USMS_Pub_64_Volume_III_(dated_2005).pdf
PDF 5 MB Posted
- Solicitation number
- GS-07P-16-HH-C-LLLL
About this file
Reference Document USMS Pub 64 Vol III
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
U.S. Marshals Service
JUDICIAL SECURITY SYSTEMS
REQUIREMENTS AND SPECIFICATIONS
VOLUME THREE, PUBLICATION 64
Active Barrier
Alarm
Alarm Annunciator Panel
Alarm Control Communicator
Audible Annunciator
Audio
Balanced Magnetic Door Contact
Ballistic-Resistant Construction
Ballistic-Resistant Glazing
Ballistic-Resistant Material
Biometric Access Control Device
Bollards
Break-Resistant Glazing
Building Standard Mortise Lock not on building master system
Card Reader Proximity
CCTV Camera
CCTV monitor w/ duplex electric outlet (specify 9", 12", 14" 16" & 20" – if no size, coordinate w/ ADT)
Cipher Lock
Closer with door position switch
Crash Gate
Dedicated Double Duplex Electric Outlet
Digital Keypad
Digital Recorder
Door closer
Door Contact Switch
Door position switch
Door Scope
Duplex Electric Outlet
ECP Camera
Electric Door Strike (generic)
Electric Lock or Electric Mortice Door Strike
Electric Door Strike Release
Elevator Annunciator Panel
Emergency Lighting (battery-operated lighting)
Explosives Detector
Gate Arm
Glass Break Sensor
Hand Activated Duress Alarm
Hirsch Scramble Pad or approved equal
Hydraulic Bollards
Intercom or
Intercom Sub-station (Remote) NE-NVP-2DCA-LE (Aiphone) or
Intercom Sub-station (Remote) NE-NVP-RA-LE (Aiphone)
Intercom with door release
Intercom with duress button
Low-wattage Signal Light
Magnetic Door Contact
Magnetic Lock
Magnetic Lock (concealed)
Master intercom with duplex electric outlet
Mechanical Push Bar
Metal Detector
Motion Detector 360°
Pan/Tilt/Zoom CCTV Camera
Pan/Tilt/Zoom CCTV Camera mounted min. 15' A.F.F. or at ceiling Control Panel
Passive Barrier
Passive infrared motion detector
Photoelectric Beam
Rate of rise heat detector
Request-to-exit passive infrared detector
Secure Light Switch
Sequential switcher and multiplexer w/ duplex elextric outlet
Signal Light Status Panel
Strobe Light with Siren
Telephone Outlet: 1 RJ-11 and 3 RJ-45 each (double gang)
Telephone Outlet: 1 RJ-11, wall-mount
Toggle Switch for Signal Light
Touch Sensor Bar
Turnstiles
Uninterruptible Power Supply ( UPS)
VCR
Vehicle Barriers
Video
Wireless Duress Alarm
Wireless Pairs (transmitter/receiver)
Wireless Remote Door Release
X-Rays
SYMBOL LEGEND AT-A-GLANCE (ABRIDGED)
JUDICIAL SECURITY SYSTEMS
REQUIREMENTS AND SPECIFICATIONS
VOLUME THREE, PUBLICATION 64
Active Barrier
Alarm
Alarm Annunciator Panel
Alarm Control Communicator
Audible Annunciator
Audio
Balanced Magnetic Door Contact
Ballistic-Resistant Construction
Ballistic-Resistant Glazing
Ballistic-Resistant Material
Biometric Access Control Device
Bollards
Break-Resistant Glazing
Building Standard Mortise Lock not on building master system
Card Reader Proximity
CCTV Camera
CCTV monitor w/ duplex electric outlet (specify 9", 12", 14" 16" & 20" – if no size, coordinate w/ ADT)
Cipher Lock
Closer with door position switch
Crash Gate
Dedicated Double Duplex Electric Outlet
Digital Keypad
Digital Recorder
Door closer
Door Contact Switch
Door position switch
Door Scope
Duplex Electric Outlet
ECP Camera
Electric Door Strike (generic)
Electric Lock or Electric Mortice Door Strike
Electric Door Strike Release
Elevator Annunciator Panel
Emergency Lighting (battery-operated lighting)
Explosives Detector
Gate Arm
Glass Break Sensor
Hand Activated Duress Alarm
Hirsch Scramble Pad or approved equal
Hydraulic Bollards
Intercom or
Intercom Sub-station (Remote) NE-NVP-2DCA-LE (Aiphone) or
Intercom Sub-station (Remote) NE-NVP-RA-LE (Aiphone)
Intercom with door release
Intercom with duress button
Low-wattage Signal Light
Magnetic Door Contact
Magnetic Lock
Magnetic Lock (concealed)
Master intercom with duplex electric outlet
Mechanical Push Bar
Metal Detector
Motion Detector 360°
Pan/Tilt/Zoom CCTV Camera
Pan/Tilt/Zoom CCTV Camera mounted min. 15' A.F.F. or at ceiling Control Panel
Passive Barrier
Passive infrared motion detector
Photoelectric Beam
Rate of rise heat detector
Request-to-exit passive infrared detector
Secure Light Switch
Sequential switcher and multiplexer w/ duplex elextric outlet
Signal Light Status Panel
Strobe Light with Siren
Telephone Outlet: 1 RJ-11 and 3 RJ-45 each (double gang)
Telephone Outlet: 1 RJ-11, wall-mount
Toggle Switch for Signal Light
Touch Sensor Bar
Turnstiles
Uninterruptible Power Supply ( UPS)
VCR
Vehicle Barriers
Video
Wireless Duress Alarm
Wireless Pairs (transmitter/receiver)
Wireless Remote Door Release
X-Rays
SYMBOL LEGEND AT-A-GLANCE (ABRIDGED)
JUDICIAL SECURITY SYSTEMS
REQUIREMENTS AND SPECIFICATIONS
VOLUME THREE, PUBLICATION 64
TABLE OF CONTENTS
PREFACE
How To Use This Manual
Symbol Legend
Introduction
Common Courthouse Construction Problems
Project Responsibilities / General Security Requirements
General Requirements for New Courthouses and Major Renovations
Judicial Security Systems Milestones
BUILDING SUPPORT FACILITIES
USMS Command and Control Center / Security Equipment Closet
Physical Plant Security / Air Intake Security
CIRCULATION
Circulation Security
Parking
Judicial Parking Security
Court Staff Parking Security
Public Parking Security
Entrances
Public Entrances Security
Judicial Pedestrian Entrances Security
Stairwell / Elevator Security
Stairwell / Staff • Public • Freight Elevator Security
