Text version

Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods:

(a) By completing items 8 and 15, and returning or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment your desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT 1. CONTRACT ID CODE

2. AMENDMENT/MODIFICATION NO. 3. EFFECTIVE DATE 4. REQUISITION/PURCHASE REQ. NO. 5. PROJECT NO. (If applicable)

7. ADMINISTERED BY (If other than Item 6) CODE

STANDARD FORM 30 (REV. 10-83)

Prescribed by GSA FAR (48 CFR) 53.243

FACILITY CODE

9A. AMENDMENT OF SOLICITATION

NO.

9B. DATED (SEE ITEM 11)

10A. MODIFICATION OF CONTRACT/ORDER NO.

10B. DATED (SEE ITEM 13)

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers is extended, is not extended.

12. ACCOUNTING AND APPROPRIATION DATA (If required) copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;

13. THIS ITEM ONLY APPLIES TO MODIFICATION OF CONTRACTS/ORDERS.

IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

CHECK ONE A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT ORDER NO.

IN ITEM 10A.

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).

C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER (Specify type of modification and authority)

Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

15C. DATE SIGNED

15A. NAME AND TITLE OF SIGNER (Type or print)

16C. DATE SIGNED

16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)

14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

PAGE OF PAGES

6. ISSUED BY CODE

8. NAME AND ADDRESS OF CONTRACTOR (No., street, county, State and ZIP Code) (X)

CODE

15B. CONTRACTOR/OFFEROR

(Signature of person authorized to sign)

16B. UNITED STATES OF AMERICA

(Signature of Contracting Officer)

NSN 7540-01-152-8070

Previous edition unusable

NEPA Facilities Engineering & Operations and Maintenance Solicitation Number: GS 03 P 16 CD D 7001 Amendment 0003

1. Questions and Answers #2 is attached in the following pages.

2. As a result of this amendment, the proposal due date and time is NOT extended and remains Thursday, April 14, 2016 by 4:00pm EST.

3. Offerors should acknowledge all amendments, Amendment 0001, Amendment 0002 and Amendment 0003, in their pricing proposals.

Solicitation GS-03P-16-CD-D-7001 Question & Answers #2

1. Question #1: From Questions and Answers #1, Answer #22, & #75. According to NFPA, testing of smoke/ fire dampers are every four years. This testing would need to take place three times over the course of this contract if all option years are exercised and the incoming O&M is required to perform this testing in the first year of the contract. Smoke/ fire damper testing has not been performed according to information provided.

Knowing this is an NFPA requirement will GSA hold the current O&M contractor liable for the inspection? Can the incoming O&M contractor place this inspection on the deficiency list until completed by the current O&M or GSA? This is expensive testing which requires a lot of time on both the O&M and subcontractor to perform.

Answer #1: No, the winning contractor shall be required to perform the testing going forward as required by the specification and code. Note the repair threshold is $1,000 on this contract so any “deficiencies” are likely going to be fully reimbursable to the Contractor.

2. Question #2: Answers # 23, 24. According to the updated bidders library information, obstruction testing has not been performed on the sprinkler systems in the buildings. Knowing this is an NFPA requirement will GSA hold the current O&M contractor liable for the inspection? Can the incoming O&M contractor place this inspection on the deficiency list until completed by the current O&M or GSA? This is expensive testing which requires a lot of time on both the O&M and subcontractor to perform.

Answer #2: No, the winning contractor shall be required to perform the testing going forward as required by the specification and code. Note the repair threshold is $1,000 on this contract so any “deficiencies” are likely going to be fully reimbursable to the Contractor.

3. Question #3: Answer # 50. Can you please provide information for each building concerning what type and quantity of dispensers are in use and what size batteries are required?

Answer #3: The following details the battery requirements at each location:

Williamsport - 2 battery operated dispensers (4 D-Batteries each).

Harrisburg- All Soap dispensers (80 units) are powered by 4 D batteries. Batteries on these units are provided by custodial vendor and shall remain so. The Contractor shall furnish and install new D batteries on the three hand sanitizer stations as needed. The Contractor shall furnish and install two new AA batteries on the 20 atomic at the building as needed Chambersburg has a motion activated sink faucet. The Contractor shall furnish and install new batteries on these unit as needed Scranton has batteries in its soap, motion sensor sinks, and paper towel dispensers (86 soap dispensers powered by 3 C batteries, 63 paper towel dispensers powered by 4 D batteries, and 39 motion sensored faucets powered by 3 C batteries). The Contractor shall furnish and install new batteries on these unit as needed Allentown has no battery operated dispensers Wilkes Barre has battery operated soap and paper towel dispenser. Batteries are provided by custodial vendor and will remain on custodial contractor Hazelton - custodial contractor responsible for replacement of batteries in dispensers

4. Question #4: Answer #85. Reference was made to C.30.3, which states, in part “The Government may upgrade or change control system software or reprogram control systems during the performance period of the contract. If the Government provides operator level training and operator level documentation for the

Contractor’s use, the Contractor shall not be entitled to a price adjustment for changing to the new or upgraded software or control programs.”

If GSA changes to a new controls system and provides operator level training, the contractor will not be allowed a price adjustment even if its cost is higher? We have had systems changed in other GSA buildings that went from an open software system to one that was proprietary and the maintenance cost almost tripled. Will GSA allow for a price adjustment if the new software legitimately increases contractor’s costs?

