GS-04-P-17-BV-C-0003_Generated_PDF_with_TOC.pdf
PDF 1 MB Posted
- Attached to
- Winston Salem VARO Renovation Project Federal contract opportunity
- Solicitation number
- GS-04-P-17-BV-C-0003
About this file
Not Listed
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| Solicitation_Package_(GS-04-P-17-BV-C-0003).zip | ZIP file |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Table Of Contents
Section Description Page Number Section A Standard Form 1 Section J - Appendix List of Attachments 4
(See ).
SOLICITATION, OFFER,
AND AWARD
(Construction, Alteration, or Repair) IMPORTANT - The "offer" section on the reverse must be fully completed by offeror.
9. FOR INFORMATION
CALL:
NOTE: In sealed bid solicitations "offer" and "offeror" mean "bid and "bidder".
SOLICITATION
1. SOLICITATION NUMBER
5. REQUISITION/PURCHASE REQUEST NUMBER
CODE
6. PROJECT NUMBER
8. ADDRESS OFFER TO
4. CONTRACT NUMBER
7. ISSUED BY
10. THE GOVERNMENT REQUIRES PERFORMANCE OF THE WORK DESCRIBED IN THESE DOCUMENTS (Title, identifying number, date)
11. The contractor shall begin performance within
12a. THE CONTRACTOR MUST FURNISH ANY REQUIRED PERFORMANCE AND PAYMENT BONDS?
(If "YES", indicate within how many calendar days after award in Item 12b.)
13. ADDITIONAL SOLICITATION REQUIREMENTS:
a. Sealed offers in original and
b. An offer guarantee
c. All offers are subject to the (1) work requirements, and (2) other provisions and clauses incorporated in the solicitation in full text or by reference.
d. Offers providing less than
STANDARD FORM 1442 (REV. 8/2014)
Prescribed by GSA - FAR (48 CFR) 53.236-1(d) calendar days for Government acceptance after the date offers are due will not be considered and will be rejected.
is, is not required.
local time containing offers shall be marked to show the offeror's name and address, the solicitation number, and the date and time offers are due.
(date). If this is a sealed bid solicitation, offers will be publicly opened at that time. Sealed envelopes copies to perform the work required are due at the place specified in Item 8 by (hour) award, YES NO notice to proceed. This performance period is mandatory negotiable.
calendar days and complete it within calendar days after receiving
a. NAME b. TELEPHONE NUMBER (Include area code) (NO COLLECT CALLS)
12b. CALENDAR DAYS
2. TYPE OF SOLICITATION
SEALED BID (IFB)
NEGOTIATED (RFP)
3. DATE ISSUED PAGE OF PAGES
11/3/2017
9:00 PM (EST)
2/3/2017
4PQAC
4PQAC
GS-04-P-17-BV-C-0003
Hiram Ward Federal Building and Courthouse located in Winston Salem, NC VARO Renovation Project Statement of Work
EQ4PC1M-15-5000
404-224-2312Joseph Ardoin
Section A Page 1
17. The offeror agrees to perform the work required at the prices specified below in strict accordance with the terms of this solicitation, if this offer is accepted calendar days after the date offers are due. (Insert any number equal to or greater than the minimum requirement by the Government in writing within stated in Item 13d. Failure to insert any number means the offeror accepts the minimum in Item 13d.)
OFFER (Must be fully completed by offeror)
AMOUNTS
18. The offeror agrees to furnish any required performance and payment bonds.
19. ACKNOWLEDGMENT OF AMENDMENTS
(The offeror acknowledges receipt of amendments to the solicitation -- give number and date of each)
AMENDMENT
NUMBER
DATE.