Judicial Elevator Security
Fire / Perimeter Exit Security
Loading Dock / Package Screening
Loading Docks
Package Screening Security / Centralized Mailrooms
BUILDING SECURITY
Courtroom Lobby Security
Judges’ Conference and Robing Room Security
Robing Room Security
Judge’s Conference / Robing Rooms
LIMITED OFFICIAL USE Not For Construction Preface | Table of Contents | 3
BUILDING SECURITY (CONTINUED)
Suite Security
Federal Judges’ Chambers Suite
Grand Jury Suite
Trial Jury Suite
Federal Courtroom Security
Jury Assembly Area Security
Facilities and Offi ce Security
Court-Related Facilities Security
Judiciary-Related Offi ce Security
Court Clerks’ Offi ces Security
Federal Public Defender’s Offi ce Security
Probation and Pre-Trial Services Security
Circuit Headquarters and Branch Library Security
SECURITY COMPONENTS
JSS General Hardware Requirements
Radio Communications Systems
Perimeter and Exterior Security Systems
Perimeter Security
Guard Booths
Vehicle Arrest Barriers
Barrier Systems
Intercom and Duress Alarm Systems
Audio / Visual Links
CCTV Video Distribution Systems
Intrusion Detection Systems
Ballistic Protection
Back Box Matrix / Power Calculation Formulas
APPENDIX
Glossary
Table of Figures
Index
Acknowledgements
4 | Preface | Table of Contents Not For Construction LIMITED OFFICIAL USE
HOW TO USE THIS MANUAL
This revised manual is designed with the end user in mind and divided into two primary sections. The fi rst section discusses JSS’ space design philosophy. This por-tion of the manual is intended to convey JSS’ requirements for courtrooms, cham-bers, circulation pathways, lobbies, and other courts related spaces.
The second portion of this manual is designed to discuss security hardware and infrastructure requirements. This section discusses equipment applications, heat loads, vehicle sequencing, and installation specifi cations. Vendors and sub contrac-tors involved in courthouse construction projects will fi nd information on JSS’ techni-cal requirements in the second portion of the book.
In addition, the Common Courthouse Construction Problems section found on pages 12 and 13 are designed to highlight frequently arising issues that consistently cause cost over runs and delays. This section is designed to assist GSA project mangers, GSA contractors, the Nationwide Security Contractor, and other project stakehold-ers in understanding and avoiding common security installation errors. A milestone chart on pages 24 and 25 is further meant to assist in the early identifi cation of JSS project requirements.
LIMITED OFFICIAL USE Not For Construction Preface | How To Use This Manual | 5
ACCESS CONTROL
Biometric Access Control Device
Card Reader Proximity
Cipher Lock
Digital Keypad
* Hirsch Scramble Pad or approved equal
‡ Intercom or
Intercom Sub-station (Remote) NE-NVP-2DCA-LE (Aiphone) or
Intercom Sub-station (Remote) NE-NVP-RA-LE (Aiphone)
Master intercom with duplex electric outlet
Request-to-exit passive infrared detector
Touch Sensor Bar
Turnstiles
ALARM DEVICES
Alarm
Alarm Annunciator Panel
Alarm Control Communicator
Audible Annunciator
Balanced Magnetic Door Contact
Door Contact Switch
Hand Activated Duress Alarm
Intercom with door release
Intercom with duress button
Magnetic Door Contact
Motion Detector 360°
Passive infrared motion detector
Rate of rise heat detector
Wireless Duress Alarm
BALLISTIC AND
BREAK-RESISTANT MATERIALS
Ballistic-Resistant Construction
Ballistic-Resistant Glazing
Ballistic-Resistant Material
Break-Resistant Glazing
COMMUNICATIONS EQUIPMENT
Elevator Annunciator Panel
Telephone Outlet: 1 RJ-11 and 3 RJ-45 each (double gang)
Telephone Outlet: 1 RJ-11, wall-mount
Wireless Pairs (transmitter/receiver
DOOR HARDWARE
Building Standard Mortise Lock not on building master system
Closer with door position switch
Door closer
Door position switch
Door Scope
Electric Door Strike (generic)
Electric Lock or Electric Mortice Door Strike
Electric Door Strike Release
Magnetic Lock
Magnetic Lock (concealed)
Mechanical Push Bar
Wireless Remote Door Release
LIGHTING INFRASTRUCTURE
Emergency Lighting (battery-operated lighting)
Low-wattage Signal Light
Secure Light Switch
Signal Light Status Panel
Strobe Light with Siren
Toggle Switch for Signal Light
PERIMETER SECURITY
Active Barrier
Bollards
Crash Gate
Gate Arm
Glass Break Sensor
Hydraulic Bollards
Passive Barrier
Photoelectric Beam
Vehicle Barriers
POWER
Dedicated Double Duplex Electric Outlet
Duplex Electric Outlet
Uninterruptible Power Supply ( UPS)
SCREENING EQUIPMENT
Explosives Detector
Metal Detectors
X-Rays
SYMBOL LEGEND
6 | Preface | Symbol Legend Not For Construction LIMITED OFFICIAL USE
SURVEILLANCE VIDEO EQUIPMENT
Audio
CCTV Camera
CCTV monitor w/ duplex electric outlet (specify 9", 12", 14" 16" & 20" – if no size, coordinate w/ ADT)
Digital Recorder
ECP Camera
Pan/Tilt/Zoom CCTV Camera Control Panel
Pan/Tilt/Zoom CCTV Camera mounted min. 15' A.F.F. or at ceiling
Sequential switcher and multiplexer w/ duplex electric outlet
VCR
Video
ADDITIONAL USMS SYMBOLS
2" Square Mesh - #4 Gauge
Deadbolt Lock Not on Building Master System
Digital Keyboard Alarm Shunt
Filled and Reinforced Painted CMU (Slab to Slab)
Filled and Reinforced Structural Glazed Facing Tile or Glazed CMU (Slab to Slab)
Impact Resistant View Panel
“Kane” Screen
Magnetic lock release switch
Mortised deadbolt lock -not on building master system