Answer #4: The Government will allow for equitable adjustment if the cost change incurred by the Contractor is significant.

5. Question #5: Solicitation, Section H.17. Personnel Qualifications: Can one (1) individual serve as both the Project Manager and the On-Site Supervisor?

Answer #5: The Contractor can propose staffing as they deem appropriate.

6. Question #6: Solicitation, Section H.17. Personnel Qualifications: Can the Chief Engineer serve as the Project Manager?

Answer #6: The Contractor can propose staffing as they deem appropriate.

7. Question #7: Solicitation, C.5. Transition Phase: The cost of the Transition Phase provides a competitive advantage to the incumbent contractor. Can this cost be separated from or isolated within the Electronic Offer Sheet?

Answer #7: No. Any transition costs will still be a cost the government has to absorb and therefore will be taken into consideration.

8. Question #8: Reference: RFP, C.35.2 Non-Reimbursable Repairs Discussion: Solicitation states that Contractor will be responsible for all non-reimbursable repair costs requiring no more than $1,000 in repair part and materials. The GSA NEPA Project and Repair History exhibit provided by the Government shows the current Contractor receiving reimbursement for repairs under $1,000.

Question: Can the Government confirm that the current Contractor is being reimbursed for all repairs or provide the non-reimbursable repair cost threshold for the current contract?

Answer #8: The incumbent contract is structured differently. The incumbent contract’s threshold is $250 per incident. The incumbent contractor is responsible for a deductible of $250 if the repair exceeds that dollar amount.

9. Question #9: Reference: RFP, L.1 INSTRUCTION TO OFFERORS and L.10 FORMAT OF

PROPOSALS AND SUBMISSION REQUIREMENTS

Discussion: Both sections L.1 and L.10 list the files to be submitted. L.10 indicates that a technical and price proposal are to be submitted. Neither section provides guidance on file types, format or the number of files to be submitted.

Question: Will the Government please specify the file type/format for:

- PRICING – ELECTRONIC OFFER SHEET

- GSA FORM 527, CONTRACTOR QUALIFICATIONS & FINANCIAL INFO

- CONTRACTOR’S RESPONSIBILITY QUESTIONNAIRE

- Prior Experience Cover Sheet

- Prior Experience Detailed Description

Answer #9: The contractor should format their response in a logical, organized manner.

File Types/Format:

- PRICING – ELECTRONIC OFFER SHEET - excel or PDF (PDF preferred)

- GSA FORM 527, CONTRACTOR QUALIFICATIONS & FINANCIAL INFO - PDF

- CONTRACTOR’S RESPONSIBILITY QUESTIONNAIRE - PDF

- Prior Experience Cover Sheet - PDF

- Prior Experience Detailed Description - PDF

Number of Files:

The contractor may submit each form separately or as a single PDF document within the necessary price or technical submissions. A single PDF file is preferable.

10. Question #10: Reference: RFP, L.1 INSTRUCTION TO OFFERORS and L.10 FORMAT OF PROPOSALS

AND SUBMISSION REQUIREMENTS

Discussion: Both sections L.1 and L.10 list the files to be submitted. L.10 indicates that a technical and price proposal are to be submitted. Neither section provides guidance on file types, format or the number of files to be submitted.

Question: Does the Government desire that all Pricing forms be submitted in a single file and that all Prior Experience documents be submitted in a single file?

Answer #10: Contractors must submit their technical proposal, including prior experience and past performance, separately from their pricing proposal. This separation may be in the form of two separate files or two separate folders or in another manner that clearly separates the technical and pricing proposals from each other.

Solicitation Amendment GS-03-P-16-CD-D-7001_0003 (2) FIX SF30 2222
Amendment 0003 Package, NEPA Solicitation GS-03P-16-CD-D-7001, 4-6-2016
topmostSubform[0]:
Page1[0]:
AmendmentNo[0]: 0003
Code[0]: 3PQXA
Code[1]:
AccountingData[0]:
A13[0]:
C13[0]:
D13[0]:
NameandTitleSigner[0]:
NameandTitleOfficer[0]: Lloyd Jenkins
Description[0]: See Attached
FacilityCode[0]:
Code[2]: 3PQXA
IssuedBy[0]: GSA REGIONAL CONTRACT SUPPORT SVCS BRANCH

100 S. INDEPENDENCE MALL WEST

PHILADELPHIA, PA 19106

NameandAddress[0]:
AdministeredBy[0]: GSA REGIONAL CONTRACT SUPPORT SVCS BRANCH

100 S. INDEPENDENCE MALL WEST

PHILADELPHIA, PA 19106

ContractIDCode[0]:
ReqNumber[0]: EQ3PSNK-16-5090
AmendmentNo[1]: GS-03-P-16-CD-D-7001
ModificationNo[0]:
ProjectNo[0]:
Page[0]: 1
Pages[0]: 5
EffectiveDate[0]: 4/6/2016
Dated9B[0]: 2/9/2016
Dated10B[0]:
CheckBox9[0]: 1
CheckBox10[0]:
CheckBox11[0]: 1
CheckBox13A[0]:
CheckBox13B[0]:
CheckBox13C[0]:
CheckBox13D[0]:
IsNot[0]:
Is[0]:
Extended[0]: 0
NotExtended[0]: 1
DateSigned[0]:
DateSigned[1]:
Copies[0]: 1
CopiesReturned[0]:

File details come from the government source that posted it. Updated .