Addendum #1
Item #1 – #8 on the drawings has changed to encompass the whole landing area. Revised dimensions are noted on the drawings.
Item #2 - #26 on drawings the dimensions are changed. Revised dimensions are noted on the drawings.
Item #3 – New #27 on drawings. A curb was added to the scope. Dimensions are noted on drawings. The contractor will sawcut the existing curb at the dimensions noted on the drawings and replace with nrw to match existing profile. Concrete to be reinforced with #4, Grade 60 epoxy coated rebar dowelled into existing concrete at 1’ o.c.
Item #4 – There is a glycol snow melt system under the concrete shown as #8 on the drawings. The contractor will splice the system inside the building (see drawing for location). The contractor will replace the existing loops with new PEX tubing secured to WWF 6X6 W1.4 x W1.4. The contractor will capture and dispose of the glycol in accordance with all local and state laws. The contractor will also re-fill the system.
Item #5 – #15 on drawings was done. Disregard any work associated with #15. Drawings reflect the change.