, valve handles and gear actuators outdoors. Provide weatherproof galvanized cast iron gear operators for valves mounted outdoors.

2. Automatic isolation valves:

i. Type of end fitting: pattern to mate with ANSI 125 flange.

ii. Cast iron GG25 with stainless steel stem and ball.

3. Pipe insulation- Match existing size/type/color scheme and labeling.

4. Steel pipe and fittings:

i. Steel pipe, DN 50 (NPS 2) and smaller: ASTM A

53, type S (seamless) or type F (furnace butt welded), grade B, schedule 40, black steel, plain ends.

ii. Steel Pipe, DN 65 through DN 300 (NPS 2-1/2 through NPS 12): ASTM A 53, type E (electric-resistance welded), Grade B, Schedule 4 0 , black steel, plain ends.

iii. Steel Pipe Nipples: ASTM A 733, made of ASTM A 53, Schedule 40, black steel; electric-resistance welded for DN 65 (NPS 2-1/2) and larger.

iv. Cast-Iron Threaded Fittings: ASME B16.4; Classes 125 and 250.

Malleable-Iron Threaded Fittings:

ASME B16.3, Classes 150 and 300.

MATERIAL TECHNICAL SPECIFICATIONS

Where a particular manufacturer's product is specified, it is not intended to discriminate against other manufacturer’s which are equal in quality of material, workmanship, appearance and function to those specified.

Rather, it is intended to establish and indicate the desired standard of quality. If any tests are required to determine the equality of any substitutes, such tests shall be made by an independent authority as approved by the government. All expenses related to proposed substitutions shall to be paid by the Contractor. Proposed items are to be submitted with the proposal and shall be a basis for the award of the contract.

All materials and equipment shall bear evidence of the Underwriter's Laboratories Inc. Label (UL) or approval of other nationally recognized independent testing organizations adequately equipped and competent to perform such services when these standards are required and such product listing is available.

PRODUCT DATA AND SAMPLES

1. Product Data: Contractor shall submit one electronic set of chiller product data including any valves, piping, insulation, BAS hardware, refrigerant monitoring system, catalog sheets, brochures, performance char ts o r o the r s t a n d a r d d e s c r i p t i v e data provided by any Subcontractor, supplier or d i s t r i b u t o r . Product Data must be certified by the Contractor stating that it was reviewed and approved. Product to be used must be highlighted on the data sheet by the Contractor.

Product Data used for construction must bear GSA’s stamp certifying final review and approval. No product shall be used that does not bear such stamp. Submittals shall be identified on a submittal register provided by the Contractor and transmitted using a transmittal letter.

2. Samples: Contractor shall submit physical samples establishing standards by which completed work is judged. Samples shall indicate color range, functional characteristics and shall represent exact material to be used on the project.

C. Special Instructions

1. Contractors shall submit proposal with a detailed cost breakdown. Cost Breakdown shall be submitted in CSI Master Format 2010. Proposal shall include make and model of all proposed equipment. Chiller selection shall include IPLV rating and pressure drops within submitted proposal. Chiller selection shall be submitted with the proposal. Chiller selection submitted with the proposal shall not exceed the pressure drop indicated in the SOW and the chiller energy efficiency (IPLV) shall be equal to or better than the chiller specifications in the exhibit.

2. Contractor is responsible to comply with the “Buy

American Act”. Buy American Act provides domestic construction material be used in performing this contract.

3. Contractor will be responsible to request and furnish all required overhead and/or road blocking permi ts f rom the City and or electrical/utility providers when using a crane at this location if the city street requires a blockage when off-loading the chiller.

PERFORMANCE REQUIREMENT

1. The Contractor shall field verify existing conditions prior to any demolition.

2. The Contractor shall be responsible for coordinating all activities of subcontractors. This responsibility includes coordination of;

preparation of shop drawings preparation of shop drawings produced by different subcontractors where their work interfaces or may potentially conflict or interfere and the installation of such work; scheduling of work by subcontractors and use of the Project site for staging and logistics.

3. The contractor shall reinstall existing access panels; etc., back to their original location and condition after all work is completed.

4. Safety Plan: Contractor shall submit a site specific plan including hazardous communication plan list of the flow of communication in case of emergency, lock-out / tag-out with narrative that explains lock-out / tag out procedures, AHA / JHA’s for major activities, crane safety plan (if applicable) for crane erection and use. Include preferred location for crane set up, operator certification credentials, and crane inspection/certification documentation within thirty (30) of Notice to Proceed.