Southern Steel #1010A deadlock (maximum security) door mounted for small swing doors -(access panel) or USMS approved equal
Southern Steel #1030A automatic deadlock or USMS approved equal
Southern Steel #1050D solenoid operated electro mechanical gate lock w/door position switch or USMS approved equal
Southern Steel #1051M motor operated electromechanical dead latch, maximum-security w/door position switch or USMS approved equal
Southern Steel 8800 Desk Top control system or USMS approved equal
Southern Steel #10120AM-Motor operated Electromechanical dead latch-medium & maximum security w/ door position switch-or USMS approved equal
Southern Steel #10300M motor operated electromechanical dead latch, minimum to medium security w/door position switch or USMS approved equal
Southern Steel #10500-Institutional mortise lock w/door position switch or USMS approved equal
Southern Steel #10600-Institutional mortise lock w/door position switch or USMS approved equal (verify operational requirements for specific model #)
* Special size / type back box available only from Nationwide Security Contractor and must be incorporated no later than the 50% Design Development Phase.
‡ Multi sub-station intercom may be required on a case by case basis. Contact the NSC for specific back box installation requirements.
LIMITED OFFICIAL USE Not For Construction Preface | Symbol Legend | 7
INTRODUCTION
This manual is the third in a series, the purpose of which is to document the speci-fi cations and requirements of U.S. Marshals Service projects under the control of the Judicial Security Systems (JSS) Team. Specifi cally, this manual governs the installation and design of electronic and physical security systems in Courts and Courts related facilities. It is part of the Requirements and Specifi cations for Special Purpose and Support Space (RSSPSS) series, and supplements the Interagency Security Committee ( ISC) Security Construction Criteria, U.S. Courts Design Guide ( USCDG), and the Facilities Standards for the Public Buildings Service ( PBS P100).
This manual includes descriptive design criteria, technical specifi cations, tables, legends, and drawings as fi eld guides. It is intended for anyone involved in the de-sign and installation of security systems for the Judicial Security Systems (JSS) Team of the U.S. Marshals Service ( USMS).
Specifi cally, Volume Three of the RSSPSS establishes requirements for physical and electronic security components controlled by JSS. The devices and security mea-sures discussed in this manual are located and deployed in non- USMS space in federal courthouse facilities. These are generally spaces for which the Judiciary pays “rent.” This space is separate and distinct from USMS space. Examples in-clude, but are not limited to: the main lobby and loading dock security screening posts, entrances to judicial chambers and related court functions, as well as all courtrooms, and public areas.
8 | Preface | Introduction Not For Construction LIMITED OFFICIAL USE
Responsible for orientation and specification of electronic security and systems in Courts Space ( courtrooms, chambers, lobbies, etc.)
Reviews and finalizes all design submittals for court and security systems
Plans and installs security equipment in Courts occupied and public areas
Serves as the liaison between the Department of Homeland Security ( FPS) and the USMS
Responsible for physical security in all Courts Space
Manages the CSO screening and radio equipment programs
JUDICIAL SECURITY
SYSTEMS TEAM
CENTRAL COURTHOUSE
MANAGEMENT GROUP
Responsible for providing security equipment to all space occupied by the USMS, including prisoner movement space
Authorizes space requests and signs Occupancy Agreements
Programs and develops space plans for all USMS occupied space
Reviews Design submittals
Provides input on security requirements for USMS occupied areas
DISTRICT USMS
Provides design and operational input into overall courthouse security
Provides input on materials and finishes
Reviews design submittals, with guidance from headquarters
Judicial Security Inspectors:
• Primary point of contact for court security on the local level
• District contact for all new construction
LIMITED OFFICIAL USE Not For Construction Preface | Introduction | 9
There are 94 federal District courts in the United States and its territories. The USMS is the agency with the statutory responsibility for protecting all federal judges, and the transportation of federal prisoners. The Judicial Security Systems (JSS) Team and the Central Courthouse Management Group (CCMG), maintain primary respon-sibility for the security of federal court facilities.
The JSS Team plans, designs, installs, and maintains electronic and physical secu-rity systems designed to protect court proceedings, court offi cials, court chambers, and support areas occupied by the Judiciary. Protected space includes: U.S. Circuit, District, Magistrate, and Bankruptcy courtrooms; jury areas and chamber suites.
In addition, JSS secures services for Courts related support areas such as lobby screening stations, judicial parking, offi ces for the Clerk of the Court, court execu-tives, court reporters, libraries, Probation and Pretrial Services, as well as Federal Public Defenders. Protected spaces may also include adjacent corridors and judicial elevators when warranted.
The USMS does not specify security systems for the U.S. Attorney or U.S.