AWARD (To be completed by Government)
CONTRACTING OFFICER WILL COMPLETE ITEM 28 OR 29 AS APPLICABLE
14. NAME AND ADDRESS OF OFFEROR (Include ZIP Code)
CODE FACILITY CODE
15. TELEPHONE NUMBER (Include area code)
16. REMITTANCE ADDRESS (Include only if different than Item 14.)
20a. NAME AND TITLE OF PERSON AUTHORIZED TO SIGN OFFER (Type or print)
21. ITEMS ACCEPTED:
22. AMOUNT
26. ADMINISTERED BY
30a. NAME AND TITLE OF CONTRACTOR OR PERSON AUTHORIZED TO SIGN (Type or print)
31c. DATE
STANDARD FORM 1442 (REV. 8/2014) BACK
31b. UNITED STATES OF AMERICA
BY
31a. NAME OF CONTRACTING OFFICER (Type or print)
29. AWARD (Contractor is not required to sign this document.) Your offer on this solicitation is hereby accepted as to the items listed. This award consummates the contract, which consists of (a) the Government solicitation and your offer, and (b) this contract award. No further contractual document is necessary.
30b. SIGNATURE 30c. DATE
28. NEGOTIATED AGREEMENT (Contractor is required to sign this document and return and deliver all items or perform all work requirements identified on this form and any continuation sheets for the consideration stated in this contract. The rights and obligations of the parties to this contract shall be governed by (a) this contract award, (b) the solicitation, and (c) the clauses, representations, certifications, and specifications incorporated by reference in or attached to this contract.
copies to issuing office.) Contractor agrees to furnish
24. SUBMIT INVOICES TO ADDRESS SHOWN IN
(4 copies unless otherwise specified)
23. ACCOUNTING AND APPROPRIATION DATA
ITEM 25. OTHER THAN FULL AND OPEN COMPETITION PURSUANT TO
27. PAYMENT WILL BE MADE BY
10 U.S.C. 2304(c) ( ) 41 U.S.C. 3304(a) ( )
20b. SIGNATURE 20c. OFFER DATE
4PQAC
Joseph Ardoin
Section A Page 2
PAGE
GENERAL SERVICES ADMINISTRATION
OF
ITEM NO., FORM OR
STOCK NUMBER DESCRIPTION OF ARTICLES OR SERVICES QUAN-
TITY
UNIT
OF
ISSUE
UNIT
PRICE
AMOUNT
0002 Phases 2 thru 7 - Interior cameras in the computer room and plumbing work to supply the IT
PoP: 12/15/2015 - 02/23/2018
VBA's spaces on floors 1, and 4
PDU's, UPS, Cooling Units and
The computer room / IT all electrical, mechanical, and office space.
demolition and renovation of the
PoP: 12/15/2015 - 02/23/2018
Upgrades plant and cable installation.
includes the racks, mounts, room. The scope of work includes interior renovation of the VBA's thorugh 7 include the interior infrastructure (i.e. this
Phase 1 - IT Infrastructure and plumbing work necessary for new IT closets and one computer
The scope of work for Phases 2 also include the IT Data Cable all electrical, mechanical, and
IT closets). The scope of work demolition, and construction of
LS
well as the computer room
Demolition and Renovation
LS
closets and computer room as
- 8. The scope of work includes infrastructure includes the
Section A Page 3
GS-04-P-17-BV-C-0003 - Section J - Appendix - List of Attachments Documents Table of Contents
Attachm ent Number
Document Title ECF
1 C301 GC Reps Certs
10 - Solicitatio n and Amendme nts
Construction Solicitiation Full and Open DB Solicitation 2 Phase Part I
10 - Solicitatio n and Amendme nts
3 DB101_-_DB_Agreement
10 - Solicitatio n and Amendme nts
4 GSA527-15a
10 - Solicitatio n and Amendme nts
NC_DAVIS_BACON_Wage_Determination_Winston_Sale m_NC_VARO
10 - Solicitatio n and Amendme nts
6 NonDisclosure_and_Conflict_of_Interest_
10 - Solicitatio n and Amendme nts
7 VARO Statement of Work (2)
10 - Solicitatio n and Amendme nts
Section J - Appendix Page 4
8 1442_GS-04-P-17-BV-C-0003 Form (2)
10 - Solicitatio n and Amendme nts
Section J - Appendix Page 5
File details come from the government source that posted it. Updated .