Solicitation #: GS-05P-12-SP-C-0023 Interior Finishes: Carpet and Paint SSA Saginaw

Contractor Questions and Responses

Q1. At the Front-end Interviewing area and the ramp area there are existing corner guards attached to the wall and wallcovering. What is the intend scope of work where the wall surface is to be painted?

R1. Remove corner guards and replace to original location.

Q2. At the Front-end Interview area there is existing numbered signage attached to the wall and wallcovering. What is the intended scope of work where the wall surface is to be re-painted?

R2. Remove signs and replace to original location.

Q3. The “Agreement” GSA Contract No. GS-05P-12-SP-C-0023, III.A.2.(b) indicates that the Contractor shall be responsible for design services.

Will these design services be necessary due to the limited scope of work, ie: re-carpet and painting?

R3. Design services are not required for this project.

Q4. Will a building permit be required on this project?

R1. Permit is not required.