Trustee, or other Executive Branch agencies that do not fall under the Courts’ jurisdiction.
In addition, this manual does not address nor refl ect USMS Central Courthouse Management Group requirements or specifi cations. Those requirements are de-tailed in Volumes One, Two, Four and Five of the RSSPSS Manual.
The CCMG is responsible for the programming, planning, acquisition, budgeting, design, and construction of all USMS offi ce/support, special purpose, and parking space. Special purpose space includes detention cell blocks, secure prisoner circu-lation corridors, courtroom holding cells, prisoner/attorney interview rooms, prisoner elevator(s), vehicle sallyport(s), secure vehicle parking, fi tness areas, and the fi ring range in space for which the USMS pays “rent” (non-court space).
Early coordination between GSA, the judiciary, JSS, and CCMG is essential, and prevents expensive, unsightly retrofi ts, which may compromise facility security. JSS security specialists are assigned to each Circuit of Courts in the United States. Each JSS specialist is responsible for tracking court projects within their Circuit(s). Securi-ty Specialists serve as liaisons between District USMS offi ces and the Administrative Offi ce of the U.S. Courts ( AOUSC). They are responsible for ensuring court security requirements are incorporated properly, and with suffi cient funding.
10 | Preface | Introduction Not For Construction LIMITED OFFICIAL USE
Federal courthouse security is the joint responsibility of the judiciary, DHS Federal Protective Service ( FPS), and the USMS. Decisions regarding security planning and design are made by individual agencies and the local Court Security Committee (CSC), or for multi-tenant buildings, the Building Security Committee ( BSC).
The primary focus of this manual is on U.S. Courthouses. However, specifi c require-ments for leased space and offi ces can be found in this manual, under the relevant sections. All courthouse construction, security systems, and requirements must be in compliance with:
• AOUSC’s U.S. Courts Design Guide
• Design Notebook for Federal Building Lobby Security
• GSA’s Facilities Standards for the Public Buildings Service (PBS P100)
• ISC Security Construction Criteria, “Medium-High” level construction
• USMS’ Requirements and Specifi cations for Special Purpose and Support Space Manual, Volumes I through IV, Publication 64
• DOJ’s Vulnerability Assessment of Federal Facilities (Level IV buildings)
• Uniform Federal Accessibility Standards
• Americans with Disabilities Act
• International Building Code (IBC)
• International Code Council (ICC)
• International Fire Code (IFC)
• Uniform Building Code
• National Fire Protection Association (NFPA) 70; National Electrical Code
• NFPA 101; Life Safety Code
• Underwriters Laboratories
• Manufacturers Specifi cations
• Any and all USMS comments on construction progress documentation
LIMITED OFFICIAL USE Not For Construction Preface | Introduction | 11
COMMON COURTHOUSE CONSTRUCTION PROBLEMS
INFRASTRUCTURE ISSUES
Lack of risers or conduit
Inadequate Pull Strings (drag lines) in conduit
Incorrect sizing of conduit/Incomplete conduit systems
Security cable and back boxes left unlabeled
Extremely long conduit runs without junction boxes (per NEC guidelines)
High and low voltage cable run in the same conduit/trough
Intercom and access control wire in the same conduit
Conduit run to the wrong location or routed incorrectly
Incorrectly sized back boxes installed at the wrong height with the wrong orientation
Inaccessible conduit and junction boxes
Junction box plates, cable trays and troughs missing/not provided/damaged
INFRASTRUCTURE SOLUTIONS
Incorporating JSS requirements during the design phase ensures that infrastructure requirements are met in a timely manner.
GSA project managers should ensure that JSS and NSC infrastructure requirements have been carefully adhered to.
Close coordination between the electrical subcontractor and the NSC ensures the conduit specified in the design is installed. JSS conduit must not exceed a maximum fill rate of 40%.
The installation contractor is responsible for labeling security cable. This ensures field devices are terminated efficiently, and allows for easier trouble shooting.
The GSA project manager should verify that the electrical contractor follows this key NEC requirement.
Separate troughs should be specified to the electrical contractor, per NEC requirements.
When calculating conduit requirements, separate conduit for intercom and access control must be accounted for.
Project managers should be aware of this common problem and promote frequent coordination between the NSC and the electrical contractor to prevent this mistake.
Back box specifications are found in this manual and can also be obtained from the NSC. Including JSS during the concept phase can help avoid this problem.
GSA project manager should ensure that subcontractors understand the importance of not blocking access to conduit and junction boxes.
GSA project manager and NSC should work closely with the electrical contractor to ensure all security infrastructure is installed correctly and completely.
12 | Preface | Common Courthouse Construction Problems Not For Construction LIMITED OFFICIAL USE
INFRASTRUCTURE SOLUTIONS
JSS requires a minimum of 32 square feet of wall space, with 2 feet standing room in front. Four duplex electrical outlets are necessary for each closet. These and other requirements outlined on pages 35 – 37 ensure that JSS equipment can be installed properly and in a timely manner
JSS is the only security consultant necessary. If an external security consultant is retained, then they must adhere to JSS’ requirements and specifications. Failure to do so can cause significant delays.
GSA should ensure all components of a vehicle control system (including but not limited to: roll up doors, loops, gate arms, and traffic lights) are functional, work in concert, and are supplied by a single vendor. JSS is solely responsible for the device that initiates sequencing, usually a card reader.
Coordinating with JSS during the concept phase will help ensure security requirements are met early on.
The vendor should install, test, and wire electrical lock devices to a junction box above the door, and keep JSS/NSC informed of progress; furnish door hardware schedule to JSS & NSC.
The electrical contractor should address this topic during construction meetings with the NSC and the GSA project manager.
The project manager should ensure security closets are not “forgotten” and are completed as quickly as possible. Cable trays should be utilized as much as possible. Fire rated plywood must be installed per JSS specifications before security infrastructure can be installed.