5. Contractor to provide a work plan within thirty (30) days of Notice to Proceed (NTP) identifying equipment access plan, CHWP / CWP piping tie-in and electrical tie-in for review and acceptance prior to installation.

6. Contractor to provide schedule of values within thirty (30) days of Notice of Proceed (NTP). The Contractor shall prepare and submit for approval a detail cost breakdown of the Contract price, to be referred to as the Schedule of Valves, assigning values to each component of the Work.

a. Values must include all direct and indirect cost, although a separate value for bond cost may be established.

b. The Schedule of Valves must contain sufficient detail to enable the Project Manager to evaluate applications for payment.

c. Before submitting a request for payment, the Contractor shall schedule a pencil copy review with the Project Manager for review and acceptance.

7. Once the chiller is fully operational the Contractor shall be responsible to provide a report to GSA Project Manager for the following: Re-balance water flow, Manufacturer’s Start-up Check-list and Commissioning (all adjustments and balancing to the system shall be in accordance with manufacturer requirements).

SECURITY CLEARANCE REQUIREMENT

All Contractor personnel performing working on premises at GSA owned and operated buildings are required to pass a security background check conducted by the Department of Homeland Security/Federal Protective Service. No Contractor employee will be allowed to perform work on the building premises until employee has been determined to be suitable for hire by the Department of Homeland Security/Federal Protective Service. Final payment will not be made until all security badges are returned to the Contracting Officer.

WORKING HOURS

Work not impacting normal building occupancy shall be performed during normal business hours Monday through Friday 7:00 am to 6:00

pm. Any work affecting normal building occupancy needs to be scheduled after normal business hours/weekends and approved by GSA building manager.

PERIOD OF PERFORMANACE

All work shall be completed within 45 calendar days after Chiller delivery.

It is estimated that it will take 12-14 weeks to manufacture the chiller. A partial NTP will be issued to place the order on the equipment upon approved submittals.

LIQUIDATED DAMAGES

If substantial completion is not achieved, the Contracting Officer may assess liquidated damages at a rate of $160 per day.

PROJECT SCHEDULE

Contractor shall submit to the GSA Project Manager a project schedule within thirty (30) days of Notice of Proceed. The project schedule shall include a written narrative describing the major work activities, activities critical path and major constraints underlying the sequence and logic, all tasks to be performed under this project, duration of each task and tentative date/s each task will be performed. Project schedule must be approved by the GSA Project Manager prior to performing any work under this project. The project schedule shall incorporate milestone events specifics in the Contract, including as applicable NTP, Substantial Completion and milestones related to specific work phases and site restrictions. The project schedule shall also include Contractor-defined milestones to identify target dates for critical events, based upon the Contractor’s chosen sequence of work. Microsoft Project or other similar format can be used for this schedule.

EXTENSION OF TIME

If the Contractor requests an extension of the time for Substantial

Completion, the Contractor shall base its request on analysis of time impact using the Project Schedule as its baseline, and shall propose as a new Substantial Completion date to account for the impact. The Contractor shall submit a written request to the Contracting Officer setting forth f a c t s and analysis in sufficient detail to enable the Contracting Officer to evaluate the Contractor’s entitlement to an extension of time.

D. General Construction Requirements

1. Keep work areas clean on a daily basis.

2. Remove debris from site on a daily basis.

3. Protect all existing walls and furniture from damage.

4. Contractor is responsible for all damages to government property caused by him/her and their subcontractors.

5. Contractor is responsible for all dimensions and quantities.

6. Contractor shall field verify all existing conditions prior to submitting a proposal.

CONSTRUCTION WASTE MANAGEMENT PLAN SPECIFICS (AFTER CONTRACT

AWARD)

1. Fourteen days (14) from Notice to proceed, the Contractor shall submit to the Project Manager, a draft Waste Management Plan for mixed debris recycling to GSA approval. The plan shall include (but not be limited to) the following: List of the materials to be reused or recycled.

2. The Contractor will record and track the type and quantity, by weight or each material salvaged, reused, recycled or disposed throughout the project. The Contractor shall p r o v i d e a Construction Management Waste Management Report upon request of Substantial Completion.