INFRASTRUCTURE ISSUES
Inadequate wall space and standing room in telephone/ communications closet
Over design by private security consultants
Inoperable vehicle barrier systems/lack of coordination between subcontractors, general contractor, GSA, JSS, NSC
Screening station design/re-design at late dates
Inoperable door hardware/NSC not supplied with a schedule
Infrastructure not ready for NSC to begin work as scheduled
Security closets not ready for wiring or security equipment, causing installation delays
A successful courthouse construction project is one where all project stake-holders coordinate and communicate frequently. During the project phase, including JSS will ensure security requirements do not cause project delays.
LIMITED OFFICIAL USE Not For Construction Preface | Common Courthouse Construction Problems | 13
PROJECT RESPONSIBILITIES
RESPONSIBILITIES OF THE GENERAL SERVICES ADMINISTRATION
Blueprint Submissions
GSA’s design team is responsible for submitting fl oorplans to JSS for review and approval. These drawings should clearly detail the placement of judicial security hardware devices, conduit, back boxes, and connections to the building’s emer-gency power source.
An electronic copy of CAD drawings must be submitted to JSS at each review phase.
All courthouse security plans, drawings, and specifi cations prepared for construc-tion or renovation must have imprinted on each page of the drawings: Property of the United States Government: Limited Offi cial Use.
Construction drawings, plans, and specifi cations detailing security equipment and design are to be disseminated only to those requiring information necessary for design, construction bidding, construction coordination, or other GSA procurement competition processes.
Security Infrastructure Installation
The GSA and their contractor is responsible for the installation of all infrastructure necessary for JSS security equipment hardware. This includes, but is not limited to:
door hardware conduit systems with appropriately sized pull strings, mounting and back boxes, cable trays, and electrical power. All conduit wiring, and associated junction and back boxes, shall be concealed within walls, fl oors, and/or ceilings.
Once installed, work must be accepted as satisfactory by JSS.
Security hardware includes all metal detectors, x-ray systems, turnstiles, intercoms, duress alarm devices, access control systems, intrusion detection devices, CCTV, and other ancillary equipment necessary for the protection of the judiciary.
14 | Preface | Project Responsibilities / General Security Requirements Not For Construction LIMITED OFFICIAL USE
DESIGN REQUIREMENTS
Once selected to design a federal courthouse, A/E representatives should contact JSS to receive guidance on security system and design requirements. Early coordination, during the design development phase saves time and resources by eliminating re-dundancies and errors. There are however, some standards that JSS and GSA share.
The following guidelines are established in GSA publication PBS P100 and should be strictly adhered to:
CAD Standards
The National CAD/CIFM Standards should be obtained via the Internet at www.gsa.gov/pbs/cifm/cifm_resources/standards.htm or by contacting the PBS CAD center at (202) 501-9094. These guidelines should be followed for all CAD drawing formatting. Regional CAD standards are available through the Regional CAD Coordi-nator and are considered supplements to the national standards.
Drawing Lettering
Lettering on all drawings must be legible when drawings are reduced to half-size. This applies to concept and design development drawings as well as construction drawings.
Construction of Courthouse Space
GSA is responsible for the construction of space, door hardware (manual and elec-tronic), glazing, and physical barriers, to meet necessary security standards.
Door Hardware
All door hardware should meet the requirements of NFPA 101. This includes but is not limited to doors equipped with electronic access control systems or delayed egress locks.
LIMITED OFFICIAL USE Not For Construction Preface | Project Responsibilities / General Security Requirements | 15
Ventilation
Mechanical system diffusers and grills in public and staff areas must be tamper-proof, particularly in areas which provide some degree of seclusion and privacy (restrooms, attorney-client visitation rooms, etc.)
Fire Detection
GSA is responsible for providing, inspecting, and testing all fi re detection and pro-tection systems, including fi re department building access and control, and public address systems.
Back Box Specifications
The GSA General Contractor is responsible for installing double gang back boxes (GBB) for all JSS Security hardware, unless otherwise noted. Double gang back box-es with single gang mud rings are the standard for Court space. Back boxes must be fl ush mounted at ADA height specifi cations, along with any required conduit and/ or power requirements. The USMS Nationwide Security Contractor is responsible for providing and installing the security hardware. If special back boxes are necessary, the USMS NSC will supply them to the General Contractor for installation.
A 120 VAC electrical outlet (connected to the emergency circuit) may be required for a particular piece of security equipment at the mounting location. If required, it will be noted on either the USMS Design Intent Drawings or during the review/ comments phase of the project. In such instances, the outlet should be mounted immediately adjacent to the back or mounting box required for the specifi c piece of security equipment.
As it branches off main conduit, the size of the conduit that terminates at the back or mounting box of each individual piece of security equipment, should be decreased as required.
Power
The General Contractor (GC) is responsible for ensuring all JSS power (which must be connected to the building’s emergency power supply) requirements are met.
In addition, conduit for signal cable runs (from device to designated monitoring location[s]) for all fi eld panels, perimeter CCTV cameras, electric strikes, and other security devices designated by JSS, are the responsibility of GSA.
16 | Preface | Project Responsibilities / General Security Requirements Not For Construction LIMITED OFFICIAL USE
LIMITED OFFICIAL USE Not For Construction Preface | Project Responsibilities / General Security Requirements | 17
Fiber Optic Cable
Some facilities may require the use of fi ber optic cabling in lieu of copper or other wire. The decision to use fi ber optics will be made by JSS.
System Accommodations
GSA must provide conduit, closets, and raceways for communications, security, and computer systems.
Lighting
Per PBS P100, GSA shall provide, “standard, emergency, backup, clean and pre-defi ned electrical power needs, including battery powered lights.”