E. Final Preparations

1. Contractor shall provide both classroom and hands-on training at a minimum four (4) hours to training to GSA m a i n t e n a n c e personnel. This training will be conducted by the Chiller Manufacturer’s authorized service technician and the BAS integration technician. This training is separate from the chiller startup work that is accomplished by the Manufacture’s authorized service technician.

2. Contactor shall provide two (2) sets of as-built drawings on compact disk (CD). As-built drawings shall be in Auto CAD format and shall illustrate all alterations performed under this contract.

Final payment will not be authorized until all as-built drawings are provided.

3. Contractor shall provide three (3) copies of owner’s (O&M) manuals for the Chiller, VFD and pumps.

4. Contractor shall return all GSA Badges issued for this project. Final payment will not be authorized until all O&M manuals and badges are provided and returned.

PRE-PROPOSAL CONFERENCE

Interested parties must notify the Contracting Officer for further information about attendance and to confirm location, time and date. Only those parties who have notified the Contracting Officer and provided necessary information in advance of the meeting will be allowed to attend. Contractors are encouraged to verify all existing c o n d i t i o n s a t the job site prior to proposing on the project. Failure to do so will not relieve the Contractor of any responsibility to properly estimate the cost of this project.

Note:

The following items will be addressed at the Pre-Proposal Conference and again at a Pre-work Conference:

1. On site storage.

2. Parking.

3. Use of elevators.

4. Access through secured area.

5. Contractor shall coordinate with the GSA mechanical maintenance Contractor, for placing the fire alarm system in test mode prior to performing any work that may result in the activation of an alarm signal from the fire alarm system including but not limited to: connecting devices to fire alarm system, cutting, welding or other work that creates excessive dust. Contractor is responsible for all costs associated with placing the fire alarm system in test mode.

6. A GSA approved welding permit will be required before performing any cutting and welding. Contractor shall submit welding permit to the Project Manager for review and acceptance by the Building Manager at least 72 hours prior to cutting and/or welding activity.

7. Contractor shall be responsible for all quantities, measurements, correct installation of all items and for any damages to the building, items such as parked vehicles and surrounding areas.

8. All materials, equipment and supplies to be i n c o r p o r a t e d i n t o work under the terms of this contract shall have been “NEW” and “UNUSED” at time of award.

9. Materials of equipment containing asbestos in any form shall not be incorporated into this project.

10. All material, workmanship and equipment shall be subject to the inspection and approval by the Contracting Officer Representative. All work unsatisfactorily performed shall be promptly corrected and made acceptable for the Government.

APPLICABLE PUBLICATIONS

A. Department of Labor:

1. Occupational and Health Standards: (29 CFR part 1926).

2. Safety and Health Regulations for Construction: (29CFR part 1518).

3. Federal Code:

All renovations shall be in accordance with the current design requirements as found in the Federal Construction & Safety Standard, and Third Party approved structure design package.

Latest Edition of the following Codes/Regulations:

4. Fire Codes: All units shall meet or exceed all required Federal, State and

Local Fire Codes.

5. Housing & Urban Development (HUD 24 CFR 3280).

6. National Electrical Code (NEC).

7. International Building Code (IBC).

8. International Mechanical Code (IMC).

9. International Plumbing Code (IPC).

10. American Society of Heating, Refrigeration and Air Conditioning (ASHRA).

11. Occupational and Safety Act (OSHA).

12. National Fire Protection Association (NFPA).

13. U.S. Environmental Protection Agency (EPA), “Mold

Remediation in Schools and Commercial Buildings”.

B. Manufacture, installation and testing shall comply with manufacturer’s instructions and standards. When more stringent requirements are call for either this S.O.W. or codes and regulations, the priority of precedence in compliance shall be:

1. Federal Requirements.

2. State Requirements.

3. Local Requirements.

4. Manufacturer’s Requirements.

5. Contractor’s Requirements.

SUNSTAINABILTY

1. Green Purchasing:

i. The contractor shall refer to the “Green Procurement

Compilation” for all products being installed in federal facilities. The Green Procurement Compilation can be found at https://sftool.gov/greenprocurement. The standards found in this compilation shall guide all product purchasing decisions as they relate to federal facilities.

ii. The use of the following standards (“Key Sustainable Product” or “KSP” standards) is mandatory for all contracts and task orders. See https://sftool.gov/green- products/1037/key-sustainable-products for more details.

a) Nylon Carpet: NSF 140 Gold certification and > 10% post-consumer recovered content.

b) Interior Latex Paint: < 50 grams per liter (g/L) VOCs post tint (i.e. SCAQMD Rule 1113 standard).

c) Gypsum Board: Greenguard Gold Standard or 0 g/L VOCs.

d) Acoustical Ceiling Tiles: Meets California

Section 01350 standard for low-VOC materials and total recycled content > 20% and recyclable in a closed loop process and USDA Certified BioPreferred and Environmental Product Declaration (EPD) available.

e) Concrete (ready-mix and site-mix): > 25% fly ash or > 15% ground granulated blast-furnace (GGBF) slag

2. For each KSP listed, the Contractor shall submit proof of compliance to the CO or his designee prior to the installation of the product or material. The CO’s designee shall verify compliance.

If the KSP materials listed above are

i. not reasonably available within a reasonable period of time

ii. fail to meet the performance standards set forth in the specification or fail to meet reasonable performance standards of GSA; or

iii. are available only at an unreasonable price, only then can the Contractor use other types of products.

In these cases the Contractor shall select products and materials, to the extent possible, which are the safest and most environmentally friendly.

Exemptions must be submitted in writing and can only be approved by the CO

DISCLOSURE OF INFORMATION

1. Any information made available to the Contractor by the government shall be used only for the purpose of carrying out the provisions of this contract. This information shall not be divulged or made known in any manner to any persons except as may be necessary in the performance of the contract.

2. In the performance of this contract the Contractor assumes responsibility for the protection of the confidentiality of government records.

3. The Contractor shall adhere to the requirements found in Part 24 of the Federal Acquisition Regulation, Protection of Privacy and Freedom of Information.

WARRANTY

1. All workmanship and materials shall be warranted for a period of not less than three hundred sixty five (365) days from date of acceptance by the Government (Standard Warranty) plus extended compressor parts and labor warranty (4 years).

2. The Contractor shall provide a copy of warranty of items procured. Warranty shall be in writing and shall include any conditions which may invalidate the warranty.

3. Warranty shall include procedures on how to exercise warranty rights. Provide points of contact in order to get services required.

4. Standard warranty shall be all inclusive of parts, labor and materials, related coverage and additional costs, if any.

5. Contractor shall provide all applicable manufacturers’ warranties at time of completion.

END OF SCOPE OF WORK

GSA Contract No. GS-07-P-16-HT-C-7015

Document: C101-SB / JAN 2016 (The Agreement) Pages 1 of 30

Construction Contract for Chiller Removal & Installation at the U.S.

Post Office & Courthouse in Alexandria, LA The Agreement

Table of Contents

I. Project Information

A. Project Summary B. The Contract C. Period of Performance D. Work Conditions/Site Requirements E. Authorized Representative F. Liquidated Damages Rate G. Buy American Exceptions H. Statement of Work, Specifications, Drawings, Exhibits and Other Attachments

II. Prices A. Basis of Pricing B. Contract Price Form

III. Terms and Conditions A. Commencement, Prosecution, and Completion of Work B. Contractor Responsibilities C. Contractor Management and Personnel D. Project Schedule E. Extensions of Time F. Interpretation of Specifications and Drawings G. Submittals H. Substantial Completion and Contract Completion I. Use and Possession Prior to Substantial Completion J. Finality of Contract Modifications K. Liquidated Damages L. Insurance Requirements M. Order of Precedence N. Administrative Matters O. Non-Compliance with Contract Requirements P. Safeguarding Sensitive Data and Information Technology Resources Q. Options and Allowances R. Additional Terms and Conditions

IV. Contract Clauses A. Clauses Incorporated in Full Text B. Clauses Incorporated by Reference C. Subcontract Requirements

(The Agreement) Pages 2 of 30

I. Project Information

I.A. Project Summary The contractor shall provide all materials, supplies, labor, equipment and supervision, necessary to complete the removal of two (2) 80 ton air cooled chillers and chilled water pumps and installation of two (2) 87 ton single compressor air cooled magnetic bearing frictionless centrifugal chillers at the U.S. Post Office/Courthouse located in Alexandria, LA.

I.B. The Contract

(1) The Contract consists of the SF 1442, the Agreement, the Statement of Work, Specifications, Drawings, Exhibits, Amendments, Modifications, and other Attachments identified herein (collectively, the Contract Documents). The Contract contains the entire agreement of the Parties, and no prior written or oral agreement, express or implied, shall be admissible to contradict or modify any part of the Contract.