Perimeter Security
The integrity of the judicial process requires that adequate security services be pro-vided to the federal courts. The Federal Protective Service ( FPS), the Administrative Offi ce of the U.S. Courts (AOUSC) and the USMS share the responsibility for secur-ing federal courts facilities.
The Judicial Security Systems Team serves as the USMS liaison to the FPS. All pe-rimeter security initiatives will refl ect the most current Memorandum of Understand-ing reached between the two agencies. JSS Specialists should be contacted with any questions or initiatives requiring FPS involvement.
Elevator Travel Cables
Security system travel cables must be installed by GSA for every elevator to ac-commodate the installation of security equipment. Travel cables with 50% spare capacity should be installed regardless of whether there is corresponding security equipment. This ensures there is adequate infrastructure to accommodate future renovations and installations.
USMS RESPONSIBILITIES AND
THE NATIONWIDE SECURITY CONTRACTOR
The USMS retains at all times a Nationwide Security Contractor (NSC). The NSC is responsible for the installation and maintenance of all USMS security systems within the court facility. The USMS Nationwide Security Contractor is required to provide fully operational security systems 15 days prior to the facility occupancy date, pro-vided the installation of security closets, security infrastructure, and the command and control room are complete.
Representatives with substantial training and knowledge will be provided for a mini-mum of three consecutive working days to demonstrate equipment and instruct the District USMS, JSS, and other designated personnel in the operation, repair, and maintenance of security systems.
The Nationwide Security Contractor is responsible for any damage to buildings caused by the installation of security equipment.
The Nationwide Security Contractor is responsible for, but not limited to, the following:
• Preparing pre-installation plans from the Statement of Works (SOW) supplied by JSS.
• Meeting with USMS District personnel at pre-construction planning conferences and design meetings, when requested by JSS. In both renovation and new con-struction projects, all available information must be utilized in the preparation of the SOW by JSS and the pre-installation plan by the NSC.
• Performing the following work at the request of JSS. This task list may be ex-panded to meet the needs of the USMS:
• Developing equipment installation engineering plans and schedules
• Assisting JSS in the development of the most effi cient, cost-effective, and operationally sound methods for accomplishing the intended security goals.
• Providing hardware and software as specifi ed by JSS
• Installing hardware and software as specifi ed by JSS
• Testing and turnover of systems hardware and software
18 | Preface | Project Responsibilities / General Security Requirements Not For Construction LIMITED OFFICIAL USE
• Determining the compatibility and interfacing capability of new equipment with existing equipment
• Determining the heat load of JSS security equipment
• Preparing system and component documentation
• Providing training on existing and new security systems
• Maintaining and servicing systems per IAW contractual requirements
SUBMITTALS
JSS will provide the Nationwide Security Contractor with annotated architectural plans by GSA to develop an installation plan in areas of buildings where the Courts pay “rent.”
Submittals by the Nationwide Security Contractor should include:
• As-built single line wiring diagrams for the entry operating systems, locking devices, and monitoring systems.
• Maintenance and operation manuals, including complete information covering items of equipment and operation.
LIMITED OFFICIAL USE Not For Construction Preface | Project Responsibilities / General Security Requirements | 19
GENERAL REQUIREMENTS FOR
NEW COURTHOUSES AND MAJOR RENOVATIONS
The following requirements are highlighted as part of an overview of this book:
• This manual is an integral component of GSA’s architectural and engineering (A/E) fi rms schematic, design development, and construction documents, including the construction specifi cations (e.g. SFO bid documents) for new court-houses and major renovations.
• Judicial security hardware is defi ned as all metal detectors, x-ray systems, explosives detectors, turnstiles, intercoms, duress alarm devices, access con-trol systems, intrusion detection devices, CCTV, and other ancillary equip-ment necessary to protect the judicial family and Courts proceedings. The Federal Protective Service ( FPS) and JSS share responsibility for provid-ing exterior perimeter security. This includes cameras, door contacts, glass break detectors, and other security equipment required to secure buildings from intrusion.
• GSA’s A&E team is responsible for providing riser and horizontal run conduit diagrams for the electronic security systems, access control systems, electrical locking devices, and monitoring systems. These engineering drawings should be submitted to the Judicial Security Systems team for review and approval, and adhere to the JSS symbol legend. (See pages 6 and 7)
• JSS is the offi cial security consultant for all courts space in U.S. federal court-houses. If external security consultants assist the design team with the size and placement of conduit and back boxes, or design electrical systems, they must do so only after reviewing infrastructure requirements established by the JSS spe-cialist. Security equipment placement, quantity, and type are the sole responsibil-ity of the JSS specialist. Security consultants hired by GSA must adhere to the requirements and specifi cations established in this manual or those specifi ed by the JSS specialist.
• GSA is responsible for coordinating with JSS staff on device locations, power, and all other security system requirements installed by the USMS Nationwide Security Contractor (NSC).
• All courthouse perimeter security must meet the requirements specifi ed in the Department of Justice’s (DOJ) Vulnerability Assessment of Federal Facilities (Level IV) buildings), and the Interagency Security Criteria ( ISC) “medium-high” level construction.
20 | Preface | General Requirements for New Courthouses and Major Renovations Not For Construction LIMITED OFFICIAL USE
• Since the USMS may be responsible for on-site monitoring systems, perimeter security, and non-judiciary and judiciary related tenants, JSS may require all se-curity systems, including those of FPS, be integrated into the USMS Command and Control Center. Security systems monitored by the USMS typically include intrusion alarms, duress alarm devices, electronic access controls, CCTV, court-room and isolation cell audio/ video, video switching, and recording systems.
• Landscaping must not obstruct the views of security personnel, CCTV cameras, or compromise security, and must take into account long term growth.
• All conduit, wiring, and associated junction and back boxes must be concealed within walls, fl oors, or ceilings in public and offi ce space areas. Concealment may not be required for parking areas.