(2) The Contractor shall provide and pay for all labor, materials, equipment, tools, water, heat, utilities, transportation, and other facilities and services necessary for the proper execution of the work described in and reasonably inferable from the Contract Documents (the Work), whether temporary or permanent. In consideration for, and upon condition of, the Contractor's completion of the Work, GSA shall pay the Contractor the price or prices established in Section II, subject to the terms and conditions set forth in this Contract.

I.C. Period of Performance

(1) Commencement. The Contractor shall commence performance of the Work within 10 days after the Contractor receives the Notice to Proceed (NTP).

(2) Substantial Completion. The Contractor shall achieve Substantial Completion of the Work, as that term is defined in this Agreement, no later than 35 calendar days from issuance of Notice to Proceed (NTP).

(3) Contract Completion. The Contractor shall achieve Contract Completion, as the term is defined in this Agreement, within 10 calendar days of Substantial Completion.

I.D. Work Conditions/Site Requirements N/A

I.E. Authorized Representative

(1) This Contract is between the United States of America, acting by and through the Administrator of General Services (GSA), and the Contractor (the Parties). References in this Contract to "the Owner" or "the Government" shall be understood to refer to GSA. The following individual is designated as the only authorized GSA representative under this Contract, unless other warranted contracting officers are designated in writing:

Contracting Officer Name: Shawna Villarreal Address: 819 Taylor St Rm 12B01, Fort Worth, TX 76102 Telephone: 817-850-5541

(The Agreement) Pages 3 of 30

Email: Shawna.villarreal@gsa.gov

(2) GSAR 552.236-71, Authorities and Limitations, is incorporated by reference in this Contract.

I.F. Liquidated Damages Rate In accordance with the “Liquidated Damages” clause in Section III (Terms and Conditions), liquidated damages shall be calculated at the rate of $160.00 per calendar day.

I.G. Buy American Exceptions For the applicable Buy American clause and any exceptions, see Section IV of this Agreement.

I.H. Statement of Work, Specifications, Drawings, Exhibits, and Other Attachments The following documents are incorporated by reference into this Contract.

(1) Statement of Work for Contract No. GS-07-P-16-HT-C-7015, Dated 08/24/2016

(2) Exhibit A – Chiller

(3) Exhibit B – Chiller Dimensions

(4) Exhibit C – R7-230900 Building Automation System

(5) Wage Determination LA160055, Dated 02/26/2016

II. Prices

II.A. Basis of Pricing

(1) Contract Prices. All Contract prices set forth in this Section include all costs necessary to complete the work for which the price is established (e.g., Base Contract, Unit Price, Options) in accordance with the Contract Documents, including, but not limited to, the cost of work performed by subcontractors and consultants, indirect costs, fees, expenses, taxes, and profit.

(2) Knowledge of Conditions Affecting Price. FAR 52.236-3, Site Investigations and Conditions Affecting the Work, is incorporated by reference in this Contract. The Contractor shall be presumed to have established all prices with knowledge of general and local conditions that may affect the cost of Contract performance at the site where the Work is to be performed, to the extent that such information is reasonably obtainable.

(3) Unit Prices and Allowances. If any portion of the Work is to be performed on a unit price basis, the Unit Price shall include all costs of coordinating and incorporating the unit-priced portion of the Work into the Base Contract Work. The Contractor shall only be obligated to perform unit-priced work to the extent that an Allowance has been established. The Contractor shall be obligated to perform such work in excess of a unit quantity for which an Allowance is established only if directed by the Contracting Officer in writing. The Contractor shall be bound to the unit price or prices set forth herein in all equitable adjustments for changes including unit priced work, and no markups shall be applied to such unit prices.

(4) Options. If any portion of the Work is to be performed upon the timely exercise of an Option, the Option Price shall include all costs of coordinating and incorporating the Option-

(The Agreement) Pages 4 of 30 priced portion of the Work into the Base Contract Work. An adjustment to the Contract price for such additional work shall be computed solely on the basis of the Option price or prices set forth herein. Unless otherwise specified, all options may be exercised within 90 days of Contract award.

(5) Bid Rates. If this Contract includes Bid Rates to be used in determination of equitable adjustments (e.g., overhead, profit, daily rates for time-related costs), such rates shall be deemed to include all costs recoverable as components of an equitable adjustment consistent with the requirements, definitions, and exclusions applicable to equitable adjustments set forth in this Contract, and consistent with the Contractor's cost accounting practices. Unless otherwise specified, the bid rates shall be deemed to include only the Contractor's costs, and not the costs of any subcontractors.

II.B. Contract Price Form Please see SF 1442.

III. Terms and Conditions

III.A. Commencement, Prosecution, and Completion of Work FAR 52.211-10, Commencement, Prosecution, and Completion of Work, is supplemented as follows:

The Contractor shall not commence the Work until the Contracting Officer has issued NTP. The Contractor shall diligently prosecute the Work so as to achieve Substantial Completion of the Work, as defined in Section III (Terms and Conditions), “Substantial Completion and Contract Completion” clause, within the time specified in Section I (Project Information), “Period of Performance” clause. If the Contract specifies different completion dates for different phases or portions of the Work, the Contractor shall diligently prosecute the Work so as to achieve Substantial Completion of such phases or portions of the Work within the times specified.

III.B. Contractor Responsibilities

(1) Unless otherwise expressly stated in the Contract, the Contractor shall be responsible for all means and methods employed in the performance of the Contract.

(2) The Contractor shall be responsible for providing professional design services in connection with performance of the Work or portions of the Work only if this responsibility is expressly stated and the Contract Documents provide the performance and design criteria that such services will be required to satisfy. In the performance of such work, the Contractor shall be responsible for retaining licensed design professionals, who shall sign and seal all drawings, calculations, specifications and other submittals that the licensed professional prepares. The Contractor shall be responsible for, and GSA shall be entitled to rely upon, the adequacy and completeness of all professional design services provided under this Contract.

(3) The Contractor shall be responsible for coordinating all activities of subcontractors. This responsibility includes coordination of: preparation of shop drawings produced by different subcontractors where their work interfaces or may potentially conflict or interfere and the installation of such work; scheduling of work by subcontractors; and use of the Project site for staging and logistics.

(The Agreement) Pages 5 of 30

(4) Where installation of separate Work components as shown in the Contract Documents will result in conflict or interference between such components or with existing conditions, including allowable tolerances, it is the Contractor's responsibility to bring such conflict or interference to the attention of the Contracting Officer and seek direction before fabrication, construction, or installation of any affected work. If the Contractor fabricates, constructs, or installs any work prior to receiving such direction, the Contractor shall be responsible for all cost and time incurred to resolve or mitigate such conflict or interference.

(5) Where drawings show work without specific routing, dimensions, locations, or position relative to other work or existing conditions, and such information is not specifically defined by reference to specifications or other information supplied in the Contract Documents, the Contractor is responsible for routing, dimensioning, and locating such work in coordination with other work or existing conditions in a manner consistent with Contract requirements.

(6) It is not the Contractor's responsibility to ensure that the Contract Documents comply with applicable laws, statutes, building codes and regulations. If it comes to the attention of the

Contractor that any of the Contract Documents do not comply with such requirements, the Contractor shall promptly notify the Contracting Officer in writing. If the Contractor performs any of the Work prior to notifying and receiving direction from the Contracting Officer, the Contractor shall assume full responsibility for correction of such work, and any fees or penalties that may be assessed for non-compliance.

(7) The Contractor shall immediately bring to the Contracting Officer's attention any hazardous materials or conditions not disclosed in the Contract Documents discovered by or made known to the Contractor during the performance of the Contract.

(8) The Contractor must submit a safety plan before commencing work.

III.C. Contractor Management and Personnel FAR 52.236-6, Superintendence by the Contractor, is supplemented as follows:

(1) The Contractor shall employ sufficient management and contract administration resources, including personnel responsible for project management, field superintendence, change order administration, estimating, coordination, inspection, and quality control, to ensure the proper execution and timely completion of the Work. The Contractor shall designate a principal of the firm or other senior management official to provide executive oversight and problem resolution resources to the Project for the life of the Contract.

(2) The Contractor shall employ, and require its subcontractors to employ, qualified personnel to perform the Work. The Government reserves the right to exclude, or remove from the site or building, any personnel for reasons of incompetence, carelessness, or insubordination, who violate rules and regulations concerning conduct on federal property, or whose continued employment on the site is otherwise deemed by the Government to be contrary to the public interest.

(3) Repeated failure or excessive delay by the Contractor to provide qualified personnel shall be deemed a default for the purposes of the Termination for Default clause.

(The Agreement) Pages 6 of 30

III.D. Project Schedule

(1) The Contractor shall use a Critical Path Method ("CPM") Project Schedule to plan, coordinate, and perform the Work. The Project Schedule shall be produced using widely used, commercially available computer software that is capable of generating and monitoring a CPM schedule and is compatible with Meridian Proliance.® For example, compatible software includes Microsoft Project,® Primavera SureTrak,® and Primavera Project Planner.®

(2) The Project Schedule shall be a rational, reasonable and realistic plan for completing the Work, and conform to requirements specified in this clause and elsewhere in this Contract.

(3) The Contractor understands and acknowledges that the preparation and proper management of the Project Schedule is a material component of the Work, and that the Contract price includes all costs of compliance with Project Schedule requirements.

(4) The Project Schedule shall depict all activities necessary to complete the Work, including, as applicable, all submittal and submittal review activities, all procurement activities, and all field activities, including mobilization, construction, start-up, testing, balancing, commissioning, and punchlist. Activities shall be sufficiently detailed and limited in duration to enable proper planning and coordination of the Work, effective evaluation of the reasonableness and realism of the Project Schedule, accurate monitoring of progress, and reliable analysis of schedule impacts.

(5) Within thirty (30) days of NTP, or such other time as may be specified herein, the Contractor shall submit its Project Schedule to the Contracting Officer, together with a written narrative describing the major work activities, activities on the critical path, and major constraints underlying the sequence and logic of the Project Schedule. The Contractor shall submit the Project Schedule in both electronic and hardcopy print format.

(6) The Contractor should anticipate that its initial submittal of the Project Schedule shall be subject to review and revision as contemplated by Paragraph (11) of this clause, and the Contractor shall devote sufficient resources for meetings, revisions, and resubmissions of the Project Schedule to address exceptions taken by the Contracting Officer to the initial submittal.

The Contractor understands and acknowledges that the purpose of the initial review and resolution of exceptions is to maximize the usefulness of the Project Schedule for the Parties during Contract performance.

(7) Activity durations shall be based upon reasonable and realistic allocation of the resources required to complete each activity, given physical and logistical constraints on the performance of the Work. All logic shall validly reflect physical or logistical constraints on relationships between activities. Except for the first and last activities in the Project Schedule, each activity shall have at least one predecessor and one successor relationship to form a logically connected network plan from NTP to the Contract Completion date.

(8) The Project Schedule shall incorporate milestone events specified in the Contract, including, as applicable, NTP, Substantial Completion, and milestones related to specified work phases

(The Agreement) Pages 7 of 30 and site restrictions. The Project Schedule shall also include Contractor-defined milestones to identify target dates for critical events, based upon the Contractor's chosen sequence of work.

(9) Unless a shorter period for updates is specified elsewhere, the Contractor shall update the Project Schedule monthly to reflect its actual progress in completing the Work, and submit the updated Project Schedule to the Contracting Officer within five (5) working days of the end of each month or other specified period.

(10) If the Contractor revises the Project Schedule after initial submission, the Contractor shall provide in writing to the Contracting Officer a narrative describing the substance of the revision, the rationale for the revision, and the impact of the revision on the projected Substantial Completion date and the available float for all activities. The Contractor shall only revise prospective activities, durations and logic, but addition of detail to prospective activities shall not be deemed a revision if the overall duration of the detailed activity does not change.

(11) If at any time the Contracting Officer finds that the Project Schedule does not comply with any Contract requirement, the Contractor shall, upon written notice of exceptions taken by the Contracting Officer, revise the Project Schedule, adjust activity progress, or provide sufficient information demonstrating compliance. Regardless of whether the Contracting Officer takes any such exception, the Contractor shall not be relieved of its responsibility for the rationality, reasonableness or realism of the Project Schedule, or its responsibility to achieve Substantial Completion within the time specified by this Contract.

(12) If the Contractor fails to sufficiently address the Contracting Officer's exceptions to the Project Schedule within thirty (30) calendar days of written notice of same, the Contracting Officer may withhold retainage until the Project is Substantially Complete or until such time as the Contractor has complied with Project Schedule…

This is the start of the file's text. The full file is on GovTribe.

File details come from the government source that posted it. Updated .