• The HVAC systems must be designed according to requirements established by the Interagency Security Criteria, PBS P100 and other governing documents for courthouse construction, unless otherwise stated in this manual. These standards are designed to avoid heat buildup in utility closets that house the microproces-sors (“panels”) for electronic security systems, as well as the rooms in which the security systems control panel and monitoring (“headend”) components are placed. Headend rooms include those in which the systems’ Command Console is located and any nearby supporting equipment “rack” rooms or closets. Air conditioning units in Command and Control Rooms should be separate from the building’s main HVAC system, and be capable of 24 hour operation.
• In order to protect against the introduction of biological or chemical contami-nants into the courthouse, ventilation system intakes should not be located below the third fl oor in new buildings. In one and two story buildings, the air intake systems should be roof-mounted if possible. Air intakes should not be placed in the garage area. Exhaust plenums must be strategically placed in or-der to ensure they do not affect evacuation routes or designated safe areas for evacuated employees. Emergency shut down capabilities of the air intake system should closely follow those established in the ISC, and PBS P100.
• Selected lighting fi xtures, as determined by building code, must provide an unin-terrupted source of lighting in the event of a power failure. Emergency lighting in courtrooms should not spotlight judges’ benches, or the judges’ egress path.
• Any lighting device requiring an uninterruptible power supply should be equipped with an integral battery backup module and be connected to the facility’s emer-gency generator. The battery module should provide a minimum of 60 minutes of power at the device in the event of an emergency generator failure.
LIMITED OFFICIAL USE Not For Construction Preface | General Requirements for New Courthouses and Major Renovations | 21
• Power outlets specifi cally provided for the console and electronics rack compo-nents (all cameras, monitors, intercoms, access control, and safety and security devices in the USMS Command and Control Center) should be connected to the building’s backup emergency generator, without exception. In addition, the Com-mand and Control Room must be equipped with emergency lighting.
• Some vaults and secure storage areas will be equipped with a keypad alarm shunt, vault door contact, a motion detector, and a duress alarm device con-nected to the USMS Command and Control Center. Should these measures be required, provision must be made for 24/7 USMS monitoring of these devices.
• Door hardware is the responsibility of GSA. All door hardware should allow for NFPA 101 requirements to be met.
• District USMS representatives will coordinate the development of the keying schedule for door hardware installed in a new or renovated facility, in conjunction with GSA and the Courts.
• FPS is responsible for security in out-lease spaces, such as vending cashiers/ATMs/credit unions and contract vending machine areas located in courthouses.
• All currently applicable federal and national codes, including electrical and life safety, must be adhered to in the design of judicial security systems, as admin-istered by the GSA. If there are confl icts in federal code provisions and require-ments, the more stringent requirements will prevail.
• GSA must ensure that the USMS Nationwide Security Contractor (NSC) has unlimited access to the courthouse construction site at least 90 days prior to the opening of small facilities (fi ve or fewer courtrooms), 120 – 150 days prior to the opening of medium facilities (six to 10 courtrooms), and 180 days prior to the opening of large facilities (11 or more courtrooms). This timeline is to ensure security devices, including cabling, are installed in an effi cient manner, become operational, and are tested before building occupancy. It is recommended that the USMS Nationwide Security Contractor be contractually involved as early as 365 days prior to the opening of extra large facilities (20 courtrooms or more).
Early collaboration with the NSC is a required component of GSA’s SFO and/or contract documents for each facility, and ensures any labor union requirements are met. If these timelines are not met, then JSS and the NSC will not be held liable for unscheduled overages.
22 | Preface | General Requirements for New Courthouses and Major Renovations Not For Construction LIMITED OFFICIAL USE
• The diagrams shown in this manual are typical and intended to convey general concepts of each space type. They are not to be used as required layouts for a particular installation.
• References to specifi c manufacturers and brands of devices should not be construed as USMS endorsement of those products. Rather, these devices are listed to provide guidance on the type of devices required. Substitution from the devices specifi ed in JSS statements of work to an equivalent device must be approved by JSS in writing, prior to installation. JSS is responsible for providing the design team and contractors with data on all approved electronic security devices, hardware, and barrier systems. In addition, JSS will provide vendor lit-erature and the size and type of each device, upon request.
• The A/E fi rm selected by GSA, and any security consultant retained by GSA, must use the security symbols listed in the legend of this manual. This require-ment must be incorporated into GSA’s SFO and/or contract documents for each facility. If a particular symbol does not exist, an appropriate new symbol may be created. However, the new symbol must be approved in advance by JSS.
• It is recommended separate drawings for security systems and conduit be provided by the A/E to JSS.
• All design intent, construction drawings, written specifi cations, etc. must be la-beled “Limited Offi cial Use.” Distribution must be limited to those individuals working on a specifi c courthouse construction project or otherwise determined by the U.S. Marshals Service as “having a need to know.”
• GSA, the architect of record, the USMS, and JSS will coordinate solutions when upgrading Courts related security systems in historical buildings that require specifi c consideration.
• Exceptions to this publication must be approved by the Chief of Judicial Security Systems in writing.
LIMITED OFFICIAL USE Not For Construction Preface | General Requirements for New Courthouses and Major Renovations | 23
Include JSS in Kick Off Meetings
Include JSS in Site Selection meetings
Include JSS when evaluating housing schemes (i.e. annexes, split-operation facilities)
JSS should be part of the Program Development Study and provide initial space requirements (such as communications closets, and lobbies)
Ensure JSS requirements and specifications (Volume III) are part of the Solicitation for Offers (SFO)
Request JSS review and comment upon the SFO to ensure major security requirements are included
Notify JSS Radio specialist of intent to construct in order to budget for radio repeater as necessary
Involve JSS in Space Allocation and Adjacency Meetings
Send Concept Drawings to JSS for review
Verify JSS comments provided at the Concept Phase are addressed/ incorporated
JSS will provide travel cable specifications
Emergency power requirements should be established
Project Manager should host:
• Low voltage coordination meeting (includes discussion of back box installation)
• Door hardware meeting – JSS and District USMS personnel must approve door hardware and agree on secure circulation pathways
• Screening Station design meeting to outline design, power, and space requirements
• Vehicle traffic flow coordination meeting
Ensure all JSS specifications are met
JUDICIAL SECURITY SYSTEMS PROJECT MILESTONES
1 2 3PRELIMINARY PLANNING
AND FEASIBILITY PHASE CONCEPTUAL PHASE
DESIGN DEVELOPMENT
PHASE (35–50%)
24 | Preface | Judicial Security Systems Milestones Not For Construction LIMITED OFFICIAL USE
Elevator coordination/programming meeting
Emergency vehicle access
Ensure earlier comments have been incorporated into the building’s design
Keying schedule meeting (if metal keys are issued)
Keep JSS informed of construction progress goals
Inform JSS when final structural beams are in place
Involve JSS and the NSC to ensure that back box and infrastructure requirements have been met
Involve NSC in decisions involving conduit and security closet installation, if different from approved design
Ensure security closets and USMS Command and Control room infrastructure are completed in a timely manner
Allow NSC on site per the requirements established on page 22
Keying distribution / Access Control System planning
4 5
CONSTRUCTION
DOCUMENT REVIEW
PHASE (75%-100%) CONSTRUCTION PHASE
LIMITED OFFICIAL USE Not For Construction Preface | Judicial Security Systems Milestones | 25
26 | Preface | Judicial Security Systems Milestones Not For Construction LIMITED OFFICIAL USE
The Project Management Plan
The GSA project manager should share the project plan with members of the Courts and the Judicial Security Systems specialist as soon as possible. Coordinating with the USMS will ensure the success of the project in the long run. In addition, early coordination will ensure the specifi c objectives and responsibilities of the USMS are met without costly and time consuming retrofi ts or change orders.
Effective Design Reviews Add Value by Saving Time and Money
The Design Phase of a project typically begins once a statement of work and pre-ferred design approach have been developed. From the schematic, the design matures into fi nal construction documents consisting of plans and specifi cations.
This then facilitates the solicitation of equipment procurement bids. Comprehensive and accurate design and construction documents reduce project and construction costs. Areas of savings include less rework on the part of the construction contractor, fewer change orders to the owner for correction of design errors or omissions, and reduced costs associated with belatedly adding features that should have been ad-dressed in the original design. Additional savings can be achieved by avoiding costs associated with lower productivity during construction delays. In short, effective de-sign reviews reduce the probability of errors associated with miscommunication.
Importance of Including JSS as a Project Stakeholder
Early coordination with the USMS and the Courts can be critical to the success of a courthouse construction project. Once notifi ed, the Judicial Security Systems team will coordinate design and infrastructure requirements from power, cables, and conduit, to lobby screening stations, perimeter, and circulation design. JSS security specialists have the ultimate authority on security equipment and design of Courts space.
BUILDING SUPPORT FACILITIES
USMS Command & Control Center 29
Security Equipment Closet 35
Physical Plant Security / Air Intake Security 39
B U
ILD
IN
G S
U P
P O
R
T FA
C
ILITIE
S
Building Support Facilities
USMS COMMAND & CONTROL CENTER / SECURITY EQUIPMENT CLOSET
GENERAL NOTES
• These are sample drawings for illustrative purposes only and are not meant to serve as a standard for design.
• Sample drawings for a variety of other layouts are available from the Administrative Office of the U.S. Courts.
• Drawings are not to scale.
Figure 1: Communications and Security Equipment Closet
Figure 2: Communications and Security Equipment Closet Installation
USMS COMMAND AND CONTROL CENTER
DESCRIPTION
The USMS Command and Control Center (one per site or complex) is the central monitoring and control station for courthouse surveillance equipment and other se-curity communication and detection devices under the purview of the USMS. It is part of the restricted circulation system and should allow direct access from the squad room. It is adjacent to the main detention cell block, USMS computer room, JSS security equipment room, and prisoner elevator. In small facilities, the USMS Command and Control Center may be a dedicated area within the squad room.
Specifi c construction requirements for this space are discussed in Volumes I and II of the USMS RSSPSS Manual.
DESIGN PHILOSOPHY
• No door to the USMS Command and Control Center may open directly to the secure circulation area.
• In courthouse-only facilities, the Command and Control Center shall be the pri-mary command center for all building security systems.
• A security console occupies the bulk of the room. The console and CCTV moni-tors must be arranged in such a manner that enables easy and rapid observa-tion. Installation technicians should not install equipment that obstructs the view through the vision panel.
• A security equipment room adjacent to the Command and Control Room may be required in larger buildings for “headend” equipment racks. A dedicated room size with a minimum of 10' x 20' may be set aside for this purpose.
ARCHITECTURAL CONSIDERATIONS
The USMS Command and Control Center net area will vary according to the size and confi guration of the facility. In small courthouses, it should be a minimum of 320 sf (30m2) (20' x 16'), in medium courthouses a minimum of 400 sf (37m2) (20' x 20'), and in large courthouses, it shall be a minimum of 600 sf (56m2) (20' x 30').
REQUIREMENTS
Card Reader
CCTV Monitor
Door Contact Switch
Electric Strike
Emergency Lighting
Uninterruptible Power Source
30 | Building Support Facilities | USMS Command and Control Center / Security Equipment Closet Not For Construction LIMITED OFFICIAL USE
The walls shall be gypsum board on metal studs that extend from slab-to-slab with…
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .